Appendix for LAr Supply RFI Nov-2025_Final.pptx

PPTX presentation 10 MB Posted

Attached to
Request for Information: Supply of Liquid Argon to Long-Baseline Neutrino Facility (Lead, South Dakota)
Solicitation number
LBNF-2025-LAR-RFI-JD
Issued by

About this file

This PowerPoint appendix is part of a Request for Information (RFI) for the Liquid Argon (LAr) Supply for the Long-Baseline Neutrino Facility (LBNF/DUNE) project located in Lead, South Dakota. The document provides technical details about the liquid argon receiving and storage infrastructure, including a proposed facility layout with 4 x 50 m3 storage tanks capable of holding 280 tons of liquid argon (supporting approximately 3.5-4 days of supply at 70 tons per day), redundant 500 kW vaporizers, and an argon purity shed for quality control and sampling.

The appendix includes project timeline information, cryogenics process flow diagrams, site access details (highlighting the steepest incline at Mill St. Grade), surface facility layouts, and conceptual design drawings for argon receiving stations. The project is being managed by David Montanari from FDC Cryogenics and is associated with a Department of Energy Fermi National Accelerator Laboratory solicitation (LBNF-2025-LAR-RFI-JD), indicating this is a pre-solicitation market research document to understand potential liquid argon supply capabilities and infrastructure requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Long-Baseline Neutrino Facility LAr Supply RFI Appendix David Montanari FDC Cryogenics Project Manager 21 November 2025

1 – LBNF/DUNE Project timeline.

2 – Cryogenics Process Flow Diagram.

3 – Argon receiving conceptual layout 3D view (not actual one).

4 – Argon receiving preliminary layout (actual one).

5 – Steepest incline on the way to the site.

6 – Photo of surface facilities.

7 – Layout of surface facilities.

Outline 11.21.25 David Montanari | LAr Supply RFI Appendix

1 – LBNF/DUNE High level timeline David Montanari | LAr Supply RFI Appendix 11.21.25

2 – Cryogenics Process Flow Diagram (PFD) supporting 1 tank

11.21.25 NO cryogens/cryogenics in the shaft.

Proximity Internal Infrastructure

INT

INF

PROXY

INF

PROXY

PROXY

INF

Integrated Cold-Boxes

3 – Argon Receiving Facilities layout (conceptual, not actual one)

11.21.25 LAr Tankers Offloading Stations Proposed LAr Storage:

4 x 50 m3

- 280 ton of LAr storage (4 days at 70 ton/d)

- Vaporizers (2N redundancy) Vaporizers: 2 x 500 kW Space and utilities for LAr Pumps (if needed) Argon Purity Shed (Controls + Argon sampling to verify impurities)

15.2 m

19.8 m

4 – Argon Receiving Facilities layout (Preliminary from Chart Inc.)

11.21.25 Proposed LAr Storage:

4 x 50 m3

- 280 ton of LAr storage (3.5 days at 70 ton/d)

- Vaporizers (2N redundancy) LAr Tankers Offloading Stations Argon Purity Shed (Controls + Argon sampling to verify impurities) Vaporizers: 2 x 500 kW Space and utilities for LAr Pumps (if needed)

5 – Mill St. Grade (Steepest incline on the way to the site) 11.21.25

Surface Facilities Truck access

6 – Surface facilities (photo with details) 11.21.25 David Montanari | LAr Supply RFI Appendix

Existing warehouse Access road Shaft Space available for receiving facilities

7 – Surface facilities (layout)

11.21.25

Existing warehouse (not available) Access road Argon Receiving Facilities Space available for receiving facilities: A = 300 m2 image6.png image7.png image8.png image9.png image10.emf image11.png image12.png image13.png image1.png image2.jpeg image3.png image4.png image5.png

File details come from the government source that posted it. Updated .