Appendix B2 - Bid Alternates CTCF Interior and Pharmacy.pdf
PDF 238 KB Posted
- Solicitation number
- IFB1 CBAA 2027000052 1
- Issued by
- El Paso County, Colorado Springs City, Colorado
About this file
This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for a project managed by the Colorado Department of Corrections Facility Management Services. The project, numbered 2027-027M26, involves interior and pharmacy improvements at CTCF (Colorado Territorial Correctional Facility). The form provides a template for bidders to submit pricing for optional work items, specifically including an additive alternate to renovate the chapel and install new carpet in Chapel 103. The document establishes the framework for bidders to propose both additive and deductive alternates, with instructions that additive and deductive alternates are mutually exclusive—only one category may be used in any given bid.
The form includes ten line items each for additive alternates (A.A.1 through A.A.10) and deductible alternates (D.A.1 through D.A.10), with designated specification sections and pricing columns for each. Bidders must complete pricing information for selected alternates and provide company name, authorized signature, and date. The document does not specify pricing amounts, response dates, site visit requirements, or award information, as these details would be contained in the primary bid documents and Instructions to Bidders (SBP-6.12). No set-asides, funding sources, or contract term information is indicated in this form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
| BID ALTERNATES |
| INSTRUCTIONS: |
| ADDITIVE ALTERNATES |
| DEDUCTIVE ALTERNATES |
| THE BIDDER |
| TextInput.127: Colorado Dept. of Corrections / Facility Management Services |
| TextInput.173: 2027-027M26 / CTCF Interior Medline and Pharmacy Improv. |
| TextInput: |
| AA1: |
| 0: |
| 2: Renovate Chapel as indicated in the Documents |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: At Chapel 103 remove and install new carpet |
| AA1S: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| AA1P: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| DA1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1S: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1P: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
Company Name:
File details come from the government source that posted it. Updated .