Appendix E - New Construction Application.pdf
PDF 419 KB Posted
- Attached to
- THOMASTON HOUSING WATER MAIN INSTALL
- Solicitation number
- 51283250000154
About this file
This document is a New Construction Application form from Maine Water for water service installation. The form captures comprehensive project details including property owner information, project location, contractor details, and specific water service requirements such as residential/commercial classification, service size, directional drilling, fire protection systems, backflow prevention, and meter specifications.
The second page outlines required steps between application and water service activation, including obtaining an Ability to Serve Letter, submitting project plans for review, securing Fire Department and Planning Board approvals, completing a Water Service Agreement, making necessary payments, scheduling inspections, conducting pressure tests, and obtaining water samples. The form includes a section for Maine Water internal use to document technical details like static pressure, existing main size, and estimated project fees. This specific form appears to be related to a water main installation project for a residence at 64 Thatcher Street in Thomaston, Maine, associated with a Department of Homeland Security US Coast Guard solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Construction Application
Owner
Date:___________ Owner:_________________________________________________________________________________
Mailing Address:__________________________________________________________________________________________
Phone:_________________________ Owner E-mail:______________________________________________________
Project
Project Description:________________________________________________________________________________________
Project Location:____________________________________________________________ Town:_________________________
Contractor:______________________________________ Contractor Email:_________________________________________
Contractor Phone:________________________________ Contractor Contact Name:___________________________________
Commercial / Residential
Residential: □ Domestic Only: □ Pool: □ Peak Dom. GPM: ____________
Commercial: □ Fire Only: □ Pressure Tank/Booster: □ Peak Irrig. GPM: ____________
Industrial: □ Combined: □ Fire Protection GPM: ____________
Irrigation: □ Peak Total GPM: ____________
Service Installation │ Private Fire Protection
Service Size:________ Directional Drill: YES □ NO □ │ Sprinkler System Dry Sprinkler System YES □ NO □
Exist Service: YES □ NO □ │ None □ Private Hydrant(s) YES □ NO □
Existing Well: YES □ NO □ │ NFPA 13 □ Number of Hydrant’s: __________
Plans Submitted: YES □ NO □ │ NFPA 13R □
│ NFPA 13D □
Backflow Prevention │ Meter Set Information
Hazard Device Required: YES □ NO □ │ Meter Size: _________
Low □ Non-Testable Dual Check □ │ Meter Pit Required: YES □ NO □
Moderate □ Testable DCVA □ │ Located In Crawl Space: YES □ NO □
High □ RPZ □ │ Accessible to all Users: YES □ NO □
I have received a copy of the Terms and Condition of Service. I authorize Maine Water to enter the premises and access the property to inspect the main/service installation, normal maintenance and reading of the water meter, evaluate, require backflow prevention devices, and evaluate potential usage. I further understand that all paperwork and estimated cost is to be paid in advance and any adjustments will be made upon completion of work.
Owner/Applicant:________________________________ Date:___________
Business Name
Requirements Between Application And Activation
□ New Construction Application
□ Ability to Serve Letter: If required, 5 days in advance.
□ Project Plan review: Plans must be submitted in paper and electronic forms and may be up for review for
30 days
□ Fire Department Review: Letter signing off of review process.
□ Planning Board Review: Letter signing off of review process.
□ New Water Service/ Water Main Ext Agreement: Needs to be completed before work may start.
□ Payment: Deposit to be completed before work may start.
□ Sub-Division / Shoreland Form: Needs to be completed before work may start.
□ Inspection Scheduling: At least 5 days in advance of tapping/installation.
□ Flush / Pressure Test of new installation: Schedule at least 5 days in advance.
□ Water Sample: If required, schedule 5 days in advance. Provide passing results to MWC.
□ Service Activation: Contact Customer Service at least 5 days in advance.
Maine Water Use Only
Closest Hydrant:_________ Static Pressure (psi)________ Size Of Existing Main:______ Type:________
Main Extension:__________ Private/Public:___________ Private Hydrant:___________
Estimated Fees:
Inspection:________ Jobbing:_______ Inventory:________ Labor:________ TOTAL:_________
| Date: |
| Owner: |
| Mailing Address: |
| Phone: |
| Owner Email: |
| Project Description: |
| Project Location: |
| Town: |
| Contractor Contact Name: |
| Contractor Phone 1: |
| Peak Dom GPM: |
| Peak Irrig GPM: |
| Fire Protection GPM: |
| Peak Total GPM: |
| Service Size: |
| Directional Drill: NO |
| Exist Service: NO_3 |
| Existing Well: NO_5 |
| Number of Hydrants: |
| Plans Submitted: NO_6 |
| Device Required: YES_7 |
| Meter Size: |
| Meter Pit Required: NO_8 |
| Located In Crawl Space: NO_9 |
| Accessible to all Users: NO_10 |
| OwnerApplicant: |
| New Construction Application: On |
| Ability to Serve Letter If required 5 days in advance: Off |
| Project Plan review Plans must be submitted in paper and electronic forms and may be up for review for: Off |
| Fire Department Review Letter signing off of review process: Off |
| Planning Board Review Letter signing off of review process: Off |
| New Water Service Water Main Ext Agreement Needs to be completed before work may start: Off |
| Payment Deposit to be completed before work may start: Off |
| SubDivision Shoreland Form Needs to be completed before work may start: Off |
| Inspection Scheduling: Off |
| Flush Pressure Test of new installation Schedule at least 5 days in advance: Off |
| Water Sample If required schedule 5 days in advance Provide passing results to MWC: Off |
| Service Activation Contact Customer Service at least 5 days in advance: Off |
| Closest Hydrant: |
| Static Pressure psi: |
| Size Of Existing Main: |
| Type: |
| Main Extension: |
| PrivatePublic: |
| Private Hydrant: |
| Inspection: |
| Jobbing: |
| Inventory: |
| Labor: |
| TOTAL: |
| AppDate: |
| Residential: Off |
| Commercial: Off |
| Industrial: Off |
| Domestic Only: Off |
| Fire Only: Off |
| Combined: Off |
| Irrigation: Off |
| Pool: Off |
| Pressure Tank/Booster: Off |
| None: Off |
| NFPA13: Off |
| NFPA13R: Off |
| NFPA13D: Off |
| PRIVATE HYDRANT YES: Off |
| PRIVATE HYDRANT NO: Off |
| MODERATE: Off |
| HIGH: Off |
| LOW: Off |
| NON-TESTABLE DUAL CHECK: Off |
| TESTABLE DCVA: Off |
| RPZ: Off |
| DRY SPRINKLER NO: Off |
| DRY SPRINKLER YES: Off |
| Contractor: |
| Contractor Email: |
File details come from the government source that posted it. Updated .