Appendix B - Work Scope.pdf
PDF 99 KB Posted
- Solicitation number
- RFP DEXT 270000000163 1
- Issued by
- Washtenaw County, Detroit City, Michigan
About this file
This document is a work scope appendix for HVAC equipment purchase bid category 23-01 issued by Dexter Community Schools in Michigan. The bid category encompasses the furnishing of light commercial air-to-air energy recovery equipment and packaged roof-top air conditioners for three projects: Wylie Elementary School Additions, New Fieldhouse, and Dexter High School Additions. Bidders must provide complete job-specific submittals as attachments to their proposals, which will be evaluated during the award process. The school district reserves the right to reject bids with incomplete submittal packages and will make award decisions based on best value analysis, considering initial installed cost, future operating and maintenance costs, and other factors. No specific response dates, site visits, or bidder's conference information is provided in this document.
The work scope requires bidders to furnish HVAC equipment with all required accessories, include applicable taxes and sales tax, and cover all shipping costs and insurance to the school loading dock. Bidders must protect sensitive components during shipping and storage, provide rigging and installation instructions in advance, and supply manufacturer-authorized onsite supervision during equipment assembly and testing. A manufacturer's trained representative is required to train school personnel on start-up and shutdown procedures, troubleshooting, vibration testing, service schedules, and preventative maintenance. Installation and final testing are excluded from this equipment purchase contract and will be performed under a separate installation contract. No allowances or requested alternates are specified in the bid category.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Category 23-01 : HVAC Equipment Purchase
A. Specification Sections
23 7210 Light Commercial Air-to-Air Energy Recovery Equipment 23 8121 Packaged Roof-Top Air Conditioners
B. GENERAL INCLUSIONS
1. Reference Project Manual, Specification Section 00 2113 Instructions To Bidders, Item 23 for list of General Scope of Work Clarifications that apply to ALL bid categories.
2. Work scope for this category applies to all (3) projects included in Appendix A – Project Drawings.
(Wylie ES Additions, New Fieldhouse, Dexter HS Additions)
C. SPECIFIC INCLUSIONS
1. Perform, furnish and installation of all specification sections above unless noted differently below.
1. Furnish HVAC Equipment at Senior Wellness Center as indicated on the mechanical schedules and with all required accessories.
2. Include applicable taxes, including sales tax.
3. Include all shipping costs and insurance during shipping to the school loading dock.
4. Provide complete, job-specific submittals as an attachment to the bid proposal. The details provided will be used to evaluate the bid proposal during the award process. The owner reserves the right to reject a bid because of an incomplete submittal package. Award will be based on the best value for the school district. Analysis may include both initial installed cost, future operating and maintenance costs, and other factosr.
5. Protect control panels, pipe openings, and other sensitive components with heavy plastic or other durable means to ensure unit cleanliness is maintained during shipping and storage.
6. Provide rigging and installation instructions in advance to allow for planning.
7. Provide manufacturer authorized onsite supervision. The manufacturer's representative shall provide technical direction and assistance to the installation contractor in assembly of the equipment, connections and adjustments, and testing of the assembly and components.
8. Manufacturer’s trained representative shall train Owner's personnel on start-up and shutdown procedures, troubleshooting, vibration test locations, service schedules, and preventative maintenance procedures
D. EXCLUDED
1. Installation and final testing shall be done under a separate contract, by the installation contractor. All necessary hardware to secure the assembly in place shall be provided by the installation contractor.
E. ALLOWANCES
1. N/A
F. REQUESTED ALTERNATES
1. N/A
END OF SECTION