Appendix B1 - Bid Alternates 7th Street Garage SBP-6.131.pdf
PDF 122 KB Posted
- Solicitation number
- IFB1 GMAA 2027000031 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Bid Alternates form (SBP-6.131) issued by the State of Colorado Office of the State Architect, State Buildings Program, for the Auraria Higher Education Center's 7th Street Garage High-Priority Structural Repairs project (P1004332). The project scope includes sealant and coating work at Level 4 of the garage, with specifications referenced in sections S0.4, S1.6, and S1.7. The form provides a structured template for contractors to submit pricing for additive and deductive alternates to the base bid, with space for up to ten options in each category. Bidders are instructed to refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information and to the full contract documents for thorough descriptions of each alternate.
The form establishes that additive and deductive alternates are mutually exclusive—only one category may be used per project. Contractors must enter pricing amounts for each applicable alternate, which will then modify the base bid upon acceptance. The document requires bidder identification through company name and authorized signature with date. No specific response deadlines, site visit requirements, award dates, or contract terms are detailed within this particular bid alternates form, as these elements are referenced in other contract documents and instructions to bidders.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $
Auraria Higher Education Center
P1004332 / 7th St. Garage High-Priority Structural Repairs
Sealant and coating work at Level 4 of the garage S0.4/S1.6/S1.7
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date