Lead-Containing Dust Remediation Specification Summary

This is a Lead-Containing Dust Remediation Specification prepared by Atlas Technical Consultants LLC for the Colorado Army National Guard Montrose Readiness Center located at 12147 6390 Road in Montrose, Colorado, project number Z035CNG002. The specification addresses lead dust contamination resulting from past operation of an indoor firing range within the 25,000 square-foot facility. The scope of work includes removal and disposal of two roof exhaust fans, two evaporative coolers, all HVAC units and associated ductwork, suspended ceiling systems (approximately 7,220 square feet), drywall ceiling systems (approximately 1,560 square feet), carpet in office areas (approximately 3,465 square feet), vinyl cove base (approximately 830 linear feet), pipe insulation, and light fixtures. The specification also requires cleaning of all roof surfaces, metal ceiling joists, electrical conduit, and all other building surfaces, with work to be performed in accordance with OSHA Lead in Construction Standard 29 CFR 1926.62 and other applicable federal, state, and local regulations. A limited lead dust survey conducted in November 2018 identified eighty of 163 wipe samples containing lead concentrations at or above the Army National Guard acceptable surface lead dust level standard of 10 micrograms per square foot, with the majority of exceedances found on above-ceiling surfaces and HVAC equipment.

The specification establishes that the Remediation Contractor assumes full responsibility for compliance with all applicable regulations and must submit a written lead compliance program for Owner's Consultant review prior to work commencement. The contractor is required to provide all necessary equipment including HEPA vacuums, negative pressure machines, respiratory protection equipment, disposable coveralls, scaffolding, and both temporary and sanitary facilities. Work Areas must be contained using 6-mil polyethylene sheeting with critical barriers, and negative air pressure of -0.02 inches of water must be maintained throughout remediation and decontamination phases. Clearance is achieved when all lead dust wipe samples measure below 10 micrograms per square foot following visual inspection and final cleaning. The project schedule is to be determined by the Owner, and the Consultant will provide project surveillance and air monitoring services throughout the work. No specific contract award date, pricing information, or incumbent contractor is identified in this specification document.

View the file

Other files

File Type Posted
082411 Montrose IFR RFP.pdf PDF
SC8.0 DBLS A_2026_1.pdf PDF
IPD_Appendix A 2025 R1.pdf PDF
SC8.1 DB LS GC_2026.pdf PDF
SBP6.18 Labor Burden Calc R8-2023.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEAD-CONTAINING DUST REMEDIATION SPECIFICATION

MONTROSE READINESS CENTER

12147 6390 Road

Montrose, Colorado 81401

Project Number Z035CNG002

May 7, 2024

PREPARED FOR:

Mr. Sam Vanzant Department of Military and Veterans Affairs 6848 South Revere Parkway Centennial, Colorado 80112

PREPARED BY:

Atlas Technical Consultants LLC 5050 South Syracuse Street, Suite 1150 Denver, Colorado 80237

Atlas Project No. Z035CNG002 Page | i

COVER LETTER

May 7, 2024

Mr. Sam Vanzant Project Manager – G9 Installations and Environment (CFMO) Department of Military and Veterans Affairs 6848 South Revere Parkway Centennial, Colorado 80112

Re: Lead-Containing Dust Remediation Specification Montrose Readiness Center 12147 6390 Road

Montrose, Colorado 81401 Atlas Project Number: Z035CNG002

Dear Mr. Vanzant, Atlas Technical Consultants LLC (Atlas) is pleased to present this Lead-Containing Dust

Remediation Specification for the Colorado Army National Guard Montrose Readiness Center building located at 12147 6390 Road in Montrose, Colorado.

Atlas has drafted the following Lead-Containing Dust Remediation Specification to remove lead dust exposure hazards resulting from past operation of the indoor firing range at this building.

This specification includes requirements for environmental cleaning and component removal activities within the building.

This remediation specification has been prepared in accordance with generally accepted industry practices for lead dust remediation. Atlas makes no determinations or warrants no conclusions beyond those stated herein. Further, Atlas submits this remediation specification to the

Department of Military and Veterans Affairs for their exclusive use.

ATLAS TECHNICAL CONSULTANTS

Specification by:

Reviewed by:

Todd Anderson Project Manager Direct Line: +1 303-799-6100 Email: todd.anderson@oneatlas.com

Alex Peck, CIH, MBA Technical Practice Director Direct Line: +1 425-273-3858 Email: alex.peck@oneatlas.com

Page | ii

CONTENTS

COVER LETTER ........................................................................................................................ I

1.0 PROJECT OVERVIEW

1.1 PROJECT INFORMATION

2.0 LEAD REMEDIATION SCOPE OF WORK

3.0 PROJECT APPROACH

3.1 DEFINITIONS

3.2 WORK HOURS

3.3 REMEDIATION CONTRACTOR RESPONSIBILITITY

3.4 MATERIALS

3.5 EQUIPMENT

3.6 PROJECT SURVEILLANCE

3.7 SCHEDULE

4.0 PROJECT EXECUTION

4.1 SEQUENCE OF WORK

4.2 TEMPORARY FACILITIES

4.3 PREPARATION OF THE WORK AREA

4.4 WORKER PROTECTION

4.5 RESPIRATORY PROTECTION

4.6 DEMOLITION OF LEAD DUST CONTAMINATED COMPONENTS

4.7 CLEANING REQUIREMENTS FOR LEAD-CONTAINING SURFACE DUST

4.8 DISPOSAL

4.9 WORK AREA CLEARANCE

APPENDICES

Appendix I Table II: Lead Dust Sampling Results

Appendix II Wipe Sample Location Drawings

Appendix III Mechanical (HVAC) and Lighting Plan Drawings

Appendix IV Lead Dust Remediation Drawings

Page | 1

1.0 PROJECT OVERVIEW

1.1 PROJECT INFORMATION

At the request of the Department of Military and Veterans Affairs (Client), ATC Group Services LLC (ATC) performed a limited lead dust survey in the building located at 12147 6390 Road in Montrose, Colorado on November 6 through 8, 2018. The purpose of this survey was to determine the presence of lead dust on various surfaces at the above-referenced property.

The Readiness Center is a one-story concrete block and steel frame structure with a concrete foundation. The building is approximately 25,000 square feet (SF), containing an 1,870 SF Indoor Firing Range (IFR) and 300 SF Arms Vault. The IFR was decommissioned approximately 15 years ago and is now being used for storage. The building also contains offices, restrooms, an assembly hall, kitchen, vehicle maintenance area, and gym. There are various heating, ventilation, and air conditioning (HVAC) systems throughout the facility. The interior finishes include concrete and concrete masonry unit (CMU), metal, drywall, ceiling tile, carpet, and ceramic tile.

ATC collected a total of 163 lead dust wipe samples throughout the building and on the roof. As of October 1, 2023, the Army National Guard (ARNG) acceptable surface lead dust level standard is less than 10 micrograms per square foot (µg/ft2). A total of eighty (80) lead dust wipe samples contained lead concentrations at or above 10 µg/ft2.

The sample results are summarized in Table II in Appendix I. Lead dust wipe samples with concentrations at or above the ARNG standard of 10 µg/ft2 are denoted in bold.

The majority of the samples above the screening criteria were collected from above ceiling surfaces and HVAC equipment.

2.0 LEAD REMEDIATION SCOPE OF WORK

Clean and remove furnishings from each Work Area.

Demolition and disposal of two exhaust fans (EF-1 and EF-2) from the roof above the

IFR. Demolish and dispose of the associated ductwork.

Demolition and disposal of two evaporative coolers from the roof above the IFR.

Demolish and dispose of the associated ductwork.

Demolition and disposal of all HVAC units. Demolish and dispose of all ductwork components associated with the HVAC units, including the supply and return air vents.

Clean the entire roof surface (approximately 25,000 square feet).

Demolition and disposal of the suspended ceiling systems including the grid and ceiling tile (approximately 7,220 square feet). Demolition and disposal of the drywall ceiling system from rooms 110, 125, 131, 132, 148, and the maintenance bay hallway (approximately 1,560 square feet).

Remove and dispose of carpet in the office areas (approximately 3,465 square feet).

Remove and dispose of vinyl cove base on walls (approximately 830 linear feet) to facilitate removal of the carpet.

Clean light fixtures throughout the building. The four-foot florescent light fixtures shall be disconnected and removed from the suspended ceiling grid for cleaning.

Remove and dispose of pipe insulation where present.

Page | 2

Clean all surfaces of the metal ceiling joists throughout the building.

Clean all electrical conduit above ceiling height throughout the building.

Clean all surfaces throughout the building starting at the ceiling deck.

3.0 PROJECT APPROACH

3.1 DEFINITIONS

Action Level - is defined as an airborne concentration of lead of 30 µg/m3 in air calculated as an 8-hour time weighted average. Periodic exposure monitoring, biologic monitoring, and initial and annual employee training is triggered whenever exposure measurements reach or exceed the action level.

Air Monitoring - The process of measuring the lead content of a specific volume of air.

Authorized Visitor - Owner's Representative, testing lab personnel, the Cleaning Contractor, emergency personnel or a representative of any federal, state and local regulatory or other agency having authority over the project.

Breathing Zone - A hemisphere forward of the shoulders with a radius of approximately 6 to 9 inches.

Consultant – Owner’s Representative and Certified Risk Assessor.

Critical Barrier – Single layer of 6-mil polyethylene sheeting installed initially over all doors, windows, ventilation openings, drains, wall penetrations, etc., as an additional measure to prevent contaminated air from escaping the Work Area.

Demolition - The dismantling and removal of any building component, system, finish or assembly of a facility together with any related handling operations.

Disposal Bag - A properly labeled 6-mil thick leak tight plastic bag used for transporting lead contaminated waste from Work Area and to disposal site.

Exposure Monitoring - Sampling of lead concentrations within the breathing zone of an employee.

HEPA Filter - A High Efficiency Particulate Air (HEPA) filter capable of trapping and retaining 99.97% of particles greater than 0.3 microns in diameter.

HEPA Vacuum - Vacuum collection equipment equipped with a HEPA filter system for exhausted air.

Lead Dust - Dust that contains lead equal to or greater than 40 µg/ft2.

Negative Pressure Respirator - A respirator in which the air pressure inside the respiratory inlet covering is positive during exhalation in relation to the air pressure of the outside atmosphere and negative during inhalation in relation to the air pressure of the outside atmosphere.

Permissible Exposure Limit - The OSHA Lead In Construction Standard 29 CFR

1926.62 sets a permissible exposure limit (PEL) of 50 micrograms of lead per cubic meter of air (50 µg/m3) averaged over an 8-hour workday which is referred to as a time weighted average (TWA).

Protection Factor - The ratio of the ambient concentration of an airborne substance to the concentration of the substance inside the respirator at the breathing zone of the wearer. The protection factor is a measure of the degree of protection provided by a respirator to the wearer.

Page | 3

Remediation - The reduction of a lead dust hazard through wet cleaning and HEPA vacuuming.

Remediation Contractor - Any business entity or person performing the actual remediation for a lead remediation project.

Time Weighted Average (TWA) - The average concentration of a contaminant in air during a specific time period.

Visible Emissions - Any emissions containing particulate material that are visually detectable without the aid of instruments. This does not include condensed uncombined water vapor.

Wet Cleaning - The process of eliminating lead contamination from building surfaces and objects by using cloths, mops, or other cleaning implements which have been dampened with water containing detergent.

Work Area - The area where lead remediation work is performed which is defined and/or isolated to prevent the spread of lead dust or debris, and entry by unauthorized personnel.

3.2 WORK HOURS

The Work Areas will be unoccupied during remediation activities. Other areas of the facility may be occupied. Hours for all Work Areas shall be coordinated with the Owner.

Weekend and evening work is not anticipated, unless specifically authorized by the Owner.

3.3 REMEDIATION CONTRACTOR RESPONSIBILITITY

The Remediation Contractor shall assume full responsibility and liability for compliance with all applicable federal, state, and local regulations pertaining to work practices, transport, disposal, and protection of workers, visitors to the site and persons occupying areas adjacent to the site. The Remediation Contractor shall hold the Owner and Consultant harmless for failure to comply on the part of himself, his employees or his subcontractors. Federal, state and local regulations include, but are not limited to, the following:

1.1.1 U.S. Department of Labor, Occupational Safety and Health Administration, (OSHA), including but not limited to:

1.1.1.1 Lead in Construction Standard: Title 29, Part 1926.62 of the Code of Federal Regulations

1.1.1.2 Respiratory Protection: Title 29, Part 1910.134 of the Code of Federal Regulations

1.1.1.3 Construction Industry: Title 29, Part 1926 of the Code of Federal Regulations

1.1.1.4 Access to Employee Exposure and Medical Records: Title 29, Part

1910.1020 of the Code of Federal Regulations

1.1.1.5 Hazard Communication: Title 29, Part 1910.1200 of the Code of Federal Regulations

1.1.1.6 Specifications for Accident Prevention Signs and Tags: Title 29, Part

1910.145 of the Code of Federal Regulations

Page | 4

1.1.2 U.S. Department of Transportation (DOT), including, but not limited to:

1.1.2.1 Hazardous Materials: Title 49, Part 171 and 172 of the Code of Federal

Regulations

1.1.3 U.S. Environmental Protection Agency (EPA), including but not limited to:

1.1.3.1 Title 40 Part 745 of the Code of Federal Regulations.

1.1.4 Colorado Department of Public Health and Environment (CDPHE) Regulation Number 19.

The Remediation Contractor shall provide a written lead compliance program that outlines details for this remediation as required to fully comply with the OSHA Lead Standard, 29 CFR 1926.62(e)(2). The plan must be submitted to the Owner’s Consultant for review prior to starting work.

3.4 MATERIALS

Provide fire retardant polyethylene sheeting of 6-mil thickness and of a size to minimize the frequency of joints.

Provide polyethylene disposable bags labeled in accordance with contents and federal, state and local regulations.

Provide waste disposal containers acceptable to the waste disposal facility.

Provide tape or adhesive spray capable of sealing joints in adjacent polyethylene sheets to finished or unfinished surfaces of dissimilar materials and capable of adhering while wet.

Provide string mop and buckets.

Provide cleaning rags.

Provide clean room sticky-mats.

Provide cleaning solution designed for removal of metals from surfaces. Cleaners must be water-based, non-flammable, non-corrosive, and not harmful to workers, finishes or substrates. Proposed cleaners must be made available for review by the Owner’s Consultant prior to use.

3.5 EQUIPMENT

Provide approved respirators that comply with 29 CFR 1910.134 (b), (d), (e) and (f) and 29 CFR 1926.62 (f).

Provide full-body disposable coveralls, head covering, and foot coverings that comply with 29 CFR 1926.62 (g).

Provide all necessary dumpsters and certified hauling vehicles necessary for the proper disposal of all hazardous and solid waste generated by the remediation work.

Provide ground fault circuit interrupters (GFCI) installed at the source for all equipment in the Work Area.

Provide a hand and face wash facility.

Provide a clean change area for workers to don disposable coveralls and other personal protective equipment and to store street clothes.

Page | 5

Provide lavatory facilities at the work site. Maintain a clean and orderly lavatory facility at all times throughout the Work. On site facilities may be available for use, but this must be coordinated and approved by the Owner.

Provide suitable hand tools for demolition of components.

Provide HEPA vacuums.

Provide electrical powered scissor lifts or similar lifts to allow access to ceiling areas.

Workers must be trained appropriately prior to lift operation.

Provide appropriate fall protection for employees while working at heights.

Provide ladders of various sizes and configurations that will allow complete access to ceiling areas. Ladders must be the appropriate strength for expected loading and must be undamaged and in good working condition.

Provide scaffolding as needed to allow complete access to ceiling areas.

3.6 PROJECT SURVEILLANCE

The Consultant will provide project surveillance and air monitoring services during lead dust remediation. The Consultant will ensure that the Remediation Contractor follows the specifications including, but not limited to: review of worker certifications and medical records, interpreting and enforcing the scope of work, observing work practices, performing visual inspections of remediation Work Areas and clearance wipe sampling, and performing air monitoring.

3.7 SCHEDULE

The remediation schedule is to be performed and completed according to the schedule set by the Owner. Any deviations from this schedule shall be determined by the Owner.

4.0 PROJECT EXECUTION

4.1 SEQUENCE OF WORK

The general sequence of work will occur as follows. Changes in the sequence must be approved by the Owner and Owner’s Consultant.

1.1.1 Work Area identification and delineation

1.1.2 Work Area isolation

1.1.3 Installation of critical barriers

1.1.4 Placement and activation of negative air pressure machines

1.1.5 Cleaning, protection, and removal of movable goods

1.1.6 Installation of two-stage chamber at entrance to containment

1.1.7 Cleaning and protection of non-movable goods

1.1.8 Pre-cleaning of floors

1.1.9 Installation of 6-mil polyethylene sheeting on walls and floors

1.1.10 Removal of ceiling tiles

1.1.11 Removal of supply and return vents

1.1.12 Removal of light fixtures associated with suspended ceiling grid

1.1.13 Removal of metal ceiling grid

1.1.14 Removal of HVAC units and ductwork

1.1.15 Temporary repair of roof penetrations

Page | 6

1.1.16 If insulated pipes in the Work Area, remove pipe insulation, then clean bare pipes

1.1.17 Cleaning of all surfaces in Work Area, starting from roof deck and working down

1.1.18 Final cleaning

1.1.19 Visual clearance inspection of Work Area

1.1.20 Clearance wipe sampling of surfaces in Work Area

1.1.21 Removal of critical barriers in Work Area

1.1.22 Repeat sequence for each subsequent Work Area

4.2 TEMPORARY FACILITIES

Water Service:

1.1.1 The Remediation Contractor may use existing water service, if available, at the project site. The Remediation Contractor will confirm the availability of water service with the Owner or Consultant prior to project commencement. All connections to the Owner's water system shall include backflow protection. Valves shall be temperature- and pressure-rated for operation of the temperatures and pressures encountered. The Owner will pay all service costs for water used from existing facilities. When domestic water service is unavailable, the Remediation Contractor shall be responsible for providing water at the job site. After completion of use, connections and fittings shall be removed without damage or alteration to the existing water piping and equipment. Leaking or dripping valves shall be repaired or replaced immediately. The Remediation Contractor is responsible for all damage to existing finishes or equipment due to leaking or dripping valves.

Electrical Service:

1.2.1 The Remediation Contractor may use existing electrical service, if available, at the project site. The Remediation Contractor will confirm the availability of electrical service with the Owner or Consultant prior to commencement of the project. The Contractor will also provide electrical services to the consultant at the job-site for air sampling at no cost to the consultant. Electrical service may be affected by the removal of ceiling and lighting components.

1.2.2 Ground Fault Protection: Provide receptacle outlets equipped with ground fault circuit interrupters, a re-set button and a pilot light, for plug-in connection of power tools and equipment.

1.2.3 Electrical Power Cords: Use only grounded extension cords. Use "hard-service" cords in areas where the cords will be exposed to abrasion and traffic. Use single lengths or, in areas where single cords will not reach Work Areas, use waterproof connectors to connect separate lengths of electric cords.

1.2.4 Lamps and Light Fixtures: Provide general service lamps for all areas of work when natural light is not adequate. Protect lamps with guard cages or tempered glass enclosures where fixtures are exposed to breakage by remediation operations.

Sanitary Facilities:

1.3.1 Existing toilet facilities in the building may be used by the Remediation Contractor's personnel during performance of the work (if available for use and approved by the

Page | 7

Owner), provided that the toilet facilities are maintained daily in a clean state of hygiene as determined by the Consultant. However, the Remediation Contractor is responsible for providing their own portable toilet facilities at the project site at the Contractor’s expense.

Temporary Storage:

1.4.1 Where necessary, and pre-approved by the Owner, provide and maintain in a neat, orderly appearance, weatherproof trailers. Coordinate location of placement with the Owner.

Site Access:

1.5.1 Site access will be limited to areas necessary to accommodate remediation.

Coordinate location of placement of such items as the decontamination unit, disposal trailer, parking, etc. with the Owner’s Representative.

4.3 PREPARATION OF THE WORK AREA

Posting of Warning Signs: The Remediation Contractor shall post all appropriate warning signs as required by regulations. Warning signs shall be posted at the entrance to the Work Area. The Remediation Contractor shall provide area isolation with appropriate warning signs. Clearly post all documentation as required by law.

Furnish and install readily visible caution signs in accordance with 29 CFR 1926.62

(m) outside each Work Area that read:

DANGER

LEAD WORK AREA

MAY DAMAGE FERTILITY OR THE UNBORN CHILD

CAUSES DAMAGE TO THE CENTRAL NERVOUS SYSTEM

DO NOT EAT, DRINK OR SMOKE IN THIS AREA

The Work Area is the location where lead remediation work occurs. It is a variable of the extent of the work of the contract. It may be a portion of a room, a single room, or a complex of rooms. A "Work Area" is considered potentially contaminated during the work, and must be isolated from the balance of the building, and decontaminated at the completion of the lead remediation work. The Remediation Contractor shall prep the entire Work Area and remove lead-containing dust from areas identified.

Visual Barrier: Where the Work Area is immediately adjacent to or within view of occupied areas, provide a visual barrier so that the work procedures are not visible to building occupants.

Required Documents to be on site: The Remediation Contractor shall maintain on-site all appropriate documentation as required by OSHA, EPA, and CDPHE. These documents must be made readily available to the Consultant or any authorized visitor at all times.

Preparation for Contained Work Area(s) prior to remediation activities:

1.6.1 Removal of the lead-containing dust shall be executed in a "Contained" Work Area.

1.6.2 Contractor shall contain the Work Area for the duration of the Project, by installing critical barriers to prevent air migration out of the Work Area with 6-mil polyethylene

Page | 8 taped securely to a clean surface. Spray adhesive, used on finished surfaces, should be avoided where possible.

1.6.3 Pre-clean visible potentially lead-containing dust from the Work Area.

1.6.4 Clean and cover fixed and movable objects that can remain in the Work Area with

6-mil polyethylene sheeting taped securely in place.

1.6.5 All fixed and movable objects requiring cleaning shall be cleaned with a HEPA vacuum and wet cleaned.

1.6.6 All objects removed shall be adequately marked and charted on a plan to ensure proper reinstallation upon completion of the decontamination of the Work Area.

The objects shall be stored in a location designated by the Owner, and in a manner that will prevent contamination or damage to the objects. Damaged and missing objects will be replaced by the Remediation Contractor at his own expense and to the satisfaction of the Owner.

1.6.7 Cover entire floor with a minimum of two (2) layers of 6-mil polyethylene sheeting.

Cover wall and column surfaces with a minimum of two (2) layers of 6-mil polyethylene sheeting. Floor coverings shall extend a minimum of 12" up vertical surfaces and behind wall covers. All seams shall be staggered and securely taped.

1.6.8 Install observation window(s) at strategic location(s) in the "Containment" barrier to allow observation of work from outside the Work Area.

1.6.9 The Remediation Contractor shall check regularly (at beginning, middle and end of each shift as a minimum) all polyethylene isolation and containment (protective) barriers for punctures, loose seals, contact with heat-generating devices, etc.

Problem areas shall be repaired or mended immediately.

1.6.10 Maintain existing emergency exits from the building. Maintain a minimum of two

(2) exits from Work Areas where possible. Exits, where possible, shall be on opposite ends of the Work Area. All exits shall be labeled in bright letters or signage. Establish alternative exits satisfactory to fire officials where existing building or Work Area emergency exits are unavoidably blocked by activities of this project.

1.6.11 Provide and maintain appropriate fire extinguisher inside and outside the Work Area.

1.6.12 Work Areas are expected to be lit with temporary lighting. Provide temporary power and lighting when necessary, and ensure safe installation of temporary power sources and equipment per applicable electrical code requirements including appropriate Ground Fault protection. Remediation Contractor shall take all precautions necessary, including inspections and testing, to insure the safety of his employees and other building occupants from electrical hazards during the course of the Project. Existing fire, smoke detection and other life safety systems shall be kept in operation at all times.

1.6.13 The Remediation Contractor shall install and maintain Negative Air Pressure Equipment during the remediation and decontamination phases of the project until the Clearance Test has passed. A sufficient amount of air shall be exhausted by the unit(s) to create a pressure of -0.02 inches of water within the Work Area with respect to the area outside the Work Area. If only one unit is necessary to provide the specified negative air pressure in a Work Area, the Remediation Contractor shall have a backup unit in place should the first unit fail, and for filter changes.

Page | 9

1.6.14 Install and maintain a manometer from the time remediation begins until the Clearance Test has passed.

Preparation of the containment, the following activities apply:

1.7.1 Clean and remove any furnishings from the remediation Work Area.

1.7.2 Clean, cover, and seal non movable objects remaining in the remediation Work

Area with one layer of 6-mil polyethylene sheeting.

1.7.3 Isolate remediation Work Area from other portions of the building. Seal penetrations with 6-mil polyethylene sheeting, mechanically fastened in place and sealed with duct tape or spray glue.

1.7.4 Install a two-stage chamber with self-closing triple flaps on either side of the chamber, at entrance to the containment.

1.7.5 No flammable materials shall be stored inside the remediation Work Area containment.

1.7.6 Install two layers of 6-mil polyethylene sheeting over walls and floors.

1.7.7 Provide wash facility.

1.7.8 Install negative pressure units utilizing HEPA filters and ensure units are located on opposite end of containment from decontamination unit.

1.7.9 Install recording manometer to monitor differential pressure between inside and outside the remediation Work Area. The minimum differential pressure shall be -

0.02 inches of water.

1.7.10 Maintain Sign In/Out log in entrance to remediation Work Area.

1.7.11 The Remediation Contractor shall install a clear plastic viewing port (e.g., Plexiglas) to allow visibility into the Work Area.

1.7.12 Install scaffolding as necessary for access to remediation work.

4.4 WORKER PROTECTION

This section describes the equipment and procedures required for protecting workers against lead dust contamination and other workplace hazards except for respiratory protection (See section 4.5).

Coveralls: Provide disposable full-body coveralls with integral head and foot covers and require that they be worn by all workers in the Work Area. Provide a sufficient number for all required changes, for all workers in the Work Area.

Boots: Provide boots with non-skid soles and, where required, OSHA-approved foot protection, for all workers. Boots shall not be worn out of the Work Area. Boots shall be decontaminated, bagged, and carried from on Work Area to another.

Personal Protective Equipment: As required by OSHA for all workers including but not limited to hard hat, eye protection, gloves, and safety foot ware.

4.5 RESPIRATORY PROTECTION

Instruct and train each worker involved in lead dust remediation in proper respiratory use and require that each worker always wear a respirator, properly fitted on the face, in the Work Area from the start of any operation that may cause airborne lead dust until the Work Area passes final clearance or the Contractor can show exposure monitoring data adequate to prove that employees are no being exposed to lead above the OSHA action level or permissible exposure limit.

Page | 10

Comply with ANSI Z88.2 - 1980 "Practices for Respiratory Protection" and OSHA 29 CFR 1910 and 1926. The Remediation Contractor shall ensure use of the appropriate respiratory protection for the work being performed and recognizes that these requirements are only minimum acceptable standards.

Fit Testing: Provide current fit test documentation.

Minimum Requirements: Respiratory protective equipment shall be OSHA/NIOSH approved in accordance with the provisions of 30 CFR Part 11 unless superseded by local regulations with more stringent requirements. Determine, in accordance with 29 CFR 1926.26 regulations, the 8-hour time-weighted average (TWA) concentration of lead dust to which employees will be exposed in each Work Area. When the exposure levels are established the appropriate level of respiratory protection can be determined.

Workers shall always wear a respirator, properly fitted on the face, in the Work Area, from the initiation of preparation work until all areas have been given written clearance by the Consultant.

Store respirators and filters at the job site in the clean change room.

4.6 DEMOLITION OF LEAD DUST CONTAMINATED COMPONENTS

HVAC Rooftop Units/Evaporative Coolers/Exhaust Vents: Clean metal shafts (intake and exhaust). Fill roof shafts with fiberglass insulation. Seal roof shafts with either metal or plywood from inside, utilizing silicone caulk to seal cover to ceiling or metal shaft frame. Seal top of roof exhaust shroud and roof intake shaft by covering with prefabricated metal cover. Use silicone caulk between the top of the roof curb and cover to make air and moisture-tight seal.

HVAC Duct Work: Prior to demolition, remove excess dust with HEPA vacuum and wet clean. Cut or open ducts to create manageable lengths based on Work Area and conditions. Seal open ends with 6-mil polyethylene sheeting, remove sealed lengths of ductwork from Work Area, and dispose of properly. The Remediation Contractor shall be aware that lead-containing dust exists inside the metal ducts and conduct activities to minimize dust generation. Cutting should be conducted using manual shears, not power saws.

Suspended Ceiling System: Remove ceiling tiles, light fixtures, supply and return vents, and metal grid. Place ceiling tiles, metal grid, and supply and return vents into proper waste containers and seal to prevent dust from escaping during handling and transport to larger waste containers. Remove materials from work area, and dispose of properly. Use methods to minimize the spread of dust throughout Work Area.

Light Fixtures: Prior to disconnection, remove excess dust with a HEPA vacuum.

Thoroughly wet clean and HEPA vacuum each light fixture, then cover and seal with 6-mil polyethylene sheeting and store in an uncontaminated location for future re-installation.

Drywall Ceiling System: Demolish drywall ceilings where present. Use methods to minimize the spread of dust throughout Work Area. Place into proper waste containers, remove from work area, and dispose of properly.

Carpet Removal: HEPA vacuum carpets to remove dust. Mist, carefully roll up, and seal with 6-mil polyethylene sheeting to prevent the release of dust.

Page | 11

Vinyl Cove Base Removal: Remove vinyl cove base to facilitate removal of carpet.

Place into proper waste containers, remove from work area, and dispose of properly.

4.7 CLEANING REQUIREMENTS FOR LEAD-CONTAINING SURFACE DUST

Pre-cleaning – After critical barriers have been installed, remove any visible lead-containing dust from the Work Area floors prior to installing polyethylene sheeting.

Cleanup - All surfaces in the Work Area and all adjacent areas used as a pathway to the Work Area shall be cleaned by HEPA vacuuming, wet cleaning, and HEPA vacuuming. Repeat as necessary to achieve ARNG clearance standard of less than 10 µg/ft2.

Final Cleaning - All surfaces in the Work Area shall be cleaned by HEPA vacuuming, followed by wet cleaning, followed by a second HEPA vacuuming.

HEPA vacuuming shall occur only after the surfaces are dry.

Wet cleaning shall use clean water mixed with a cleaning agent. At a minimum, open-dipped cleaning mixtures shall be changed after use in each room or hallway to avoid re-contaminating an area.

The Remediation Contractor shall visually inspect each cleaned surface to ensure that visible dust and residues have been adequately removed. This can be accomplished by using the “white cloth” test. Wipe a clean white cloth on a cleaned surface. Little to no visible residue should be present on the cloth.

Following final cleaning and inspection procedures, notify Consultant for visual inspection of cleanliness of the containment and clearance wipe sampling.

4.8 DISPOSAL

Metal components may be recycled (i.e. metal grid and HVAC duct work) if approved by the Owner and in compliance with applicable waste management regulations.

All other waste shall be considered lead contaminated waste. Provide securable area pre-approved by Owner for the temporary storage of all solid, hazardous or contaminated wastes generated. Place all hazardous and potentially hazardous waste in containers lined with two layers of 6-mil polyethylene sheeting. Each container shall be clearly labeled with regard to specific contents, including the date the container was sealed. Store all solid and hazardous waste in full compliance with federal, state, and local requirements and do not allow hazardous waste generated to be stored on site for more than 90 days.

Package and label all waste for transport in accordance with the United States DOT regulations on packaging.

4.9 WORK AREA CLEARANCE

Visual inspections and final lead in dust wipe sampling will be conducted in the Work

Area. If any portion of the Work Area fails the visual inspection or clearance dust standards, it is the responsibility of the Remediation Contractor to re-clean and re-sample failed surfaces (utilizing the Owner’s Consultant).

Following the completion of cleanup, the Remediation Contractor shall ensure that there is no evidence of settled dust or debris.

Page | 12

Settled dust or debris present in the Work Area following completion of cleanup shall constitute sufficient evidence that Remediation Contractor cleanup procedures were inadequate.

Consultant will inspect and approve the Work Area for settled dust or debris. As part of the visual examination, the Consultant will ensure that settled dust or debris is not present on any surface in the Work Area. If such conditions are observed, the Remediation Contractor shall repeat cleaning procedures, followed by a second visual inspection.

These procedures will continue until the Consultant has inspected and approved the Work Area after final cleaning.

Dust wipe samples will be collected from all representative surfaces within visually cleared work areas at the Owner’s discretion, including but not limited to floors, walls, ceilings, other horizontal surfaces and movable and non-movable items. Clearance shall be achieved when all lead dust samples are below 10 µg/ft2.

Work Areas are not cleared for removal of critical barriers and put-back until both visual and wipe sample criteria have been passed.

APPENDIX I

TABLE II: LEAD DUST SAMPLING RESULTS

LEAD DUST SURFACE WIPE SAMPLING RESULTS

Colorado Army National Guard (COARNG) Montrose Readiness Center 12147 6390 Road

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

119-1 Cabinet Office 119 <10

119-2 Ceiling Office 119 <10

119-3 Window Sill Office 119 <10

119-4 Wall Office 119 <10

120-5 Window Sill Office 120 11

103-6 Cabinet Forms 103 <10

103-7 Ceiling Forms 103 <10

118-8 Top of Light Fixture Office 118 210

114-9 Top of HVAC Duct Office 114 1,000

114-10 Cabinet Office 114 <10

114-11 Wall Office 114 <10

117-12 Desk Office 117 <10

117-13 Wall Office 117 <10

116-14 Supply Vent Office 116 51

112-15 Top of Locker Office 112 <10

112-16 Top of HVAC Duct Office 112 17

113-17 Top of Locker Below Supply

Vent Office 113 110

113-18 Metal Deck above Ceiling Tiles Office 113 <10

109-19 Floor Office 109 <10

111-20 Shelf Office 111 <10

111-21 Wall Office 111 <10

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

104-22 Wall Conference Room 104 <10

104-23 Supply Vent Conference Room 104 35

104-24 Back of Ceiling Tile Conference Room 104 <10

104-25 Wall Conference Room 104 <10

121-26 Top of Refrigerator Administration Room 121 <10

121-27 Metal Deck above Ceiling Tiles Administration Room 121 <10

**11618-FB Field Blank N/A <10

124-28 Window Sill Administration Room 124 <10

121-29 Wall Administration Room 121 <10

*121-30 Spike #1 121-007 240

128-30 Podium Classroom 128 <10

128-31 Top of HVAC Flex Duct Classroom 128 34

128-32 Window Sill Classroom 128 <10

128-33 Wall Classroom 128 <10

128-2-34 Cabinet Office 128-2 <10

127-35 Top of HVAC Duct Office 127 110

130-36 Wall Office 130 <10

129-37 Metal Truss Office 129 17

HLWAY-38 Floor North/South Office Hallway <10

HLWAY-39 Floor East/West Office Hallway <10

HLWAY-40 Floor Main Office Hallway <10

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

HLWAY-41 Floor Main Office Hallway <10

HLWY-42 Supply Vent Main Office Hallway 48

HLWY-43 Supply Vent Main Office Hallway 35

139-44 Floor Assembly Room 139 <10

139-45 Floor Assembly Room 139 <10

139-46 Floor Assembly Room 139 <10

139-47 Floor Assembly Room 139 <10

139-48 Floor Assembly Room 139 <10

139-49 Wall Assembly Room 139 <10

139-50 Wall Assembly Room 139 <10

139-51 Wall Assembly Room 139 <10

139-52 Wall Assembly Room 139 21

139-53 Ceiling Joist Assembly Room 139 130

139-54 Ceiling Joist Assembly Room 139 89

139-55 Ceiling Joist Assembly Room 139 240

139-56 Top of Light Fixture Assembly Room 139 180

139-57 Top of Light Fixture Assembly Room 139 72

139-58 Top of Light Fixture Assembly Room 139 66

139-59 Windowsill Assembly Room 139 <10

139-60 Windowsill Assembly Room 139 24

139-61 Inside HVAC Duct Assembly Room 139 150

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

139-62 Inside HVAC Duct Assembly Room 139 570

139-63 Inside HVAC Duct Assembly Room 139 610

139-64 Inside HVAC Duct Assembly Room 139 120

152-65 Floor Unit Storage Room 152

(Inside Vault)

152-66 Floor Unit Storage Room 152 21

152-67 Floor Unit Storage Room 152 16

152-68 Wall Unit Storage Room 152 <10

152-69 Wall Unit Storage Room 152 <10

152-70 Ceiling Joist Unit Storage Room 152 33

152-71 Ceiling Joist Unit Storage Room 152 22

152-72 Top of Light Fixture Unit Storage Room 152 100

152-73 Top of Light Fixture Unit Storage Room 152 30

152-74 Shelf Unit Storage Room 152 13

152-75 Countertop Unit Storage Room 152 <10

152-76 Ceiling Unit Storage Room 152 <10

152-77 Top of Gun Vault Unit Storage Room 152 47

152-78 Supply Vent Unit Storage Room 152 41

152-79 Supply Vent Unit Storage Room 152 99

152-80 Top of HVAC Duct Unit Storage Room 152 41

152-81 Top of HVAC Duct Unit Storage Room 152 38

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

149-82 Floor Maintenance Room 149 <10

149-83 Floor Maintenance Room 149 <10

149-84 Wall Maintenance Room 149 <10

149-85 Wall Maintenance Room 149 <10

149-86 Ceiling Joist Maintenance Room 149 68

149-87 Ceiling Joist Maintenance Room 149 53

149-88 Top of Light Fixture Maintenance Room 149 170

149-89 Top of Light Fixture Maintenance Room 149 120

149-90 Windowsill Maintenance Room 149 19

149-91 Windowsill Maintenance Room 149 15

148-92 Cabinet Hazmat Room 148 12

147-93 Shelf Supply Room 147 <10

145-94 Desk Office 145 <10

141-95 Wall Kitchen Room 141 <10

141-96 Wall Kitchen Room 141 <10

140-97 Back of Ceiling Tile Scullery Room 140 <10

142-98 Floor Food Storage Room 142 <10

140-99 Serving Window Sill Scullery Room 140 <10

141-100 Serving Window Sill Kitchen Room 141 <10

UTL-101 Floor Utility Room 138A 47

UTL-102 Wall Utility Room 138A <10

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

UTL-103 Top of Metal Box Utility Room 138A 34

UTL-104 Ceiling Joist Utility Room 138A 47

131-105 Floor Restroom 131 <10

132-106 Floor Restroom 132 <10

131-107 Wall Restroom 131 <10

132-108 Wall Restroom 132 <10

131-109 Supply Vent Restroom 131 22

132-110 Supply Vent Restroom 132 32

134-111 Floor IFR Room 134 14

134-112 Floor IFR Room 134 200

134-113 Wall IFR Room 134 <10

134-114 Wall IFR Room 134 <10

134-115 Top of Heat Shield IFR Room 134 360

134-116 Ceiling IFR Room 134 <10

134-117 Ceiling IFR Room 134 83

134-118 Ceiling IFR Room 134 <10

134-119 Top of Locker IFR Room 134 26

134-120 Top of Locker IFR Room 134 88

134-121 Top of Locker IFR Room 134 12

134-122 Top of Locker IFR Room 134 40

134-123 Top of Light Fixture IFR Room 134 <10

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

134-124 Top of Light Fixture IFR Room 134 <10

134-125 Top of Light Fixture IFR Room 134 <10

134-126 Ceiling IFR Room 134 <10

134-127 Inside Exhaust Duct IFR Room 134 2,800

134-128 Inside Exhaust Duct IFR Room 134 530

134-129 Inside Evaporative Cooler Duct IFR Room 134 11,000

134-130 Inside Evaporative Cooler Duct IFR Room 134 3,100

133-131 Floor Gym Room 133 <10

133-132 Floor Gym Room 133 <10

133-133 Wall Gym Room 133 <10

133-134 Wall Gym Room 133 <10

133-135 Ceiling Joist Gym Room 133 23

133-136 Ceiling Joist Gym Room 133 39

133-137 Top of Light Fixture Gym Room 133 66

133-138 Top of Light Fixture Gym Room 133 45

133-139 Mat Gym Room 133 <10

133-140 Mat Gym Room 133 <10

133-141 Supply Vent Gym Room 133 55

133-142 Supply Vent Gym Room 133 29

133-143 Top of HVAC Duct Gym Room 133 16

133-144 Top of HVAC Duct Gym Room 133 19

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

ROOF-145

Roof Membrane above East Office

Hallway Roof <10

ROOF-146 Roof Membrane above Gym Roof 21

*ROOF-147 Spike #2 N/A 230

ROOF-148 Roof Membrane South Area of IFR Roof <10

ROOF-149

Roof Membrane between IFR

Exhaust Vents Roof 530

ROOF-150 Roof Membrane above Scullery Roof 18

ROOF-151

Metal Roof above Vehicle

Maintenance Bay Roof <10

ROOF-152

Roof Membrane above Supply

Room Roof 11

*ROOF-153 Spike #3 N/A 220

**11/7/18-FB1 Field Blank N/A <10

ROOF-155 Inside HVAC Equipment (RU-2) Roof 50

ROOF-156 Inside HVAC Equipment (RU-1) Roof <10

ROOF-157 Inside HVAC Equipment (RU-4) Roof 39

ROOF-158 Inside HVAC Equipment (RU-5) Roof 85

ROOF-159 Inside HVAC Equipment (RU-3) Roof 20

ROOF-160 Inside Exhaust Fan (EF-1) Roof Above IFR 15,000

ROOF-161 Inside Exhaust Fan (EF-2) Roof Above IFR 21,000

ROOF-162 Exhaust Vent Roof Above Kitchen <10

ROOF-163 Inside HVAC Equipment (MA-3) Roof 28

Montrose, Colorado 81401

Sample Number

Surface Sampled Location of Sample Sample Result

(µg/ft2)

ROOF-164 Roof Vent Roof Near Kitchen <10

102-165 Cabinet Office Room 102 <10

102-166 Above Ceiling Office Room 102 <10

*MISC-167 Spike #4 N/A 200

**MISC-168 Field Blank N/A <10

* Denotes Sample Spike ** Denotes Field Blank

APPENDIX II

WIPE SAMPLE LOCATION DRAWINGS

A P

P R

O V

E D

B

Y

P R

O J E

C T

N

U M

B E

R

F I G

U R

E

D R

A W

N

B

Y

D A

T E

E

N i c h o l s

A v e

S t e

C e n t e n n i a l

C o l o r a d o

P h

F a x

L E

S

T

W

I P

E

S

A M

P L

E

L

O C

A T

I O

N

M

A P

M O

N T

R O

S E

C

O

R

O A

D

C O

L O

R A

O

R M

Y

N

A T

I O

N A

L

G

U A

M

N

T R

O S

E

R

E A

D I N

E S

S

C

E N

T E

R

Z

C N

G

K Y

B K

NOTE: ALL LOCATIONS ARE APPROXIMATE

LEGEND

NOT TO SCALE

HLWY-40

129-37 130-36

128-2-34

128-33

128-30

128-31

113-17

113-18

112-15

112-16

HLWY-39

HLWY-38

116-14

117-12

117-13

114-11

114-10

114-9

118-8

111-20

111-21

109-19

128-32

127-35

HLWY-42

121-29

121-27

124-28

121-26

104-24

104-25

104-22

104-23

102-165

102-166

103-7

103-6

HLWY-41

HLWY-43

119-1

119-2

119-4

119-3

120-5

<10 µg/ft²

³10 µg/ft²

SAMPLE LOCATIONS:

OFFICE AREAS

S P r o j e c t s B

S T

D

E P

T

M

I L

I T

A R

Y

V

E T

E R

A N

S

A

F F

A I R

S Z

C

N G

S

A M

P L

O C

S

A d w g

AutoCAD SHX Text

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text 138B

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 138A

AutoCAD SHX Text

SCULLERY

AutoCAD SHX Text

AutoCAD SHX Text

FOOD PREP

AutoCAD SHX Text

AutoCAD SHX Text

FOOD STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

AutoCAD SHX Text

BATTERY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

MAINTENANCE BAY

AutoCAD SHX Text

AutoCAD SHX Text

STATE CREW

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

CHAIR

AutoCAD SHX Text

VAULT

AutoCAD SHX Text

AutoCAD SHX Text

UNIT STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

DRILL HALL

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

LIBRARY

AutoCAD SHX Text

AutoCAD SHX Text

LIBRARY

AutoCAD SHX Text

AutoCAD SHX Text

MAINT

AutoCAD SHX Text

AutoCAD SHX Text

FAC

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

CAP

AutoCAD SHX Text

AutoCAD SHX Text

RECRUITING

AutoCAD SHX Text

AutoCAD SHX Text

RECRUITING

AutoCAD SHX Text

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text

AutoCAD SHX Text

RECEPT

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

FITNESS

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

P R

O V

P R

O J E

M

B E

R

F I G

U R

E

D R

A W

N

B

Y

D A

T E j c f kd sl ;a a s

E

N i c h o l s

A v e

S t e

C e n t e n n i a l

C o l o r a

P h x

L E

S

T

W

I P

E

S

A M

P L

E

L

O C

A T

I O

N

M

A P

M O

N T

R O

S E

C

O

R

O A

D

C O

L O

R A

M

Y

N

A T

I O

N A

L

G

U A

N

T R

O S

E

R

E A

D I N

E S

S

C

E N

T E

R

Z

C N

G

K Y

B K

NOTE: ALL LOCATIONS ARE APPROXIMATE

LEGEND

NOT TO SCALE

134-123

134-119

134-118

134-127

134-128

134-112

134-114

134-117

134-120

134-121

134-124

134-113

134-126

134-111

134-115

134-116

134-125

134-122

134-130

134-129

133-144

133-131

133-141

133-133

133-136

133-139

133-137

133-142

133-132

133-138

133-140

133-134

133-135

133-143

132-108

132-106

131-105

131-109

131-107

132-110

139-60

139-62

139-55

139-56

139-59

149-89

149-87

149-90

149-91 149-88

149-86

139-54

139-63

139-58

139-64

139-53

139-61

139-57

<10 µg/ft²

³10 µg/ft²

149-84

149-83

142-98

141-96

141-95

140-97

UTL-101

UTL-103

UTL-104

UTL-102

149-82

149-85

152-69

148-92

147-93

141-100

139-44

139-50

140-99

145-94

139-45

152-73

152-72

152-79

152-74

152-71

152-66

152-80

139-51

139-47

139-46

152-65

152-76

152-77

152-81

152-70

152-67

152-75

152-68

152-78

139-49

139-48

139-52

SAMPLE LOCATIONS:

ASSEMBLY

SUPPLY

VEHICLE MAINTENANCE (OFFICE & STORAGE ROOMS)

KITCHEN AREAS

IFR STORAGE LOCKERS

GYM

UTILITY

RESTROOMS

S P r o j e c t s B

S T

D

E P

T

M

I L

I T

A R

Y

V

E T

E R

A N

S

A

F F

A I R

S Z

C

N G

S

A M

P L

O C

S

A d w g

AutoCAD SHX Text

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text 138B

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 138A

AutoCAD SHX Text

SCULLERY

AutoCAD SHX Text

AutoCAD SHX Text

FOOD PREP

AutoCAD SHX Text

AutoCAD SHX Text

FOOD STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

AutoCAD SHX Text

BATTERY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

MAINTENANCE BAY

AutoCAD SHX Text

AutoCAD SHX Text

STATE CREW

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

CHAIR

AutoCAD SHX Text

VAULT

AutoCAD SHX Text

AutoCAD SHX Text

UNIT STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

DRILL HALL

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

LIBRARY

AutoCAD SHX Text

AutoCAD SHX Text

LIBRARY

AutoCAD SHX Text

AutoCAD SHX Text

MAINT

AutoCAD SHX Text

AutoCAD SHX Text

FAC

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

CAP

AutoCAD SHX Text

AutoCAD SHX Text

RECRUITING

AutoCAD SHX Text

AutoCAD SHX Text

RECRUITING

AutoCAD SHX Text

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text

AutoCAD SHX Text

RECEPT

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

FITNESS

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

TOILET

P R

O V

P R

O J E

M

B E

R

F I G

U R

E

D R

A W

N

B

Y

D A

T E

E

N i c h o l s

A v e

S t e

C e n t e n n i a l

C o l o r a

P h x

R

O O

F

L E

S

T

W

I P

E

S

A M

P L

E

L

O C

A T

I O

N

M

A P

M O

N T

R O

S E

C

O

R

O A

D

C O

L O

R A

M

Y

N

A T

I O

N A

L

G

U A

N

T R

O S

E

R

E A

D I N

E S

S

C

E N

T E

R

Z

C N

G

K Y

B K

ALL LOCATIONS ARE APPROXIMATE

LEGEND

NOT TO SCALE

ROOF-163

ROOF-164

ROOF-162

ROOF-161

ROOF-149

ROOF-160

ROOF-151

ROOF-152

ROOF-148

ROOF-146

ROOF-158

ROOF-159

ROOF-157

ROOF-155

ROOF-156

ROOF-145

<10 µg/ft²

ROOF-150

³10 µg/ft²

SAMPLE LOCATIONS:

ROOF

NOTE:

SAMPLE NUMBERS: ROOF-147, ROOF-153

ARE SPIKES AND 154 IS A FIELD BLANK

S P r o j e c t s B

S T

D

E P

T

M

I L

I T

A R

Y

V

E T

E R

A N

S

A

F F

A I R

S Z

C

N G

S

M P

L O

C

R O

O F d w g

AutoCAD SHX Text

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text 138B

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 138A

AutoCAD SHX Text

SCULLERY

AutoCAD SHX Text

AutoCAD SHX Text

FOOD PREP

AutoCAD SHX Text

AutoCAD SHX Text

FOOD STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

AutoCAD SHX Text

BATTERY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

MAINTENANCE BAY

AutoCAD SHX Text

AutoCAD SHX Text

STATE CREW

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

CHAIR

AutoCAD SHX Text

VAULT

AutoCAD SHX Text

AutoCAD SHX Text

UNIT STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

DRILL HALL

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

LIBRARY

AutoCAD SHX Text

AutoCAD SHX Text

LIBRARY

AutoCAD SHX Text

AutoCAD SHX Text

MAINT

AutoCAD SHX Text

AutoCAD SHX Text

FAC

Au…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .