This document is a detailed Geotechnical Exploration Report prepared by Tierra, Inc. for Consor Engineers, LLC, focusing on bridge replacement work within the Blackwater River State Forest in Santa Rosa County, Florida. Specifically, the report covers the geotechnical investigation for Bridge No. 580813, located on Environmental Road over Middle Creek #1. The study involved drilling two 5-foot deep auger borings and two 100-125 foot deep Standard Penetration Test (SPT) borings to evaluate subsurface conditions. The investigation analyzed soil characteristics, groundwater levels, and conducted laboratory soil testing to provide foundation design recommendations for 18-inch square prestressed concrete piles.
The report includes comprehensive geotechnical data and recommendations, with key findings indicating the subsurface conditions are suitable for bridge foundation using the planned pile type. The soil layers predominantly consist of sand with varying percentages of silt, classified primarily as cohesionless materials. Groundwater was encountered approximately 7 feet below road grade, with potential for fluctuation. Laboratory tests revealed Limerock Bearing Ratio (LBR) values ranging from 47 to 172, and the report provides detailed guidance on pile driving conditions, settlement expectations, and construction considerations. The geotechnical analysis supports the proposed bridge replacement, offering specific recommendations for pile installation, lateral stability, and potential construction challenges.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| APPENDIX II.pdf | ||
| 570824-High Bridge Road.pdf | ||
| APPENDIX VI.pdf | ||
| APPENDIX IV.pdf | ||
| 580831-NormanRiley_580832-Envirn.Rd..pdf | ||
| APPENDIX I.pdf | ||
| Addedum I_Final.pdf | ||
| APPENDIX V.pdf | ||
| Pre-Bid Site Visit Attendees.pdf | ||
| APPENDIX III.pdf | ||
| ITB FFS 24 25 135_Final.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
175 South A Street • Pensacola, FL 32502
Phone (850) 462-8774 • Fax (850) 462-8784
TIERRA
REPORT OF GEOTECHNICAL EXPLORATION
Blackwater River State Forest Bridge Replacements Existing Bridge No. 580813 – Environmental Road Over Middle Creek #1
Santa Rosa County, Florida
Tierra Project No. 4511-24-016
Prepared for:
Consor Engineers, LLC Attn: Ms. Leahann Powell, PE
4489 Woodbine Road Pace, Florida 32571
Prepared by:
Tierra, Inc.
175 South A Street
Pensacola, Florida 32502
November 21, 2024
TIERRA
175 South A Street • Pensacola, FL 32502
Phone (850) 462-8774 • Fax (850) 462-8784
November 21, 2024
Consor Engineers, LLC
4489 Woodbine Road
Pace, Florida 32571
Attn: Ms. Leahann Powell, PE
Subject: Blackwater River State Forest Bridge Replacements
Existing Bridge No. 580813 – Environmental Road over Middle Creek #1
Santa Rosa County, Florida
Project No. 4511-24-016
Dear Ms. Powell:
Thank you for choosing Tierra, Inc. (Tierra) as your Geotechnical consultant. Per your authorization, we have completed the Geotechnical exploration for the subject project. The results of the exploration are discussed in this report.
Should you have any questions regarding the enclosed report or the project in general, please do not hesitate to contact us at (850) 462-8774.
Sincerely, TIERRA, INC.
Matthew McCoy, EI Mitchell L. Smith, PE Engineer Intern Principal Geotechnical Engineer Florida License No. 43416
TABLE OF CONTENTS
1.0 PROJECT INFORMATION
1.1 Project Authorization
1.2 Project Description
1.3 Purpose and Scope of Services
2.0 SITE AND SUBSURFACE CONDITIONS
2.1 Site Location and Description
2.2 Boring Location Plan
2.3 Roadway Borings
2.3.1 General Subsurface Conditions – Roadway
2.4 Bridge Borings
2.4.1 General Subsurface Conditions – Bridge
2.5 Groundwater Conditions
2.6 Laboratory Soil Testing
3.0 ROADWAY EVALUATION AND RECOMMENDATIONS
3.1 General Comments
3.2 Plastic Soils
3.3 Embankment Settlement
3.4 Slope Stability
3.5 Groundwater
3.6 Pavement Design Considerations
4.0 FOUNDATION DESIGN RECOMMENDATIONS
4.1 General Comments
4.2 Downdrag (Negative Skin Friction)
4.3 Net Scour Resistance
4.4 Axial Pile Compression Capacity
4.5 Pile Group Action
4.6 Pile Foundation Settlement
4.7 Lateral Pile Resistance
5.0 CONSTRUCTION CONSIDERATIONS
5.1 General Comments
5.2 Temporary Side Slopes
5.3 Groundwater Control
5.4 Pile Driving Conditions
5.5 Dynamic Load Testing
6.0 REPORT LIMITATIONS
TABLE OF CONTENTS (CONT)
APPENDIX A
Project Location Map
Boring Location Plan
Roadway Soil Survey Sheet
Roadway Soil Profiles
Report of Core Boring Sheets
Table 1 – Summary of Laboratory Test Results
Table 2 – Summary of Corrosion Series Test Results
Table 3 – Grainsize Data for Scour Analysis
Gradation Curves
Limerock Bearing Ratio Test Reports
APPENDIX B
Axial Pile Capacity Curves
Sample FB-DEEP Output Files
Geotechnical Design Parameters for FB-MultiPier Input
Pile Data Table
Consor Engineers, LLC November 21, 2024
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 1 of 14
1.0 PROJECT INFORMATION
1.1 Project Authorization
Authorization to proceed on this project was issued by Mr. Jeffrey Novotny, PE with Consor
Engineers, LLC, via a subconsultant agreement for FDACS Project Number SOQ FFS 23 24 68. A formal contract has been executed between Tierra, Inc. (Tierra) and Consor Engineers, LLC
(Consor) for these services.
1.2 Project Description
We understand that three bridges in the Blackwater River State Forest, Bridge Nos. 580804 and
580813 in Santa Rosa County and Bridge No. 574038 in Okaloosa County, are scheduled for replacement. The focus of this report is Environmental Road over Middle Creek #1 Existing Bridge
No. 580813. The Norman Riley bridge over Lighter Knot and the High Bridge Road over Panther
Creek #3 are addressed in separate reports. The Project Location Map can be found in Appendix
A.
The project limits are from STA 201+52 to STA 204+30 Centerline Construction Environmental
Road. Note that all stationing in this report will be referenced to this alignment. The roadway typical section consists of two (2) 10-foot wide paved travel lanes with 2-1/2-foot wide paved shoulders and guardrails. Roadway grades will be within 2 feet of existing grades.
The new bridge will be replacing the existing bridge on the same alignment. The new bridge will begin at Sta 202+47.13 and end at Sta 203+35.63. The bridge will be a three-span concrete structure with sloped embankments at the end bents. Roadway grades at the end bents will be within 2 feet of existing grades.
The bridge will be founded on 18-inch square prestressed concrete piles in a bent configuration. The end bents and intermediate bents will have 3 piles each with Factored Design Loads (FDL) of 115 tons and 155 tons, respectively. Pile cut-off elevations will be approximately +72 feet to +74 feet
NAVD 88. Note that unless otherwise stated, elevations in this report are referenced to NAVD 88.
Pile information is summarized on the Geotechnical Pile Data Table (Appendix B).
If any of the project information noted above is incorrect or has changed, please inform Tierra so that we may amend the recommendations presented in this report, if necessary.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 2 of 14
1.3 Purpose and Scope of Services
The purpose of this study was to provide foundation design recommendations for the proposed bridge and roadway. This study consisted of:
1. Drilling two 5 foot deep auger borings in the proposed roadway improvement areas and two
100 foot to 125 foot deep Standard Penetration Test (SPT) borings at the bridge location.
2. Laboratory soil testing including water content tests, wash #200 sieve tests, Atterberg Limits tests, corrosion series tests, and Limerock Bearing Ratio tests.
3. Evaluation of the suitability of the existing roadway subsoils to support the proposed roadway improvements.
4. Deep foundation analysis for 18-inch square prestressed concrete piles.
5. Preparation of this Geotechnical engineering report.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 3 of 14
2.0 SITE AND SUBSURFACE CONDITIONS
2.1 Site Location and Description
Environmental Road over Middle Creek Bridge No. 580813 is located in the Blackwater River State
Forest in Santa Rosa County, Florida.
Environmental Road is a 2-lane asphalt paved road with grassed shoulders. The roadway approach on the north side of the bridge is on approximately 5 feet of embankment fill. The existing bridge is a timber structure supported by timber piles. Based on a review of survey of the subject area, grades in and around Bridge No. 580813 range from approximately +60 feet to +80 feet NAVD 88.
2.2 Boring Location Plan
Prior to commencing the subsurface exploration, a Boring Location Plan was prepared based on general guidance provided in the FDOT “Soils and Foundation Handbook” and on discussions with project team. The Boring Location Plan is attached in Appendix A and shown on the Report of Core
Boring sheets.
The borings were field located using a hand-held Garmin GPSMap 66ST Global Positioning System
(GPS) unit with a typical accuracy of 1 meter or less. Utility clearances were coordinated with
“Sunshine State One Call” prior to performing the soil borings.
The locations (station and offset) of the borings were estimated using the project design files provided in conjunction with the recorded GPS coordinates obtained by Tierra. The station and offset of the borings are referenced from the Centerline of Construction (C/L of Const.) of
Environmental Road provided by the design team. The ground surface elevations were estimated based on survey files provided by the design team and are referenced to the North American Vertical
Datum of 1988 (NAVD 88).
2.3 Roadway Borings
Two (2) 5 foot deep hand auger borings (AB-3 and AB-4) were performed to evaluate the subsurface conditions within the project limits for the proposed roadway improvements. The borings were performed by manually twisting and advancing a bucket auger into the ground, typically in 4-inch to
6-inch increments. Soil sampling was performed in general accordance with the American Society for Testing and Materials (ASTM) test designation D1452. As each soil type was revealed, Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 4 of 14 representative samples were placed in air-tight containers and returned to our laboratory for testing and visual classification. The subsurface conditions encountered in the roadway borings will be discussed in general terms below.
2.3.1 General Subsurface Conditions – Roadway
The soil types encountered in the roadway borings were assigned a stratum number and presented on the Roadway Soil Survey sheet (Appendix A). The stratum number and soil description/AASHTO classification is shown in the table below.
Stratum Soil Description
AASHTO
Classification
1 Brown, Orange, Red Silty SAND (10% - 15% Fines) (Select Soil) A-2-4
2 Brown, Orange, Red Silty SAND (15% - 35% Fines) (Select Soil) A-2-4
Soil stratification was based on visual review of the recovered samples, laboratory testing, and interpretation of the field boring logs. The boring stratification lines on the Roadway Soil Profile sheet
(Appendix A) represent the approximate boundaries between soil types of significantly different engineering properties; however, the actual transition may be gradual.
In some cases, small variations in properties not considered pertinent to our engineering evaluation may have been abbreviated or omitted for clarity. The boring profiles represent the conditions at the particular boring location and variations do occur among the borings.
2.4 Bridge Borings
To evaluate the subsurface conditions for the proposed bridge, two (2) 100-foot to 125-foot deep
SPT borings were performed near the end bents of the bridge and through the existing asphalt paved roadway. The SPT borings were performed using mud rotary drilling techniques. Soil sampling was performed in general accordance with ASTM D1586 “Penetration Test and Split-Barrel Sampling of
Soils”. The bridge borings were sampled and SPT resistances (Nf) were obtained on 2-foot intervals from the ground surface to a depth of 10 feet and on 5-foot intervals thereafter to the boring termination depth. Representative soil samples were sealed in glass jars, labeled, and transported to our laboratory for classification and analysis. Upon completion of the borings, the boreholes were sealed with grout.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 5 of 14
The Boring Location Plan and the Report of Core Boring sheets for the borings drilled for the study can be found in Appendix A. Soil stratification was determined based on a review of the recovered samples and interpretation of field boring logs. Stratification lines represent approximate boundaries between soil layers of differing engineering properties; however actual transitions between layers may be gradual. In some cases, small variations in properties that were not considered pertinent to our engineering evaluation may have been abbreviated or omitted for clarity. The soil profiles represent the conditions at the particular boring location and variations do occur among the borings.
Specific details about subsurface conditions and materials encountered at each test location can be obtained from the soil profiles presented on the Report of Core Boring sheets (Appendix A). The subsurface conditions encountered in the borings will be discussed in general terms below.
2.4.1 General Subsurface Conditions – Bridge
The two bridge borings (BB-3 and BB-4) encountered relatively similar subsurface conditions. While the Report of Core Boring sheets (Appendix A) should be reviewed for specific subsurface conditions at each boring location, the following idealized soil profile summarizes the conditions encountered:
Elevation (ft. NAVD 88) Soil Description
+75 to +65 Loose to medium dense SAND w/ silt (SP-SM, SM)
+65 to +45 Loose SAND w/ silt/clay and firm CLAY (SM, SC, CH)
+45 to +0 Very loose to loose SAND w/silt (SP-SM, SM)
+0 to -50 Medium dense to dense SAND w/silt (SP-SM, SM)
2.5 Groundwater Conditions
Groundwater was encountered roughly 7 feet below road grade at the time of drilling. Groundwater levels will fluctuate with rainfall and could vary several feet during typical seasonal fluctuations.
Larger fluctuations are possible under severe weather conditions.
2.6 Laboratory Soil Testing
Laboratory testing consisted of water content tests, grainsize tests, Atterberg Limits tests, corrosion series tests, and Limerock Bearing Ratio tests. The results of the water content tests, grainsize tests, and Atterberg Limits tests can be found on the Report of Core Boring sheets opposite the samples tested and in Table 1 (Appendix A).
Results of the corrosion series tests are summarized in Table 2 (Appendix A).
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 6 of 14
The gradation curves are attached in Appendix A. Table 3 (Appendix A) presents grainsize data for the scour analysis. Scour considerations are discussed in Section 4.3 of this report.
Two (2) Limerock Bearing Ratio (LBR) tests were performed on the Stratum 1 and 2 Select (A-2-4) materials encountered in the borings to aid in pavement design for any rework or widening efforts associated with the planned improvements. The results of the tests are attached in Appendix A. To summarize, Stratum 1 had an LBR value of 47 and Stratum 2 had an LBR value of 172.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 7 of 14
3.0 ROADWAY EVALUATION AND RECOMMENDATIONS
3.1 General Comments
In general, the subsurface conditions encountered in the roadway borings are suitable for supporting the proposed roadway after subgrade preparation in accordance with FDOT specifications. The
Stratum 2 sand soils (A-2-4, 15% to 35% fines) will retain water and should be managed accordingly.
The general suitability of the soils encountered in the geotechnical exploration is presented on the
Roadway Soil Survey (see Appendix A). The FDOT Standard Plans should be consulted to determine the specific use/suitability of the soil types encountered in the geotechnical exploration.
3.2 Plastic Soils
Plastic soils were not encountered in the roadway borings drilled during this study. If encountered during construction, plastic soils will need to be removed in accordance with FDOT Standard Plans, Index 120-002 and utilized in accordance with FDOT Standard Plans, Index 120-001.
3.3 Embankment Settlement
Based on the proposed roadway profile and the subsurface conditions present, embankment settlement is not a design consideration for this project.
3.4 Slope Stability
Based on the proposed roadway profile, slope stability is not a design consideration for this project.
3.5 Groundwater
Groundwater was not encountered in the roadway borings at the time of drilling. However, the soils encountered in the borings are slow draining and perched/slowly infiltrating groundwater should be expected in/above these soils during periods of normal and increased rainfall.
Given that proposed grades are expected to be at or up to 2 foot above existing grades, groundwater does not appear to be a significant concern at this time. Providing positive drainage and roadside ditches/swales to direct surface water and laterally flowing perched groundwater away from the roadbed should address the groundwater conditions identified to date.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 8 of 14
3.6 Pavement Design Considerations
Provided groundwater is managed in accordance with FDOT guidelines (that is, grades for the roadway are set to provide the minimum 3 foot separation between the bottom of the base and the estimated seasonal high groundwater levels), we see no geotechnical conditions that would negatively impact pavement design at this time.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 9 of 14
4.0 FOUNDATION DESIGN RECOMMENDATIONS
4.1 General Comments
The subsurface conditions encountered in the bridge borings are suitable for founding the bridge on
18-inch square prestressed concrete piles as planned. The following sections present the results of our engineering analysis.
4.2 Downdrag (Negative Skin Friction)
Based on the subsurface conditions encountered and the minimal fill proposed at the end bents, downdrag is not a design consideration for this project.
4.3 Net Scour Resistance
The 100-yr. scour elevations at the bent locations range from approximately EL +59 feet to +71 feet.
Given the surficial soils and the Standard Specifications requirement to predrill through the existing embankment, which extends to EL +69 feet, Total Scour Resistances are relatively small (i.e. 2 tons to 8 tons). Given the minimal impact this has on the theoretical pile lengths, no preforming has been specified to reduce the scour resistances, and consequently the Net Scour Resistances are equal to the Total Scour Resistances in the Pile Data Table (Appendix B).
4.4 Axial Pile Compression Capacity
Axial compression capacities for the selected 18-inch square prestressed concrete piles (PCPs) were analyzed based on the subsurface conditions encountered in the SPT borings. The Load
Resistance Factor Design (LRFD) method was used in the analysis. Davisson axial capacities were computed for the PCPs using the computer program FB-DEEP.
The Davisson axial capacity equals the ultimate skin friction plus the mobilized end bearing capacity
(defined as one-third of the ultimate end bearing). The Davisson capacity is typically considered to be equivalent to the LRFD Nominal Bearing Resistance (Rn) and must satisfy the following equation:
𝑅𝑛 ≥ (𝐹𝑎𝑐𝑡𝑜𝑟𝑒𝑑 𝐷𝑒𝑠𝑖𝑔𝑛 𝐿𝑜𝑎𝑑) + (𝐷𝑜𝑤𝑛𝑑𝑟𝑎𝑔) + (𝑁𝑒𝑡 𝑆𝑐𝑜𝑢𝑟 𝑅𝑒𝑠𝑖𝑠𝑡𝑎𝑛𝑐𝑒)
𝑅𝑒𝑠𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝐹𝑎𝑐𝑡𝑜𝑟, ∅
Factored design loads (per pile) are reportedly 115 tons at the end bents and 155 tons at the intermediate bents. As noted in Sections 4.2 and 4.3 above, downdrag is not a design consideration
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 10 of 14 and scour resistance ranges from 2 tons to 8 tons. The Resistance Factor (∅) depends on the load test program specified by the designer. We understand that dynamic load testing, specifically Pile
Dynamic Analysis (PDA), will be specified on 100% of the piles, and therefore a Resistance Factor
() of 0.75 for compression has been applied.
The results of the axial capacity analyses are presented as Axial Pile Capacity Curves in Appendix
B. Also included in Appendix B are sample computer FB-DEEP Output Files and Pile Data Table.
The table below summarizes theoretical production pile tip elevations based on the design Nominal
Bearing Resistances (NBR), the subsurface conditions encountered in the borings, and the FB-Deep analysis.
Bridge Structure
Bent/Pier Reference Borings
Nominal Bearing Resistance
(tons)
Theoretical Pile Tip Elevation
(ft. NAVD88)
Bridge No.
580813
End Bent 1 BB-3 164 -22
Intermediate Bent 2 BB-3 210 -36
Intermediate Bent 3 BB-3 210 -37
End Bent 4 BB-4 159 -18
Based on the theoretical pile tip elevations noted above, minimum pile tip elevations for lateral stability, and pile cut-off elevations provided by the design team, recommended test piles lengths have been provided on the Pile Data Table (Appendix B). The test pile lengths are based on the subsurface profile(s) at each boring location, the variability of the subsurface conditions across the site as indicated by the borings, and the capacity curves developed from the FB Deep program, including the shape(s) of the curves, particularly where indications of reduced capacity are apparent at/near the elevation required to achieve the NBR.
4.5 Pile Group Action
Provided the center-to-center pile spacing meets/exceeds 3 times the pile width, no reduction in individual pile capacity will be required in the proposed pile groups. Pile caps may contribute to the overall bearing capacity of the group, provided that the bottom of the cap is directly in contact with the soils underneath the cap. However, it is not recommended to include this additional capacity because of the potential for loss of soil beneath the cap.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 11 of 14
4.6 Pile Foundation Settlement
Settlements of driven pile foundations are typically small and should not be a concern on this project as the piles are expected to be tipped in either medium dense or dense sandy soils.
4.7 Lateral Pile Resistance
FB-MultiPier soil parameters for lateral analysis for 18-inch square PCPs are presented in Appendix
B.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 12 of 14
5.0 CONSTRUCTION CONSIDERATIONS
5.1 General Comments
The overall site preparation and construction should be in accordance with FDOT Standard
Specifications and Standard Index requirements.
5.2 Temporary Side Slopes
Side slopes should be cut on slopes of 2H:1V or flatter. If conditions exist that restrict the slopes to be laid back as recommended, the excavations should be shored in accordance with OSHA requirements. Furthermore, open-cut excavations exceeding 10 feet in depths should be properly dewatered and sloped 2H:1V or flatter or be benched using a bracing plan approved by a State of
Florida licensed professional engineer. During foundation construction, excavated material should not be stockpiled at the top of the slope or within a horizontal distance equal to the depth of the excavation.
5.3 Groundwater Control
Depending on the groundwater levels at the time of construction, some form of dewatering may be required at the site to achieve soil compaction requirements. The borings were drilled during a period of normal rainfall, and shallow perched groundwater should be expected during periods of increased rainfall. For this reason, groundwater levels should be determined immediately prior to construction and should be maintained a minimum of 3 feet below the lowest working level to facilitate proper material placement and compaction.
5.4 Pile Driving Conditions
No significant conditions were encountered in the borings which would be expected to negatively impact pile driving operations. The soils through which the piles will be driven have a low chance of resulting in pile rebound based on studies performed by the FDOT in Northwest Florida. However, the contractor should be made aware of this potential and should size his pile driving hammer accordingly (e.g. a pile hammer with a heavier ram acting over a shorter stroke is preferable to a lighter ram acting over a longer stroke). During pile installation, the contractor should exercise caution so as to not overstress the piles. Piles should not be driven beyond practical refusal (as defined in Section 455 of the FDOT Standard Specifications) to meet the bearing requirements.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 13 of 14
5.5 Dynamic Load Testing
We recommend that a minimum of one pile per bent be dynamically monitored during pile driving operations using the Pile Driving Analyzer (PDA). Doing so will help ensure that allowable stress levels are not exceeded during pile installation, will provide documentation regarding pile penetration versus pile capacity, and will provide information for developing driving criteria recommendations.
CAPWAP analysis should be performed on select conditions for evaluation of the PDA results. The installation of the piles should be in accordance with Section 455 of the FDOT Standard
Specifications.
Blackwater River State Forest – Environmental Road over Middle Creek #1 Bridge No. 580813 Page 14 of 14
6.0 REPORT LIMITATIONS
The recommendations submitted as based on the available soil information obtained by Tierra, Inc.
and design details furnished by Consor Engineers, LLC for the subject project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, Tierra should be notified immediately to determine if changes in foundation, or other, recommendations are required. If Tierra is not retained to perform these functions, we cannot be responsible for the impact of such conditions on the performance of the project.
The findings, recommendations, specifications, and professional advice contained herein have been made in accordance with generally accepted professional Geotechnical engineering practices in the local area.
After the plans and specifications are more complete, the Geotechnical engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of Consor Engineers, LLC for the specific application to the subject project.
APPENDIX A
Project Location Map
Boring Location Plan
Roadway Soil Survey
Roadway Soil Profiles
Report of Core Boring Sheets
Table 1 – Summary of Laboratory Test Results
Table 2 – Summary of Corrosion Series Test Results
Table 3 – Grainsize Data for Scour Analysis
Gradation Curves
201 202 203 204
AB-3
AB-4
N
10 40
Feet
¡ CONST. ENVIRONMENTAL RD
STA. 201+52.73
BEGIN PROJECT
STA. 204+30.03
END PROJECT
STA. 202+47.13
BEGIN BRIDGE
STA. 203+35.63
END BRIDGE
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
ROAD NO. FINANCIAL PROJECT IDCOUNTY
N/A
SANTA ROSA
N/A32502 FLORIDA, PENSACOLA
175 SOUTH A STREET
TIERRA, INC.
43416LICENSE NUMBER:
MITCHELL L. SMITH, P.E.
ENGINEER OF RECORD
BORING LOCATION PLAN
BLP01 [SHEET] : c:\pw_work\american-pw-01\brittany.garcia\d0924805\ABORRD01_580813.dgn
11:53:18 AM11/20/2024bgarcia
APPROXIMATE AUGER BORING LOCATION
LEGEND
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
TIERRA, INC.
43416LICENSE NUMBER:
MITCHELL L. SMITH, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ROADWAY SOIL SURVEY
SOILSURVEYSHEET : c:\pw_work\american-pw-01\brittany.garcia\d0924805\SSUVRD01_580813.dgn
11:57:20 AM11/20/2024bgarcia
SURVEY ENDS STA. : SURVEY BEGINS STA. :
MATERIALS AND RESEARCH
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
CROSS SECTION SOIL SURVEY FOR THE DESIGN OF ROADS
CONTENT
ORGANIC
CONTENT
MOISTURE
PERCENT PASS (%)
SIEVE ANALYSIS RESULTS
MESH
MESH
LIMIT
LIQUID
DATE OF SURVEY:
SURVEY MADE BY:
SUBMITTED BY: COUNTY:
ROAD NO.:
DISTRICT:
REFERENCE:
LIMITS (%)
ATTERBERG
TESTS
NO. OF
INDEX
PLASTIC
GROUP
AASHTO
CONTENT
MOISTURE DESCRIPTION
TESTS
NO. OF
CORROSION TEST RESULTS
pH
11 93 4 -- 1 48 23 -- 75 -- -- -- -- -- -- 1 1 --
EMBANKMENT AND SUBGRADE MATERIAL
STRATA BOUNDARIES ARE APPROXIMATE. MAKE FINAL CHECK AFTER GRADING.
EXPLORATIONS
- GROUNDWATER LEVEL ENCOUNTERED DURING FIELD
- GROUNDWATER NOT ENCOUNTERED
A-2-4
TIERRA, INC.
201+52.73 204+30.03 CENTERLINE CONSTRUCTION OF ENVIRONMENTAL ROAD
MESH
MESH
MESH
TESTS
NO. OF
TESTS
NO. OF
ORGANIC
TESTS
NO. OF
NO.
STRATUM
ohm-cm
RESISTIVITY
ppm
CHLORIDE
ppm
SULFATES
NOTES:
- ESTIMATED SEASONAL HIGH GROUNDWATER TABLE
- NON-PLASTIC
THREEAUGUST 2024
PROJECT NAME: ENVIRONMENTAL ROAD OVER MIDDLE CREEK #1
FINANCIAL PROJECT ID : N/A
2.
1.
BROWN, ORANGE, RED SILTY SAND (10% TO 15% FINES)
22-24 82-97 6-7 -- 2 51-57 34-36 -- 70-83 -- -- -- -- -- -- -- 2-- A-2-4
GNE
NP
- GROUNDWATER NOT APPARENTGNA
THE "--" INDICATES AN UNMEASURED PARAMETER.
ABOVE THE WATER LEVEL EXISTING AT THE TIME OF CONSTRUCTION.
BE DIFFICULT TO DRY AND COMPACT. IT SHOULD BE USED IN THE EMBANKMENT
HOWEVER, THIS MATERIAL IS LIKELY TO RETAIN EXCESS MOISTURE AND MAY
THE MATERIAL FROM STRATUM 2 (A-2-4, 15%-35% FINES) IS A SELECT SOIL.
IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-001.
AND APPEARS SATISFACTORY FOR USE IN THE EMBANKMENT WHEN UTILIZED
THE MATERIAL FROM STRATUM 1 (A-2-4, 10%-15% FINES) IS A SELECT SOIL
2 BROWN, ORANGE, RED SILTY SAND (15% TO 35% FINES)
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
TIERRA, INC.
43416LICENSE NUMBER:
ROADWAY SOIL PROFILES
PROFS01 : N:\4511 GEO\Projects\2024 Projects\4511-24-016_Blackwater River State Park Bridges\ORD\4511-24-016\Geotechnical\ABORRDProfs01_580813.dgn
4:59:24 PM11/20/2024bgarcia
LEGEND
A-3
VISUAL REVIEW.
ON SELECTED SAMPLES FOR CONFIRMATION OF
BY VISUAL REVIEW AND LABORATORY TESTING
AASHTO GROUP SYMBOL AS DETERMINED
2.
1.
A - WITH ROCK
35% FINES)
BROWN, ORANGE, RED SILTY SAND (A-2-4, 15% TO
15% FINES)
BROWN, ORANGE, RED SILTY SAND (A-2-4, 10% TO
D E
P T
H I
N F
E E
T
AB-3
STA. 202 + 27
¡ ENV. RD
11' LT.
8/27/2024
1A
GNE
AB-4
STA. 203 + 93
¡ ENV. RD
12' RT.
8/27/2024
1A
GNE
D E
P T
H I
N F
E E
T
¡ ENV. RD CENTERLINE CONSTRUCTION OF ENVIRONMENTAL ROAD
GNE GROUNDWATER NOT ENCOUNTERED
12 to 24
6 to 12
24 to 40
8 to 24
(BLOWS/FT.)
(BLOWS/FT.)
GREATER THAN 24
LESS THAN 3
GREATER THAN 40
LESS THAN 1
3 to 6
1 to 3
3 to 8
8 to 15
30 to 50
10 to 30
4 to 10
(BLOWS/FT.)
SPT N-VALUE
(BLOWS/FT.)
GREATER THAN 30
LESS THAN 4
GREATER THAN 50
LESS THAN 2
VERY LOOSE
HARD
VERY STIFF
STIFF
SILTS AND CLAYS
CONSISTENCY
FIRM
SOFT
VERY SOFT
LOOSE
DENSE
VERY DENSE
4 to 8
2 to 4
RELATIVE DENSITY
GRANULAR MATERIALS-
SAFETY HAMMER AUTOMATIC HAMMER
APPROXIMATE SPT BORING LOCATION
CASING
LEGEND
FIELD EXPLORATIONS
GROUNDWATER LEVEL ENCOUNTERED DURING
SPT N-VALUE
SPT N-VALUE SPT N-VALUE
15 to 30
ESTIMATED SEASONAL HIGH GROUNDWATER TABLE
MEDIUM DENSE
NAVD 88
PI
LL
NMC
-200
N
SP
NORTH AMERICAN VERTICAL DATUM OF 1988
PLASTICITY INDEX (%)
LIQUID LIMIT (%)
NATURAL MOISTURE CONTENT (%)
PERCENT PASSING #200 SIEVE
(UNLESS OTHERWISE NOTED).
SPT VALUE FOR 12 INCHES OF PENETRATION
NUMBERS TO THE LEFT OF BORINGS INDICATE
FOR CONFIRMATION OF VISUAL REVIEW.
AND LABORATORY TESTING ON SELECTED SAMPLES
GROUP SYMBOL AS DETERMINED BY VISUAL REVIEW
UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 2487)
BROWN, GRAY, WHITE, YELLOW SAND (SP)
BROWN, GRAY, YELLOW SLIGHTLY SILTY SAND (SP-SM)
BROWN, GRAY, RED SILTY SAND (SM)
BROWN, GRAY, RED CLAYEY SAND (SC)
GRAY, RED CLAY (CH)
ENVIRONMENTAL CLASSIFICATION:
SUBSTRUCTURE
SUBSTRUCTURE
SUPERSTRUCTURE
CONCRETE: EXTREMELY AGGRESSIVE (pH≤5.0) STEEL: EXTREMELY AGGRESSIVE (pH<6.0)
SLIGHTLY AGGRESSIVE
¡ CONST. ENV. RD
ROAD
CENTERLINE CONSTRUCTION OF ENVIRONMENTAL
ASPHALT
N
BOR # BB-3
STA. 202+52
REF. ¡ CONST. ENV. RD
ELEV. 74.9
DATE 8/1/2024
DRILLER R. SHUEY
HAMMER AUTOMATIC
RIG D-25
ELEVATION -50.1 FT (NAVD 88)
BORING TERMINATED AT
-5
-10
-15
-20
-25
-30
-35
-40
-45
-50
-55
E L E
V A
T
IO
N I N
F E
E T
N
A V
D
BROWN, GRAY, YELLOW SLIGHTLY SILTY SAND (SP-SM)
BROWN, GRAY, YELLOW SLIGHTLY SILTY SAND (SP-SM)
BROWN, GRAY, YELLOW SLIGHTLY SILTY SAND (SP-SM)
BROWN, GRAY, RED SILTY SAND (SM)
BROWN, GRAY, RED SILTY SAND (SM)
BROWN, GRAY, RED CLAYEY SAND (SC)
GRAY, RED CLAY (CH)
-5
-10
-15
-20
-25
-30
-35
-40
-45
-50
-55
E L E
V A
T
IO
N I N
F E
E T
N
A V
D
LONGITUDE: W 86.79300
LATITUDE: N 30.79046
NMC=3
-200=8
NMC=31
-200=20
NMC=29
-200=10
NMC=30
-200=19
NMC=26
-200=21
NMC=24
-200=8
NMC=18
-200=7
NMC=25
-200=31
PI=42
LL=54
NMC=26
OFF. 2' RT.
ASPHALT
201 202 203 204 205
BB-3
BB-4
¡ CONST. ENVIRONMENTAL RD
STA. 202+47.13
END BENT 1
BEGIN BRIDGE
STA. 202+76.63
INT. BENT 2
STA. 203+06.13
INT. BENT 3
STA. 203+35.63
END BENT 4
END BRIDGE
BORING LOCATION PLAN
Feet
100200
N
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
BRIDGE2_01 [SHEET] : c:\pw_work\american-pw-01\brittany.garcia\d0924805\B2Boring01.dgn
4:40:54 PM11/21/2024bgarcia
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA08-24 BMG
08-24 MM
08-24 BMG
08-24 MLS
32502 FLORIDA, PENSACOLA
175 SOUTH A STREET
TIERRA, INC.
43416License Number:
EXISTING BRIDGE NO. 580813
REPORT OF CORE BORINGS (1 OF 2)
ENVIRONMENTAL ROAD OVER MIDDLE CREEK #1
(4 INCHES THICK)
12 to 24
6 to 12
24 to 40
8 to 24
(BLOWS/FT.)
(BLOWS/FT.)
GREATER THAN 24
LESS THAN 3
GREATER THAN 40
LESS THAN 1
3 to 6
1 to 3
3 to 8
8 to 15
30 to 50
10 to 30
4 to 10
(BLOWS/FT.)
SPT N-VALUE
(BLOWS/FT.)
GREATER THAN 30
LESS THAN 4
GREATER THAN 50
LESS THAN 2
VERY LOOSE
HARD
VERY STIFF
STIFF
SILTS AND CLAYS
CONSISTENCY
FIRM
SOFT
VERY SOFT
LOOSE
DENSE
VERY DENSE
4 to 8
2 to 4
RELATIVE DENSITY
GRANULAR MATERIALS-
SAFETY HAMMER AUTOMATIC HAMMER
APPROXIMATE SPT BORING LOCATION
CASING
LEGEND
FIELD EXPLORATIONS
GROUNDWATER LEVEL ENCOUNTERED DURING
SPT N-VALUE
SPT N-VALUE SPT N-VALUE
15 to 30
ESTIMATED SEASONAL HIGH GROUNDWATER TABLE
MEDIUM DENSE
NAVD 88
PI
LL
NMC
-200
N
SP
NORTH AMERICAN VERTICAL DATUM OF 1988
PLASTICITY INDEX (%)
LIQUID LIMIT (%)
NATURAL MOISTURE CONTENT (%)
PERCENT PASSING #200 SIEVE
(UNLESS OTHERWISE NOTED).
SPT VALUE FOR 12 INCHES OF PENETRATION
NUMBERS TO THE LEFT OF BORINGS INDICATE
FOR CONFIRMATION OF VISUAL REVIEW.
AND LABORATORY TESTING ON SELECTED SAMPLES
GROUP SYMBOL AS DETERMINED BY VISUAL REVIEW
UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 2487)
BROWN, GRAY, WHITE, YELLOW SAND (SP)
BROWN, GRAY, YELLOW SLIGHTLY SILTY SAND (SP-SM)
BROWN, GRAY, RED SILTY SAND (SM)
BROWN, GRAY, RED CLAYEY SAND (SC)
GRAY, RED CLAY (CH)
ENVIRONMENTAL CLASSIFICATION:
SUBSTRUCTURE
SUBSTRUCTURE
SUPERSTRUCTURE
CONCRETE: EXTREMELY AGGRESSIVE (pH≤5.0) STEEL: EXTREMELY AGGRESSIVE (pH<6.0)
SLIGHTLY AGGRESSIVE
¡ CONST. ENV. RD
ROAD
CENTERLINE CONSTRUCTION OF ENVIRONMENTAL
ASPHALT
N
BOR # BB-4
ELEV. 74.0
DATE 7/31/2024
DRILLER R. SHUEY
HAMMER AUTOMATIC
RIG D-25
ELEVATION -26.0 FT (NAVD 88)
BORING TERMINATED AT
-5
-10
-15
-20
-25
-30
E L E
V A
T
IO
N I N
F E
E T
N
A V
D
-5
-10
-15
-20
-25
-30
E L E
V A
T
IO
N I N
F E
E T
N
A V
D
BROWN, GRAY, YELLOW SLIGHTLY SILTY SAND (SP-SM)
BROWN, GRAY, YELLOW SLIGHTLY SILTY SAND (SP-SM)
BROWN, GRAY, RED SILTY SAND (SM)
BROWN, GRAY, RED SILTY SAND (SM)
BROWN, GRAY, RED SILTY SAND (SM)
BROWN, GRAY, RED CLAYEY SAND (SC)
BROWN, GRAY, WHITE, YELLOW SAND (SP)
LONGITUDE: W 86.79286
LATITUDE: N 30.79068
NMC=28
-200=42
NMC=26
-200=4
NMC=28
-200=21
NMC=24
-200=10
NMC=22
-200=14
NMC=30
-200=10
NMC=29
-200=9
NMC=28
-200=10
STA. 203+43
REF. ¡ CONST. ENV. RD
OFF. 6' LT.
ASPHALT
201 202 203 204 205
BB-3
BB-4
¡ CONST. ENVIRONMENTAL RD
STA. 202+47.13
END BENT 1
BEGIN BRIDGE
STA. 202+76.63
INT. BENT 2
STA. 203+06.13
INT. BENT 3
STA. 203+35.63
END BENT 4
END BRIDGE
BORING LOCATION PLAN
Feet
100200
N
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
BRIDGE2_02 [SHEET] : c:\pw_work\american-pw-01\brittany.garcia\d0924805\B2Boring01.dgn
4:40:55 PM11/21/2024bgarcia
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA08-24 BMG
08-24 MM
08-24 BMG
08-24 MLS
32502 FLORIDA, PENSACOLA
175 SOUTH A STREET
TIERRA, INC.
43416License Number:
EXISTING BRIDGE NO. 580813
REPORT OF CORE BORINGS (2 OF 2)
ENVIRONMENTAL ROAD OVER MIDDLE CREEK #1
(3 INCHES THICK)
1 AB-3 0.3 - 1.5 --- 4 93 75 48 23 11 --- --- A-2-4
2 AB-4 0.5 - 3.2 --- 7 82 70 51 34 22 --- --- A-2-4
2 AB-4 3.5 - 5.0 --- 6 97 83 57 36 24 --- --- A-2-4
2 BB-3 2 - 4 --- 3 97 69 30 14 8 --- --- SP-SM
2 BB-3 6 - 8 --- 18 98 51 23 11 7 --- --- SP-SM
4 BB-3 18.5 - 20 --- 25 100 68 38 32 31 --- --- SC
5 BB-3 23.5 - 25 --- 26 --- --- --- --- --- 54 42 CH
2 BB-3 28.5 - 30 --- 24 --- --- --- --- 8 --- --- SP-SM
3 BB-3 48.5 - 50 --- 26 --- --- --- --- 21 --- --- SM
3 BB-3 68.5 - 70 --- 30 --- --- --- --- 19 --- --- SM
2 BB-3 88.5 - 90 --- 29 --- --- --- --- 10 --- --- SP-SM
3 BB-3 113.5 - 115 --- 31 --- --- --- --- 20 --- --- SM
4 BB-4 8 - 10 --- 28 100 98 95 77 42 --- --- SC
1 BB-4 13.5 - 15 --- 26 100 73 26 11 4 --- --- SP
3 BB-4 18.5 - 20 --- 28 100 64 30 22 21 --- --- SM
2 BB-4 33.5 - 35 --- 24 --- --- --- --- 10 --- --- SP-SM
3 BB-4 53.5 - 55 --- 22 --- --- --- --- 14 --- --- SM
2 BB-4 73.5 - 75 --- 30 --- --- --- --- 10 --- --- SP-SM
2 BB-4 78.5 - 80 --- 29 --- --- --- --- 9 --- --- SP-SM
2 BB-4 98.5 - 100 --- 28 --- --- --- --- 10 --- --- SP-SM
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
ENVIRONMENTAL ROAD OVER MIDDLE CREEK #1
SANTA ROSA COUNTY, FLORIDA
BORING
MOISTURE
CONTENT
SAMPLE
DEPTH
(ft)
ORGANIC
CONTENT
SIEVE ANALYSES (% PASSING)
#10 #40 #60 #100 #200
TIERRA PROJECT NO. 4511-24-016
LL
AASHTO/
USCS
ATTERBERG
LIMITS (%)
PI
STRATUM
BB-3 67 - 60 5.2 55,000 45 0 Extremely Aggressive Moderately Aggressive
BB-4 72 - 68 4.5 54,000 30 0 Extremely Aggressive Extremely Aggressive
MIDDLE CREEK WATER --- - --- 8.8 62,000 30 0 Slightly Aggressive Slightly Aggressive
Notes: Notes: (1) Any test result shown as "0" is below the detection limit of the test (<15 ppm)
(2) Any test result shown as "0" is below the detection limit of the test (<3 ppm)
(3) As per FDOT Structures Manual, Table 1.3.2-1, Updated January, 2024.
BORING
TIERRA PROJECT NO. 4511-24-016
Bridge No.
SAMPLE
ELEVATION,
(ft NAVD 88)
TABLE 2
SUMMARY OF CORROSION SERIES TEST RESULTS
ENVIRONMENTAL ROAD OVER MIDDLE CREEK #1
SANTA ROSA COUNTY, FLORIDA
580813 pH
(FM 5-550)
CONCRETESTEEL
CHLORIDES
(ppm)
(FM 5-552)
(1)
RESISTIVITY
(ohm-cm)
(FM 5-551)
ENVIRONMENTAL CLASSIFICATION
(3)
SULFATES
(ppm)
(FM 5-553)
(2)
BB-3 73 - 71 Brown, Gray, Yellow Slightly Silty Sand (Stratum 2) 0.11 0.25 0.31 0.35 3.2 1.6 SP-SM
BB-3 69 - 67 Brown, Gray, Yellow Slightly Silty Sand (Stratum 2) 0.14 0.29 0.41 0.55 3.9 1.1 SP-SM
BB-4 66 - 64 Brown, Gray, Red Clayey Sand (Stratum 4) ND ND 0.09 0.11 ND ND SC
BB-4 61 - 59 Brown, Gray, White, Yellow Sand (Stratum 1) 0.15 0.26 0.31 0.34 2.3 1.3 SP
BB-3 57 - 55 Brown, Gray, Red Clayey Sand (Stratum 4) ND ND 0.30 0.35 ND ND SC
BB-4 56 - 54 Brown, Gray, Red Silty Sand (Stratum 3) ND 0.25 0.32 0.38 ND ND SM
Notes: (1) D10 = Effective Grainsize, mm
(2) D50 = Median Particle Diameter, mm
(3) CU = Coefficient of Uniformity
(4) CC = Coefficient of Curvature
(5) ND = Non-Determinant
580813
TABLE 3
GRAINSIZE DATA FOR SCOUR ANALYSIS
SANTA ROSA COUNTY, FLORIDA
BORING
ENVIRONMENTAL ROAD OVER MIDDLE CREEK #1
TIERRA PROJECT NO. 4511-24-016
MATERIAL
CLASSIFICATION
(USCS)
EXISTING
BRIDGE NO.
CUD60 CC
GRAINSIZE PARAMETER
SAMPLE
ELEVATION
(ft NAVD88) D10 D50D30
SAMPLE DESCRIPTION
Project No: 4511-24-016 Date: 7/27/2024
Project: Blackwater River State Forest - Environmental Rd Bridge 580813
Sample Location: BB-3: +73 to +71 NAVD 88
Soil Description: Brown, Gray, Yellow Slightly Silty Sand (Stratum 2)
Soil Classification: LL --- PI ---
NMC % 3.0
% Gravel % Sand % Silt/Clay
2 90 8
D60 D50 D30 D10 CC CU
0.35 0.31 0.25 0.11 1.6 3.2 Copies:
Respectfully Submitted, TIERRA INC.
This report shall not be reproduced, except in full, without the written permission of the laboratory
TIERRA
175 South A Street Pensacola, Florida 32502
Phone: (850) 462-8774 ● Fax: (850) 462-8784
FDOT Lab No. I03066
GRAIN SIZE DISTRIBUTION TEST REPORT
SP-SM
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0.010.1110
P E
R C
E N
T F
IN
E
R
GRAIN SIZE, mm
GRAIN SIZE DISTRIBUTION
Sieve 3/8 4 10 40 60 100 200
SandGravel Silt / Clay
Sample Location: BB-3: +69 to +67 NAVD 88
Soil Description: Brown, Gray, Yellow Slightly Silty Sand (Stratum 2)
Soil Classification: LL --- PI ---
NMC % 18.4
% Gravel % Sand % Silt/Clay
0 93 7
D60 D50 D30 D10 CC CU
0.55 0.41 0.29 0.14 1.1 3.9 Copies:
Respectfully Submitted, TIERRA INC.
175 South A Street Pensacola, Florida 32502
TIERRA
Phone: (850) 462-8774 ● Fax: (850) 462-8784
FDOT Lab No. I03066
GRAIN SIZE DISTRIBUTION TEST REPORT
SP-SM
This report shall not be reproduced, except in full, without the written permission of the laboratory
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0.010.1110
P E
R C
E N
T F
IN
E
R
GRAIN SIZE, mm
GRAIN SIZE DISTRIBUTION
Sieve 3/8 4 10 40 60 100 200
Sample Location: BB-3: +57 to +55 NAVD 88
Soil Description: Brown, Gray, Red Clayey Sand (Stratum 4)
Soil Classification: LL --- PI ---
NMC % 25.1
% Gravel % Sand % Silt/Clay
0 69 31
D60 D50 D30 D10 CC CU
0.35 0.30 ND ND ND ND
Copies:
Notes: ND - Non-Determinant Respectfully Submitted, TIERRA INC.
175 South A Street Pensacola, Florida 32502
TIERRA
Phone: (850) 462-8774 ● Fax: (850) 462-8784
FDOT Lab No. I03066
GRAIN SIZE DISTRIBUTION TEST REPORT
SC
This report shall not be reproduced, except in full, without the written permission of the laboratory
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0.010.1110
P E
R C
E N
T F
IN
E
R
GRAIN SIZE, mm
GRAIN SIZE DISTRIBUTION
Sieve 3/8 4 10 40 60 100 200
Sample Location: BB-4: +66 to +64 NAVD 88
Soil Description: Brown, Gray, Red Clayey Sand (Stratum 4)
Soil Classification: LL --- PI ---
NMC % 27.8
% Gravel % Sand % Silt/Clay
0 58 42
D60 D50 D30 D10 CC CU
0.11 0.09 ND ND ND ND
Copies:
Notes: ND - Non-Determinant Respectfully Submitted, TIERRA INC.
175 South A Street Pensacola, Florida 32502
TIERRA
Phone: (850) 462-8774 ● Fax: (850) 462-8784
FDOT Lab No. I03066
GRAIN SIZE DISTRIBUTION TEST REPORT
SC
This report shall not be reproduced, except in full, without the written permission of the laboratory
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0.010.1110
P E
R C
E N
T F
IN
E
R
GRAIN SIZE, mm
GRAIN SIZE DISTRIBUTION
Sieve 3/8 4 10 40 60 100 200
Sample Location: BB-4: +61 to +59 NAVD 88
Soil Description: Brown, Gray, White, Yellow Sand (Stratum 1)
Soil Classification: LL --- PI ---
NMC % 26.3
% Gravel % Sand % Silt/Clay
0 96 4
D60 D50 D30 D10 CC CU
0.34 0.31 0.26 0.15 1.3 2.3 Copies:
Respectfully Submitted, TIERRA INC.
175 South A Street Pensacola, Florida 32502
TIERRA
Phone: (850) 462-8774 ● Fax: (850) 462-8784
FDOT Lab No. I03066
GRAIN SIZE DISTRIBUTION TEST REPORT
SP
This report shall not be reproduced, except in full, without the written permission of the laboratory
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0.010.1110
P E
R C
E N
T F
IN
E
R
GRAIN SIZE, mm
GRAIN SIZE DISTRIBUTION
Sieve 3/8 4 10 40 60 100 200
Sample Location: BB-4: +56 to +54 NAVD 88
Soil Description: Brown, Gray, Red Silty Sand (Stratum 3)
Soil Classification: LL --- PI ---
NMC % 28.3
% Gravel % Sand % Silt/Clay
0 79 21
D60 D50 D30 D10 CC CU
0.38 0.32 0.25 ND ND ND
Copies:
Notes: ND - Non-Determinant Respectfully Submitted, TIERRA INC.
175 South A Street Pensacola, Florida 32502
TIERRA
Phone: (850) 462-8774 ● Fax: (850) 462-8784
FDOT Lab No. I03066
GRAIN SIZE DISTRIBUTION TEST REPORT
SM
This report shall not be reproduced, except in full, without the written permission of the laboratory
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0.010.1110
P E
R C
E N
T F
IN
E
R
GRAIN SIZE, mm
GRAIN SIZE DISTRIBUTION
Sieve 3/8 4 10 40 60 100 200
Tested For: Consor Engineers, LLC Project: Blackwater River State Park
4489 Woodbine Road Bridge Replacements
Pace, Florida 32571
Tierra Project No: 4511-24-016
Sample No: AB-1
Report Date: 11/5/2024
LBR & MOISTURE-DENSITY RELATIONSHIP
LBR Value 172 Description: Brown, Orange, Red Silty Sand
Maximum Density 134 pcf Sampled From: AB-1 (0 to 2 feet below grade)
Optimum Moisture 7.4 % AASHTO Classification: Stratum 2 A-2-4 (15% to 35% Fines)
Test Method: FM 5-515 (Soaked)/FM T-180 Sampled By: M. Davis
(%)Passing #4 Sieve 100.0% Date Sampled: 8/28/2024
(%)Passing #200 Sieve 24.4%
Tested By: B. Carter
Sampled in accordance with AASHTO T-2
Remarks:
Respectfully Submitted, TIERRA INC.
This report shall not be reproduced, except in full, without the written permission of the laboratory
175 South A Street Pensacola, Florida 32502
TIERRA
Phone: (850) 462-8774 ● Fax: (850) 462-8784
FDOT Laboratory No. I03066
RESULTS OF LABORATORY TESTING
4% 5% 6% 7% 8% 9% 10% 11% 12% 13%
D ry
U n it W e ig h t
(p c f)
Moisture Content
L B
R V a lu e
Tested For: Consor Engineers, LLC Project: Blackwater River State Park
4489 Woodbine Road Bridge Replacements
Pace, Florida 32571
Tierra Project No: 4511-24-016
Sample No: AB-3
Report Date: 11/5/2024
LBR & MOISTURE-DENSITY RELATIONSHIP
LBR Value 47 Description: Brown, Orange, Red Silty Sand
Maximum Density 112.0 pcf Sampled From: AB-3 (0 to 1-1/2 feet below grade)
Optimum Moisture 10.8 % AASHTO Classification: Stratum 1 A-2-4 (10% to 15% Fines)
Test Method: FM 5-515 (Soaked)/FM T-180 Sampled By: M. Davis
(%)Passing #4 Sieve 100.0% Date Sampled: 8/28/2024
(%)Passing #200 Sieve 10.4%
Tested By: B. Carter
Sampled in accordance with AASHTO T-2
Remarks:
Respectfully Submitted, TIERRA INC.
This report shall not be reproduced, except in full, without the written permission of the laboratory
175 South A Street Pensacola, Florida 32502
TIERRA
Phone: (850) 462-8774 ● Fax: (850) 462-8784
FDOT Laboratory No. I03066
RESULTS OF LABORATORY TESTING
6% 7% 8% 9% 10% 11% 12% 13% 14% 15%
D ry
U n it W e ig h t
(p c f)
Moisture Content
L B
R V a lu e
APPENDIX B
Axial Pile Capacity Curves
Sample FB-DEEP Output Files
Geotechnical Design Parameters for FB-MultiPier Input
Pile Data Table
DRAWN BY: SCALE: PROJECT NO.
MRM Noted 4511-24-016
CHECKED BY: DATE:
MLS 11/2024
Bridge No. 580813
FDACS 01200ROAD23
Santa Rosa County, FL
Blackwater River State Forest Bridge Replacements
Environmental Road over Middle Creek #1
End Bent 1 (Boring BB-3)
-60
-50
-40
-30
-20
-10
0 100 200 300 400 500 600
P il e T ip E le v a ti o n fe e t, N A
V D
Nominal Bearing Resistance (tons)
18-Inch Square PCP
Assume starter hole 10 feet below existing grade.
CHECKED BY: DATE:
MLS 11/2024
Intermediate Bent 2 (Boring BB-3)
Santa Rosa County, FL
Blackwater River State Forest Bridge Replacements
Environmental Road over Middle Creek #1
Bridge No. 580813
FDACS 01200ROAD23
-60
-50
-40
-30
-20
-10
0 100 200 300 400 500 600
P il e T ip E le v a ti o n fe e t, N A
V D
Nominal Bearing Resistance (tons)
Assume mudline at EL +62 ft NAVD 88.
CHECKED BY: DATE:
MLS 11/2024
Bridge No. 580813
FDACS 01200ROAD23
Santa Rosa County, FL
Blackwater River State Forest Bridge Replacements
Environmental Road over Middle Creek #1
Intermediate Bent 3 (Boring BB-3)
-60
-50
-40
-30
-20
-10
0 100 200 300 400 500 600
P il e T ip E le v a ti o n fe e t, N A
V D
Nominal Bearing Resistance (tons)
Assume mudline at EL +61 ft NAVD 88.
CHECKED BY: DATE:
MLS 11/2024
Bridge No. 580813
FDACS 01200ROAD23
Santa Rosa County, FL
Blackwater River State Forest Bridge Replacements
Environmental Road over Middle Creek #1
End Bent 3 (Boring BB-4)
-60
-50
-40
-30
-20
-10
0 100 200 300 400 500 600
P il e T ip E le v a ti o n fe e t, N A
V D
Nominal Bearing Resistance (tons)
Assume starter hole 10 feet below existing grade.
Florida Bridge Software Institute Date: November 14, 2024
Shaft and Pile Analysis (FB-Deep v.3.1.0) Time: 15:29:19
General Information:
Input file: ..... River State Park Bridges\Analysis\FB Deep\BB-3_18 inch PCP.in
Project number: 4511-24-016
Job name: Blackwater FDACS Bridges
Engineer: MRM
Units: English
Analysis Information:
Analysis Type: SPT
Soil Information:
Boring date: 8/1/2024, Boring Number: BB-3
Station number: 202+52 Offset: 2' RT.
Ground Elevation: 74.900(ft)
Hammer type: Automatic Hammer, Correction factor = 1.24
ID Depth No. of Blows Soil Type
(ft) (Blows/ft)
1 0.00 16.00 3- Clean sand
2 2.00 16.00 3- Clean sand
3 4.00 5.00 3- Clean sand
4 6.00 4.00 3- Clean sand
5 8.00 2.00 3- Clean sand
6 10.00 5.00 3- Clean sand
7 15.00 4.00 3- Clean sand
8 20.00 3.00 2- Clay and silty sand
9 25.00 4.00 1- Plastic Clay
10 30.00 4.00 3- Clean sand
11 35.00 2.00 3- Clean sand
12 40.00 2.00 3- Clean sand
13 45.00 2.00 3- Clean sand
14 50.00 2.00 3- Clean sand
15 55.00 7.00 3- Clean sand
16 60.00 2.00 3- Clean sand
17 65.00 2.00 3- Clean sand
18 70.00 3.00 3- Clean sand
19 75.00 5.00 3- Clean sand
End Bent 1 Boring BB-3 18-Inch Prestressed Concrete Pile
Assume starter hole to 10 feet below existing grade.
(1/2 N Values over 10)
20 80.00 7.00 3- Clean sand
21 85.00 10.00 3- Clean sand
22 90.00 25.00 3- Clean sand
23 95.00 30.00 3- Clean sand
24 100.00 31.00 3- Clean sand
25 105.00 22.00 3- Clean sand
26 110.00 25.00 3- Clean sand
27 115.00 28.00 3- Clean sand
28 120.00 37.00 3- Clean sand
29 125.00 43.00 3- Clean sand
Blowcount Average Per Soil Layer
Layer Starting Bottom Thickness Average Soil Type
Num. Elevation Elevation Blowcount
(ft) (ft) (ft) (Blows/ft)
1 74.90 54.90 20.00 6.55 3-Clean Sand
2 54.90 49.90 5.00 3.00 2-Clay and Silty Sand
3 49.90 44.90 5.00 4.00 1-Plastic Clay
4 44.90 -50.10 95.00 12.95 3-Clean Sand
Driven Pile Data:
Pile unit weight = 150.00(pcf), Section Type: Square
Pile Geometry:
Width Length Tip Elev.
(in) (ft) (ft)
18.00 1.00 73.90
18.00 2.00 72.90
18.00 3.00 71.90
18.00 4.00 70.90
18.00 5.00 69.90
18.00 6.00 68.90
18.00 7.00 67.90
18.00 8.00 66.90
18.00 9.00 65.90
18.00 10.00 64.90
18.00 11.00 63.90
18.00 12.00 62.90
18.00 13.00 61.90
18.00 14.00 60.90
18.00 15.00 59.90
18.00 16.00 58.90
18.00 17.00 57.90
18.00 18.00 56.90
18.00 19.00 55.90
18.00 20.00 54.90
18.00 21.00 53.90
18.00 22.00 52.90
18.00 23.00 51.90
18.00 24.00 50.90
18.00 25.00 49.90
18.00 26.00 48.90
18.00 27.00 47.90
18.00 28.00 46.90
18.00 29.00 45.90
18.00 30.00 44.90
18.00 31.00 43.90
18.00 32.00 42.90
18.00 33.00 41.90
18.00 34.00 40.90
18.00 35.00 39.90
18.00 36.00 38.90
18.00 37.00 37.90
18.00 38.00 36.90
18.00 39.00 35.90
18.00 40.00 34.90
18.00 41.00 33.90
18.00 42.00 32.90
18.00 43.00 31.90
18.00 44.00 30.90
18.00 45.00 29.90
18.00 46.00 28.90
18.00 47.00 27.90
18.00 48.00 26.90
18.00 49.00 25.90
18.00 50.00 24.90
18.00 51.00 23.90
18.00 52.00 22.90
18.00 53.00 21.90
18.00 54.00 20.90
18.00 55.00 19.90
18.00 56.00 18.90
18.00 57.00 17.90
18.00 58.00 16.90
18.00 59.00 15.90
18.00 60.00 14.90
18.00 61.00 13.90
18.00 62.00 12.90
18.00 63.00 11.90
18.00 64.00 10.90
18.00 65.00 9.90
18.00 66.00 8.90
18.00 67.00 7.90
18.00 68.00 6.90
18.00 69.00 5.90
18.00 70.00 4.90
18.00 71.00 3.90
18.00 72.00 2.90
18.00 73.00 1.90
18.00 74.00 0.90
18.00 75.00 -0.10
18.00 76.00 -1.10
18.00 77.00 -2.10
18.00 78.00 -3.10
18.00 79.00 -4.10
18.00 80.00 -5.10
18.00 81.00 -6.10
18.00 82.00 -7.10
18.00 83.00 -8.10
18.00 84.00 -9.10
18.00 85.00 -10.10
18.00 86.00 -11.10
18.00 87.00 -12.10
18.00 88.00 -13.10
18.00 89.00 -14.10
18.00 90.00 -15.10
18.00 91.00 -16.10
18.00 92.00 -17.10
18.00 93.00 -18.10
18.00 94.00 -19.10
18.00 95.00 -20.10
18.00 96.00 -21.10
18.00 97.00 -22.10
18.00 98.00 -23.10
18.00 99.00 -24.10
18.00 100.00 -25.10
18.00 101.00 -26.10
18.00 102.00 -27.10
18.00 103.00 -28.10
18.00 104.00 -29.10
18.00 105.00 -30.10
18.00 106.00 -31.10
18.00 107.00 -32.10
18.00 108.00 -33.10
18.00 109.00 -34.10
18.00 110.00 -35.10
18.00 111.00 -36.10
18.00 112.00 -37.10
18.00 113.00 -38.10
18.00 114.00 -39.10
18.00 115.00 -40.10
18.00 116.00 -41.10
18.00 117.00 -42.10
18.00 118.00 -43.10
18.00 119.00 -44.10
18.00 120.00 -45.10
18.00 121.00 -46.10
18.00 122.00 -47.10
18.00 123.00 -48.10
18.00 124.00 -49.10
18.00 125.00 -50.10
Driven Pile Capacity:
Section Type: Square
Pile Width: 18.00 (in)
Test Pile Ultimate Mobilized Estimated Allowable Ultimate
Pile Width Side End Davisson Pile Pile
Length Friction Bearing Capacity Capacity Capacity
(ft) (in)…