This is a Lime Silo Inspection Report prepared for the City of Bartow, Florida Water Department, documenting the current condition of the lime silo structure located at 2500 Highway 17N, Bartow, FL 33830. The inspection report provides a detailed assessment of the silo's structural integrity, identifying deficiencies and areas requiring repair or refurbishment. The report serves as the technical foundation for the City's refurbishment project, which seeks qualified contractors to perform repairs to exterior metal panels, interior bands, metal doorframes and doors, and associated painting work. The inspection findings establish the scope of work and engineering specifications that selected contractors must address to restore the silo to proper operational condition.
The report documents existing conditions and defects that must be remediated through the refurbishment contract, thereby informing contractors of the specific requirements, safety considerations, and technical standards they must meet. As Appendix B to the contract opportunity, this inspection report is a critical reference document that contractors must review to accurately prepare bids and develop project plans. The technical details and condition assessments outlined in the report directly support the City's requirement that the selected contractor deliver a turnkey solution while adhering to all engineering specifications and maintaining strict safety standards throughout the project execution and site restoration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIME SILO
INSPECTION REPORT
Appendix B
CITY OF BARTOW BARTOW
WATER PLANT
20’-0”Ø x 63’-6”
LIME SILO
SEPTEMBER 18, 2020
Bartow Water Plant – Bartow, FL Lime Silo September 2020
Page | 2
TABLE OF CONTENTS
EXECUTIVE SUMMARY
RECOMMENDED REPAIRS
LIMITATIONS OF INSPECTION
TANK DATA
INSPECTION RESULTS
Silo Bottom Skirt Roof Support Posts Coatings
CONCLUSION
APPENDIX A – INSPECTION METHODOLOGY AND PROCEDURES
Personnel Inspection and Evaluation Procedures Inspection Equipment and Instruments
APPENDIX B – PHOTOGRAPHS
Page | 3
EXECUTIVE SUMMARY
An In-Service (External) Inspection was completed on the lime silo at the Bartow Water Plant on September 18, 2020. The inspection was completed to determine the silo’s suitability for service and recommendations for repair.
The exterior of the silo appeared to be in overall acceptable condition. Coating failure and minor to severe corrosion was present on the lower interior of the silo. Through holes were noted at the top of the main doorway. Further inspection details are available in the following report. Photographs of the key inspection points are also included at the end of the report.
The lime silo appeared to be suitable for continued service. The repairs listed on page 4 should be completed as soon as possible.
Inspected By:
Darrin A. Laughlin API 510 Certified Inspector No. 34223
Page | 4
RECOMMENDED REPAIRS
1. Replace approximately 320 feet of 1/8”-thick, 3-inch wide flat bar on lower interior.
2. Clean areas of coating failure, repair if necessary, and recoat.
3. Patch holes above doorway and recoat.
4. Seal weld or re-caulk underside of stiffening ring.
5. Repair unit on silo roof.
6. Consider replacing curved section of fill pipe.
LIMITATIONS OF INSPECTION
1. External inspection of silo only. Internal lower area inspected.
Page | 5
TANK DATA
General Owner City of Bartow Location Bartow, FL Height 63’-6” Diameter 20’-0” Number of Supports 5 Diameter of Supports 30” Material(s) Carbon Steel Construction Welded
Page | 6
INSPECTION RESULTS
Silo The silo shell appeared to be in acceptable structural condition. Ultrasonic thickness measurements (UTMs) showed an average thickness of 0.250” (1/4”). The bottom cone also appeared to be in acceptable structural condition. UTMs ranged from 0.231” to 0.263”.
Bottom Skirt The bottom skirt of the silo appeared to be in overall acceptable condition, with minor to severe corrosion present. The skirt was found to range in thickness from 0.116” to 0.125” (1/8”). The interior bands on the welds were not seal welded and corrosion is present behind them. It is recommended that all the bands be removed, the areas cleaned, and new 1/8”-thick, 3”-wide bands be installed. The new bands should be seal welded to prevent future corrosion.
Through holes were noted above the ground level entry door. These areas should be cleaned, patched, and recoated.
Roof The silo roof appeared to be in acceptable structural condition, with UTMs ranging from 0.238” to 0.240”.
The unit on the roof was being held together with a ratchet strap. It is recommended that the unit be properly repaired.
The fill line going to the roof had a patch plate near the curve where it turns down the side of the silo.
UTMs taken in this area showed an average remaining thickness of 0.160” (approx. 5/32”). UTMs away from the curved area showed an average remaining thickness of 0.260”. Consideration may want to be given to replacing curved section of the pipe.
Support Posts The silo was supported by 5 posts. The support posts are 30”-diameter and 0.500”-thick (1 /2”).
The support posts appeared to be in acceptable structural condition.
Coatings The exterior coatings appeared to be in overall acceptable condition. Coating failure and corrosion were noted throughout the silo, skirt, roof and accessories. Areas of coating failure should be cleaned and recoated.
The lower interior coating appeared to be in overall acceptable condition. Coating failure and minor corrosion were noted. Areas of coating failure should be cleaned and recoated.
Page | 7
CONCLUSION
The lime silo appeared to be in overall acceptable structural condition. The coatings were found to be in overall acceptable condition with isolated areas of failure.
The lime silo appeared to be suitable for continued service. The repairs listed on page 4 should be completed as soon as possible.
Any and all information and data contained in AmSpec's final report(s) are obtained as a result of inspection and testing protocols undertaken according to the requirements of AWWA technical standards and protocols. AmSpec warrants that it has exercised due diligence and care with respect to the information, opinions and professional judgments embodied in this report. The report reflects the findings at the time and place of inspection. AmSpec, LLC cannot attest to the veracity of any information or data supplied by third parties and as a consequence, cannot be held liable for same.
Page | 8
APPENDIX A – INSPECTION METHODOLOGY AND PROCEDURES
Personnel The field inspection was performed by Darrin A. Laughlin.
Inspection and Evaluation Procedures
1. The overall tank layout, physical measurements, and general site location A visual inspection of the tank interior and exterior surfaces to evaluate:
a. Leaks
b. Shell distortions
c. Signs of corrosion
d. Condition of coatings
e. Condition of nozzles and fittings
f. Condition of appurtenances
g. Condition of welds
Inspection Equipment and Instruments
1. Ultrasonic Thickness Measurements (UTMs) are taken on the nozzles, roof, and shell with an Olympus
38DL Plus instrument utilizing the “echo-to-echo” technique and “coating eliminator” software.
Instrument calibration is verified before and after testing is performed.
2. Digital photographs are taken of all essential structures, appurtenances and deficiencies for historical records and report submittal.
Page | 9
APPENDIX B – PHOTOGRAPHS
Page | 10
1. Tank Overall. 2. Outside Bottom.
3. Ground. 3. Corrosion Around Doorway.
Page | 11
5. Through Holes on Top of Doorway. 6. Areas of Corrosion on I Beams.
7. Internal View of Gap at Stiffening Ring. 8. View of Bottom Cone.
Page | 12
9. Corrosion on Bands. 10. Warped Area on Bands.
11. More Corrosion on Bands. 12. Caulk Coming off on Stiffening Ring.
Page | 13
13. Corrosion/Missing Caulk on Underside of Stiffening Ring.
14. Corrosion on Shell to Bottom Area
15. Shell Vent. 16. Areas of Coating Failure on Support Column.
Page | 14
17. View of Caged Ladder. 18. Coating Failure on Rim Angle.
19. Roof Vent. 20. Fill Pipe.
Page | 15
21. Roof Unit Held With Ratchet Straps. 22. Coating Failure on Roof.
23. Patch on Fill Pipe. 24. Coating Failure on Fill Pipe.
| EXECUTIVE SUMMARY |
| RECOMMENDED REPAIRS |
| LIMITATIONS OF INSPECTION |
| TANK DATA |
| INSPECTION RESULTS |
| Silo |
| Bottom Skirt |
| Roof |
| Support Posts |
| Coatings |
| CONCLUSION |
| APPENDIX A – INSPECTION METHODOLOGY AND PROCEDURES |
| Personnel |
| Inspection and Evaluation Procedures |
| Inspection Equipment and Instruments |
APPENDIX B – PHOTOGRAPHS