APPENDIX E - Salt Load Reduction Worksheet 2020.pdf
PDF 83 KB Posted
- Opportunity number
- BOR-UC-20-F001
- Issued by
-
Department of the Interior
About this file
Appendix E: Salt Load Reduction Worksheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Applicant Signature Approval Letter.pdf | ||
| FOA SALINITY Application Worksheet.docx | DOCX document | |
| FOA SALINITY Application Worksheet.docx | DOCX document | |
| APPENDIX E - Salt Load Reduction Worksheet 2020 (2).docx | DOCX document | |
| APPENDIX E - Salt Load Reduction Table.docx | DOCX document | |
| APPENDIX B - Enable On-Farm Worksheet.xlsx | XLSX spreadsheet | |
| APPENDIX B - Enable On-Farm Worksheet (1).xlsx | XLSX spreadsheet | |
| APPENDIX A Cost Estimate Sheet FOA 2020.xlsx | XLSX spreadsheet | |
| FOA SALINITY Document and Application Worksheet (1).pdf | ||
| FOA SALINITY Document and Application Worksheet (2).pdf | ||
| FOA SALINITY Document and Application Worksheet.pdf | ||
| FOA SALINITY Document Application Worksheet - 7-12-19.pdf | ||
| Salt Load Reduction Worksheet.pdf | ||
| FOA.pdf | ||
| PKG00251548-instructions.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bureau of Reclamation Colorado River Basinwide and Basin States Salinity Control Programs
Salt Load Reduction Worksheet
BOR-UC-20-F001
Colorado River Basinwide and Basin States Salinity Control Programs
PROJECT NAME & LOCATION
Applicant Name
Date
Salt Load Reduction Worksheet
BOR-UC-20-F001
A.1 WORKSHEET SUBMITTAL INSTRUCTIONS & SCHEDULE
Applications for salt load reduction must be emailed to the Grant’s Office at:
bor-sha-uc-foasaltloadreduction@usbr.gov
Point of Contact:
Richard Pew rpew@usbr.gov 801-524-3740
A request for salt numbers will only be accepted, by email, from the proposing entity that is eligible to apply. Reclamation will carbon copy response to engineers at the request of the entity.
Deadline:
Applicants are encouraged to submit the Salt Load Reduction Worksheet as early as possible following the release of the FOA, especially if applicants anticipate submitting a revised version of the Salt Load Reduction Worksheet. Final submissions of Salt Load Reduction Worksheet must be received by Reclamation no later than August 1, 2019.
A.2 PROPOSED SALINITY CONTROL
A.2.A IRRIGATION DELIVERY SYSTEM IMPROVEMENTS
Prior to preparing the responses for the Worksheet, applicants proposing salinity control projects through irrigation delivery system improvements should contact the appropriate Reclamation Technical Contact listed in Section B to learn if salt load reduction estimates are available for your area. Salt load reduction estimates for agricultural areas can only be provided where Reclamation has been able to make estimates from Reclamation, Natural Resources Conservation Service (NRCS), or United States Geological Survey (USGS) salinity studies. For proposed salinity control projects through irrigation delivery system improvements, applicants must complete and submit the Worksheet including Part D.1 of the Background & Information section describing the facilities to be improved or replaced and Appendix B detailing the facility data. Describe plans for abandoning any facilities. If the project plan does not remove or fill in the canal, please describe why this will be left open. (Leaving a ditch/canal open will decrease the salt loading and will increase cost effectiveness)
A.2.B OTHER TYPES OF SALINITY CONTROL
Applications for other types of salinity control (non-irrigation related) will be accepted for evaluation in the FOA. Applicants proposing other types of salinity control must complete and submit the Worksheet including Part D.2 of the Background & Information section and Appendix C. The Worksheet is to include relevant information and data regarding the salinity source and proposed salinity control process and must quantify the salt load reduction.
Reclamation will review the information regarding the salinity source and control process and mailto:bor-sha-uc-foasaltloadreduction@usbr.gov
Salt Load Reduction Worksheet
BOR-UC-20-F001
may request additional information. In the response letter to the applicant, Reclamation will either confirm and accept the applicant’s estimated salt load reduction or provide a revised estimate based on Reclamation’s analysis of the information.
A.2.C WATER IMPOUNDMENT STRUCTURES
This section contains special provisions for applications involving new pond or reservoir construction.
It is allowable to include the construction of a new pond or reservoir in a salinity control proposal if that structure is needed for the operation of a piped irrigation water delivery system or for other essential purposes. Justification for the pond or reservoir must be provided in the application. To be acceptable the design and construction must meet standards developed by Reclamation. The standards are aimed at providing the impoundment structure liner and other components sufficient to last for the life of the entire project (50 years if coupled with buried pipelines) and that they are built to acceptable standards. Applicants contemplating a new pond or reservoir can obtain these standards from the appropriate Technical Contact listed in Section B. A successful applicant’s funding agreement will require a complete Reclamation review and approval of the proposed design, specification, and construction standards.
Additional seepage will likely occur from the new pond or reservoir and must be accounted for in the application’s overall salt load reduction estimate. This seepage must be identified and multiplied by the appropriate local salt loading rate to estimate new salt loading which will then be deducted from the application’s total salt load reduction estimate. Applicants proposing new water impoundment structures as part of a salinity control project must obtain a salt load reduction estimate from Reclamation by completing and submitting the Salt Load Reduction Worksheet.
Salt Load Reduction Worksheet
BOR-UC-20-F001
SECTION B - RECLAMATION SALINITY TECHNICAL CONTACTS
Colorado River Basin Salinity Control Program Manager
Mr. Kib Jacobson 125 South State Street, Room 8100 Salt Lake City, UT 84138 Phone: 801-524-3753 Email: kjacobson@usbr.gov
Colorado River Basin Salinity Control Program Basinwide Coordinator Mr. Brad Parry 125 South State Street, Room 8100 Salt Lake City, UT 84138 801-524-3723 bjparry@usbr.gov
Colorado River Basin Salinity Control Program Basin States Coordinator Ms. Marcie Bainson 125 South State Street, Room 8100 Salt Lake City, UT 84138 801-524-3747 mbainson@usbr.gov
Western Colorado & Southwest Colorado, New Mexico, and Arizona
Mr. Andrew Limbach
445 West Gunnison Ave Suite 221 Grand Junction CO 81501-5711 Phone: 970-248-0644
Email: alimbach@usbr.gov
Eastern Utah and Western Wyoming
Mr. Ben Radcliffe Bureau of Reclamation 302 East 1860 South Provo UT 84606 Phone: 801-379-1213 Email: bradcliffe@usbr.gov mailto:kjacobson@usbr.gov mailto:bjparry@usbr.gov mailto:mbainson@usbr.gov mailto:alimbach@usbr.gov mailto:bradcliffe@usbr.gov
Salt Load Reduction Worksheet
BOR-UC-20-F001
REQUESTOR INFORMATION
This worksheet may only be submitted by the owner/operator of the facilities proposed to be improved or constructed. The owners may, at their discretion, designate an engineering/consulting company or individual as their representative in an email to bor-sha-uc-foasaltloadreduction@usbr.gov
Salt load reduction estimates will be provided directly to the Entity Manager with a copy to any designated representative.
A. REQUESTING ENTITY NAME:
City/town, State Response:
B. PROJECT NAME:
C. WORKSHEET PREPARED BY:
D. ENTITY MANAGER CONTACT INFORMATION:
Name:
Title:
Address:
Telephone:
Fax:
E-mail:
Salt Load Reduction Worksheet
BOR-UC-20-F001
BACKGROUND & INFORMATION FOR SALT LOAD
REDUCTION ESTIMATE
IN ORDER TO OBTAIN SALT LOAD REDUCTION ESTIMATES FOR FOA APPLICATIONS, THIS
WORKSHEET MUST BE SUBMITTED TO
BOR-SHA-UC-FOASALTLOADREDUCTION@USBR.GOV
Provide a brief narrative or tabular data responding to each of the following sections that apply to the proposed salinity control project. All information must be entered into the response boxes provided in the application, with the exception of data tables which may be inserted in Appendix B. Additional instructions for completing this worksheet are provided in Section A. (It is important to confer with or contact the appropriate Technical Contact listed in Section B, prior to preparing the responses for this worksheet) A. BACKGROUND & DESCRIPTION OF PROJECT AREA: Describe project setting and geographic location. For irrigation-related applications, include general hydrology, geology, soils, climate (average rainfall, temperature, and growing season), water storage facilities, existing irrigation facilities (total mileage of canals & laterals and number of users), irrigated acreage, types of crops, etc.
B. PROJECT MAP(S): Attach a detailed map(s) as Appendix A scaled appropriately to easily identify the project area, existing facilities, and major geographic features including roads, streams, reservoirs, towns, etc. If the proposed project is irrigation related, the map should show locations of canals, laterals, and irrigated lands and land ownership (Federal, state, Tribal, private etc). Those canals or laterals proposed for improvement or abandonment under this application should be identified. Existing lined or piped sections of canals or laterals should also be clearly identified.
C. WATER RIGHTS AND SUPPLY: Describe the water rights for both diversion and storage.
Describe irrigation water supply and water shortages.
D. DESCRIPTION OF PROPOSED SALINITY CONTROL: Describe proposed process or changes (in parts D.1, D.2, or D.3) anticipated by the proposed project that will lead to salt load reductions to the Colorado River system. This would include improvements to or elimination of existing facilities or operations. Describe plans for abandoning any facilities. If the project plan does not remove or fill in the canal, please describe why this will be left open. (leaving a ditch/canal open will raise cost effectiveness) If the application does not contemplate changes in one of the three categories below, please indicate by entering “NA” or “Not Applicable”.
D.1 IRRIGATION DELIVERY SYSTEM (CANALS, LATERALS, DITCHES)
IMPROVEMENTS: If specific facilities are to be improved or replaced, include a detailed description of the facilities and complete Appendix B.
D.2 OTHER TYPES OF SALINITY CONTROL (NON-IRRIGATION
RELATED): For desalinization, evaporation or other salinity control measures, clearly describe the proposed project, identify the salinity sources and quantify the salt (in tons/year) that will be controlled or eliminated. Include data that defines the salt loading and control in tabular format in Appendix C.
D.3
NEW WATER IMPOUNDMENT STRUCTURES: If new ponds, reservoirs, settling basins, or other water impoundment structures are to be constructed for any purpose (e.g., re-regulation, evaporation pond, etc.) as part of this application, address the requirements listed in Section IV.C.1.b. If the size of a proposed or existing water impoundment structure increases later a new salt load calculation will be developed and funding may be reduced, and/or the application ranking may change. Modifications to the structures would require Reclamation review and approval of the proposed design, specification, and construction standards”.
APPENDIX A: EXISTING IRRIGATION DELIVERY FACILITIES DATA SHEET (Use required format)
APPENDIX B: PROJECT MAPS
Salt Load Reduction Worksheet
BOR-UC-20-F001
APPENDIX C: SUPPLEMENTAL DATA TABLES AND/OR DATA FOR OTHER
TYPES OF SALINITY CONTROL (NON-IRRIGATION RELATED)
| A.1 Worksheet submittal instructions & Schedule |
| A.2 Proposed salinity control |
| A.2.A Irrigation delivery system improvements |
| A.2.B Other Types of Salinity Control |
| A.2.C Water impoundment structures |
Section B - RECLAMATION SALINITY TECHNICAL CONTACTS
| REQUESTING ENTITY NAME Citytown State: |
| Response: |
| PROJECT NAME: |
| Response_2: |
| WORKSHEET PREPARED BY: |
| Response_3: |
| Name: |
| Title: |
| Address: |
| Telephone: |
| Fax: |
| Email: |
| Response_4: |
| Response_5: |
| Response_6: |
| Response_7: |
| Response_8: |
| Text1: |
| Text3: |
| Text2: |
File details come from the government source that posted it.