Appendix B2 - Bid Alternates CTCF Interior and Pharmacy.pdf

PDF 238 KB Posted

Attached to
CTF CTCF Interior Medline and Pharmacy IFB1 TBD CMS211958
Solicitation number
IFB1 CBAA 2027000052 1
Issued by
El Paso County, Colorado Springs City, Colorado

About this file

This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for a project managed by the Colorado Department of Corrections Facility Management Services. The project, numbered 2027-027M26, involves interior and pharmacy improvements at CTCF (Colorado Territorial Correctional Facility). The form provides a template for bidders to submit pricing for optional work items, specifically including an additive alternate to renovate the chapel and install new carpet in Chapel 103. The document establishes the framework for bidders to propose both additive and deductive alternates, with instructions that additive and deductive alternates are mutually exclusive—only one category may be used in any given bid.

The form includes ten line items each for additive alternates (A.A.1 through A.A.10) and deductible alternates (D.A.1 through D.A.10), with designated specification sections and pricing columns for each. Bidders must complete pricing information for selected alternates and provide company name, authorized signature, and date. The document does not specify pricing amounts, response dates, site visit requirements, or award information, as these details would be contained in the primary bid documents and Instructions to Bidders (SBP-6.12). No set-asides, funding sources, or contract term information is indicated in this form.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBP-6.131

Rev 7/2025 R1

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

BID ALTERNATES

Institution or Agency:

Project No./Project Name:

INSTRUCTIONS:

1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.

2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.

3. Refer to the contract documents for thorough description(s) of the alternates.

4. If alternates are accepted, the base bid will be modified by the amount entered below.

ADDITIVE ALTERNATES

Alt. # Description of Additive Alternate Spec. Section Pricing

A.A.1 $

A.A.2 $

A.A.3 $

A.A.4 $

A.A.5 $

A.A.6 $

A.A.7 $

A.A.8 $

A.A.9 $

A.A.10 $ lanexxTX Line lanexxTX Line

SBP-6.131

Rev 7/2025 R1

DEDUCTIVE ALTERNATES

Alt. # Description of Deductive Alternate Spec. Section Pricing

D.A.1

D.A.2 $

D.A.3 $

D.A.4 $

D.A.5 $

D.A.6 $

D.A.7 $

D.A.8 $

D.A.9 $

D.A.10 $

THE BIDDER

BY_________________________________________________________________

Company Name

BY__________________________________________________________________

Signature Date

BID ALTERNATES
INSTRUCTIONS:
ADDITIVE ALTERNATES
DEDUCTIVE ALTERNATES
THE BIDDER
TextInput.127: Colorado Dept. of Corrections / Facility Management Services
TextInput.173: 2027-027M26 / CTCF Interior Medline and Pharmacy Improv.
TextInput:
AA1:
0:
2: Renovate Chapel as indicated in the Documents
3:
4:
5:
6:
7:
8:
9:
1: At Chapel 103 remove and install new carpet
AA1S:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1:
AA1P:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1:
DA1:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1S:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1P:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:

Company Name:

File details come from the government source that posted it. Updated .