Appendix B - SOW A25-1118.pdf
PDF 118 KB Posted
- Solicitation number
- RFP-A25-1118
- Issued by
-
Department of Energy Ames Laboratory
About this file
This document is a Contractor/Vendor Requirements document for a substation equipment purchase for the Ames National Laboratory's Metals Development 150 project. The requirements specify the procurement of substation equipment from Square D/Schneider Electric, including medium-voltage primary incoming section, transformer section, and low-voltage secondary switchgear section with coordinated circuit breakers, fusible switches, and metering components. The document outlines detailed requirements for manufacturing, delivery, storage, and handling, with the Project General Contractor directing logistics and the substantial completion date set for March 31, 2026.
Key stipulations include contractors obtaining parking permits if using ISU or Ames Labs parking, unloading at the Metals Development dock, maintaining a clean and safe work area, and following all specified guidelines. The document explicitly notes that Construction Wage Rate Requirements (Davis-Bacon) do not apply to this work, and contractors must adhere to the specifications dated February 14, 2025, for the AMES LAB-MD 150 SUBSTATION PREPURCHASE.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR/VENDOR REQUIREMENTS FOR:
PRJ0012953 MD 150: Substation
Square D; Schneider Electric: Equipment Purchase Only
14 MARCH 2025
1. GENERAL CONDITIONS
a. All decontamination work done by Ames Lab.
b. At the time of equipment delivery, Construction for Metals Development
150 will be underway and will have an appointed Project General Contractor (GC).
c. If the Project GC asks to have this equipment delivered to the site, and the contractor wants to park in an ISU or Ames Labs parking lot, the contractor will obtain a parking permit from ISU parking division. This will be at the Contractor expense.
d. Ames Labs FES will allow contractors to unload material at the Metals Development dock.
i. If the Project GC determines that this equipment should be delivered off site; the contractor will get location address and delivery instructions from the Project GC.
ii. If the contractor is parking at ISU or Ames Lab, they will then have to move to a permit parking lot after unloading. The Contractor can also park free at the Ames labs shop area.
2. General Contractor Responsibilities
a. Schedule the work, keep a safe clean construction area and coordinate work with Project GC and all subs. Develop and maintain timeline for work. Keep Ames Labs informed of any changes to the delivery timeline (need timeline prior to starting).
i. Design, develop and keep a schedule for the delivery.
ii. Contractor to keep a clean, safe work area.
b. The SSAP and Safety Appendix for purchase and the installation will fall under the Safety Appendix for the project Construction as it will be installed by the GCs subcontractors.
3. Description of Services
a. Provide (only) the Substation equipment per specifications titled: AMES LAB- MD 150 SUBSTATION PREPURCHASE; dated February 14, 2025.
i. Manufacturing Equipment
1. Square D; Schneider Electric
2. Medium- Voltage, primary incoming section
3. Transformer Section
4. Low-Voltage Secondary Switchgear Section
5. Including coordinated circuit breakers, fusible switches, metering components
6. Follow all specifications laid out
ii. Delivery, Storage and Handling
1. Delivery per the direction of Project General Contractor
2. Storage as per direction of Project General Contractor
3. Follow all specifications laid out
iii. Warranty
1. Provide Warranty as per specifications
4. Construction Wage Rate Requirements (Davis-Bacon) do not apply to this work.
5. Reference details in attached specifications and drawings.
i. Substantial completion March 31, 2026
6. Scope drawings/Specifications/Locations