| Appendix C - Accident Prevention Plan Checklist (Form A-02).pdf | ||
| Appendix A - VFD Inventory.pdf | ||
| Sources Sought (BPA).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Army Corps of Engineers Rivers Project Office 301 Riverlands Way West Alton, Missouri 63386 Ph: 636-899-2600 Fax: 636-899-2655
Quality Control Plan Checklist (Section 01440)
Project Name:
Contract Number:
Contractor:
Review Date:
Reviewed By:
1. Description of the quality control organization
a. Chart showing lines of authority
b. Acknowledgement of Three-Phase Control System
Yes No
Yes No
Comments:
2. Name, qualifications (resume format), duties, responsibilities, and authorities of each person assigned a CQC function. Includes certificate of completion for Construction Quality Management for Contractors (within past 5 years)
Yes No
Comments:
3. Corps of Engineers validated commercial testing laboratory
a. Name and address
b. Letter of validation from Material Testing Center
c. List of applicable ASTM procedures
d. Qualifications of field technician(s) identified for the project
Yes No
Yes No
Yes No
Yes No
Comments:
4. Copy of the letter to the CQC System Manager signed by an authorized official, which describes the responsibilities and delegates the authorities of the CQC Manager
Yes No
Comments:
5. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, off-site fabricators, suppliers, and purchasing agents. Shall be in accordance with Section 01300 - Submittal Procedures.
Yes No
Comments:
b3odnclt Typewritten Text
APPENDIX B
U.S. Army Corps of Engineers Rivers Project Office 301 Riverlands Way West Alton, Missouri 63386 Ph: 636-899-2600 Fax: 636-899-2655
6. Control, verification, and acceptance testing procedures for each specific test
a. Test name
b. Specification paragraph requiring test
c. Feature of work to be tested
d. Test Frequency
e. Person responsible for test
Yes No
Yes No
Comments:
7. Procedures for conducting and tracking preparatory, initial, and follow-up control phases and control,verification, and acceptance tests including documentation
8. Procedures for tracking construction deficiencies from identification through acceptable corrective action. These procedures shall establish verification that identified deficiencies have been corrected. Also to include completion inspection and punch-list procedures.
9. Reporting procedures, including proposed reporting formats Yes No
10. List of definable features of work (a task that is separate and distinct from other tasks and has separate control requirements)
Quality Control Plan Acceptance
Yes No Partial with Comments
Reviewer Signature :
Project Engineer / COR :
| U.S. Army Corps of Engineers |
| U.S. Army Corps of Engineers |
File details come from the government source that posted it. Updated .