Appendix B.pdf
PDF 910 KB Posted
- Solicitation number
- Not on record
About this file
This document is a detailed welding procedure specification for a Loader and Reactor component, dated 5/6/2024. The procedure outlines a precise two-setup welding sequence for fabricating a complex multi-part assembly with specific welding techniques:
First Setup involves positioning the top plate upside down, positioning and clamping webs and blocks, tack welding these components to the top plate on both sides, and then performing 100% penetration fillet welds at all locations. The Second Setup requires placing the bottom plate side up, aligning top and bottom plates, and executing plug welds through holes connecting the bottom plate to web locations. The document includes detailed 3D diagrams illustrating each welding stage, with specific instructions for fillet and plug weld placements, ensuring precise structural assembly of the Loader and Reactor components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LAWS Fixture Final SOW.pdf | ||
| Appendix A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOADER / REACTOR
WELDING PROCEDURE
5/6/2024 G. J. KORKOSZ 1
LOADER
TOP
BOTTOM
WEB
BLOCK
5/6/2024 G. J. KORKOSZ 2
UPSIDE DOWN
POSITION AND CLAMP
ALL WEBS & BLOCKS
BEFORE WELDING
TACK WELD ALL
WEBS & BLOCKS TO
TOP
BOTH SIDES
FIRST SETUP
THEN
THEN
FILLET WELD ALL
LOCATIONS 100%
PENETRATION
NEXT
5/6/2024 G. J. KORKOSZ 3
BOTTOM
SIDE UP
ALIGN TOP AND
BOTTOM PLATES
PLUG WELD BOTTOM TO WEB
LOCATIONS THROUGH HOLES
SECOND
SETUP
FIRST
THEN
5/6/2024 G. J. KORKOSZ 4
LOADER WELD DETAIL
FILLET
WELDS
BOTTOM PLATE
(TRANSPARENT)
PLUG
WELDS
5/6/2024 G. J. KORKOSZ 5
REACTOR
BOTTOM
WEB
FOLLOW LOADER
SEQUENCE
FOLLOW LOADER
SEQUENCE
FOLLOW LOADER
SEQUENCE
5/6/2024 G. J. KORKOSZ 6
File details come from the government source that posted it. Updated .