This document provides details on obstacles and areas that will require removal, relocation or tight maneuvering for the rehabilitation of the Tubb's Cordage Building located at the Hyde Street Pier in San Francisco, California. The boat shed and potentially a light pole will need to be removed by National Park Service staff with at least 14 days' notice. If any light poles require removal, it will be the contractor's responsibility. Masts currently stored in one area will need relocation by NPS with seven days' notice. A fence, gate and sign in another area will require dismantling, with the sign able to be unbolted but leaving six inches still attached. Clearance may be tight between certain structures. The related federal contract opportunity is solicitation number 140P8522R0010 for the repair, preservation and relocation of the Tubb's Cordage Building at the San Francisco Maritime National Historical Park, issued by the National Park Service within the Department of the Interior.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
sdturner Line sdturner Typewritten Text 20 ' sdturner Line sdturner Line sdturner Text Box Boat shed will have to be removed, maybe the light pole too. The boat shed will be removed by NPS Staff. The contractor must give NPS a minimum of 14 day notice to allow for removal.
If light poles have to be removed it will be the contractors responsibility.
Text Box Tubb's should be able to make it between light pole multipurpose building.
If light poles have to be removed it will be the contractors responsibility.
sdturner Line sdturner Typewritten Text about 24' sdturner Typewritten Text more than 24' here sdturner
This are area may not be a problem.
sdturner Typewritten Text just over 24' sdturner Text Box It will be a tight squeeze between the corner of the arch and the Wapama engine. The mast blanks in this area will need to be moved by NPS again give 7 day advance notice.
sdturner
Area currently occupied filled with masts blanks sdturner Line sdturner Line sdturner Line sdturner Text Box Fence, gate, and HSP sign will have to be removed. The sign can unbolt, but there will be about 6" sticking up.
Note the fence may be removed by the time contract is for bid.
sdturner Line sdturner Typewritten Text Just over 24', very tight.
sdturner Line sdturner
This sing will also have to be removed.