This is a prepurchase specification document for the Dexter Community Schools Wellness Center Renovations project, specifically for Air Handling Unit (AHU) equipment procurement, located at 2810 Baker Road, Dexter, Michigan 48130. The project manual, prepared by TMP Architecture, Inc. (Project No. 25031, issued September 25, 2026), establishes comprehensive procurement and construction requirements for light commercial air-to-air energy recovery equipment and packaged rooftop air conditioning units. The document outlines detailed specifications for two primary HVAC components: energy recovery ventilators (ERVs) with manufacturers including Oxygen8, Ventar CES, Thermal Corporation, Ruskin Company, RenewAire LLC, Loren Cook Company, Greenheck, Dunham-Bush, Inc., and American ALDES Ventilation Corporation; and packaged rooftop air conditioning units from manufacturers such as AAON, Inc., Carrier Corp., Daikin Applied, Johnson Controls/YORK, Lennox Industries Inc., and Trane. The specifications detail unit construction requirements, electrical components, controls, filters, and accessories necessary for proper installation and operation. The document establishes the framework for contractor submittals, substitution procedures, quality assurance protocols, and field installation requirements, with specifications requiring compliance with ASHRAE 90.1-2019, Michigan Building Code 2021, and applicable HVAC standards including AHRI and UL certifications.
The specifications establish comprehensive quality, performance, and warranty requirements for all equipment specified. Contractors must submit detailed product data, shop drawings, and equipment specifications for architect review and approval prior to procurement and installation. Warranty requirements include minimum five-year coverage on compressor components and ten-year coverage on heat exchangers from the date of Substantial Completion. The document mandates single-source manufacturer procurement, specifying that all air-to-air energy recovery units must be obtained through one manufacturer source. Submittal procedures require compliance with TMP Architecture's standardized forms and electronic file protocols, with CAD file access available at no cost and BIM file access available for a $750 fee. Extra materials required include complete filter sets and fan belts for each unit type. The project incorporates building automation system (BAS) integration requirements and specifies compliance with energy efficiency standards, requiring economizer controls and low-ambient operation capabilities. Installation requires coordination with roof curb installation, condensate drain systems with heat trace for outdoor equipment, vibration isolation provisions, and field quality control testing by factory-authorized service representatives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BP9 - HVAC Equipment Purchase - Project Manual.pdf | ||
| Appendix A - Prepurchase Drawings.pdf | ||
| Appendix B - Work Scope.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Copyright (c) 2024 TMP Architecture, Inc.
PROJECT MANUAL
PROJECT:
WELLNESS CENTER RENOVATIONS
D.R.1. – AHU PRE-PURCHASE
2810 Baker Road Dexter MI, 48130
OWNER:
DEXTER COMMUNITY SCHOOLS
2704 Baker Road Dexter MI 48130
TMP PROJECT NO.: 25031
DATE: SEPTEMBER 25, 2026
ISSUED FOR: D.R.1 PRE-PURCHASE
ARCHITECT
TMP ARCHITECTURE, INC.
1191 West Square Lake Road Bloomfield Hills, MI 48302-0374
PH (248) 338-4561
Email info@tmp-architecture.com
CONSTRUCTION MANAGER
GRANGER CONSTRUCTION
8100 Shield Road Dexter, MI 48130
PH (734) 253-2197
Email grangerconstruction.com
MECHANICAL CONSULTANT
PETER BASSO ASSOCIATES, INC.
5145 Livernois Road, Suite 100 Troy, MI 48098
PH (248) 879-5666
Email peterbassoassocites.com
ELECTRICAL CONSULTANT
PETER BASSO ASSOCIATES, INC.
5145 Livernois Road, Suite 100 Troy, MI 48098
PH (248) 879-5666
Email peterbassoassocites.com
TMP Architecture, Inc. TMP25031
09-25-2026 D.R.1 PRE-PURCHASE PROFESSIONAL SEALS PAGE
00 0107-1
Wellness Center Renovations – D.R.1. – AHU Pre-Purchase 25031
This Document has been prepared under the supervision of the Architect and/or Professional Engineer as indicated by their individual License Seals affixed hereon.
Professional License Seals
Seal Seal Seal
TMP Architecture, Inc.
Architect
Peter Basso Associates, Inc.
Mechanical Engineer
Peter Basso Associates, Inc.
Electrical Engineer
09-25-2026 D.R.1 PRE-PURCHASE TABLE OF CONTENTS
00 0110-1
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
Section Title Issued
00 0101 Title Page DD 00 0107 Professional Seals Page DD 00 0110 Table of Contents DD 00 0115 List of Drawings DD 00 8200 Availability of Electronic Files DD 00 8200.01 Electronic Files Release Form DD
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS
Section Title Issued
01 0005 Related Requirements DD 01 2500 Substitution Procedures DD 01 2500.01 TMP Substitution Request Form DD 01 3000 Administrative Requirements DD 01 3000.01 TMP Submittal and Sample Transmittal
Form
DD
01 4000 Quality Requirements DD 01 4100 Regulatory Requirements DD 01 4216 Definitions DD 01 4219 Reference Standards DD 01 4533 Code-Required Special Inspections and
Procedures
DD
01 6000 Product Requirements DD
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 – EXISTING CONDITIONS
Not used
DIVISION 03 - CONCRETE
Not Used
00 0110-2
DIVISION 04 - MASONRY
Not Used
DIVISION 05 - METALS
Not Used
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
Not Used
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Not Used
DIVSION 08 - OPENINGS
Not Used
DIVISION 09 - FINISHES
Not Used
DIVISION 10 - SPECIALTIES
Not Used
DIVISION 11 - EQUIPMENT
Not Used
DIVISION 12 - FURNISHINGS
Not Used
DIVISION 13 - SPECIAL CONSTRUCTION
Not Used
DIVISION 14 - CONVEYING EQUIPMENT
00 0110-3
FACILITY SERVICES SUBGROUP
DIVISION 20 – COMMON MECHANICAL REQUIREMENTS
Not Used
DIVISION 21 – FIRE SUPPRESSION
Not Used
DIVISION 22 - PLUMBING
Not Used
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING (HVAC)
Section Title Issued
23 7210 Light Commercial Air-To-Air Energy Recovery Equipment
DD
23 8121 Packaged Roof-Top Air Conditioners DD
DIVISION 25 – INTEGRATED AUTOMATION
Not Used
DIVISION 26 – ELECTRICAL
Not Used
DIVISION 27 – COMMUNICATIONS
Not Used
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
Not Used
SITE AND INFRASTRUCTURE SUBGROUP
DIVISION 31 – EARTHWORK
00 0110-4
DIVISION 32 – EXTERIOR IMPROVEMENTS
Not Used
DIVISION 33 – UTILITIES
END OF SECTION
09-25-2026 D.R.1 PRE-PURCHASE LIST OF DRAWINGS
00 0115-1
SECTION 00 0115 - LIST OF DRAWINGS
LIST OF DRAWINGS
1.01GENERAL
A. Drawings: Drawings consist of the Contract Drawings including drawings listed on the TITLE
SHEET page of the separately bound drawing set titled Dexter Wellness Center - D.R.1 AHU Pre-Purchase, dated 09-25-2026 and any subsequent Addenda and Contract modifications which may occur.
END OF SECTION 00 0115
09-25-2026 D.R.1 PRE-PURCHASE AVAILABILITY OF ELECTRONIC FILES
00 8200-1
SECTION 00 8200 - AVAILABILITY OF ELECTRONIC FILES
AVAILABILITY OF ELECTRONIC FILES
1.01POLICY
A. As a service to Contractor, subcontractors, vendors, material suppliers and others needing electronic copies of Drawings, the Architect will provide CAD files electronically in accordance with the following policy:
1. By acceptance it is understood and agreed that the data and medium being supplied is to be used only for the project referenced.
2. It is further understood and agreed that the undersigned will hold TMP Architecture, Inc.
and its Consultants harmless and indemnify TMP Architecture, Inc. and its Consultants from all claims, liabilities, losses, and so forth, including attorney's fees arising out of the use or misuse of the transferred files.
3. It is understood and agreed that the files transmitted are prepared from CAD files current at the time of preparation. All files are AutoCAD version 2024 dwg files.
a. Composite plans of floor plan, reflected ceiling plan, or roof plan will be provided in lieu of individual zone sheets. General Information, Life Safety Plans, and Detail sheets are not available for release.
4. This information does not waive the need to verify and review current field conditions and the status of Addenda and/or Bulletin and Proposal Request or Construction Change Directive documentation.
5. As a record of information to be transmitted, TMP Architecture, Inc. will prepare a duplicate electronic back-up for its record.
6. Compensation Fee for providing this material will be as follows: $0.00 / No Charge.
7. A signed copy of the Release Form must be provided before files will be released.
1.02 REQUEST PROCEDURE
A. To receive Drawing CAD files the Release Form must be completed in full and submitted to the
Construction Manager to be forwarded to the Project Manager at TMP Architecture, Inc.
1. A signed copy of the Release Form must be submitted.
a. Emailed copies will be accepted.
2. Upon remittance of the signed Release Form , allow five working days for processing.
3. Transmission of Drawings will be provided electronically to the Construction Manager .
1.03 RELEASE FORM
A. Release Form is located immediately after this Section. Refer to Section 00 8200.01 Electronic
Files Release Form.
END OF SECTION 00 8200
09-25-2026 D.R.1 PRE-PURCHASE TMP ELECTRONIC FILES RELEASE FORM
00 8200.01-1
SECTION 00 8200.01 - TMP ELECTRONIC FILES RELEASE FORM
RE: AUTHORIZATION FORM FOR CAD FILE TRANSFERS
PROJECT NAME: DEXTER WELLNESS CENTER- D.R. 1 AHU PRE-PURCHASE
TMP PROJECT NO. : 25031
Dear Sir/Madam:
Per your request, TMP Architecture, Inc. will electronically transmit requested CAD files upon receipt of an original signed copy of this form which states the conditions of agreement and the receipt of the required compensation fee.
1. By acceptance it is understood and agreed that the data and medium being supplied is to be used only for the project referenced.
2. It is further understood and agreed that the undersigned will hold TMP Architecture, Inc.
and its Consultants harmless and indemnify TMP Architecture, Inc. and its Consultants from all claims, liabilities, losses, and so forth, including attorney's fees arising out of the use or misuse of the transferred files.
3. It is understood and agreed that the items transmitted are prepared from CAD files current at the time of preparation. All files are AutoCAD version 2024 dwg files.
a. Composite plans of floor plan, reflected ceiling plan, or roof plan will be provided in lieu of individual zone sheets. General Information, Life Safety Plans, and Detail sheets are not available for release.
4. This information does not waive the need to verify and review current field conditions and the status of Addenda and/or Proposal Request or Construction Change Directive documentation.
5. As a record of information to be transmitted, TMP Architecture, Inc. will prepare a duplicate electronic back-up for its record.
6. Compensation for providing this material will be as follows: $0.00 / No Charge
7. A signed copy of this form must be provided before files will be released. Please remit to
Construction Manager to be forwarded to the Project Manager at TMP Architecture, Inc.
and allow five working days for processing.
REQUESTED DRAWINGS: _________________________________________________
FIRM REQUESTING FILES:
Company: ___________________________________________________________ Address: ____________________________________________________________ Signed:_______________________________________Date: __________________ Printed Name / Title: ___________________________________________________ Email: ______________________________________________________________
TO BE COMPLETED BY TMP ARCHITECTURE, INC.
Released(signed by): _________________________________TMP Architecture, Inc.
Printed Name/Title:______________________________ Date: _________________
END OF SECTION 00 8200.01
09-25-2026 D.R.1 PRE-PURCHASE TMP ELECTRONIC BIM RELEASE FORM
00 8201-1
SECTION 00 8201 - TMP ELECTRONIC BIM RELEASE FORM
AVAILABILITY OF ELECTRONIC BIM FILES
1.01GENERAL PROVISIONS
A. This document establishes the terms and protocols of the following: ownership, development, uses, transmission, and sharing of Building Information Models and other Digital Data for the Project.
B. All the following will be removed from the Revit file prior to the file being distributed; sheets, title blocks, cover sheets, details, schedules, views (all) and TMP and consultant company information.
C. Definitions
1. Building Information Model or Model. A Building Information Model (BIM), or Model, is a digital representation of the Project or a subset of the Project. A Model is a collection of one or more Model Portions, each of which is an assemblage of Model Elements.
2. Model Portion or Portion. A Model Portion, or Portion, is a subset of a Model as designated within this document. The Model Portion may be designated by discipline, trade, area, location, phase, or other mutually agreeable distinction.
3. Model Author or Author. A Model Author, or Author, is the Project Participant responsible for developing a Model Portion.
4. Model Version. A Model Version is a specific edition of a Model or Model Portion that is sufficiently identifiable as unique and unchanged as of the time it is saved by its Author.
5. Model Element. A Model Element is a digital representation of a component, system, object, or assembly within a Model.
6. Non-Graphic Information. Non-Graphic Information is any information other than the physical geometry associated with, or attached to, a Model Element. Examples of Non- Graphic Information include equipment or product manufacturer, maintenance schedule, tonnage of HVAC, etc.
7. Digital Data. Digital Data is information created or stored for the Project in digital form.
8. Level of Development. The Level of Development (LOD) establishes the minimum dimensional, spatial, quantitative, and qualitative aspects of a Model Element, and the degree to which Project Participants may rely upon the Model Element when developed to that level in the Model. Level of Development (LOD) is established by Architect and Consultants at time of BIM Kickoff Meeting and is discipline specific as defined in section (1.05) below.
9. Project Participant. A Project Participant is the owner of, and any entity or individual providing services or work on, the Project.
D. This document shall not be construed to create a contractual relationship of any kind between Project Participants who are not otherwise in contractual privity.
1.02 POLICY
A. At the request of, and as a courtesy for the convenience of the Construction Manager, Architect will provide BIM files in accordance with the following policy:
1. By acceptance it is understood and agreed that the Model being supplied is to be used only for the project referenced.
2. It is further understood and agreed that the undersigned will hold TMP Architecture, Inc., and its Consultants harmless and indemnify TMP Architecture, Inc. and its Consultants from all claims, liabilities, losses, and so forth, including attorney's fees arising out of the use or misuse of the transferred files.
00 8201-2
3. Data contained on these electronic files are part of our instruments of service and shall not be used by you or anyone else receiving these data through or from you for any purpose other than as a convenience in the preparation of shop drawings for the referenced project. Any other use or reuse by you or by others will be at your sole risk and without liability or legal exposure to us. You agree to make no claim and hereby waive, to the fullest extent permitted by law, any claim or cause of action of any nature against our firm, our officers, directors, employees, agents or subconsultants that may arise out of or in connection with your use of the electronic files.
4. The digital data is diagrammatic and represents the general intent of systems. The plans and 3D model are not to be considered coordination, fabrication, or shop drawing level.
Coordination with all trades is required. Additional fittings, offsets, and components will be required to complete each system and to avoid interferences with other systems including the structural, sheet metal, HVAC piping, plumbing, electrical, fire protection, etc. and/or other space constraints.
5. It is understood and agreed that the files transmitted are prepared from BIM files current at the time of preparation. All files are Revit version decided upon between the Architect and Design Team at time of Project Kick-off meeting, unless mutually decided upon by the Architect and Consultant Team throughout the project duration. The Revit version for this Model or Model Portion will be stated below.
6. This document shall indicate the Model Version at time of release. Reliance upon the Model, Model Portion, or Model Elements shall be limited to the uses listed within this document. Any reliance on a Model Version not in accordance with this document shall be at the Project Participant’s sole risk.
7. These electronic files are not construction documents. Differences may exist between these electronic files and corresponding hard-copy construction documents. We make no representation regarding the accuracy or completeness of the electronic files you receive.
In the event that a conflict arises between the signed or sealed hard-copy construction documents prepared by us and the electronic files, the signed or sealed hard-copy construction documents shall govern. You are responsible for determining if any conflict exists. By your use of these electronic files, you are not relieved of your duty to fully comply with the contract documents, including, and without limitation, the need to check, confirm and coordinate all dimensions and details, take field measurements, verify field conditions and coordinate your work with that of other contractors for the project.
8. Because information presented on the electronic files can be modified, unintentionally or otherwise, we reserve the right to remove all indicia of ownership and/or involvement from each electronic display.
9. This information does not waive the need to verify and review current field conditions and the status of Addenda and/or Bulletin and Proposal Request or Construction Change Directive documentation.
10. As a record of information to be transmitted, TMP Architecture, Inc. will prepare a duplicate electronic back-up for its record.
11. Compensation Fee for providing this material will be as follows: $750.00.
12. A signed copy of this document, stating Project, Model Version, Level of Development at time of release, and intended use of Model or Model Portion must be provided before files will be released.
13. If Project Participants discover or become aware of any discrepancies, inconsistencies, errors, or omissions in any Model Version, they shall promptly report the discrepancy, inconsistency, error, or omission in writing to the Author and the Architect.
14. Under no circumstances shall delivery of the electronic files for use by you be deemed a sale by us, and we make no warranties, either express or implied, of merchantability and fitness for any particular purpose. In no event shall we be liable for any loss of profit or any consequential damages as a result of your use or reuse of these electronic files.
00 8201-3
15. By transmitting Digital Data, the transmitting Party does not convey ownership right in the Digital Data or in the software used to generate the Digital Data. Unless otherwise granted in a separate document, the receiving Party’s right to use, or modify Digital Data is specifically limited to the intended use of Model or Model Portion as indicated within this document.
16. The electronic files are issued only as supplemental information for the convenience of the Construction Manager.
1.03 LEVEL OF DEVELOPMENT
A. Level of Development Descriptions: The LOD descriptions included within this document shall be used to identify the minimum required characteristics for each Model Element at progressively developed levels. Other Project Participants may only rely on a Model Element consistent with the minimum required characteristics for the designated LOD.
1. Non-Graphic Information: Non-Graphic Information may be attached to a Model Element.
If Non-Graphic Information has a different degree of reliance than the Model Element to which it is attached, then the Model Author shall indicate the difference.
2. LOD 100: The Model Element may be graphically represented in the Model with a symbol or other generic representation but does not satisfy the requirements for LOD 200.
Information related to the Model Element can be derived from other Model Elements.
3. LOD 200: The Model Element is generically and graphically represented within the Model with approximate quantity, size, shape, location, and orientation.
4. LOD 300: The Model Element, as designed, is graphically represented within the Model such that its quantity, size, shape, location, and orientation can be measured.
5. LOD 350: The Model Element, as designed, is graphically represented within the Model such that its quantity, size, shape, location, orientation, and interfaces with adjacent or dependent Model Elements can be measured.
6. LOD 400: The Model Element is graphically represented within the Model with detail sufficient for fabrication, assembly, and installation.
7. LOD 500: The Model Element is a graphic representation of an existing or as-constructed condition developed through a combination of observation, field verification, or interpolation. The level of accuracy shall be noted or attached to the Model Element.
1.04 REQUESTED PROJECT MODEL
TMP Project Name: Dexter Wellness Center - D.R.1 - AHU Pre-Purchase TMP Project Number: 23031 Requested Model Portion (Architectural, Structural, Mechanical/Electrical, etc.)
Company Requesting Files: ______________________________________________ Address: ____________________________________________________________ Signed: _____________________________________________________________ Printed Name / Title: ___________________________________________________ Email: ______________________________________________________________ By signing above, it is understood and agreed that the undersigned will hold TMP Architecture, Inc., and its Consultants harmless and indemnify TMP Architecture, Inc. and its Consultants from all claims, liabilities, losses, and so forth, including attorney's fees arising out of the use or misuse of the transferred files. Reliance upon the Model, Model Portion, or Model Elements shall be limited to the uses listed within this document. Any reliance on a Model Version not in accordance with this document shall be at the Project Participant’s sole risk. It is understood and agreed that the items transmitted are current as of date indicated below and this information does not waive the need of the user to verify and review current field conditions and the status of subsequent revisions including Addenda and/or Bulletin and Proposal Request or Construction Change Directive Documentation.
00 8201-4
1.05 TO BE COMPLETED BY TMP ARCHITECTURE, INC.
Model Version: ______________________ Software Version: ____________________ Level of Development: __________________________________________________ Comments: _________________________________________________________ Released (signed by): ________________________________ TMP Architecture, Inc.
Printed Name / Title: _________________________________ Date: ______________
END OF SECTION 00 8201
09-25-2026 D.R.1 PRE-PURCHASE RELATED REQUIREMENTS
01 0005-1
SECTION 01 0005 - RELATED REQUIREMENTS
PART 1 GENERAL
1.01DIVISION 00 AND DIVISION 01
A. Unless otherwise noted, all provisions of sections and documents in Division 00 and Division
01, including, but not limited to, General Conditions and Supplementary Conditions, relate and apply to all sections and documents within Project Manual; including, but not limited to, sections and documents in Division 00 through Division 48.
1.02 DRAWINGS
A. Unless otherwise noted, Drawings relate and apply to all specification sections and documents within Project Manual; including, but not limited to, sections and documents in Division 00 through Division 48.
PART 2 PRODUCTS -- NOT USED
PART 3 EXECUTION -- NOT USED
END OF SECTION 01 0005
09-25-2026 D.R.1 PRE-PURCHASE SUBSTITUTION PROCEDURES
01 2500-1
SECTION 01 2500 - SUBSTITUTION PROCEDURES
PART 1 GENERAL
1.01SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 RELATED REQUIREMENTS
A. Section 01 2500.01 - TMP Substitution Request Form.
1.03 DEFINITIONS
A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to materials, products, assemblies, and equipment.
1. Substitutions for Cause: Proposed due to changed Project circumstances beyond
Contractor's control.
2. Substitutions for Convenience: Proposed due to possibility of offering substantial advantage to the Project.
B. Substitutions: Any proposed substitution to be evaluated by the Architect and accepted as stipulated below.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL REQUIREMENTS
A. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to provide same or equivalent maintenance service and source of replacement parts, as applicable.
4. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.
5. Waives claims for additional costs or time extension that may subsequently become apparent.
B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.
1. Note explicitly any non-compliant characteristics.
C. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
1. Forms included in the Project Manual are adequate for this purpose, and must be used.
D. Limit each request to a single proposed substitution item.
1. Submit an electronic document, combining the request form with supporting data into single document.
3.02 SUBSTITUTION PROCEDURES DURING PROCUREMENT
A. Submittal Time Restrictions:
B. Substitution Request Form: TMP Substitution Request Form must be completed and provided at the beginning of each substitution request.
1. Refer to Section 01 2500.01 - TMP Substitution Request Form.
2. Submittals without a completed TMP Substitution Request Form will not be acknowledged, reviewed, or returned. Use only this form; other forms of submission are unacceptable.
C. Instructions to Bidders specifies time restrictions for submitting requests for substitutions during the bidding period.
09-25-2026 D.R.1 PRE-PURCHASE SUBSTITUTION PROCEDURES
01 2500-2
3.03 SUBSTITUTION PROCEDURES DURING CONSTRUCTION
A. Substitution Request Form: TMP Substitution Request Form must be completed and provided at the beginning of each substitution request.
1. Refer to Section 01 2500.01 - TMP Substitution Request Form.
2. Submittals without a completed TMP Substitution Request Form will not be acknowledged, reviewed, or returned. Use only this form; other forms of submission are unacceptable.
B. Submit request for Substitution for Cause immediately upon discovery of need for substitution, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
C. Submit request for Substitution for Convenience within 14 days of discovery of its potential advantage to the project, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
1. In addition to meeting general documentation requirements, document how the requested substitution benefits the Owner through cost savings, time savings, greater energy conservation, or in other specific ways.
2. Document means of coordinating of substitution item with other portions of the work, including work by affected subcontractors.
3. Bear the costs engendered by proposed substitution of:
a. Owner's compensation to the Architect for any required redesign, time spent processing and evaluating the request.
b. Other unanticipated project considerations.
D. Substitutions will not be considered under one or more of the following circumstances:
1. When they are indicated or implied on shop drawing or product data submittals, without having received prior approval.
2. Without a separate written request.
3.04 RESOLUTION
A. Architect may request additional information and documentation prior to rendering a decision. Provide this data in an expeditious manner.
B. Architect will notify Contractor in writing of decision to accept or reject request.
1. During construction, Architect's decision following review of proposed substitution will be noted on the submitted form.
2. During bidding, Architect will approve substitution requests by issuing an Addendum.
Substitutions not approved by addendum are rejected.
3.05 ACCEPTANCE
A. Accepted substitutions change the work of the Project. They will be documented and incorporated into work of the project by Change Order, Construction Change Directive, Architectural Supplementary Instructions, or similar instruments provided for in the Conditions of the Contract.
3.06 CLOSEOUT ACTIVITIES
A. See Section 01 7800 - Closeout Submittals, for closeout submittals.
END OF SECTION 01 2500
09-25-2026 D.R.1 PRE-PRCHASE TMP SUBSTITUTION REQUEST FORM
01 2500.01-1
SECTION 01 2500.01 - TMP SUBSTITUTION REQUEST FORM
SUBSTITUTION REQUEST NUMBER: ____________ DATE SUBMITTED: ______________________
TMP PROJECT NUMBER: 25031 PROJECT NAME: DEXTER WELLNESS CENTER - D.R.1 AHU
PRE-PURCHASE
SPECIFIED ITEM
SPECIFICATION TITLE:________________________________________________________________
SPECIFICATION SECTION___________SPECIFICATION ARTICLE/PARAGRAPH: _______________
SPECIFIED PRODUCT / DESCRIPTION: __________________________________________________ SPECIFIED MANUFACTURER: _________________________________________________________ SPECIFIED PRODUCT / MODEL: _______________________________________________________ REASON SPECIFIED ITEM CANNOT BE PROVIDED: _______________________________________
PROPOSED SUBSTITUTION
DESCRIPTION OF PROPOSED SUBSTITUTION: ___________________________________________
PROPOSED MANUFACTURER: ________________________________________________________
ADDRESS: ____________________________________________________________________
WEBSITE: _____________________________________________________________________
PRODUCT / MODEL: __________________________________________________________________
YEARS PRODUCT/MODEL HAS BEEN MANUFACTURED: __________
DIFFERENCES BETWEEN PROPOSED SUBSTITUTION AND SPECIFIED ITEM: ________________
WILL PROPOSED SUBSTITUTION AFFECT OTHER PARTS OF WORK? ☐ NO ☐ YES
IF YES, EXPLAIN HOW: _______________________________________________________________
HOW WILL SUBSTITUTION BENEFIT THE OWNER: ☐ COST SAVINGS ☐ TIME SAVINGS ☐ OTHER
PROVIDE SPECIFIC DETAILS: _________________________________________________________
THE FOLLOWING INFORMATION IS REQUIRED; CHECK TO INDICATE INFORMATION IS
ATTACHED. (REQUEST WILL BE REJECTED WITHOUT REQUIRED DATA)
32.01 A. ☐ List of references where proposed product has been installed; include address, owner, architect, and date installed.
B. ☐ Product data sheets.
01 2500.01-2
C. ☐ Applicable certificates and test reports.
D. ☐ Comparative Data: Provide point-by-point, side-by-side comparison of specified product and proposed substitution addressing essential attributes specified.
INDICATE WHICH OF THE FOLLOWING VOLUNTARY INFORMATION IS ATTACHED, IF ANY:
☐ DRAWINGS.
☐ SAMPLES.
☐ OTHER ITEMS: ____________________________________________________________________
SIGNATURE
THE UNDERSIGNED CERTIFIES:
The proposed substitution meets or exceeds the quality level of the specified product, equipment, assembly, or system.
To provide the same warranty for the substitution as for the specified product.
Agrees to provide same or equivalent maintenance service and source of replacement parts, as applicable.
Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.
The proposed substitution will have no adverse effects on other work.
The proposed substitution will not affect project schedule.
Waives claims for additional costs or time extension that may subsequently become apparent.
CONTRACTOR / COMPANY: ___________________________________________________________ SIGNED BY: _________________________________PRINTED NAME: _________________________ TITLE: ______________________________________________________________________________ ADDRESS: __________________________________________________________________________ EMAIL: ____________________________________ PHONE: _________________________________
ARCHITECT’S RESPONSE
A. During bidding, Architect will approve substitution requests by issuing an Addendum.
Substitutions not approved by addendum are rejected.
B. During construction, Architect will notify Contractor in writing (see below) of decision to accept or reject request, and incorporate the substitution into the project by Change Order, Construction Change Directive, Architectural Supplementary Instructions, or similar instruments as provided for in the Conditions of the Contract.
01 2500.01-3
☐ SUBSTITUTION APPROVED - PROVIDE SUBMITTALS PER SECTION 01 3000 AND
RESPECTIVE SECTION FOR WHICH SUBSTITUTION WAS MADE.
☐ SUBSTITUTION REJECTED - PROVIDE SPECIFIED MATERIALS.
SIGNED BY: ______________________________PRINTED NAME: ____________________________ ARCHITECT’S COMMENTS: ___________________________________________________________
END OF SECTION 01 2500.01
09-25-2026 D.R.1 PRE-PURCHASE ADMINISTRATIVE REQUIREMENTS
01 3000-1
SECTION 01 3000 - ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01SECTION INCLUDES
A. Submittals for review, information, and project closeout.
B. Number of copies of submittals.
C. Requests for Information (RFI) procedures.
D. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 01 3000.01 - TMP Submittal and Sample Transmittal Form.
1.03 REFERENCE STANDARDS
A. AIA G716 - Request for Information; 2004.
B. CSI/CSC Form 13.2A - Request for Information; Current Edition.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 REQUESTS FOR INFORMATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
2. A resolution to an issue which has arisen due to field conditions and affects design intent.
B. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of
Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.
b. Do not forward requests which solely require internal coordination between subcontractors.
2. Prepare in a format and with content acceptable to Architect. Use one of the following:
a. Use AIA G716 - Request for Information .
b. Use CSI/CSC Form 13.2A - Request for Interpretation.
c. Other format acceptable to Architect.
3. Combine RFI and its attachments into a single electronic file. PDF format is preferred.
4. Submit RFIs through Procore, email, or other approved method agreed to by the Architect and Owner.
a. RFIs submitted via an internet-based submittal service are to send electronic documents to the Architect via email with a downloadable link.
C. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Include in each request Contractor's signature attesting to good faith effort to determine from Contract Documents information requiring interpretation.
2. Improper RFIs: Requests not prepared in conformance to requirements of this section, and/or missing key information required to render an actionable response. They will be returned without a response and may include an explanatory notation.
3. Frivolous RFIs: Requests regarding information that is clearly indicated on, or reasonably inferable from, the Contract Documents, with no additional input required to clarify the question. They will be returned without a response and may include an explanatory notation.
01 3000-2
a. The Owner reserves the right to assess the Contractor for the costs (on time-and-materials basis) incurred by the Architect, and any of its consultants, due to processing of such RFIs.
D. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
1. Official Project name and number, and any additional required identifiers established in
Contract Documents.
2. Discrete and consecutive RFI number, and descriptive subject/title.
3. Issue date, and requested reply date.
4. Reference to particular Contract Document(s) requiring additional information/interpretation. Identify pertinent drawing and detail number and/or specification section number, title, and paragraph(s).
5. Annotations: Field dimensions and/or description of conditions which have engendered the request.
6. Contractor's suggested resolution: A written and/or a graphic solution, to scale, is required in cases where clarification of coordination issues is involved, for example;
routing, clearances, and/or specific locations of work shown diagrammatically in Contract Documents. If applicable, state the likely impact of the suggested resolution on Contract Time or the Contract Sum.
E. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
F. RFI Log: Prepare and maintain a tabular log of RFIs for the duration of the project.
1. Indicate current status of every RFI. Update log promptly and on a regular basis.
2. Note dates of when each request is made, and when a response is received.
3. Identify and include improper or frivolous RFIs.
G. Review Time: Architect will respond and return RFIs to Contractor within seven calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 3:00 PM will be considered as having been received on the following regular working day.
1. Response period may be shortened or lengthened for specific items, subject to mutual agreement, and recorded in a timely manner in progress meeting minutes.
H. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to Owner.
1. Response may include a request for additional information, in which case the original RFI will be deemed as having been answered, and an amended one is to be issued forthwith. Identify the amended RFI with an R suffix to the original number.
2. Do not extend applicability of a response to specific item to encompass other similar conditions, unless specifically so noted in the response.
3. Upon receipt of a response, promptly review and distribute it to all affected parties, and update the RFI Log.
4. Notify Architect within seven calendar days if an additional or corrected response is required by submitting an amended version of the original RFI, identified as specified above.
3.02 SUBMITTAL SCHEDULE
A. Submit to Architect for review a schedule for submittals in tabular format.
1. Submit at the same time as the preliminary schedule.
2. Coordinate with Contractor's construction schedule and schedule of values.
3. Format schedule to allow tracking of status of submittals throughout duration of construction.
01 3000-3
4. Arrange information to include scheduled date for initial submittal, specification number and title, description of item of work covered, and role and name of subcontractor.
5. Account for time required for preparation, review, manufacturing, fabrication and delivery when establishing submittal delivery and review deadline dates.
a. For assemblies, equipment, systems comprised of multiple components and/or requiring detailed coordination with other work, allow for additional time to make corrections or revisions to initial submittals, and time for their review.
3.03 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Architect for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - Closeout Submittals.
3.04 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Other types indicated.
B. Submit for Architect's knowledge as contract administrator or for Owner.
3.05 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 7800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Other types as indicated.
D. Submit for Owner's benefit during and after project completion.
3.06 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy.
B. Samples: Submit the number specified in individual specification sections, but not less than 3;
one (minimum) of which will be retained by Architect.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.07 SUBMITTAL PROCEDURES
A. Transmittal Form: TMP Submittal and Sample Transmittal Form must be completed and provided at the beginning of each submittal.
1. Refer to Section 01 3000.01 - TMP Submittal and Sample Transmittal Form.
01 3000-4
2. Submittals without a completed TMP Submittal and Sample Transmittal Form will not be acknowledged, reviewed, or returned.
B. Submittals shall be submitted in electronic form.
1. Exceptions: Physical samples.
a. Physical Samples must be accompanied by an electronic copy and a hard/physical copy of the completed TMP Submittal and Sample Transmittal Form.
C. Electronic Submittals: Comply with the following:
1. Submittal process shall be through Procore, email, or other approved method agreed to by the Architect and Owner.
a. Submittals via an internet-based submittal service are to send electronic documents to the Architect via email with a downloadable link.
2. File Format: Portable Document Format (PDF).
3. File Naming: File naming shall be in the following format:
a. Specification section number, followed by a hyphen, and a consecutive number indicating sequential submittals for that section; followed by a general description of the submittal contents.
1) Examples:
(a) Section 07 9200; first submittal:
(1) 07 9200-01 Joint Sealants
(b) Section 07 9200; second submittal:
(1) 07 9200-02 Joint Sealant Color
b. Resubmittals. For revised resubmittals use original number and a sequential combination numerical and alphabetical suffix; hyphen followed by "R" and a two-digit consecutive number indicating sequential resubmittals for that particular submittal.
1) Examples:
(a) Section 07 9200; resubmittal of first submittal of section:
(1) 07 9200-01-R01 Joint Sealants.
(b) Section 07 9200; second resubmittal of first submittal of section:
(1) 07 9200-01-R02 Joint Sealants
(c) Section 07 9200; first resubmittal of second submittal of section:
(1) 07 9200-02-R01 Joint Sealant Color
4. Each Submittal shall be one file, complete with all attachments.
a. Multi-file submittal will not be acknowledged, reviewed, or returned.
D. General Requirements:
1. Use a single transmittal for related items.
a. Each transmittal shall be for one specification section only; do not submit items for multiple sections under the same transmittal.
1) Multi-section submittals will be acknowledged and returned; stamped "X - Not
Approved - Resubmit".
2. Submit separate packages of submittals for review and submittals for information, when included in the same specification section.
3. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
a. Submittals from sources other than the Contractor, or without Contractor's stamp will not be acknowledged, reviewed, or returned.
4. Deliver each submittal on date noted in submittal schedule, unless an earlier date has been agreed to by all affected parties, and is of the benefit to the project.
5. Schedule submittals to expedite the Project, and coordinate submission of related items.
a. For each submittal for review, allow 14 calendar days excluding delivery time to and from the Contractor.
b. For sequential reviews involving Architect's consultants, Owner, or another affected party, allow an additional 7 calendardays.
01 3000-5
6. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed work.
7. When revised for resubmission, identify all changes made since previous submission.
8. Distribute reviewed submittals. Instruct parties to promptly report inability to comply with requirements.
9. Incomplete submittals will not be reviewed, unless they are partial submittals for distinct portion(s) of the work, and have received prior approval for their use.
10. Submittals not requested will be recognized and returned; stamped "NA - No Action Taken
- Not Reviewed" E. Product Data Procedures:
1. Submit only information required by individual specification sections.
2. Collect required information into a single submittal.
3. Submit concurrently with related shop drawing submittal.
4. Do not submit (Material) Safety Data Sheets for materials or products unless specifically called for in individual sections.
F. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting Contract Documents and coordinating related work.
2. Do not reproduce Contract Documents to create shop drawings.
3. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
4. Non-complying submittals will be acknowledged and returned; stamped "X - Not Approved
- Resubmit".
G. Samples Procedures:
1. Transmit related items together as single package.
2. Identify each item to allow review for applicability in relation to shop drawings showing installation locations.
3. Submit actual physical samples.
4. Electronic submittals will not be accepted unless prior approval is received from the
Architect. Electronic samples without prior approval will be acknowledged and returned;
stamped "X - Not Approved - Resubmit."
3.08 SUBMITTAL REVIEW
A. General: Submittals that do not conform to the requirements of this section will not be acknowledged, reviewed, or returned.
B. Submittals for Review: Architect will review each submittal, and approve, or take other appropriate action.
C. Submittals for Information: Architect will acknowledge and may review. See below for actions to be taken.
D. Architect's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
1. Where more than one action has been indicated, each shall apply to that portion of the submittal for which the action is indicated.
E. Architect's review shall not indicate approval of dimensions, quantities or fabrication processes unless specific notations are made by the Architect regarding same.
F. Architect's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. "Reviewed - No Exceptions Taken", "Approved", or language with same legal meaning.
b. "Reviewed with Corrections Noted", "Approved as Noted, Resubmission not required", or language with same legal meaning.
1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.
01 3000-6
2. Not Authorizing fabrication, delivery, and installation:
a. "Revise and Resubmit", "Not Approved - Resubmit", or language with the same legal meaning.
1) Resubmit revised item, with review notations acknowledged and incorporated.
3. Not Authorizing manufacturer:
a. Rejected - Resubmit, or language with the same legal meaning.
G. Architect's and consultants' actions on items submitted for information:
1. Items for which no action was taken:
a. "No Action Taken - Not Reviewed" or "Received" - to notify the Contractor that the submittal has been received for record only.
END OF SECTION 01 3000
SUBMITTAL AND SAMPLE TRANSMITTAL FORM 01 3000.01
CONST. MANAGER / CONTRACTOR PROJECT TMP PROJECT NO. DATE SUBMITTED SUBMITTAL NO.
Name and Address: Title:
25031
* ACTION CODES Initial Submittal ☐
R Reviewed – No Exceptions Taken Resubmittal ☐
Wellness Center Renovations D.R.1. AHU Pre-Purchase
RN Reviewed with Corrections Noted
Email: Location: RR Revise and Resubmit REVIEWED BY
X Not Approved – Resubmit TMP ☐
Phone: NA No Action Taken – Not Reviewed Consultant ☐ 2810 Baker Road Dexter, MI 48130
Reviewer:
SPECIFICATION
SECTION NO.
SUBCONTRACTOR /
MANUFACTURER ITEM DESCRIPTION NO. OF
SAMPLES
NO. OF
SAMPLES
RETURNED
ACTION
CODE *
DATE
REVIEWED
DATE
RETURNED
Transmittal shall be for one specification section only; do not submit items from multiple sections under the same transmittal. Multi-section submittals will be returned;
stamped "X - Not Approved - Resubmit"
Submittal Stamps may be placed on subsequent blank page.
CONTRACTOR COMMENTS ARCHITECT COMMENTS The undersigned certifies that the above submitted items have been reviewed in detail and are correct and in strict conformance with the Contract Documents except as otherwise noted. NOTE: Approval of items submitted does not relieve Contractor from complying with all requirements of the Contract Documents.
CONTRACTOR NAME
SIGNATURE
TMP Architecture, Inc. • 1191 WEST SQUARE LAKE ROAD, BLOOMFIELD HILLS, MI 48302 • PH 248.338.4561
This page intentionally left blank for Submittal Stamps
09-25-2026 D.R.1 PRE-PURCHASE QUALITY REQUIREMENTS
01 4000-1
SECTION 01 4000 - QUALITY REQUIREMENTS
PART 1 GENERAL
1.01SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. References and standards.
D. Testing and inspection agencies and services.
E. Contractor's design-related professional design services.
F. Control of installation.
G. Mock-ups.
H. Tolerances.
I. Manufacturers' field services.
J. Defect Assessment.
1.02 REFERENCE STANDARDS
A. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection; 2026.
B. ASTM E543 - Standard Specification for Agencies Performing Nondestructive Testing; 2026.
C. ASTM E699 - Standard Specification for Agencies Involved in Testing, Quality Assurance, and
Evaluating of Manufactured Building Components; 2016.
1.03 DEFINITIONS
A. Contractor's Professional Design Services: Design of some aspect or portion of the project by party other than the design professional of record. Provide these services as part of the Contract for Construction.
1. Design Services Types Required:
a. Design-Related: Design services explicitly required to be performed by another design professional due to highly-technical and/or specialized nature of a portion of the project. Services primarily involve engineering analysis, calculations, and design, and are not intended to alter the aesthetic aspects of the design.
B. Design Data: Design-related, signed and sealed drawings, calculations, specifications, certifications, shop drawings and other submittals provided by Contractor, and prepared directly by, or under direct supervision of, appropriately licensed design professional.
1.04…