Appendix D - mwc_customer-service-line-details_2016.pdf_safe.pdf
PDF 482 KB Posted
- Attached to
- THOMASTON HOUSING WATER MAIN INSTALL
- Solicitation number
- 51283250000154
About this file
This document is a collection of engineering technical drawings (labeled MWC SD-1 through MWC SD-5 and MWC SMS-1 through MWC SMS-2) created by Maine Water for standard water service line installation and infrastructure details. The drawings provide comprehensive technical specifications for various water infrastructure components, including:
Detailed drawings cover curb stop valve installation (MWC SD-1), erosion and sedimentation control (MWC SD-2), catch basin protection (MWC SD-3), water main trench construction (MWC SD-4), service line electrical continuity (MWC SD-5), and 1" and 2" service line installation details (MWC SMS-1 and MWC SMS-2). Each drawing includes precise measurements, material specifications, and installation guidelines for components such as copper tubing, tracer wires, valves, meters, and proper trench preparation. The technical specifications address requirements for pipe materials, bonding, electrical continuity, and installation procedures to ensure proper water service line construction and maintenance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURB STOP VALVE MWC SD-1
SERVICE LINE AND
DETAIL
EROSION AND
MWC SD-2SEDIMENTATION
CONTROL DETAILS
CATCH BASIN
MWC SD-3
PROTECTION
DETAIL
WATER MAIN
MWC SD-4TRENCH DETAIL
WATER MAIN OR SERVICE PIPE
MWC SD-5
TEMPORARY TRENCH
MWC SD-11PAVEMENT DETAIL
1" SERVICE LINE
INSTALLATION DETAILS MWC SMS-1
2" SERVICE LINE
INSTALLATION DETAILS MWC SMS-2
File details come from the government source that posted it. Updated .