Appendix A Inspection and Maintenance Requirements.pdf
PDF 122 KB Posted
- Attached to
- Airfield Lighting Control System Maintenance
- Solicitation number
- Not on record
About this file
Appendix A details the annual inspection and maintenance requirements for the ACE3 System at McGuire and Lakehurst Systems. The document outlines comprehensive preventive maintenance (PM) tasks for the Airfield Lighting Control System (ALCS) network, including technical specifications for system checks and updates.
Key maintenance activities include computer node inspections, software and firmware version updates, communication system tests, UPS testing, network diagnostics, touchscreen calibrations, radio testing, and AGLAS system review. The contractor is required to perform comprehensive communication reliability testing, re-configuration tasks, repeater analysis, database cleanup, input/output data review, and local user training if necessary. The maintenance process involves updating firmware on PC boards, providing latest system executable files, and conducting diagnostics on network hard drives and communication systems, with instructions to follow additional repair protocols if deficiencies are identified during the maintenance cycle.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ALC - Performance Work Statement.pdf | ||
| Appendix F UFGS 25 05 11.pdf | ||
| Appendix G DAFGM 2024 32 01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A – Inspection/Maintenance Requirements
The following is a summary of the manufacturer’s recommended inspection and maintenance requirements. The list is not all inclusive and the contractor shall acquire the full inspection maintenance requirements from the system’s manufacturer.
McGuire and Lakehurst Systems
Annual Requirements (ACE3 System)
ADB Basic ACE3 PM includes inspections of each computer node in the ALCS network, including:
Constant Current Regulator output current tuning
UPS testing
Software version updates Firmware version updates Communication system tests Computer hard drive diagnostics Touchscreen calibrations Database clean-up Radio testing AGLAS system review/clean-up Enclosure inspections (fans/heating/cooling) Network hubs and switch inspections Primary Power/remote-local testing Insulation Resistance (IRMS Diagnostics)
ADB’s ACE3 PM service must include comprehensive communication reliability testing as well as re-configuration when required, including the following tasks:
• Communication tests/diagnostics
• Repeater analysis
• Inspecting/troubleshooting event/alarm database
• IRMS measurements/review of input/output data
• AGLAS system review of status of airfield lighting devices
• Database cleanup
• Remote status verifications
• Local user refresher training, if necessary
In addition, the contractor shall update firmware versions on all operating ACE3 unit PC boards, provide the latest system executable files, perform touchscreen calibrations in the airfield Tower cab and electrical vault and perform diagnostics on all network hard drives along with all other communication and system operational checks. If any further repairs/deficiencies are identified during the PM cycle, please follow the steps in section 1.4.