Appendix E - New Construction Application.pdf

PDF 419 KB Posted

Attached to
THOMASTON HOUSING WATER MAIN INSTALL
Solicitation number
51283250000154
Issued by

About this file

This document is a New Construction Application form from Maine Water for water service installation. The form captures comprehensive project details including property owner information, project location, contractor details, and specific water service requirements such as residential/commercial classification, service size, directional drilling, fire protection systems, backflow prevention, and meter specifications.

The second page outlines required steps between application and water service activation, including obtaining an Ability to Serve Letter, submitting project plans for review, securing Fire Department and Planning Board approvals, completing a Water Service Agreement, making necessary payments, scheduling inspections, conducting pressure tests, and obtaining water samples. The form includes a section for Maine Water internal use to document technical details like static pressure, existing main size, and estimated project fees. This specific form appears to be related to a water main installation project for a residence at 64 Thatcher Street in Thomaston, Maine, associated with a Department of Homeland Security US Coast Guard solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Construction Application

Owner

Date:___________ Owner:_________________________________________________________________________________

Mailing Address:__________________________________________________________________________________________

Phone:_________________________ Owner E-mail:______________________________________________________

Project

Project Description:________________________________________________________________________________________

Project Location:____________________________________________________________ Town:_________________________

Contractor:______________________________________ Contractor Email:_________________________________________

Contractor Phone:________________________________ Contractor Contact Name:___________________________________

Commercial / Residential

Residential: □ Domestic Only: □ Pool: □ Peak Dom. GPM: ____________

Commercial: □ Fire Only: □ Pressure Tank/Booster: □ Peak Irrig. GPM: ____________

Industrial: □ Combined: □ Fire Protection GPM: ____________

Irrigation: □ Peak Total GPM: ____________

Service Installation │ Private Fire Protection

Service Size:________ Directional Drill: YES □ NO □ │ Sprinkler System Dry Sprinkler System YES □ NO □

Exist Service: YES □ NO □ │ None □ Private Hydrant(s) YES □ NO □

Existing Well: YES □ NO □ │ NFPA 13 □ Number of Hydrant’s: __________

Plans Submitted: YES □ NO □ │ NFPA 13R □

│ NFPA 13D □

Backflow Prevention │ Meter Set Information

Hazard Device Required: YES □ NO □ │ Meter Size: _________

Low □ Non-Testable Dual Check □ │ Meter Pit Required: YES □ NO □

Moderate □ Testable DCVA □ │ Located In Crawl Space: YES □ NO □

High □ RPZ □ │ Accessible to all Users: YES □ NO □

I have received a copy of the Terms and Condition of Service. I authorize Maine Water to enter the premises and access the property to inspect the main/service installation, normal maintenance and reading of the water meter, evaluate, require backflow prevention devices, and evaluate potential usage. I further understand that all paperwork and estimated cost is to be paid in advance and any adjustments will be made upon completion of work.

Owner/Applicant:________________________________ Date:___________

Business Name

Requirements Between Application And Activation

□ New Construction Application

□ Ability to Serve Letter: If required, 5 days in advance.

□ Project Plan review: Plans must be submitted in paper and electronic forms and may be up for review for

30 days

□ Fire Department Review: Letter signing off of review process.

□ Planning Board Review: Letter signing off of review process.

□ New Water Service/ Water Main Ext Agreement: Needs to be completed before work may start.

□ Payment: Deposit to be completed before work may start.

□ Sub-Division / Shoreland Form: Needs to be completed before work may start.

□ Inspection Scheduling: At least 5 days in advance of tapping/installation.

□ Flush / Pressure Test of new installation: Schedule at least 5 days in advance.

□ Water Sample: If required, schedule 5 days in advance. Provide passing results to MWC.

□ Service Activation: Contact Customer Service at least 5 days in advance.

Maine Water Use Only

Closest Hydrant:_________ Static Pressure (psi)________ Size Of Existing Main:______ Type:________

Main Extension:__________ Private/Public:___________ Private Hydrant:___________

Estimated Fees:

Inspection:________ Jobbing:_______ Inventory:________ Labor:________ TOTAL:_________

Date:
Owner:
Mailing Address:
Phone:
Owner Email:
Project Description:
Project Location:
Town:
Contractor Contact Name:
Contractor Phone 1:
Peak Dom GPM:
Peak Irrig GPM:
Fire Protection GPM:
Peak Total GPM:
Service Size:
Directional Drill: NO
Exist Service: NO_3
Existing Well: NO_5
Number of Hydrants:
Plans Submitted: NO_6
Device Required: YES_7
Meter Size:
Meter Pit Required: NO_8
Located In Crawl Space: NO_9
Accessible to all Users: NO_10
OwnerApplicant:
New Construction Application: On
Ability to Serve Letter If required 5 days in advance: Off
Project Plan review Plans must be submitted in paper and electronic forms and may be up for review for: Off
Fire Department Review Letter signing off of review process: Off
Planning Board Review Letter signing off of review process: Off
New Water Service Water Main Ext Agreement Needs to be completed before work may start: Off
Payment Deposit to be completed before work may start: Off
SubDivision Shoreland Form Needs to be completed before work may start: Off
Inspection Scheduling: Off
Flush Pressure Test of new installation Schedule at least 5 days in advance: Off
Water Sample If required schedule 5 days in advance Provide passing results to MWC: Off
Service Activation Contact Customer Service at least 5 days in advance: Off
Closest Hydrant:
Static Pressure psi:
Size Of Existing Main:
Type:
Main Extension:
PrivatePublic:
Private Hydrant:
Inspection:
Jobbing:
Inventory:
Labor:
TOTAL:
AppDate:
Residential: Off
Commercial: Off
Industrial: Off
Domestic Only: Off
Fire Only: Off
Combined: Off
Irrigation: Off
Pool: Off
Pressure Tank/Booster: Off
None: Off
NFPA13: Off
NFPA13R: Off
NFPA13D: Off
PRIVATE HYDRANT YES: Off
PRIVATE HYDRANT NO: Off
MODERATE: Off
HIGH: Off
LOW: Off
NON-TESTABLE DUAL CHECK: Off
TESTABLE DCVA: Off
RPZ: Off
DRY SPRINKLER NO: Off
DRY SPRINKLER YES: Off
Contractor:
Contractor Email:

File details come from the government source that posted it. Updated .