This is a draft Service Level Agreement (SLA) KPI (Key Performance Indicator) specification document that outlines performance targets and metrics for IT service management ticket handling across multiple categories. The document defines detailed SLAs for Requested Items (RITM), Changes (CHG), Incidents (INC), and Security Incidents (SIR) across both Infrastructure and Application service domains.

The SLAs are stratified by priority level (Critical, High, Moderate, Low) with specific response, approval, and resolution timeframes. For Infrastructure service requests, response times range from TBD hours on an 8AM-5PM weekday schedule for High/Moderate/Low priorities, with deprovision requests operating 24/7. Infrastructure incident response times are 2 hours for Critical priority, 8 hours for High, 96 hours for Moderate, and 192 hours for Low priority, all on 24/7 schedules. Change management approval and resolution times follow 8AM-5PM weekday schedules for Infrastructure (24/7 for Critical), while Application changes operate primarily on weekday schedules with emergency changes available 24/7. Each KPI specifies detailed start conditions (such as ticket creation or assignment), stop conditions (such as ticket approval or resolution completion), pause conditions (vendor involvement or approval waiting), and cancellation criteria. Security incidents (SIR) and critical infrastructure incidents include sub-KPIs with dual tracking for ownership confirmation and technical resolution phases. The document also requires Root Cause Analysis (RCA) reports for Critical Infrastructure incidents within 24 hours of resolution. All KPIs include severity definitions contextualizing business impact, user affected populations, and operational consequences for each priority level.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

DRAFT

Tab Number SNOW KPI Detailed

1 RITM Target Response (Infra)

2 RITM Target Approval (Infra)

3 RITM Target Resolution (Infra)

4 RITM Target Response (App)

5 RITM Target Approval (App)

6 RITM Target Resolution (App)

7 CHG Target Response (Infra)

8 CHG Target Resolution (Infra)

9 CHG Target Approval (Infra)

10 CHG Target Response (App)

11 CHG Target Resolution (App)

12 CHG Target Approval (App)

13 INC Target Response (Infra)

14 INC Target Resolution (Infra)

15 INC RCA Report (Infra)

16 INC Target Response (App)

17 INC Target Resolution (App)

18 SIR Target Response

19 SIR Target Resolution

1. RITM Target Response-Infra

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure SR Response

(High)

Requested Items Response TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

*Deprovisions (24/7, excluding weekends but not firm holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure Service

Request

*Timer starts when ticket is created

Priority = High AND

Active = False

AND

Item=infrastructure Service

Request AND State !=

Cancelled

*Timer stops when assigned

OR pushed for approvals

(UAR only)

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=infrastructure Service

Request

OR State = Cancelled

The maximum length of time it will take for a ticket’s initial review, for questions (if any) to be provided back to the submitter, and for the ticket to be assigned or auto-assigned.

High service requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Infrastructure SR Response

(Moderate)

Requested Items Response TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=infrastructure Service

Request

*Timer starts when ticket is created

Priority = Moderate AND

Active = False

AND

Item=infrastructure Service

Request AND State !=

Cancelled

*Timer stops when assigned

OR pushed for approvals

(UAR only)

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=infrastructure Service

Request

OR State = Cancelled

The maximum length of time it will take for a ticket’s initial review, for questions (if any) to be provided back to the submitter, and for the ticket to be assigned or auto-assigned.

Moderate service requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These service requests impact individual users or specific teams with limited repercussions on overall business performance

Infrastructure SR Response

(Low)

Requested Items Response TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=infrastructure Service

Request

*Timer starts when ticket is created

Priority = Low AND

Active = False

AND

Item=infrastructure Service

Request AND State !=

Cancelled

*Timer stops when assigned

OR pushed for approvals

(UAR only)

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=infrastructure Service

Request

OR State = Cancelled

The maximum length of time it will take for a ticket’s initial review, for questions (if any) to be provided back to the submitter, and for the ticket to be assigned or auto-assigned.

Low service requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or minor aspects of business operations

2. RITM Target Approval-Infra

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition

*This KPI will require multiple sub-KPIs, one for each appprover (four separate approvals)*

Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure SR

Response (High)

Requested Items Approval TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

*Deprovisions (24/7, excluding weekends but not firm holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure Service

Request

*Each approval will start as the UAR gets pushed to an approver (User’s

Supervisor/Manager to

Security Team to NOC to

Ginnie Mae OSO)

Priority = High AND

Active = False

AND

Item=infrastructure

Service Request AND

State != Cancelled

*The timer will stop once the ticket is approved KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=infrastructur e Service Request

OR State =

Cancelled

The maximum length of time it will take for a UAR to undergo necessary approvals. This SLA is only applicable to User Access

Requests.

High service requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Infrastructure SR

Response (Moderate)

Requested Items Approval TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement Priority = High AND

Active = True

AND

Item=infrastructure Service

Request

*Each approval will start as the UAR gets pushed from one to the next

(User’s

Supervisor/Manager to

Security Team to NOC to

Ginnie Mae OSO)

Priority = Moderate

AND

Active = False

AND

Item=infrastructure

Service Request AND

State != Cancelled

*The timer will stop once the ticket is approved

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=infrastructur e Service Request

OR State =

Cancelled

The maximum length of time it will take for a UAR to undergo necessary approvals. This SLA is only applicable to User Access

Requests.

Moderate service requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These service requests impact individual users or specific teams with limited repercussions on overall business performance

Infrastructure SR

Response (Low)

Requested Items Approval TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement Priority = High AND

Active = True

AND

Item=infrastructure Service

Request

*Each approval will start as the UAR gets pushed from one to the next

(User’s

Supervisor/Manager to

Security Team to NOC to

Ginnie Mae OSO)

Priority = Low AND

Active = False

AND

Item=infrastructure

Service Request AND

State != Cancelled

*The timer will stop once the ticket is approved

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=infrastructur e Service Request

OR State =

Cancelled

The maximum length of time it will take for a UAR to undergo necessary approvals. This SLA is only applicable to User Access

Requests.

Low service requests have little immediate impact on business operations and do not require urgent action. They include inconveniences that affect very few users or minor aspects of business operations

3. RITM Target Resolution-Infra

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure SR Resolution

(Moderate)

Requested Items Resolution TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

*Deprovisions (24/7, excluding weekends but not firm holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=infrastructure Service

Request

*Start timer at ticket assignment

Priority = Moderate AND

Active = False

AND

Item=infrastructure Service

Request AND State !=

Cancelled

*Stop timer when ticket resolution is completed

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=infrastructure Service

Request

OR State = Cancelled

The maximum length of time it will take for a request to be resolved from time of ticket assignment.

Moderate service requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These service requests impact individual users or specific teams with limited repercussions on overall business performance

Infrastructure SR Resolution

(Low)

Requested Items Resolution TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=infrastructure Service

Request

*Start timer at ticket assignment

Priority = Low AND

Active = False

AND

Item=infrastructure Service

Request AND State !=

Cancelled

*Stop timer when ticket resolution is completed

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=infrastructure Service

Request

OR State = Cancelled

The maximum length of time it will take for a request to be resolved from time of ticket assignment.

Low service requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or minor aspects of business operations

Infrastructure SR Resolution

(High)

Requested Items Resolution TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure Service

Request

*Start timer at ticket assignment

Priority = High AND

Active = False

AND

Item=infrastructure Service

Request AND State !=

Cancelled

*Stop timer when ticket resolution is completed

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=infrastructure Service

Request

OR State = Cancelled

The maximum length of time it will take for a request to be resolved from time of ticket assignment.

High service requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

4. RITM Target Response-App

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Application SR Response

(High)

Requested Items Response TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

*Deprovisions (24/7, excluding weekends but not firm holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=Application Service

Request

*Timer starts when ticket is created

Priority = High AND

Active = False

AND

Item=Application Service

Request AND State !=

Cancelled

*Timer stops when assigned

OR pushed for approvals

(UAR only)

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=Application Service

Request

OR State = Cancelled

The maximum length of time it will take for a ticket’s initial review, for questions (if any) to be provided back to the submitter, and for the ticket to be assigned or auto-assigned.

High service requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Application SR Response

(Moderate)

Requested Items Response TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=Application Service

Request

*Timer starts when ticket is created

Priority = Moderate AND

Active = False

AND

Item=Application Service

Request AND State !=

Cancelled

*Timer stops when assigned

OR pushed for approvals

(UAR only)

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=Application Service

Request

OR State = Cancelled

The maximum length of time it will take for a ticket’s initial review, for questions (if any) to be provided back to the submitter, and for the ticket to be assigned or auto-assigned.

Moderate service requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These service requests impact individual users or specific teams with limited repercussions on overall business performance

Application SR Response

(Low)

Requested Items Response TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=Application Service

Request

*Timer starts when ticket is created

Priority = Low AND

Active = False

AND

Item=Application Service

Request AND State !=

Cancelled

*Timer stops when assigned

OR pushed for approvals

(UAR only)

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=Application Service

Request

OR State = Cancelled

The maximum length of time it will take for a ticket’s initial review, for questions (if any) to be provided back to the submitter, and for the ticket to be assigned or auto-assigned.

Low service requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or

5. RITM Target Approval-App

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition

*This KPI will require multiple sub-KPIs, one for each appprover*

Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure SR Response

(High)

Requested Items Approval TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

*Deprovisions (24/7, excluding weekends but not firm holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure

Service Request

*Each approval will start as the UAR gets pushed to an approver

Priority = High AND

Active = False

AND

Item=infrastructure

Service Request AND

State != Cancelled

*The timer will stop once the ticket is assigned

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=infrastructure

Service Request

OR State = Cancelled

The maximum length of time it will take for a UAR to undergo necessary approvals.

This SLA is only applicable to User

Access Requests.

High service requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Infrastructure SR Response

(Moderate)

Requested Items Approval TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure

Service Request

*Each approval will start as the UAR gets pushed to an approver

Priority = Moderate

AND

Active = False

AND

Item=infrastructure

Service Request AND

State != Cancelled

*The timer will stop once the ticket is assigned

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=infrastructure

Service Request

OR State = Cancelled

The maximum length of time it will take for a UAR to undergo necessary approvals.

This SLA is only applicable to User

Access Requests.

Moderate service requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions.

These service requests impact individual users or specific teams with limited repercussions on overall business performance

Infrastructure SR Response

(Low)

Requested Items Approval TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure

Service Request

*Each approval will start as the UAR gets pushed to an approver

Priority = Low AND

Active = False

AND

Item=infrastructure

Service Request AND

State != Cancelled

*The timer will stop once the ticket is assigned

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=infrastructure

Service Request

OR State = Cancelled

The maximum length of time it will take for a UAR to undergo necessary approvals.

This SLA is only applicable to User

Access Requests.

Low service requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or

6. RITM Target Resolution-App

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Application SR Resolution

(High)

Requested Items Resolution TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

*Deprovisions (24/7, excluding weekends but not firm holidays)

No Requirement No Requirement No Requirement Priority = High AND

Active = True

AND

Item=Application Service

Request

*Start timer at ticket assignment

Priority = High AND

Active = False

AND

Item=Application Service

Request AND State !=

Cancelled

*Stop timer when ticket resolution is completed

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=Application Service

Request

OR State = Cancelled

The maximum length of time it will take for a request to be resolved from time of ticket assignment.

High service requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Application SR Resolution

(Moderate)

Requested Items Resolution TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=Application Service

Request

*Start timer at ticket assignment

Priority = Moderate AND

Active = False

AND

Item=Application Service

Request AND State !=

Cancelled

*Stop timer when ticket resolution is completed

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=Application Service

Request

OR State = Cancelled

The maximum length of time it will take for a request to be resolved from time of ticket assignment.

Moderate service requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These service requests impact individual users or specific teams with limited repercussions on overall business performance

Application SR Resolution

(Low)

Requested Items Resolution TBD 8AM-5PM weekdays

(excluding weekends & federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=Application Service

Request

*Start timer at ticket assignment

Priority = Low AND

Active = False

AND

Item=Application Service

Request AND State !=

Cancelled

*Stop timer when ticket resolution is completed

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=Application Service

Request

OR State = Cancelled

The maximum length of time it will take for a request to be resolved from time of ticket assignment.

Low service requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or

7. CHG Target Response-Infra

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure CR Response

(Critical)

Changes Response TBD 24/7 No Requirement No Requirement No Requirement Priority = Critical AND

Active = True

AND

Item=infrastructure Change

Request

*Timer starts when ticket is submitted

Priority = Critical AND

Active = False

AND

Item=infrastructure Change

Request AND State !=

Cancelled

*Timer Ends when CHG is assigned

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement Priority != Critical

OR

Item!=infrastructure Change

Request

OR State = Cancelled

The maximum length of time it will take for a ticket to be assigned, for questions (if any) to be provided back to the submitter, and between updates on a ticket’s status from the ticket recipient.

Critical change requests impact all or most of the organization and/or have potential financial, reputational, or legal ramifications. Immediate implementation is necessary to prevent severe consequences

Infrastructure CR Response

(High)

Changes Response TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure Change

Request

*Timer starts when ticket is submitted

Priority = High AND

Active = False

AND

Item=infrastructure Change

Request AND State !=

Cancelled

*Timer Ends when CHG is assigned

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=infrastructure Change

Request

OR State = Cancelled

The maximum length of time it will take for a ticket to be assigned, for questions (if any) to be provided back to the submitter, and between updates on a ticket’s status from the ticket recipient.

High change requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Infrastructure CR Response

(Moderate)

Changes Response TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=infrastructure Change

Request

*Timer starts when ticket is submitted

Priority = Moderate AND

Active = False

AND

Item=infrastructure Change

Request AND State !=

Cancelled

*Timer Ends when CHG is assigned

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=infrastructure Change

Request

OR State = Cancelled

The maximum length of time it will take for a ticket to be assigned, for questions (if any) to be provided back to the submitter, and between updates on a ticket’s status from the ticket recipient.

Moderate change requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These change requests impact individual users or specific teams with limited repercussions on overall business performance.

Infrastructure CR Response

(Low)

Changes Response TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=infrastructure Change

Request

*Timer starts when ticket is submitted

Priority = Low AND

Active = False

AND

Item=infrastructure Change

Request AND State !=

Cancelled

*Timer Ends when CHG is assigned

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=infrastructure Change

Request

OR State = Cancelled

The maximum length of time it will take for a ticket to be assigned, for questions (if any) to be provided back to the submitter, and between updates on a ticket’s status from the ticket recipient.

Low change requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or

8. CHG Target Approval-Infra

Name Applies to (Table) Target (Respone or Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition

*This KPI will require multiple sub-KPIs, one for each appprover

(four separate approvals)*

Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure CR

Approval (Critical)

Changes Approval TBD 24/7 No Requirement No Requirement No Requirement Priority = Critical

AND

Active = True

AND

Item=infrastructure

Change Request

*Timer starts when pushed to CIRB for approval

Priority = Critical

AND

Active = False

AND

Item=infrastructure

Change Request

AND State !=

Cancelled

*Timer ends when ticket is fully approved to deploy

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae

Approval

No Requirement Priority != Critical

OR

Item!=infrastructure

Change Request

OR State =

Cancelled

The maximum length of time it will take for a change request to be approved for implementation from time of ticket submission

Critical change requests impact all or most of the organization and/or have potential financial, reputational, or legal ramifications. Immediate implementation is necessary to prevent severe consequences

Infrastructure CR

Approval (High)

Changes Approval TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure

Change Request

*Timer starts when pushed to CIRB for approval

Priority = High AND

Active = False

AND

Item=infrastructure

Change Request

AND State !=

Cancelled

*Timer ends when ticket is fully approved to deploy

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae

Approval

No Requirement

Priority != High

OR

Item!=infrastructure

Change Request

OR State =

Cancelled

The maximum length of time it will take for a change request to be approved for implementation from time of ticket submission

High change requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Infrastructure CR

Approval (Low)

Changes Approval TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=infrastructure

Change Request

*Timer starts when pushed to CIRB for approval

Priority = Low AND

Active = False

AND

Item=infrastructure

Change Request

AND State !=

Cancelled

*Timer ends when ticket is fully approved to deploy

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae

Approval

No Requirement

Priority != Low

OR

Item!=infrastructure

Change Request

OR State =

Cancelled

The maximum length of time it will take for a change request to be approved for implementation from time of ticket submission

Low change requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or minor aspects of business operations

Infrastructure CR

Approval (Moderate)

Changes Approval TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate

AND

Active = True

AND

Item=infrastructure

Change Request

*Timer starts when pushed to CIRB for approval

Priority = Moderate

AND

Active = False

AND

Item=infrastructure

Change Request

AND State !=

Cancelled

*Timer ends when ticket is fully approved to deploy

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae

Approval

No Requirement

Priority != moderate

OR

Item!=infrastructure

Change Request

OR State =

Cancelled

The maximum length of time it will take for a change request to be approved for implementation from time of ticket submission

Moderate change requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These change requests impact individual users or specific teams with limited repercussions on overall business performance.

9. CHG Target Resolution-Infra

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure CR Resolution

(Critical)

Changes Resolution TBD 24/7 No Requirement No Requirement No Requirement Priority = Critical AND

Active = True

AND

Item=infrastructure Change

Request

*Timer starts when ticket is assigned

Priority = Critical AND

Active = False

AND

Item=infrastructure Change

Request AND State !=

Cancelled

*Timer ends when ticket is pushed for approvals

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement Priority != Critical

OR

Item!=infrastructure Change

Request

OR State = Cancelled

The maximum length of time it will take for a solution to be prepared from time of ticket assignment

Critical change requests impact all or most of the organization and/or have potential financial, reputational, or legal ramifications. Immediate implementation is necessary to prevent severe consequences

Infrastructure CR Resolution

(High)

Changes Resolution TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure Change

Request

*Timer starts when ticket is assigned

Priority = High AND

Active = False

AND

Item=infrastructure Change

Request AND State !=

Cancelled

*Timer ends when ticket is pushed for approvals

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=infrastructure Change

Request

OR State = Cancelled

The maximum length of time it will take for a solution to be prepared from time of ticket assignment

High change requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Infrastructure CR Resolution

(Moderate)

Changes Resolution TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=infrastructure Change

Request

*Timer starts when ticket is assigned

Priority = Moderate AND

Active = False

AND

Item=infrastructure Change

Request AND State !=

Cancelled

*Timer ends when ticket is pushed for approvals

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=infrastructure Change

Request

OR State = Cancelled

The maximum length of time it will take for a solution to be prepared from time of ticket assignment

Moderate change requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These change requests impact individual users or specific teams with limited repercussions on overall business performance.

Infrastructure CR Resolution

(Low)

Changes Resolution TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=infrastructure Change

Request

*Timer starts when ticket is assigned

Priority = Low AND

Active = False

AND

Item=infrastructure Change

Request AND State !=

Cancelled

*Timer ends when ticket is pushed for approvals

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=infrastructure Change

Request

OR State = Cancelled

The maximum length of time it will take for a solution to be prepared from time of ticket assignment

Low change requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or

10. CHG Target Response- App

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Application CR Response

(Critical)

Changes Response TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

Emergency & Latent Change

Requests are 24/7

No Requirement No Requirement No Requirement Priority = Critical AND

Active = True

AND

Item=Application Change

Request

*Timer starts when ticket is submitted

Priority = Critical AND

Active = False

AND

Item=Application Change

Request AND State !=

Cancelled

*Timer Ends when CHG is assigned

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement Priority != Critical

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a ticket to be assigned, for questions (if any) to be provided back to the submitter, and between updates on a ticket’s status from the ticket recipient.

Critical change requests impact all or most of the organization and/or have potential financial, reputational, or legal ramifications. Immediate implementation is necessary to prevent severe consequences

Application CR Response

(High)

Changes Response TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=Application Change

Request

*Timer starts when ticket is submitted

Priority = High AND

Active = False

AND

Item=Application Change

Request AND State !=

Cancelled

*Timer Ends when CHG is assigned

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a ticket to be assigned, for questions (if any) to be provided back to the submitter, and between updates on a ticket’s status from the ticket recipient.

High change requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Application CR Response

(Moderate)

Changes Response TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=Application Change

Request

*Timer starts when ticket is submitted

Priority = Moderate AND

Active = False

AND

Item=Application Change

Request AND State !=

Cancelled

*Timer Ends when CHG is assigned

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a ticket to be assigned, for questions (if any) to be provided back to the submitter, and between updates on a ticket’s status from the ticket recipient.

Moderate change requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These change requests impact individual users or specific teams with limited repercussions on overall business performance.

Application CR Response

(Low)

Changes Response TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=Application Change

Request

*Timer starts when ticket is submitted

Priority = Low AND

Active = False

AND

Item=Application Change

Request AND State !=

Cancelled

*Timer Ends when CHG is assigned

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a ticket to be assigned, for questions (if any) to be provided back to the submitter, and between updates on a ticket’s status from the ticket recipient.

Low change requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or

12. CHG Target Resolution-App

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Application CR Resolution

(Critical)

Changes Resolution TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

Emergency & Latent Change

Requests are 24/7

No Requirement No Requirement No Requirement Priority = Critical AND

Active = True

AND

Item=Application Change

Request

*Timer starts when ticket is assigned

Priority = Critical AND

Active = False

AND

Item=Application Change

Request AND State !=

Cancelled

*Timer ends when ticket is pushed for approvals

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement Priority != Critical

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a solution to be prepared from time of ticket assignment

Critical change requests impact all or most of the organization and/or have potential financial, reputational, or legal ramifications. Immediate implementation is necessary to prevent severe consequences

Application CR Resolution

(High)

Changes Resolution TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=Application Change

Request

*Timer starts when ticket is assigned

Priority = High AND

Active = False

AND

Item=Application Change

Request AND State !=

Cancelled

*Timer ends when ticket is pushed for approvals

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a solution to be prepared from time of ticket assignment

High change requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Application CR Resolution

(Moderate)

Changes Resolution TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=Application Change

Request

*Timer starts when ticket is assigned

Priority = Moderate AND

Active = False

AND

Item=Application Change

Request AND State !=

Cancelled

*Timer ends when ticket is pushed for approvals

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != moderate

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a solution to be prepared from time of ticket assignment

Moderate change requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These change requests impact individual users or specific teams with limited repercussions on overall business performance.

Application CR Resolution

(Low)

Changes Resolution TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=Application Change

Request

*Timer starts when ticket is assigned

Priority = Low AND

Active = False

AND

Item=Application Change

Request AND State !=

Cancelled

*Timer ends when ticket is pushed for approvals

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != Low

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a solution to be prepared from time of ticket assignment

Low change requests have little immediate impact on business operations and do not require urgent action.

They include inconveniences that affect very few users or

11. CHG Target Approval-App

Name Applies to

(Table)

Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Application CR

Approval (Critical)

Changes Approval TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

Emergency & Latent

Change Requests are 24/7

No Requirement No Requirement No Requirement Priority = Critical AND

Active = True

AND

Item=Application Change

Request

*Timer starts when pushed to CIRB for approval

Priority = Critical AND

Active = False

AND

Item=Application

Change Request AND

State != Cancelled

*Timer ends when ticket is fully approved to deploy KPI is paused when ticket is with a vendor or waiting for Ginnie Mae

Approval

No Requirement Priority != Critical

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a change request to be approved for implementation from time of ticket submission

Critical change requests impact all or most of the organization and/or have potential financial, reputational, or legal ramifications. Immediate implementation is necessary to prevent severe consequences

Application CR

Approval (High)

Changes Approval TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=Application Change

Request

*Timer starts when pushed to CIRB for approval

Priority = High AND

Active = False

AND

Item=Application

Change Request AND

State != Cancelled

*Timer ends when ticket is fully approved to deploy

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae

Approval

No Requirement

Priority != High

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a change request to be approved for implementation from time of ticket submission

High change requests do not have immediate severe consequences, but their impact may disrupt normal operations. They have a manageable workaround but need timely attention to prevent further complications

Application CR

Approval

(Moderate)

Changes Approval TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=Application Change

Request

*Timer starts when pushed to CIRB for approval

Priority = Moderate

AND

Active = False

AND

Item=Application

Change Request AND

State != Cancelled

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae

Approval

No Requirement

Priority != moderate

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a change request to be approved for implementation from time of ticket submission

Moderate change requests affect a subset of users or processes and may cause inconvenience or delays rather than complete disruptions. These change requests impact individual users or specific teams with limited repercussions on overall business performance.

Application CR

Approval (Low)

Changes Approval TBD 8AM-5PM weekdays

(excluding weekends and federal holidays)

No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=Application Change

Request

*Timer starts when pushed to CIRB for approval

Priority = Low AND

Active = False

AND

Item=Application

Change Request AND

State != Cancelled

*Timer ends when ticket is fully approved to deploy

KPI is paused when ticket is with a vendor or waiting for Ginnie Mae

Approval

No Requirement

Priority != Low

OR

Item!=Application Change

Request

OR State = Cancelled

The maximum length of time it will take for a change request to be approved for implementation from time of ticket submission

Low change requests have little immediate impact on business operations and do not require urgent action. They include inconveniences that affect very few users or minor aspects of business operations

13. INC Target Response-Infra

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure INC Resolution

(Critical)

Incidents Response 2 24/7 No Requirement No Requirement No Requirement Priority = Critical AND

Active = True

AND

Item=infrastructure Incident

*Start timer at incident creation

Priority = Critical AND

Active = False

AND

Item=infrastructure Incident

AND State != Cancelled

*Stop timer when INC is assigned to the resource

KPI is paused when ticket is with a vendor, pending a change, or waiting on initiator

No Requirement Priority != Critical

OR

Item!=infrastructure Incident

OR State = Cancelled

The maximum allowable time from when an incident is reported to when the incident is created, and an incident is declared.

Business Operations

Impacted: Complete outage or significant impairment of core production operations.

Large Number of End Users

Impacted: Affects 75% of users' ability to access Ginnie

Mae services to conduct daily operations. No workaround available.

Infrastructure INC Resolution

(High)

Incidents Response 8 24/7 No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure Incident

*Start timer at incident creation

Priority = High AND

Active = False

AND

Item=infrastructure Incident

AND State != Cancelled

*Stop timer when INC is assigned to the resource

KPI is paused when ticket is with a vendor, pending a change, or waiting on initiator

No Requirement

Priority != High

OR

Item!=infrastructure Incident

OR State = Cancelled

The maximum allowable time from when an incident is reported to when the incident is created, and an incident is declared.

Production Operations

Impaired: Degraded performance or partial impairment (e.g. partial system failure)

Non-Production Operations

Impacted: Disruption of non-critical systems; disaster recovery capabilities impaired

End Users Affected: Affects

50% of end users, expedited restoration needed;

workaround provides partial relief

Infrastructure INC Resolution

(Moderate)

Incidents Response 96 24/7 No Requirement No Requirement No Requirement

Priority = Moderate AND

Active = True

AND

Item=infrastructure Incident

*Start timer at incident creation

Priority = Moderate AND

Active = False

AND

Item=infrastructure Incident

AND State != Cancelled

*Stop timer when INC is assigned to the resource

KPI is paused when ticket is with a vendor, pending a change, or waiting on initiator

No Requirement

Priority != moderate

OR

Item!=infrastructure Incident

OR State = Cancelled

The maximum allowable time from when an incident is reported to when the incident is created, and an incident is declared.

Non-Production System

Impaired: Degraded performance or functionality in non-critical systems (e.g., DEV environment goes down)

End Users Inconvenienced:

Affects 25% of end users, causing minor disruption or inconvenience

Redundancy Impaired: Non-production redundancy mechanisms is impaired (if applicable)

Infrastructure INC Resolution

(Low)

Incidents Response 192 24/7 No Requirement No Requirement No Requirement

Priority = Low AND

Active = True

AND

Item=infrastructure Incident

*Start timer at incident creation

Priority = Low AND

Active = False

AND

Item=infrastructure Incident

AND State != Cancelled

*Stop timer when INC is assigned to the resource

KPI is paused when ticket is with a vendor, pending a change, or waiting on initiator

No Requirement

Priority != Low

OR

Item!=infrastructure Incident

OR State = Cancelled

The maximum allowable time from when an incident is reported to when the incident is created, and an incident is declared.

Non-Production System

Impaired: Minimal delays in non-critical systems (e.g., backup in dev environments fail)

End Users Inconvenienced:

Affects 10% of end users, causing minor disruption or inconvenience

Redundancy Impaired:

Minimal impact on redundancy mechanisms, with no significant effect on backup or failover capabilities

14. INC Target Resolution-Infra

Name Applies to (Table) Target (Respone or

Response or Approval)

Duration (hrs) Schedule Percentage of SLA Notification Target Notification Start Condition

*Sub-KPIs below required*

1. Ownership Confirmation:

Starts timer when INC is assigned to the resource.

2. Technical Resolution:

Timer ends when the incident is resolved, and INC ticket is updated.

Stop Condition Pause Condition Reset Condition Cancel Condition KPI Definition Severity Definition (for reference)

Infrastructure INC Resolution

(Critical)

Incidents Resolution 2

24/7 No Requirement No Requirement No Requirement Priority = Critical AND

Active = True

AND

Item=infrastructure Incident

*Start timer when INC is assigned to the resource

Priority = Critical AND

Active = False

AND

Item=infrastructure Incident

AND State != Cancelled

*Timer ends when the incident is resolved, and INC ticket is updated KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement Priority != Critical

OR

Item!=infrastructure Incident

OR State = Cancelled

The maximum allowable time from when an incident is declared to when it is fully resolved, and normal operations are restored.

Business Operations

Impacted: Complete outage or significant impairment of core production operations.

Large Number of End Users

Impacted: Affects 75% of users' ability to access Ginnie

Mae services to conduct daily operations. No workaround available.

Infrastructure INC Resolution

(High)

Incidents Resolution 4

24/7 No Requirement No Requirement No Requirement

Priority = High AND

Active = True

AND

Item=infrastructure Incident

*Start timer when INC is assigned to the resource

Priority = High AND

Active = False

AND

Item=infrastructure Incident

AND State != Cancelled

*Timer ends when the incident is resolved, and INC ticket is updated

KPI is paused when ticket is with a vendor or waiting for

Ginnie Mae Approval

No Requirement

Priority != High

OR

Item!=infrastructure Incident

OR State = Cancelled

The maximum allowable time from when an incident is declared to when it is fully resolved, and normal operations are restored.

Production Operations

Impaired: Degraded performance or partial impairment (e.g. partial system failure)

Non-Production Operations

Impacted: Disruption of non-critical systems; disaster recovery capabilities impaired

End Users Affected: Affects

50% of end users, expedited restoration needed;

workaround provides partial relief