PARTICULAR SPECIFICATION

SECTION 07 54 11

THERMOPLASTIC POLYOLEFINE SHEET ROOFING (TPO)

PART 1 GENERAL

This specification covers the requirements for fully adhered, mechanically attached, and ballasted thermoplastic polyolefin (TPO) sheet roofing. TPO roofing system shall not be used in areas exposed to asphalt, coal-tar, grease, oil, solvents, vegetable or mineral oil and animal fat, and steam venting. An oil resistant coating may be used where the roofing will be exposed to petroleum, grease, oil and solvents. Roofs must be constructed to drain with a minimum slope ratio, rise to horizontal, of 1 to 48 (1/4 in. per ft).

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM C 29/C 29M Bulk Density (“Unit Weight”) and Voids in Aggregate

ASTM D 448 Sizes of Aggregate for Road and Bridge Construction

ASTM D 6878 Standard Specification for Thermoplastic Polyolefin Based Sheet Roofing

ASTM E 84 Standard Test Methods for Surface Burning Characteristics of Building Materials.

ASTM E 108 Standard Test Methods for Fire Tests of Roof Coverings

FACTORY MUTUAL ENGINEERING AND RESEARCH (FM)

FM 4470 Approval Standards for Class 1 Roof Covers

KOREAN INDUSTRIAL STANDARDS (KS)

KS M 3809 Thermal Insulation Material Made of Rigid Urethane Foam

KS F 4911 Waterproofing sheets of synthetic polymer

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Roofing system; G

Drawings showing size of sheets, position of sheets and splices, flashing details, fastening patterns where applicable for insulation and membrane sheets, and expansion joint details.

SD-03 Product Data

Materials; G

Membrane (TPO Sheets), Bonding adhesive, Fasteners, Roof insulation (Poly-isocianurate board), Accessories

SD-06 Test Reports: G

Report signed by authorized official of a certified independent testing laboratory verifying conformance of properties as per ASTM D 6878, KS M 3809, KS F 4911, and class A fire rating as per ASTM E 108, FM 4470, or UL 790.

SD-07 Certificates

Applicator's Qualifications; G

A copy of approved applicator letter and/or certificate as issued by the manufacturer.

SD-08 Manufacturer's Instructions

Application instructions; G

Manufacturer’s instructions for preparing and installing the membrane, flashings, seams, insulation, nailers and other accessories.

1.3 GENERAL REQUIREMENTS

TPO membrane roofing shall be fully adhered, mechanically fastened and ballasted to the roof surface indicated. Roofing membrane sheet widths shall be consistent with membrane attachment methods and wind uplift requirements, and shall be as large as practical to minimize joints. Membrane shall be free of defects and foreign material. Flashing work shall be coordinated to permit continuous roof-surfacing operations. Applied insulation shall be weatherproofed by the membrane on the same day.

1.3.1 Delivery and Storage

Materials shall be delivered to the job site in the manufacture’s original, unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Materials other than ballast shall be stored in clean, dry areas. Storage temperature shall be as specified by the manufacturer. Materials other than ballast stored on the roof shall not exceed one day’s supply and shall be distributed so as not to exceed the roof live load capacity. Ballast shall be stored uncovered, shall not be in contact with sod or earth, and shall not be stored on the roof.

1.3.2 Fire Resistance

The completed roof covering system shall be Class A (Class I) rated in accordance with ASTM E108, FM 4470, or UL 790.

1.3.3 Wind Uplift Requirements

Fully adhered and mechanically attached roofing system shall be in accordance with FM 4470 class 1-60, 75, 90, 135, 165 RC rating. Ratings from other independent laboratories may be substituted provided that the tests, requirements and ratings are documented to be equivalent, to the satisfaction of the Contracting Officer.

1.3.4 Roof Membrane Manufacturer Warranty

Manufacturer’s standard warranty for entire roofing system shall be provided for not less than 20 years from acceptance of the work. Warranty shall state that manufacturers shall repair or replace defective materials if the roofing system leaks or allows the insulation beneath the membrane to become wet during the period of the warranty.

1.3.5 Roof System Installer Warranty

The roof system installer shall warrant for a period of not less than 2 years that the roof system, as installed, is free defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. The warranty shall run directly to the Government. Correction of defective workmanship and replacement of damaged or affected materials shall be the responsibility of the roof system installer.

PART 2 PRODUCTS

2.1 BONDING ADHESIVE

Low volatile organic compound (VOC) or synthetic rubber adhesive as supplied by roof membrane manufacturer and recommended by the manufacturer’s printed data for bonding TPO membrane materials to insulation, wood, metal, concrete or other substrate materials. Bonding adhesive shall not be used to bond membrane materials to each other.

2.2 FASTENERS

Fasteners for sheet-metal flashing shall be corrosion resistant steel annular type nails or screws. Fasteners for anchoring the roofing membrane shall be coated, corrosion resistant one as approved by the membrane manufacturer and identical to those used to obtain the wind uplift rating.

2.3 MEMBRANE (TPO SHEET)

TPO Sheet shall conform to ASTM D6878 or KS F 4911, 1.52 mm (0.060 inch-60 mils) minimum thickness, and dark brown color.

2.4 PRE-MANUFACTURED ACCESSORIES

Pre-manufactured accessories shall be manufacturer’s standard for intended purpose, compatible with the membrane roof system and approved for use by the roof membrane manufacturer.

2.5 HOT AIR SPLICE

All field splices will be hot air welded using an automatic hot air welding machine or hot air hand welder in accordance with the manufacturer’s specification. At all splice intersections, roll the seams with a silicone roller prior to membrane seam cooling. All intersections shall be overlaid with non-reinforced flashing. Pressure sensitive pre-fabricated parts should be used whenever possible (walkways, pipe flashings, curb wraps, pressure-sensitive RUSS strips for perimeter fastening).

2.6 ROOF INSULATION BELOW TPO SHEET

Insulation system and facer material shall be compatible with membrane application specified and as approved by the roof membrane manufacturer. Insulation shall be polyisocyanurate to meet ASTM E84 Class A and KS M 3809 Type 1, Class 2 or Type 2, Class 2. A smoke developed index shall be no higher than 50 when tested in accordance with ASTM E 84.

2.7 BALLAST

Ballast should be concrete pavers, smooth round stone, screened gravel, or crushed rock, with gradations conforming to ASTM D 448, sizes 2 and 4, with the additional requirement that particles passing the 9.5 mm (3/8 inch) sieve shall not exceed 2 percent. A protective mat shall be required if the only available ballast is crushed rock. Crushed rock shall be used over a protective layer of extruded polystyrene foam insulation at least 9 mm (3/8 inch) thick and a filter fabric at least 900 gm/ sq. meter (3 oz/sq. ft.), placed between the ballast and the membrane. Ballast laid directly on the membrane shall be pavers or rounded-edge aggregate, and must not break during freeze-thaw cycles. Unit weight of stone ballast shall be no less than 960 kg/cu. m (60 lbs/cu. ft.)

when determined in accordance with ASTM C 29/C 29M. Concrete pavers shall be precast air-entrained concrete, minimum 38 mm (1-1/2 inches) thick, having 21 MPa (3000 psi) minimum compressive strength.

Pavers other than walkways shall include drainage channels on their lower surfaces, or shall rest on membrane pads extending at least 25 mm (1 inch) beyond the paver edges.

PART 3 EXECUTIONS

3.1 ENVIRONMENTAL CONDITIONS

Membrane shall not be installed in high wind, inclement weather or when there is visible ice, frost or moisture on the deck, insulation or membrane. Membrane shall not be installed when air temperature is below minimum specified by the membrane manufacturer.

3.2 PREPARATION

The substrate of any bay or section of the building shall be complete and suitable for insulation and membrane installation before roofing is begun. Surfaces against which membrane is applied shall be smooth, clean, and free from dirt, water, dew, oil, grease, sharp edges and construction debris; all joints over 6 mm (1/4 inch) wide shall be sealed; joints over 13 mm (1/2 inch) between insulation boards shall be filled with the same insulation.

Wood nailers shall comply with Section 06 10 00 ROUGH CARPENTRY.

3.3 INSTALLATION

Installation shall comply with the manufacturer's approved instructions, except as otherwise specified.

3.3.1 Flashing

Edges of membrane, projections through the roof and changes in roof planes shall be flashed. Flashing material shall be extended and sealed a minimum of 75 mm (3 inches) on each side of the fasteners which attach the membrane to nailers. The installed flashing shall be fastened at the top of the flashing a maximum of 300 mm (12 inches) on center under metal counter-flashing or cap.

3.3.2 Expansion Joints

Expansion joints shall be covered using prefabricated covers or elastomeric flashing in accordance with the manufacturer's recommendations.

3.3.3 Membrane Installation

Membrane shall be applied in accordance with the manufacturer's instructions and the following requirements.

Layout membrane and side lap adjoining sheets in accordance with membrane manufacturer’s installation instruction. Allow for sufficient membrane to form proper membrane terminations. Remove dusting agents and dirt from membrane and substrate areas where bonding adhesive are to be applied. Apply specified adhesive evenly and continuously to substrate at rates recommended by the roof membrane manufacturer’s application instructions. Do not apply bonding adhesive to surfaces of membrane in seam or lap areas. Allow adhesive to flash off or dry to consistency prescribed by manufacturer before adhering sheets to the substrate, Roll each sheet into adhesive slowly and evenly to avoid wrinkles; broom or roll the membrane to remove air pockets and fish mouths and to ensure full, continuous bonding of sheet to substrate. Form field lap splices or seams as specified. Allow the adhesive to dry until it is tacky but will not string or stick to a dry finger touch.

3.3.4 Lap Splices

Weathered Membranes Cleaner may be used to remove construction dirt and prepare the TPO membrane splice area prior to welding. Hot Air weld the Sure-Weld membrane using and Automatic Hot Air Welding Machine or Hot Air Hand Welder in accordance with the manufacturer’s specifications. At all splice intersections, roll the seam with a silicone roller to ensure a continuous hot air welded seam. When using 60 mils thick membranes, all splice intersections shall be overlaid with Sure-Weld non-reinforced flashing.

3.3.5 Cutoffs

Cutoffs shall be installed if work day is ended or interrupted by bad weather before roof section is complete.

The insulation line shall be straightened using loose-laid cut insulation and the membrane shall be sealed to the roof deck. Flutes in metal decking shall be sealed off along the cutoff edge.

Membrane shall be pulled free or cut to expose the insulation when resuming work, and cut insulation sheets used for fill-in shall be removed as necessary to maintain the staggered pattern.

3.3.6 Installation of Walkways

Install walkways at roof access points and where otherwise indicated for traffic areas and for access to mechanical equipment, in accordance with the roof membrane manufacturer’s instructions. Provide minimum 150mm (6 inch) separation between adjacent walkways to accommodate drainage.

3.4 BALLAST

When ballast is required, ballast shall be applied as the membrane is installed to prevent wind uplift, except that seams and terminations shall be left uncovered until completion and inspection. Membrane shall be protected from mechanical damage from wheeled equipment during ballast application. Minimum ballast weight shall not be less than required by required by RP-4, or indicated. Ballast shall be spread as indicated or as recommended by the manufacturer for the anticipated wind conditions. Unless otherwise specified, size 2 ballast shall be spread at the rate of 620 to 720 Pa (13 to 15 psf.) and size 4 ballast shall be applied at the rate of 480 to 575 Pa (10 to 12 psf.)

3.5 PROTECTION OF FINISHED ROOFING

The roofing membrane shall be protected from damage by other trades. After completion of work by other trades, the protection shall be removed and the roof shall be inspected. Any damage shall be repaired in accordance with the recommendations of the roofing manufacturer.

3.6 INSTRUCTIONS TO GOVERNMENT PERSONNEL

Furnish written and verbal instructions on proper maintenance procedures to designated Government personnel.

Prepare and submit written instructions in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

Furnish instructions by a competent representative of the roof membrane manufacturer and include a minimum of 4 hours on maintenance and emergency repair of the membrane. Include a demonstration of membrane repair, and give sources of required special tools. Furnish information on safety requirements during maintenance and emergency repair operations. Include copies of Material Safety Data Sheets for maintenance/repair materials.

3.7 INFORMATION CARD

For each roof, furnish one paper copy & one digital copy (.pdf – text searchable) of an information card for facility records and a photoengraved 1 mm (0.032) inch thick aluminum card for exterior display. Paper and aluminum copies of card must be 215 mm by 275 mm (8-1/2 by 11 inches) minimum. Information card must identify facility name and number; location; contract number; approximate roof area; detailed roof system description, including deck type, membrane, number of plies, method of application, manufacturer, insulation and cover board system and thickness; presence of tapered insulation for primary drainage, presenceof vapor retarder; date of completion; installing contractor identification and contact information; membrane manufacturer warranty expiration, warranty reference number, and contact information. Install aluminum card at roof top or access location as directed by the Contracting Officer and provide paper and digital copies to the Contracting Officer.

Osan Air Base Republic of Korea

Contract Number F41624-03-D-8608

Task Order 001

Final Asbestos Survey and Assessment Electrical Facilities

Prepared for:

Air Force Center for Environmental Excellence Brooks City-Base, Texas

March 2005

BUILDING 1831

Asbestos Survey and Assessment March 2005 Osan Air Base, Republic of Korea Building 1831 Page 1

FINDINGS

The purpose of this section is to discuss the findings of the detailed asbestos survey and assessment of Building 1831 – Generator Shed and the visually inspected Buildings 1837 and 1838. Buildings 1837 and 1838 were identified as having additional suspect materials.

The Laboratory Analysis Data Sheets and Chain-of-Custody forms are included in Attachment 1. For a complete listing of all materials identified within each building please refer to Attachment 2 - Building Materials Log.

BUILDING 1831 – GENERATOR SHED

Homogeneous Areas

During the inspection of Building 1831, four (4) homogeneous areas were identified as suspected asbestos-containing materials. A summary of the homogeneous materials is as follows:

• Concrete block mortar

• Black HVAC expansion joint

• Gray caulking (around window and vent frames)

• Mortar patching

Sampling and Analysis Program

The building sampling and analysis program included the collection and analysis of twelve

(12) bulk PLM samples collected from the materials listed above. The bulk sample log is included in Attachment 3 and lists the sample number, location, description of the sample, and the asbestos content. The sample locations are shown on the Building Layout/Sampling Plan in Drawing A20.

Summary of Findings

Table 1 summarizes those areas of Building 1831 where asbestos-containing materials are located. While every room and area of the building was inspected, this table lists areas of the facility where materials were found to be asbestos containing. If an area is not listed on the table, then no asbestos containing materials were identified in that particular area of the facility. For a complete listing of all materials in each room in the facility, refer to the Building Materials Log. The Extent of Materials is presented in Drawing A21.

Building 1831 Page 2

BUILDING 1837 - GENERATOR SHED

Homogeneous Areas

During the inspection of Building 1837, three (3) additional homogeneous areas were identified as suspected asbestos-containing materials. A summary of the homogeneous materials is as follows:

• Silver paint

• White HVAC gasket

• Green gasket on exhaust pipe of generator

Sampling and Analysis Program

The building sampling and analysis program included the collection and analysis of seven

(7) bulk PLM samples collected from the materials listed above. The bulk sample log is included in Attachment 3 and lists the sample number, location, description of the sample, and the asbestos content. The sample locations are shown on the Building Layout/Sampling Plan in Drawing A41.

Summary of Findings

Table 1 summarizes those areas of Building 1837 where asbestos-containing materials are located. While every room and area of the building was inspected, this table lists areas of the facility where materials were found to be asbestos containing. If an area is not listed on the table, then no asbestos containing materials were identified in that particular area of the facility. For a complete listing of all materials in each room in the facility, refer to the Building Materials Log. The Extent of Materials is presented in Drawing A42.

BUILDING 1838 - GENERATOR SHED

Homogeneous Areas

During the inspection of Building 1838, one additional homogeneous area was identified as a suspected asbestos-containing material. A summary of the homogeneous material is as follows:

• Gray putty

Building 1831 Page 3

Sampling and Analysis Program

The building sampling and analysis program included the collection and analysis of one bulk PLM sample collected from the material listed above. The bulk sample log is included in Attachment 3 and lists the sample number, location, description of the sample, and the asbestos content. The sample location is shown on the Building Layout/Sampling Plan in Drawing A22.

CONCLUSIONS

In order to promote a safe and healthy work environment, the Air Force requires that asbestos-containing materials be identified and controlled.

Building 1831 (Baseline)

One non-friable miscellaneous material was observed in Building 1831. The material that tested positive for asbestos consisted of:

• Gray caulking (around window and vent frames)

At the time of the inspection, the gray caulking (around window and vent frames) appeared to be in good condition and had a potential for damage resulting in a Hazard Ranking of 1 for this material. In this condition, the material does not constitute a hazard. However, any disturbance of the material such as replacement, cutting or abrading may release fibers into the air. In order to facilitate the proper management and maintenance of the material, MWH recommends that it be included in an O&M Plan.

Building 1837

One non-friable miscellaneous material was observed in Building 1831. The material that tested positive for asbestos consisted of:

• White HVAC gasket

At the time of the inspection, the white HVAC gasket appeared to be in good condition and had a potential for damage resulting in a Hazard Ranking of 1 for this material. In this condition, the material does not constitute a hazard. However, any disturbance of the material such as replacement, cutting or abrading may release fibers into the air. In order to facilitate the proper management and maintenance of the material, MWH recommends that it be included in an O&M Plan.

Please refer to the baseline unit for asbestos containing materials

Building 1831 Page 4

Building 1838

None of the additional exception materials tested positive for asbestos. Please refer to the baseline unit for asbestos containing materials

It is important to note that the roofing materials and miscellaneous materials such as fire door interior insulation, interior ductwork lining insulation, and any other non-accessible building materials, if present in the building, were not sampled as previously discussed.

These items should be tested and reassessed if major roof work, remodeling, or building demolition is planned.

TABLE

TABLE 1

Summary of Positive Findings - Building 1831 Osan Air Base, Republic of Korea

Exterior of Building (Around

Window and Vent Frames)

1831:07- 09 Gray Caulking 3 %

Chrysotile 28 LF 1 G LPD O&M Miscellaneous NF

Interior of Building (Around

Window and Vent Frames)

1831:07- 09 Gray Caulking 3% Chrysotile 28 LF 1 G LPD O&M Miscellaneous NF

Location Sample Number Series

Material Description

Asbestos Content

Approx.

Quantity Units Hazard

Ranking Physical

Condition

Potential for

Disturb.

Response Action

Type of ACM Friability

9/20/2004http://www.mwmadison.com/osan/internet/dmtTx.aspx?type=dmt&xsl=reportTable1-html.xs

DRAWINGS

ATTACHMENT 1

LABORATORY ANALYSIS DATA SHEETS AND CHAIN-OF-CUSTODY

ATTACHMENT 2

BUILDING MATERIAL LOG

Attachment 2 Osan Air Base Building 1831 Page 1

ATTACHMENT 2

Building Materials Log Baseline

This baseline unit building material log pertains to Buildings 1837 and 1838.

Building 1837 and 1838 were identified as having additional suspect materials as compared to this baseline unit. Those exceptions are presented as separate building material logs.

Room Material Exterior of Building Concrete block;

Gray caulking around window and vent frames;

White silicone calking around electrical conduit (non-suspect);

Metal roof;

Interior of Building Walls – Concrete block;

Black HVAC expansion joint on duct;

Gray caulking around window and vent frames;

Ceiling – Concrete Floor – Concrete with mortar patch

Building 1831 Page 2

ATTACHMENT 2

Exceptions to Building 1831

Room Material Interior of Building Walls – Silver paint on HVAC duct;

White HVAC gasket on duct;

Green gasket on exhaust pipe of generator;

Building 1831 Page 3

ATTACHMENT 2

Exception to Building 1831

Room Material Exterior of Building Gray putty around telephone box conduit

ATTACHMENT 3

BULK SAMPLE LOG

ATTACHMENT 3

Bulk Sample Log - Building 1831

Client: AFCEE Location: Osan Air Base Date of Collection: October 29, 2003

1831-01 Exterior of Building Concrete Block Mortar ND 1831-02 Exterior of Building Concrete Block Mortar ND 1831-03 Exterior of Building Concrete Block Mortar ND 1831-04 Interior of Building Black HVAC Expansion Joint ND 1831-05 Interior of Building Black HVAC Expansion Joint ND 1831-06 Interior of Building Black HVAC Expansion Joint ND

1831-07 Exterior of Building (Around Window and Vent Frames) Gray Caulking 3 % Chrysotile

1831-08 Exterior of Building (Around Window and Vent Frames) Gray Caulking

3% Chrysotile (Sample assumed positive due to prior positive in samples series.)

1831-09 Interior of Building (Around Window and Vent Frames) Gray Caulking

3% Chrysotile (Sample assumed positive due to prior positive in samples series.)

1831-10 Interior of Building Mortar Patching ND 1831-11 Interior of Building Mortar Patching ND 1831-12 Interior of Building Mortar Patching ND

Sample No. Sample Location Material Asbestos Content (%)

9/20/2004http://www.mwmadison.com/osan/internet/dmtTx.aspx?type=dmt&xsl=ReportAtt3-html.xsl&

ATTACHMENT 4

PHOTOGRAPH LOG

ATTACHMENT 4

Photographic Log - Building 1831

1831-0010 Gray Caulking 1831:07-09

Photograph Number Material Type / Description Sample

Numbers

9/20/2004http://www.mwmadison.com/osan/internet/dmtTx.aspx?type=dmt&id=dev-p7s-0&depth=4&

ATTACHMENT 5

PHOTOGRAPHS

Building 1831 documents/library/Electrical_Facilities/1831/1831_07-09/DCP_0010.JPG

Photo 1831:07-09: Asbestos containing Gray Caulking.

9/20/2004http://www.mwmadison.com/osan/internet/dmtTx.aspx?type=dmt&id=dev-p7s-0&depth=4&

USFK REG 201-1, 18 June 2012 Chapter 15

Chapter 15 Asbestos

15-1. Scope This chapter contains criteria to control and abate threats to human health and the environment from asbestos, and describes proper management of asbestos during removal and disposal.

Asbestos management and training activities will be conducted in accordance with standards set forth in the Asbestos Hazard Emergency Response Act (AHERA), Title 40, Code of Federal Regulations (CFR), Part 763, Subpart E, ―Asbestos-Containing Materials in Schools.‖ Policy requirements for a Comprehensive Occupational Health and Safety program policy are not covered in this chapter. To protect personnel from asbestos exposure, refer to DoDI 6055.1, "DoD Occupational Safety and Health Program," and DoDI 6055.5, "Industrial Hygiene and Occupational Health," and concomitant service instructions.

15-2. Definitions

a. Adequately Wet. Sufficiently mix or penetrate with liquid to prevent the release of particulates. If visible emissions coming from ACM are observed, then that material has not been adequately wetted. However, the absence of visible emissions is not sufficient evidence of being adequately wet.

b. Asbestos. Generic term used to describe six distinctive varieties of fibrous mineral silicates, including chrysotile, amosite, crocidolite, tremolite, anthophyllite, and actinolite. Also includes any of these materials that have been chemically treated and/or altered.

c. Asbestos-containing material (ACM). Any material containing more than one percent asbestos by weight.

d. Asbestos-containing waste material (ACWM). As applied to demolition and renovation operations, ACWM includes, regardless of its phase (i.e., liquid, solid) (a) all friable asbestos waste, (b) Category I non-friable ACM that has become friable (e.g., dust collected in dust collectors and debris produced from cutting, grinding, or shaping of asbestos products), or is in poor condition, (c) Category II non-friable ACM that becomes crumbled, pulverized, or reduced to powder by forces that acted on the material during the course of demolition or renovation operations, and (d) materials contaminated with asbestos, including disposal equipment, floor vinyl sheets, respirators, and protective clothing, etc. Wastes generated during building demolition are classified as designated wastes if ≥1% of asbestos is present, regardless of its phase (liquid, solid, or else).

e. Category I non-friable ACM. Asbestos-containing packings, mastic, gaskets, resilient floor covering and asphalt roofing products in accordance with the Asbestos National Emission Standard for Hazardous Air Pollutants (NESHAP). Category I non-friable ACM is not subject to regulation unless it (a) has been subjected to sanding, grinding, cutting, or abrading, (b) becomes friable, or (c) is in poor condition.

f. Category II non-friable ACM. Any non-friable asbestos-containing material not designated as Category I, in accordance with the Asbestos NESHAP, that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Some examples of Category II non-friable ACM are cementitious asbestos board (transite), acoustical ceiling tiles, flex connectors, expansion joints, caulking material, and textured paint.

g. Composite sample. Multiple layers of a single core sample are composited for analysis. A composite sample does NOT combine multiple individual samples to obtain a single result.

h. Friable Asbestos. Any material containing more than one percent asbestos that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure.

i. Joint compound. The material used to fill nail holes, cracks, and small spaces between sections of wallboard.

j. Multi-layered interior wall system. A system that contains multiple layers of material, any or all of which may be ACM.

k. Non-friable asbestos. A material containing more than one percent asbestos as determined using Polarized Light Microscopy (PLM) that when dry cannot be crumbled, pulverized, or reduced to powder by hand pressure.

l. Regulated asbestos-containing material (RACM). Includes (a) friable asbestos material,

(b) Category I non-friable ACM that has become friable or has been/will be subjected to sanding, grinding, cutting or abrading, and (c) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder in the course of demolition or renovation operations.

15-3. Criteria

a. Installations will appoint, in writing, an asbestos program manager to serve as the single point of contact for all asbestos-related activities.

b. Installations will prepare and implement an asbestos management plan. Service components may elect to standardize and publish procedures that may be used as a common component for the asbestos management plans of multiple installations. At a minimum, the plan will include the following:

(1) An ACM inventory, conducted by sample and analysis or visual determination.

(2) A notification and education program to inform workers, tenants, and building occupants where potentially friable ACM is located, and how and why to avoid disturbing the ACM;

all persons affected should be properly informed.

(3) Regular ACM surveillance to note, assess, and document any changes in the ACM's condition.

(4) Work control/permit systems to control activities that might disturb ACM.

(5) Operations and maintenance (O&M) work practices to avoid or minimize fiber release during activities affecting ACM.

(6) Record-keeping to document O&M activities related to asbestos identification management and abatement.

(7) Training for the asbestos program manager, as well as custodial and maintenance staff.

(8) Procedures to assess and prioritize identified hazards for abatement.

(9) Procedures to prevent the use of ACM in new construction.

(10) Medical surveillance and respiratory protection programs required to support all USFK personnel involved in asbestos-related activities, IAW 29 CFR 1926.1101(h). Contractors are responsible for the health and safety of their personnel IAW applicable regulatory standards.

c. Prior to the demolition or renovation of a facility, the installation will make a determination whether or not the activity will remove or disturb ACM, and will record this determination on the project authorization document (e.g., work order).

d. Prior to the demolition or renovation of a facility that involves removing or disturbing friable ACM, a written assessment of the action will be prepared and furnished to the installation commander. A copy of the assessment will also be kept on permanent file.

e. Installations will remove friable ACM when the ACM poses a threat to release airborne asbestos fibers and cannot be reliably repaired or isolated.

f. Prior to disturbing or demolishing any part of a facility, all regulated ACM will be removed.

g. If in-house abatement is performed, installations will, as a minimum:

(1) Prior to removal, train all workers involved in the removal.

(2) Establish monitoring programs during asbestos removal operations to document exposure levels.

(3) Ensure that all workers involved in the removal use properly fitted respiratory protection and personal protection equipment.

(4) Use engineering controls and work practices to contain and control asbestos fiber releases for all asbestos removal that has the potential to release airborne asbestos fibers greater than the permissible exposure limit (PEL) of 0.1 fibers/cc.

h. Waste asbestos shall be collected and transported in double-layered, high-density, waterproof bags or air-tight containers after sufficient water has been sprayed to prevent scattering, and the cargo should be covered during transportation. In storage, waste asbestos shall be humidified and double wrapped with sacks, sealed in a sturdy container, or solidified with cement or synthetic polymer compounds, or by similar methods, so as not to be scattered during storage. Containers shall be labeled in both English and Korean as follows:

―DANGER - CONTAINS ASBESTOS FIBERS - AVOID CREATING DUST - CANCER AND LUNG

DISEASE HAZARD." Storage of asbestos waste shall not exceed 60 days. Permanent records documenting the disposal action and site shall be maintained.

i. When disposing of ACWM, material shall be adequately wetted, sealed in a leak-proof container, and properly disposed of through a licensed Designated Waste Disposal contractor IAW applicable ROK regulations as follows:

(1) Dust, debris, or materials that may easily be crushed by palm pressure shall be solidified or melted at high temperature.

(2) Solidified wastes considered to produce no airborne dust shall be packed in polyethylene or high density waterproof bags and disposed at a designated waste landfill.

(3) Vinyl sheets used for asbestos removal, protection masks, respirators, protection gear, etc. shall be packed in double-layered high density water-proof bags to be disposed at a designated wastes landfill, melted at high temperature, or solidified.

j. For demolition projects, all ACM will be removed prior to demolition. During the demolition process, if the ACM material is combined with the rest of the demolition debris, all of the mixed material will be managed and disposed of as ACM.

k. For renovation projects, all ACM will be removed from project debris and managed and disposed of as ACM. During the renovation process, if the removed ACM material is combined with the other debris, all of the nixed material will be managed and disposed of as ACM.

l. DoD schools will comply with applicable requirements 15 U.S.C. 2643(l) and implementing regulations in 40 CFR Part 763, Subpart E, ―Asbestos-Containing Materials in Schools.‖

m. Sampling of multi-layered interior wall systems:

(1) For multi-layered interior wall systems, including joint compound and skim coats, discrete layers from one sample location are combined to produce a composite analytical result. If the composite result is less than or equal to one percent, then the sampled material is not classified as ACM, and no further analysis is required. If the composite result is greater than one percent, then the sampled material is considered to be ACM.

(2) For multi-layered interior wall systems not including joint compound, the material is classified as ACM if asbestos content is greater than one percent. If no asbestos is detected in the composite sample, then the material is classified as non-ACM. However, if the analysis detects asbestos up to one percent, then each layer of the sample must be analyzed individually. If any one layer contains greater than one percent asbestos, then that layer is classified as ACM. If it is infeasible or impossible to separate the layers, then the entire sample is considered to be ACM.

As an alternative to the standard PLM method, and if available, composite samples may be gravimetrically analyzed to derive the percentage of asbestos by weight.

n. Exterior Textured Paint. ACM exterior textured paint is considered Category II non-friable ACM. For renovation projects, routine abatement and disposal procedures shall be followed when the impact of renovation activities may result in the release of significant levels of airborne asbestos fibers.

o. Training. All USFK personnel engaged in asbestos-related activities, including, but not limited to, the program manager, management planner, abatement project monitor, inspector, worker, project designer, supervisor, and operations and maintenance personnel, shall maintain US EPA AHERA accreditation commensurate with their asbestos-related duties and responsibilities. Completion of the appropriate class(es) and refresher training is required for USFK personnel maintaining accreditation. Contractors are responsible for the health, safety, and training of their personnel IAW applicable regulatory standards.

1462477755U Highlight

CEMP-RT

Engineer Pamphlet 1110-1-11

Department of the Army U.S. Army Corps of Engineers

Washington, DC 20314-1000

EP 1110-1-11

15 July 1992/ 30 September 1997

Engineering and Design

ASBESTOS ABATEMENT GUIDELINE

DETAIL SHEETS

Distribution Restriction Statement Approved for public release; distribution is unlimited.

CE!YIP-RT

Pamphlet No. 1110-1-11

DEPARTivfENT OF THE ARlv1Y U.S. Army Corps ofEngineers Washington, DC 20314-1000

Engineering and Design

EP 1110-1-11

Change 1

30 September 1997

ASBESTOS ABATEMENT GUIDELINE DETAIL SHEETS

1. This Change 1 to EP 1110-1-11, 15 Jul 92:

a. Lists additional OSHA and EPA references.

b. Incorporates the requirements of specific exposure and target risk activities established by

OSHA.

c. Incorporates specific training requirements mandated by the Asbestos Hazard Reauthorization Act.

2. Substitute the attached pages as shown below:

Part

Remove page

1 and 2 5 and 6 27 and 28

Insert page

1 thru 2-a 5 and 6 27 and 28

3. File this change sheet in front of the publication for reference purposes.

FOR THE CO.MMANDER:

Colonel, Corps ofEngineers Chief of Staff

Errata Sheet

No.1

ENGINEERING AND DESIGN

Asbestos Abatement Guideline Detail Sheets

EP 1110-l-11, Change 1

30 September 1997

22 April 1998

Page 2a: Replace page 2a with the enclosed page.

EP 1110-l-11 Change 1

* and designed. Planners and designers shall ensure the appropriate requirements are considered in abatement specifications for individual projects.

c. Asbestos Training. When the Asbestos Hazardous Emergency Response Act (AHERA) was reauthorized as the Asbestos Hazard Reauthorization Act (ASHARA) it mandated specific training requirements for activities carried out in private and public buildings as well as schools. Specific training requirements for inspectors, management planners, project designers, contractors’ supervisors and workers are found in the EPA Model Accreditation Program (MAP) in 40 CFR Part 763, Subpart E, Appendix C.

EPA agreement states may have more stringent requirements. Ensure appropriate requirements are included where necessary for the type of asbestos related activity to be performed. *

d. Building Occupancy. According to Army policy, asbestos should be abated during periods when area occupancy is minimal or prohibited: however, project phasing or other critical factors may cause buildings to be occupied during abatement. If abatement must be scheduled while the building is occupied, the designer must investigate the following items before developing the contract specifications.

(1) The ability to install critical barriers that prevent access into and the exchange of air flow from the abatement-regulated work area to the occupied areas.

(2) The ability to install ventilation systems that will continuously maintain a negative pressure within the contained abatement work area and provide an air change rate of at least four or more air changes per hour within the abatement area, thereby augmenting pressure differential between the abatement area and the occupied area. Air exchange rates must be calculated for the regulated work area in order to

-2a-m US fl.rfJIV Corps of Engineers Office of the Chief of Engineers

CHANGE 1 INCORPORATED

ASBESTOS ABATEMENT GUIDELINE

DETAIL SHEETS

EP 1110-1-11

15 JULY 1992

Pamphlet No. 1110-1-11

DEPARTMENT OF THE ARMY

U.S. Army Corps of Engineers Washington, DC 2031 4-1 000

Engineering and Design

ABATEMENT DETAIL SHEETS

EP 1110-1-11

15 July 1992

1. PURPOSE. This pamphlet provides asbestos abatement Guideline Detail Sheets (Setup and Response Action) that will be used in conjunction with Corps of Engineers Guide Specification for Military Construction CEGS

02080, Asbestos Abatement.

2. APPLICABILITY. This pamphlet applies to all HOUSACE/OCE elements and all U.S. Army Corps of Engineers commands (major subordinate commands, district commands, laboratories, and field operating activities) having civil works and/or military program responsibility.

3. CONTENTS. This pamphlet is divided into three primary parts. Part 1, ASBESTOS ABATEMENT DETAIL

SHEET INSTRUCTIONS, (pages 1-30) provides guidance to specifiers and designers on how to select. modify, and use the detail sheets in the preparation of asbestos abatement solicitations. Part 2, SETUP DETAILS, (pages 31 -60) contains a series of detail drawing sheets with instructions that identify the proper containment and controls to be employed in support of individual abatement work tasks. One or more setup detail sheets are required for each defined abatement work task and are directly dependent upon the required response action detail sheet selected for that work task. Part 3, RESPONSE ACTION DETAILS, (pages 61-1 36) contains a series of detail drawing sheets with instructions that identify the abatement method to be employed

(removal, encapsulation, encasement, enclosure, or repair) and the item to be abated (for example, removal of acoustical wall plastic on masonry). Only one response action detail sheet will be selected for each abatement work task. Each response action detail sheet refers to the appropriate setup detail sheets that are to be used to protect, contain, and control during the performance of the work task.

4. USE OF DETAIL SHEETS. Asbestos abatement in CEGS 02080 entails the removal, encapsulation, encasement, enclosure, and repair of friable and nonfriable asbestos-containing materials. The series of detail drawing sheets must be used in conjunction with the CEGS 02080 in order to identify specific methods of abatement, containment, and control required during the performance of abatement work tasks. These detail sheets take into account all identifiable abatement work tasks that might be requested by Corps of Engineers' customers. Specifiers and designers must select the appropriate detail sheets and modify, as necessary, to fit the unique conditions of each defined abatement task, and then append the selected sheets to asbestos abatement solicitations for use by the Contractor.

FOR THE COMMANDER

*UNTEA

Colonel, Corps of Engineers

Chief of Staff

Table of Contents

PART 1, ASBESTOS ABATEMENT DETAIL SHEET INSTRUCTIONS

1. Purpose ...

2. Applicability .

3. References .

4. Explanation of Abbreviations.

5. Background: Guideline Development .

6. Relative Hazard and Risk Assessment

7. Response Action Options

8. Abatement Decision Alternatives

9. Work Area Containment

1 0. Respiratory Protection

11. Guideline Application: Preparation of Contract Documents

12. Administrative Considerations . .

13. Containment Area Considerations

14. Response Action Selection

1 5. Abatement Design .

16. Replacement Design

17. Cost Estimating

Figure 1. Notification of Demolition and Renovation Sample Format

Figure 2. Waste and Shipment Record Sample Format

Table 1 . Recommended Respirator Selection for Protection Against Asbestos

Table 2. Asbestos Abatement Setup Details

Table 3. Response Action Details

Table 4. Response Action Detail Sheets By Abatement Method

Table 5. Final Air Clearance Requirements .

PART 2, SETUP DETAILS

Air lock

Installation of critical barrier and full containment area (for carpeted floors)

Installation of critical barrier and full containment area (for hard floor surfaces)

Installation of critical barrier and full containment area (for vinyl tile floors)

Single bulkhead containment area .

Double bulkhead containment area .

Mini-containment area

Ventilation of containment area and decontamination unit, using HEPA filters

Containers-double bagging

-i-

EP1110-1-11

15 JUL 92

Page

Sheet Page

2 32

3 33

4 34

5 35

6 36

7 37

8 38

9A 39

EP 111 0-1 -11

15JUL92

Table of Contents-Continued

PART 2, SETUP DETAILS-Continued

Containers-leak-tight wrapping . . .

Containers-corrugated cardboard boxes

Glove bag

Area warning signs and warning tape

Respiratory protection table

Protective clothing . .

Disposal container label

Decontamination unit signage

Preparation of full containment area for final clearance (for carpeted floors)

Preparation of full containment area for final clearance (for hard-surfaced floors) .

Preparation of containment area for final clearance (for vinyl tile floors)

Certification of final cleaning and visual inspection

Load-out unit floor plan . .

Modified containment area

Decontamination unit floor plan

Decontamination unit piping details

Temporary equipment enclosure

Access tunnel

Asbestos power vacuum collection and removal system

Cleaning and storage . .

Structural critical barrier

PART 3, RESPONSE ACTION DETAILS

Bridging encapsulation of troweled wall plaster

Repair of troweled wall plaster on stud wall

Repair of troweled ceiling or wall plaster on masonry

Removal of troweled wall plaster on masonry .

Removal of troweled wall plaster on stud wall

Bridging encapsulation of solid or acoustical ceiling plaster .

Removal of troweled ceiling plaster on structural substrate .

Removal of troweled ceiling plaster on hung ceiling .

Enclosure of acoustical wall plaster on masonry wall

Bridging encapsulation of acoustical wall plaster

Penetrating encapsulation of acoustical wall and ceiling plaster .

Combination encapsulation of acoustical wall and ceiling plaster

-11-

Sheet Page

. 98 40

. 9C 41

10 42

11 43

12 44

13 45

14 46

15 47

16 48

17 49

18 50

19 51

. 20 52

. 21 53

. 22 54

. 23 55

. 24 56

. 25 57

. 26 58

. 27 59

. 28 60

Sheet Page

. 29 61

. 30 62

. 31 63

. 32 64

. 33 65

. 34 66

. 35 67

. 36 68

. 37 69

. 38 70

. 39 71

. 40 72

Table of Contents~ontinued

PART 3, RESPONSE ACTION DETAILS-Continued

Repair of acoustical ceiling or wall plaster

Removal of acoustical wall plaster on masonry

Enclosure of acoustical ceiling plaster, spray-on fireproofing, and thermal insulation

Removal of acoustical ceiling plaster (nonasbestos substrate)

Removal of miscellaneous asbestos-containing materials

Removal of asbestos decorative paint on plaster

Removal of light curtain

Removal of interior asbestos cement, fiberboard, and drywall panels

Bridging encapsulation of asbestos cement wall, fiberboard, and drywall panels

Removal of asbestos-contaminated masonry for masonry chimney . .

Removal of asbestos-contaminated masonry wall or thermal insulation

Removal of suspended asbestos cement ceiling tile

Removal of asbestos cement architectural products

Removal of suspended acoustical ceiling tile . . .

Removal of glued-on acoustical ceiling and wall tile

Repair of vinyl asbestos tile adhered to concrete floor system

Removal of vinyl asbestos tile adhered to concrete floor system by asbestos-containing adhesive

Removal of vinyl asbestos tile adhered to concrete floor system by asbestos-free adhesive

Removal of vinyl asbestos tile and chemical dissolution of asbestos-containing adhesives on concrete floor system

Repair of vinyl asbestos tile adhered to wood floor system by asbestos-containing adhesive

Removal of vinyl asbestos tile adhered to wood floor system by asbestos-containing adhesive

Removal of vinyl asbestos tile adhered to wood floor system by asbestos-free adhesive

Removal of sheet-flooring adhered to wood floor system

Removal of sheet-flooring adhered to concrete floor system by asbestos-containing adhesive

Removal of carpeting (asbestos-containing or -contaminated)

Encasement of fireproofing or thermal insulation of beams and decking

Encasement of fireproofing or thermal insulation on columns

Removal of fireproofing or thermal surface insulation

Encasement of acoustical ceiling insulation

Removal of acoustical ceiling insulation

Enclosing asbest{)s-<:ontaminated soil ~

Penetrating encapsulation of asbestos-contaminated soil

Removal of asbestos-contaminated soil

Removal of built-up roofing and flashing

-iii-

EP1110-1-11

15 JUL 92

Sheet Page

. 41 73

. 42 74

. 43 75

. 44 76

. 45 77

. 46 78

. 47 79

. 48 80

. 49 81

50 82

51 83

52 84

53 85

. 54 86

. 55 87

56 88

57 89

58 90

59 91

. 60 92

. 61 93

. 62 94

63 95

64 96

. 65 97

. 66 98

. 67 99

. 68 100

. 69 101

. 70 102

71 103

72 104

73 105

. 74 106

EP 111 0-1-11

15 JUL 92

Table of Contents-Continued

PART 3, RESPONSE ACTION DETAILS-Continued

Removal of roof. shingles, and underlay

Bridging encapsulation of exterior asbestos stucco

Bridging encapsulation of interior asbestos stucco .

Repair of interior asbestos stucco .

Removal of exterior asbestos stucco

Repair of exterior asbestos stucco .

Removal of asbestos cement siding

Removal of asbestos cement roofing

Removal of asbestos-containing walkway cover .

Removal of asbestos-contaminated metal siding

Removal of asbestos cement sunscreen louvers .

Repair of pipe and fitting insulation (using glove bag)

Removal of pipe insulation (using glove bag)

Removal of horizontal pipe insulation (using containment area)

Removal of pipe insulation (using mini-containment area)

Encasement of storage tank or boiler breeching

Bridging encapsulation of storage tank and boiler breeching

Repair of storage tank and boiler breeching

Removal of storage tank and boiler breeching insulation

Removal of pipe-fitting insulation (using glove bag)

Removal of asbestos-insulated electrical wiring

Removal of asbestos-insulated electrical fixture

Removal of boiler firebox insulation

Bridging encapsulation of boiler and piping gaskets

Removal of boiler and piping gaskets .

Repair of duct insulation

Removal of duct insulation

Removal of asbestos cement pipe

Removal of asbestos cement ductwork .

Removal of asbestos flex connector . .

- iv-

Sheet Page

. 75 107

76 108

77 109

. 78 110

79 111

80 1 1 2

81 1 1 3

82 114

83 1 15

84 1 16

85 1 17

86 1 18

87 1 19

. 88 120

. 89 121

. 90 122

. 91 123

. 92 124

. 93 125

. 94 126

. 95 127

. 96 128

. 97 129

. 98 130

. 99 131

100 132

101 133

102 134

103 135

104 136

30 Se 97

Part 1, Asbestos Abatement Detail Sheet Instructions

1. PURPOSE. This engineer pamphlet (EP) provides the Setup and Response Detail Sheets that the designer must use in conjunction with CEGS 02080, Asbestos Abatement, when preparing asbestos abatement contract documents.

2.…