This is a Statement of Objectives (SOO) Appendix specifying building requirements for the AEDC-Arnold AFB Raw Water Cooling System Modernization project. The document establishes comprehensive technical and construction standards for a new free-standing metal building to house raw water cooling system infrastructure.
General requirements mandate that the contractor relocate or replace all affected utilities with Government approval, position the building without requiring modifications to existing structures or exhaust stacks, and maintain access to Building 579 and storage facilities for gaseous nitrogen, butane, liquid oxygen, heated fuel, and waste fuel tanks. The contractor must coordinate utility usage and capacity requirements with Government approval and obtain Government authorization prior to any system modifications.
Civil requirements specify a minimum building foundation capacity of 1,000 lbs/ft², with each pump installed on a dedicated inertia block foundation completely isolated from the building using waterproof synthetic vibration isolation material allowing a maximum deflection of 1/8 inch under API 610 vibration limits. The building must include internal floor drains to prevent flooding, positive site drainage with additional storm drainage if needed, and a 20-ton bridge crane with 5-ton auxiliary hook.
Architectural specifications mandate a free-standing metal building with vertical-profile preformed metal wall panels and standing-seam roof panels using minimum 24-gauge steel factory-coated with polyvinylidene fluoride (PVDF). Wall systems require minimum R-Value 19 thermal resistance and roofs require minimum R-Value 30, with water penetration not exceeding 0.01 oz/ft² of free area. The building must comply with Sound Transmission Class 45 standards and include two exterior insulated access doors, two overhead coiling roll-up service doors (minimum 18 feet wide and tall with steel bollards), with all doors and finishes meeting Arnold Installation Facilities Standards using specified Sherwin Williams colors.
Mechanical requirements mandate HVAC systems providing heating and ventilation only, designed for 65°F in non-work areas based on contractor-performed heat load studies, with electric heaters and reversible high-volume low-speed fans compliant with ASHRAE 62.1. All potable water connections must meet Tennessee Department of Environment and Conservation standards and AEDC backflow prevention requirements, with double-block-and-bleed protection on all utility supply lines. Underground water lines must maintain 10-foot clearance from building foundation perimeter, while all other utilities must remain outside the foundation footprint.
Electrical requirements mandate single-point entry for all utilities using 600V copper stranded conductors per ASTM B8, with THHN/THWN interior conductors and underground raceways. The contractor must perform detailed load analysis to verify existing power distribution capacity; if insufficient, identify required modifications. Transformers, if needed, must be dry-type general-purpose units meeting DOE 2016 efficiency standards with copper windings and clearly identified kVA ratings. LED lighting must comply with NDAA Section 2863 and ASHRAE 90.1, with all fixtures designed for vibration resistance and securely mounted. Panel boards require copper current-carrying components, copper ground and neutral buses, and minimum short-circuit ratings of 22,000A for 208V and 42,000A for 480V systems. Additional requirements include flexible metal conduit in wet locations and at vibration-prone connections, three-layer taped wire nut connections, cascaded surge protection per UFC 3-575-01, lightning protection per NFPA 780, and fire detection systems compliant with NFPA standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STINFO
SOO # 16904-26-001
ATTACHMENT 1
APPENDIX G
2 March 2026
DISTRIBUTION A: Approved for public release, distribution is unlimited.
IRA-26-1433
Statement of Objectives (SOO)
Attachment 1 – Performance Parameters
Appendix G – Building Requirements AEDC-Arnold AFB: Raw Water Cooling System Modernization
Building Requirements:
General Requirements:
1. Contractor shall be responsible for relocating or replacing all existing utilities affected by the new building. The new configuration for each utility system shall be approved by the
Government prior to any modification of the existing system.
2. Building location shall not require any modifications to the existing buildings or the existing exhaust stack.
3. Building location shall not restrict or impede access to Building 579, existing gaseous nitrogen storage, existing butane storage, existing liquid oxygen storage, existing heated fuel storage, or the existing waste fuel tanks.
4. Contractor shall coordinate with the Government for use of utilities not explicitly identified within this document. The Contractor shall provide a list of all required utilities, including capacity required and recommended source, to the Government. The Government will approve the requested source or provide a recommended alternate source. The source and capacity usage of each utility shall be approved by the Government prior to any modification to the existing systems.
Civil Requirements:
5. Building foundation shall be designed for a minimum of 1,000 lbs/ft2.
6. Each pump shall be installed on a dedicated foundation.
a. All pump foundations shall be designed as an inertia block and completely isolated from the building.
b. Each pump foundation shall have a waterproof synthetic vibration isolation material, or Government-approved alternative, that will allow a maximum of 1/8 in deflection with the worst case API 610 vibration limits.
ATTACHMENT 1
7. Building shall have internal floor drains to prevent flooding in the event of equipment malfunction or pipe rupture.
8. Building shall be provided with a 20 ton bridge crane with a 5 ton auxiliary hook in accordance with Appendix I – Bridge Crane.
9. Building shall be provided with positive site drainage as well as additional storm drainage, if required. Contractor shall verify that the new building does not negatively affect the drainage of the existing buildings.
Architectural Requirements:
10. All architectural and interior work shall conform to the latest version of the applicable codes and standards, including International Building Code (IBC), International Energy
Conservation Code (IECC), International Existing Building Code (IEBC), International
Plumbing Code (IPC), National Fire Protection Association (NFPA) 101, Unified Facilities
Criteria (UFC) 1-200-01, UFC 3-101-01, UFC 3-110-03, UFC 3-120-10, UFC 3-600-01, UFC 4-010-01, and UFC 4-010-02.
11. Building shall be constructed as a free-standing metal building.
a. Walls shall be preformed metal panels of vertical profile, with sub-girt framing and anchoring assembly, insulation, liner sheets, and accessory components.
b. Roof shall be preformed metal panels of standing seam profile, with sub-girt framing and anchorage assembly, insulation, and accessory components.
c. Exterior panels and other sheet materials shall be a minimum of 24 gauge steel stock and factory coated with polyvinylidene fluoride (PVDF).
d. Water penetration into the building shall not exceed 0.01 oz/ft2 of free area at maximum face velocity.
e. Installed wall systems shall have a minimum thermal resistance (R-Value) of 19.
f. Installed roof systems shall have a minimum thermal resistance (R-Value) of 30.
g. All structural members shall be designed to withstand, at a minimum, dead loads, applicable snow loads, vertical and horizontal seismic loads, and wind loads in accordance with IBC and ASCE 7.
h. Deflection of any exterior wall or roof system shall not exceed 1/180 of the span under any imposed loading identified above.
ATTACHMENT 1
i. All work shall be performed in accordance with Metal Building Manufacturer’s
Association (MBMA) Low Rise Building Systems Manual.
12. Construction shall meet Sound Group 3 – Sound Transmission Class (STC) 45 or better. All perimeter wall penetrations shall be approved by the Government.
13. Building shall be provided with a minimum of two exterior access doors, with one on either end of the building.
a. Access doors shall be insulated hollow metal doors.
b. Access doors shall accommodate a standard cylinder lock, which will be provided and installed by the Government.
c. Access door hinges shall be ball bearing type with securable pins (e.g. set screw).
14. Building shall be provided with a minimum of two exterior service doors, with one on either end of the building.
a. Service doors shall be overhead coiling roll-up doors.
b. Service doors shall be a minimum of 18 ft wide and 18 ft tall.
c. Service doors shall be insulated.
d. Protective steel bollards shall be provided at jams of all service doors.
15. All exterior doors shall be protected in accordance with UFC 4-010-01 and UFC 4-010-02.
16. Building style, color, and trim shall comply with Arnold Installation Facilities Standards and match existing test and shop facilities in the area unless otherwise approved by the
Government.
a. Access doors shall be painted Walnut Brown (Sherwin Williams SW4009).
b. Service doors shall be factory painted or powder coated to match Walnut Brown.
c. Exterior windows shall be dark bronze anodized and insulated.
d. Exterior wall panels shall be pre-finished to match Shale.
e. Roof shall be pre-finished to match Walnut Brown.
f. Exterior trim shall be pre-finished to match Walnut Brown.
g. Gutters and downspouts shall be pre-finished to match Walnut Brown
h. Protective bollards shall be painted Safety Yellow (Sherwin Williams SW4084).
ATTACHMENT 1
17. Exterior building signage shall be provided and shall match existing AEDC building signage in size, style, and color.
18. Interior building signage shall be provided in accordance with IBC, UFC 3-101-01, and UFC
3-120-10.
Mechanical Requirements:
19. All mechanical systems shall meet the DOD Minimum Antiterrorism Standards for
Buildings (UFC 4-010-01), Mechanical Engineering (UFC 3-401-01), and International
Mechanical Code.
20. Heating, Ventilation, and Air-Conditioning (HVAC) system shall provide heating and ventilation only.
a. Contractor shall perform a heat load study for the new building.
b. HVAC system design shall be designed for 65°F for non-work areas with minimum human activity and based on the results of the performed heat load study.
c. Air quality and air turnover rate shall be in accordance with American Society of
Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) 62.1.
d. All heaters shall be electric.
e. All fans shall be high volume, low speed (HVLS) fans with controls that can reverse direction. Fans shall not interfere with lights or the bridge crane.
f. HVAC system shall include an emergency stop button in accordance with UFC 4-
010-01.
21. All connections to the existing potable water distribution system shall be in accordance with
Tennessee Department of Environment and Conservation rules for Public Water Systems
(Chapter 0400-45-01) and the AEDC Safety, Health, and Environmental Standard for Cross
Connection and Backflow Prevention (AEDC-SHE-STD-D14).
22. Supply lines for all utilities shall include double-block-and-bleed protection to allow for maintenance or repair of the building systems without affecting other facilities.
23. All underground water lines shall maintain a minimum of 10 ft clearance from the footprint of the building foundation. All other utilizes shall be outside of the footprint of the building foundation.
ATTACHMENT 1
24. Contractor shall relocate the existing fire hydrant in accordance with NFPA 1, NFPA 24, and
UFC 3-600-01. The new hydrant location shall be approved by the Government prior to any modification of the existing system.
Electrical Requirements:
25. Electrical power shall be provided in accordance with NFPA 70 and UFC 3-520-01.
a. All electrical utilities shall enter the building at a single point.
b. All power and lighting conductors shall be 600 V copper stranded conductors in accordance with ASTM B8.
c. All interior conductors and conductors in underground raceways shall be dual rated thermoplastic, high heat resistant, nylon coated (THHN) / thermoplastic, heat resistant, water resistant, nylon coated (THWN).
26. Contractor shall perform a complete and detailed load analysis to verify that the capacity of the existing power distribution system is sufficient for the new loads. If the existing power distribution system is insufficient, the Contractor shall identify all additional equipment or modifications required to support the new loads.
27. If required to support the new loads, transformers shall be general purpose, dry type transformers provided in accordance with NFPA 70, UFC 3-600-01, and Department of
Energy 2016 Efficiency Standards: Low Voltage Distribution Transformers.
a. Transformers shall be equal to heavy-duty Class 1100 (single-phase) or Class 1200
(three-phase)
b. Transformers shall be two-winding type and self-cooled.
c. Transformer kVA ratings shall be clearly identified.
d. Windings shall be copper. Aluminum windings shall not be permitted.
28. LED lighting shall be provided in accordance with the National Defense Authorization Act
(NDAA) Section 2863, ASHRAE 90.1, UFC 3-530-01, Illuminating Engineering Society of
North America (IESNA) Lighting Handbook (10th Edition), and NFPA 70.
29. Emergency lighting shall be provided in accordance with NFPA 70, NFPA 101, UFC 3-520-
01, and UFC 3-530-01.
ATTACHMENT 1
30. All light fixtures shall be designed for vibration resistance.
a. All fixtures shall be securely mounted to prevent movement and vibration.
b. Vibration dampeners shall be used on poles.
c. Reinforced housings and components shall be used in high vibration environments.
d. Ballast shall be securely mounted such that it will not contribute to vibration.
31. Lighting controls shall be in accordance with UFC 3-530-01. Occupancy sensors shall not be used.
32. Flexible metal conduit shall be provided in accordance with NFPA 70.
e. Short sections of liquid-tight flexible conduit shall be provided at lighting connections and components subject to vibration or periodic removal.
f. Liquid-tight flexible conduit shall be provided in all wet locations.
33. All wire nut connections shall be taped with a minimum of three layers to seal against moisture and loosening due to vibration.
34. Panel boards shall be provided in accordance with NFPA 70. All panel boards shall be provided with a panel board directory.
a. All current carrying components shall be copper.
b. All panel boards shall be furnished with a copper ground bus and copper neutral bus.
c. All panel boards shall be furnished with a main breaker having a continuous current trip rating equal to the bus rating and capable of interrupting the available fault current.
d. Minimum integrated short circuit rating shall be 22,000 A RMS symmetrical for 208
V panel boards and 42,000 A RMS symmetrical for 480 V panel boards.
35. HVAC units and equipment shall be provided with line reactors installed in accordance with
NFPA 70.
36. All electrical outlets shall be flush mounted to the wall unless otherwise approved by the
Government.
37. Cascaded system of surge protection shall be provided in accordance with UFC 3-575-01, including, but not limited to, service entrance and branch panel protection.
ATTACHMENT 1
38. Lightning protection shall be provided in accordance with NFPA 780, Air Force Manual
(AFMAN) 32-1065, and UFC 3-575-01.
a. All lightning protection systems shall be designed by personnel with qualifications meeting AFMAN 32-1065, Chapter 4.
b. All lightning protection systems shall be inspected in accordance with AFMAN 32-
1065, Chapter 2.6 prior to acceptance.
39. Fire detection systems shall be provided in accordance with NFPA 70, NFPA 72, NFPA
90A, NFPA 101, and UFC 3-600-01.