This contract price schedule template outlines pricing requirements for the rehabilitation of the Tubb's Cordage Building located at the San Francisco Maritime National Historical Park. The solicitation seeks fixed pricing for 8 contract line items involving fumigation, exterior repairs, painting, skirting replacement, interior repairs and roof assessment. Offerors must submit pricing for the base requirements encompassing items 1 through 7 as well as 3 optional seismic retrofit and relocation items 8 through 10. Pricing should be provided as both unit costs and extended totals for unit priced items, with lump sum pricing for other requirements. The total proposed price must encompass the base work and all option line items. The National Park Service is the contracting agency, with a performance location at the San Francisco Maritime National Historical Park.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number:

PARK - PMIS: PMIS 254257

(Project Management Information System)

Developed Area:

Project Title:

Contract Line Item Number

(CLIN)

Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price

1 Fumigation for termite infestation 1 LS

2 Replace and repair exterior wood elements 1 LS

3 Exterior painting and preventative pest treatment 1 LS

Replacement of existing plywood skirting and vent covers

1 LS

Repair or replacment and repainting of damaged interior elements and trim

1 LS

6 Roof assessment and repair 1 LS

7 Relocate Tubbs Cordage Office to 3250 Van Ness Avenue 1 LS

8 OPTION 1, Seismic retrofit 1 LS

9 OPTION 2, Relocate Sea Fox Pilot House 1 LS

OPTION 3,Site Preparation at 3250 Van Ness for Tubbs and Sea Fox relocation

1 LS

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 8 through 10) -----------------------------------------------------------

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 10) --------------------------

All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.

TOTAL BASE PRICE (Contract Line Item Number 1 through 7) --------------------------------------------------------------------------------

Contract Price Schedule Template National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18

San Francisco Maritime National Historical Park Tubb's Cordage Building

Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all

140P8522R0010

File details come from the government source that posted it. Updated .