About this file

This document is an Appendix B Building Walkthrough Analysis for the City of Peoria, Illinois, detailing comprehensive building condition assessments for multiple properties including the PNC Bank Building, Creve Coeur Building, and associated parking garage. The walkthrough report systematically examines various building components across multiple floors, highlighting structural, mechanical, and maintenance issues. Key observations include water damage in multiple locations, mold presence in the basement, non-functioning elevators, aging mechanical systems with asbestos insulation, and deteriorating infrastructure such as rusted pipes and support beams.

The report suggests significant potential for building renovation and repurposing, noting that floors have flexibility for subdivision and potential residential conversion. Major systems requiring attention include elevators, HVAC, plumbing, and electrical infrastructure. The properties appear to have been previously used by various tenants including PNC Bank, CliftonLarsonAllen, and potentially Caterpillar, with some spaces currently vacant. Substantial capital investment would be needed to bring the buildings to contemporary standards, addressing issues like water intrusion, structural wear, outdated mechanical systems, and compliance with current building codes. The walkthrough analysis provides a detailed baseline assessment that would be crucial for any redevelopment planning or property acquisition strategy.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PNC Bank Building Review 05.17.2024

Appendix B

Table of Contents

Contents Table of Contents

General Summary

Rich Storm Notes

PNC Bank Section

CliftonLarsonAllen Floor

Vacant Floor

Low Roof

High Roof

Basement

General Summary

Total Floors: 11 Square Feet per Floor: 12,910 square feet Total Square Feet for Building: 166,948 square feet Floors have availability to be subdivided

Elevators: 3, with no single elevator accessing all floors

Lead flashing on roof piping speaks to age of building

Freight elevator has shared access between buildings

Residential conversion would require some plumbing on the east side of building, but floor plan is conducive for residential.

Only floors that are sprinkled are floors 10 & 11

CliftonLarsonAllen built independent stairway between floors 10 & 11

Safe in basement which has 2 feet thick of steel

Rich Storm Notes

Requires Resolution Before Occupancy of Building

• Elevators that function between all floors for residential conversion

• Service elevator needs to have crack repaired in basement

Should be Resolved

• Utilize a check of all mechanical systems

PNC Bank Section Note: PNC did not allow photographs in many sections

Elevators on mezzanine

Elevators accessible on 1st floor

Executive meeting room above customer space

Window in executive conference room

View of PNC bank public area from executive conference room

CliftonLarsonAllen Floor Note: CLA did not allow photographs in many sections

Updated offices and meeting rooms from hallway

Updated offices and meeting rooms from hallway

Hallway off elevators

Employee Break Room

Floor of meeting room

Meeting room with ceiling removed

CLA is replacing the HVAC unit

Employee work area of

CLA

Stairwell connecting floors 10 & 11

Vacant Floor Example of a layout of the vacant floor

Elevator landing on 7th floor

Elevators and reception area on floor

Floor layout example provided from brochure

Low Roof Standing water on roof due to a clogged drain

Rooftop chiller unit

Serial number on unit

Low roof entrance

Water drainage on low roof to clogged drain

Entrance to second room on low roof

Access above PNC main lobby

Steam pipe system

Wear on insulation in section above main lobby

No issues, but needs addressed for efficiency utilization

High Roof View from roof of Peoria

PNC sign affixed to roof and building

Elevator systems

Elevator systems

Lead flashing on rooftop pipe

Rusted out drain cap on roof

Basement Elevator doors in basement

Publicly accessible restrooms off the elevator in the basement

Hallway in basement

Water heater in

Damage on wall and bulging rusted pipe

Plastering around vent work

Communications board in

Crack in basement for service elevator shaft

Airflow comes through the crack

Will need to be repaired

Second picture of crack

Water damage and rust in ceiling of basement

Hallway in basement

Workshop in basement

Bank vault outer cage

Bank vault where PNC security deposits are held

Ceiling in basement of bank vault cage area

Creve Coeur Building Review 05.17.2024

Table of Contents

Contents Table of Contents

General Summary

Rich Storm Notes

Creve Coeur 1st Floor (Street Level)

Creve Coeur Mezzanine

Creve Coeur Floor Two

Creve Coeur Floor Three

Creve Coeur Floor Four

Creve Coeur Building Basement

Parking Garage Office Space

Parking Garage Lower Level

Shared Boiler Room above Parking Garage

General Summary

Total Floors: 4 + Mezzanine Square Feet per Floor: Approximately 13,000.

Total Square Feet for Building: Approximately 65,000 square feet.

Floors have availability to be subdivided.

Elevators: 3 elevators facing street, only one operational, one is a façade, other one is broken. 2 broken interior elevators that are not operational.

Basement has mold, a water ingress, and a newer A/C unit that was installed, likely for use for the more recently operated Caterpillar offices.

Walkway: Connects floors 2, 3, and 4.

Water leaks: Entering floor 3, noting a significant water leak with water damage coming from restroom. Additional severe water leak on roof.

Piping by roof access has asbestos insulation.

Roof has lead flashing and some damaged concrete exterior.

The fire escape has been certified within the last 5 years.

Freight elevator has shared access between buildings.

Commissary Kitchen on the 4th floor has been unused for approximately 10 years.

Building likely has A/C issues.

Rich Storm Notes

Requires Resolution Before Occupancy of Building

• Elevators that function between all floors for residential conversion

• All elevator shafts completely sealed

• HVAC system will need to be checked

Should be Resolved

• Repair water leaks through roof

• Repair damaged plumbing

• Asbestos insulation can stay, until mechanicals are changed in building o Would require asbestos abatement

• Hydraulic elevators will need to be repaired

Creve Coeur 1st Floor (Street Level) Rigging of bathrooms in the first floor

Needs short wall bracing

Picture of interior

Hole in elevator shaft

Needs to be sealed

Picture of hole with elevator

Needs to be sealed

Non-functioning elevator

Needs to be repaired prior to occupancy

Doorway with damaged hole above it

Old layout during Creve Coeur Club tenure

First floor hallway between sections

Creve Coeur Mezzanine Crack in drywall in hallway

Breakroom

Inactive office space

High ceilings in the mezzanine above drop ceiling tiles

Old office space on mezzanine

Moisture damage on old wallpapered office

Creve Coeur Floor Two Office space used as storage

Hydronic heat system, coverings off due to repairs

Employee break room

Internal space

Water damage down wall

Office space

Creve Coeur Floor Three Conference room in center of floor

Conference room in center of floor

Data hookup

Water damage in wall

Bathrooms accessible by PNC building on third floor (blocked by propped up tables)

Two walk-in vaults

Office space on floor

Vault as part of office space

Connecting hallway between open office areas

Office area

Built out room

Creve Coeur Floor Four Storage room as part of kitchen

Office by commercial kitchen

Damage by freight

Damaged wall

Dining area

Commercial kitchen

Commercial kitchen

Walk in cooler/freezer

Water damage in stairwell

Ductwork with asbestos

HVAC system

Chilling tower

Lead flashing on rooftop pipe

Doesn’t need replaced

Insulation on piping

Water damage at top of the stairwell

Hallway

Water damage

Training room

Training room

Creve Coeur Building Basement Built out AC room and elevation

Open main room

Open main room

Mold on drywall

Broken button by

Needs to be repaired if publicly accessible

Built frames for basement restroom

Rust damage on pipe and replaced section

Basement spare room

Elevator and damage outside of it

Replaced piping section

Standing water in mechanical room

Parking Garage Office Space Entrance to parking garage room

Exterior of parking garage room

Room shot

Safe in inner room

Safe as part of room

Parking Garage Lower Level Note: Active case by Community Development for things that need rectification in parking garage.

Basement of parking garage

Tunnel to underground power source

New switch gear for building

New switch gear for building

Worn down piping in

Blocked flam cabinet

Storage central room in basement of parking

Rusted air mover in basement central room

Rusted support beam in basement of parking

Shared Boiler Room above Parking

Garage Boiler 1

Boiler 2

Appendix B PNC Building
Table of Contents
General Summary
Rich Storm Notes
PNC Bank Section
CliftonLarsonAllen Floor
Vacant Floor
Low Roof
High Roof
Basement
Appendix C Creve Coeur Building
Table of Contents
General Summary
Rich Storm Notes
Creve Coeur 1st Floor (Street Level)
Creve Coeur Mezzanine
Creve Coeur Floor Two
Creve Coeur Floor Three
Creve Coeur Floor Four
Creve Coeur Building Basement
Parking Garage Office Space
Parking Garage Lower Level
Shared Boiler Room above Parking Garage

File details come from the government source that posted it. Updated .