This is a Feature Work List document for the PKAA Walsen Project in Colorado, detailing mine closure and maintenance work specifications for eight primary closure features and three maintenance features. The project encompasses multiple types of mine openings including sink holes, subsidence features, shafts, and air shafts located across the Walsen mining area. Primary closure work (Item 4.0) includes eight features requiring excavation, backfill installation, and erosion control measures, with estimated backfill volumes ranging from 1 cubic yard to 3,318 cubic yards of imported material. Maintenance work (Item 5.0) includes three features requiring grading, debris removal, and backfill operations. All features are mapped with specific UTM coordinates (NAD83) and documented with precise dimensions including excavated, eroded, and present measurements along with depth specifications.
The work specifications indicate standardized closure methods across features, with most requiring machine backfill using hard, durable, well-graded imported material approximately twelve inches in median diameter. Erosion control requirements include wattle installation along downslope perimeters, with total linear footage ranging from zero to 300 linear feet depending on feature size and location. One feature (W08) requires a monolithic concrete plug installation prior to final backfill. The document specifies that rockfill is generally not required across features, with the exception of feature W08 (10 cubic yards) and feature 748 RH-03 (use of on-site waste pile material). Special considerations include proximity to high-voltage powerlines at multiple feature locations and requirements to preserve existing trees during grading operations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item 4.0: Install Mine Closures Walsen Table 1.0 – Feature Work List
Feature ID Type Description of Mine Opening
Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
W01 Sink Hole
Excavated:30ft by 27ft
Eroded:30ft by 27ft
Present:30ft by 27ft
Depth:32 ft Lining:Other Drainage:No
Machine Backfill
Section 2.0
518148.2825 1179,
4162675.041 28458
The feature is located approx. twenty-five (25) feet north of high voltage, overhead, powerlines. Excavate along perimeter until all sides of feature are bound by stable bed rock.
Excavate ramp down to the bottom of the hole. Ramp is intended to be parallel to existing mine workings; to create a stable and safe work area. Backfill feature with imported material: backfill shall consist of a hard, durable, and well graded material with a medium diameter of approximately twelve
(12) inches and sufficient finer particles to minimize the presents of voids. Install one hundred and ten (110) LF of wattles along downslope perimeter of feature. Rockfill IS NOT Required.
The total backfill volume is estimated at seven hundred and fifty-four (754) cubic yards of imported material. This was calculated by multiplying the surface area of the oval feature by its depth.
Excavation will require a larger excavator such as a CAT 325 Excavator (or approved equivalent).
Description of Mine Opening
Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
W02 Subsidence Feature
Excavated:61ft by 55ft
Eroded:61ft by 55ft
Present:61ft by 55ft
Depth:4 ft Lining:Rock +
Timber Drainage:No
Machine Backfill Section 2.0
518138.6115 41593,
4162613.075 49521
The feature is located underneath overhead powerlines. Excavate to determine extent of subsidence. Machine backfill with imported material; backfill shall consist of a hard, durable, and well graded material with a medium diameter of approximately twelve
(12) inches and sufficient finer particles to minimize the presents of voids. Install one hundred and fifty (150) LF of wattles along downslope perimeter of closure. Rockfill IS NOT Required.
The total backfill volume is estimated at two hundred and sixty-one (261) cubic yards of imported fill material. This was calculated by assuming the feature is a half ellipsoid and calculating the volume.
W03 Subsidence Feature
Excavated:41ft by 63ft
Eroded:41ft by 63ft
Present:41ft by 63ft
Depth:5 ft Lining:Other Drainage:No
Machine Backfill Section 2.0
518125.4431 41507,
4162692.865 82402
Machine backfill with imported material;
backfill shall consist of a hard, durable, and well graded material with a medium diameter of approximately twelve (12) inches and sufficient finer particles to minimize the presents of voids. Install eighty (80) LF of wattles along downslope perimeter of closure.
Rockfill IS NOT Required.
The total backfill volume is estimated at two hundred and fifty-one (251) cubic yards of imported material. This was calculated by assuming both sides of the figure 8 shaped feature are individual, half-ellipsoids and summing the two volumes.
Description of Mine Opening
Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
W04 Sink Hole
Excavated:3.5ft by 5ft Eroded:3.5ft by
5ft Present:3.5ft by
5ft Depth:3 ft
Lining:Other Drainage:No
Machine Backfill Section 2.0
518101.1039 09745,
4162723.938 91824
Machine backfill with onsite material; Total backfill volume is estimated at one (1) cubic yard. This was calculated by assuming the feature is a half-ellipsoid.
Wattles are NOT required. Rockfill IS NOT Required.
W05 Sink Hole
Excavated:201ft by 170ft
Eroded:201ft by 170ft
Present:201ft by 170ft
Depth:5 ft Lining:Other Drainage:No
Machine Backfill Section 2.0
517901.9583 7195,
4162870.817 18573 well graded material with a medium diameter of approximately twelve (12) inches and sufficient finer particles to minimize the presents of voids. Install two hundred (200) LF of wattles along downslope perimeter of closure. Rockfill IS NOT Required.
The total backfill volume is estimated at three-thousand, three-hundred and eighteen (3,318) cubic yards of imported material. This was calculated by summing the areas of the six subsidence features, assuming each feature takes the shape of a half-ellipsoid.
Description of Mine Opening
Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
W06 Sink Hole
Excavated:4ft by 5ft
Eroded:4ft by 5ft Present:4ft by 5ft
Depth:3 ft Lining:Other Drainage:No
Machine Backfill Section 2.0
517878.3652 53244,
4162897.578 09966 well graded material with a medium diameter of approximately twelve (12) inches and sufficient finer particles to minimize the presents of voids. Install twenty five (25) LF of wattles along downslope perimeter of closure.
Rockfill IS NOT Required.
The total backfill volume is estimated at two
(2) cubic yards of imported material. This was calculated by multiplying the surface area of the oval feature by its depth.
W07 Subsidence Feature
Excavated:21ft by 19ft
Eroded:21ft by 19ft
Present:21ft by 19ft
Depth:3 ft Lining:Other Drainage:No
Machine Backfill Section 2.0
518176.6481 05027,
4162596.825 23708
Excavate to find the extent of the void.
backfill shall consist of a hard, durable, and well graded material with a medium diameter of approximately twelve (12) inches and sufficient finer particles to minimize the presents of voids. Install sixty (60) LF of wattles along downslope perimeter of closure.
Rockfill IS NOT Required.
The total backfill volume is estimated at twenty-three (23) cubic yards of imported material. This was calculated by multiplying the surface area of the half ellipsoid feature by its depth.
Description of Mine Opening
Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
W08 Sink Hole
Excavated:6ft by 6ft
Eroded:6ft by 6ft Present:6ft by 6ft
Depth:6 ft Lining:Other Drainage:No
Monolithic Plug Section 7.0
518275.8593 82076,
4162522.771 70515
Excavate the perimeter and bottom of the feature to find the full extent of the void.
Secure opening with a monolithic plug (eight
(8) cubic yards concrete and ten (10) cubic yards of imported rockfill).
At least seven (7) days after the concrete has been poured, the contractor may backfill the remainder of the opening with onsite materials.
Install one hundred and ninety (190) LF of wattles along downslope perimeter of closure.
The contractor may re-use the existing wattles onsite if they meet specifications in Bid Item 3.0.
The Project Manager will take cylinder samples of concrete.
Item 5.0 Install Maintenance Mine Closures - Walsen Table 2.0 – Feature Work List
Description of Mine Opening
Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
107Walsen -Area1SF1
Subsidence Feature
Excavated:25ft by 12ft
Eroded:25ft by 12ft
Present:25ft by 12ft
Depth:6 ft Lining:N/A
Drainage:No
Grade N/A
517960.6447 06412,
4163167.107 08708
The area consists of nine (9) individual subsidence features requiring maintenance.
Grade the site to eliminate the saddles between each feature, ensuring improved drainage, and blend the depressions seamlessly into the surrounding topography.
Finally, install three hundred (300) LF of wattles along the downslope perimeter for erosion control.
Area to be graded is approximately 0.35 acres. Take care not to disturb the existing trees.
704 HL-06 Shaft
Excavated:2ft by 3.5ft
Eroded:2ft by 3.5ft
Present:2ft by 3.5ft
Depth:1.5 ft Lining:N/A
Drainage:No
Machine Backfill Section 2.0
517707.1943 21651,
4162920.940 51989
Excavate around the perimeter of the feature and backfill with onsite material. Backfill will require 0.3 cubic yards of material. Wattles are NOT Required. Rockfill IS NOT Required.
Item 5.0 Install Maintenance Mine Closures - Walsen Table 2.0 – Feature Work List
Description of Mine Opening
Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
748 RH-03 Air Shaft
Excavated:35ft by 35ft
Eroded:35ft by 35ft
Present:35ft by 35ft
Depth:5 ft Lining:Rock Drainage:No
Machine Backfill Section 2.0
516570.2116 09127,
4165463.248 90167
An estimated sixty (60) cubic yards of debris must be removed from feature. All trash and debris shall be hauled to a county approved landfill. Landfill invoices shall be provided by the Contractor.
Excavate the sinkhole to a solid bottom and machine backfill with the on-site waste pile material located approximately three hundred
(300) feet south-east of feature 748 RH-03.
Install fifty (50) LF of wattles along the downslope perimeter. The contractor may reuse existing onsite wattles if they meet the specifications outlined in Bid Item 3.0.
Rockfill IS NOT Required.