Appendix A Division 01 Specifications.pdf

PDF 4 MB Posted

Attached to
ACCESS CONTROL POINT DESIGN BUILD II Federal contract opportunity
Solicitation number
W912DY-21-R-0030
Issued by
Department of the Army Corps of Engineers Engineering Support Center Huntsville

About this file

This is a solicitation for a Multiple Award Task Order Contract to provide design-build services for Access Control Points. The contract has an estimated capacity of $95 million to be shared across awardees. It is a 100% small business 8(a) set-aside for NAICS 237310. The Corps of Engineers Engineering Support Center Huntsville is the issuing agency. Offerors must be registered in SAM to be eligible for award. The Government intends to make awards to all qualifying offerors. Task orders will be on a firm-fixed price basis. Design-build services include planning, design, construction, equipment procurement and installation for access control points at various DoD installations worldwide.

View the file

Other files for this federal contract opportunity

Other files attached to ACCESS CONTROL POINT DESIGN BUILD II, newest first.
File Type Posted
W912DY21R0030 AMENDMENT 0003 ACP DB II.pdf PDF
SOL_W912DY21R0030 ACP DB II.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACP Pr ogr am - Di v i s i on 01 Speci f i cat i ons - 19APR19

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 11 00. 10 STATEMENT OF WORK

01 14 00 WORK RESTRI CTI ONS

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 10 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 33 16. 00 10 DESI GN DATA ( DESI GN AFTER AWARD)

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 10 QUALI TY CONTROL

01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 58 00 PROJECT I DENTI FI CATI ON

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

DI VI SI ON 34 - TRANSPORTATI ON

34 71 13. 19 CRASH RATED ACTI VE VEHI CLE BARRI ERS AND CONTROLS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 WORK COVERED BY CONTRACT DOCUMENTS

1. 3. 1 Pr oj ect Descr i pt i on

1. 3. 1. 1 Geot echni cal

1. 3. 1. 2 Ci v i l Si t e and Ut i l i t i es

1. 3. 1. 3 Ar chi t ect ur al

1. 3. 1. 4 I nt er i or Desi gn

1. 3. 1. 4. 1 St r uct ur al I nt er i or Desi gn ( SI D)

1. 3. 1. 4. 2 Fur ni t ur e, Fi xt ur es and Equi pment ( FF&E)

1. 3. 1. 5 St r uct ur al

1. 3. 1. 6 Pl umbi ng

1. 3. 1. 7 Heat i ng, Vent i l at i on and Ai r Condi t i oni ng ( HVAC)

1. 3. 1. 8 Fi r e Pr ot ect i on and Li f e Saf et y

1. 3. 1. 9 El ect r i cal Wor k

1. 3. 1. 10 Ant i t er r or i sm and For ce Pr ot ect i on

1. 3. 1. 11 Cyber secur i t y

1. 3. 1. 12 Syst ems Wor k

1. 3. 1. 13 Mi cr opr ocessor Cont r ol Syst ems

1. 3. 1. 14 Tel ecommuni cat i ons

1. 3. 1. 15 Secur i t y

1. 3. 1. 16 Cost Engi neer i ng

1. 3. 1. 17 Syst ems

1. 3. 1. 18 Ener gy Conser vat i on and Renewabl e Ener gy

1. 3. 2 Locat i on

1. 4 OCCUPANCY OF PREMI SES

1. 5 EXI STI NG WORK

1. 6 LOCATI ON OF UNDERGROUND UTI LI TI ES

1. 6. 1 Not i f i cat i on Pr i or t o Excavat i on

1. 7 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT

1. 7. 1 Del i ver y Schedul e

1. 7. 2 Del i ver y Locat i on

1. 8 GOVERNMENT- I NSTALLED WORK

1. 9 SALVAGE MATERI AL AND EQUI PMENT

1. 10 CERTI FI CATI ON OF WORK

1. 11 DEFI NI TI ONS

1. 11. 1 Si t e I nvest i gat i on

1. 11. 2 Wor k Pl an

1. 11. 3 Desi gn Submi t t al Package

1. 11. 4 Access Cont r ol Poi nt s ACP) Pr oj ect

1. 11. 5 ACP Act i on

1. 11. 6 Task Or der

1. 11. 7 Task El ement s

1. 12 EXI STI NG WORK

SECTI ON 01 11 00 Page 1

1. 13 SECURI TY REQUI REMENTS

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 ACTI VI TI ES UNDER ACCESS CONTROL POI NTS ( ACP) PROJECTS

3. 1. 1 El ement 1 Si t e I nvest i gat i on

3. 1. 2 El ement 2A Wor k Pl an

3. 1. 3 El ement 2B Desi gn Submi t t al

3. 1. 4 El ement 3 ACP Act i on

3. 2 REQUI REMENTS AND CRI TERI A

3. 2. 1 The f ol l owi ng over al l cr i t er i a and r equi r ement s appl y t o t hi s cont r act act i on.

3. 2. 1. 1 Ar my ECBs

3. 2. 1. 2 UFC 1- 200- 01

3. 2. 1. 3 UFC 4- 010- 06

3. 3 LEVEL OF EFFORT

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 00 Page 2

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 REFERENCES

The Cont r act or i s r esponsi bl e f or obt ai ni ng and updat i ng al l publ i cat i ons r ef er enced i n t he cont r act document s. The maj or i t y of t he admi ni st r at i ve and t echni cal r ef er ences wi l l be i ncl uded i n t he appl i cabl e Di v i s i on 00 or Di v i s i on 01 Speci f i cat i on Sect i on and addi t i onal t echni cal or ot her cr i t er i a wi l l be i ncl uded i n each St at ement of Wor k ( SOW) or Per f or mance Wor k St at ement ( PWS) t hat i s i ncl uded i n t he i ndi v i dual t ask or der s or st and al one cont r act s. The t er m " SOW" , as used i n t hi s cont r act , wi l l r epr esent ei t her a SOW or a PWS. The det ai l ed pr oj ect speci f i c SOW wi l l be i ncl uded as a separ at e SOW document i n a Task Or der cont r act or as a st and al one cont r act ed ef f or t . The det ai l ed pr oj ect speci f i c SOW wi l l suppl ement t he SOW i ncl uded i n Speci f i cat i on Sect i on 01 11 00. 10 STATEMENT

OF WORK.

The dat es of t he publ i cat i ons pr ovi ded i n t he cont r act document s ar e t hose i n ef f ect at t he t i me of awar d of t hi s cont r act . Wor k per f or med under t he i ndi v i dual t ask or der s or cont r act s shal l ut i l i ze t he l at est i ssue of t he publ i cat i ons dat ed at t he t i me of awar d of t he t ask or der . When a r equi r ed publ i cat i on i s not r ef er enced f or any and al l appl i cabl e or r el evant and appr opr i at e r equi r ement s, t he Cont r act or shal l ut i l i ze a commer ci al st andar d t hat has nat i onal appl i cat i ons.

U. S. DEPARTMENT OF DEFENSE ( DOD)

Ar my ECBs Ar my Engi neer i ng & Const r uct i on Bul l et i ns (ECBs)

UFC 1- 200- 01 Gener al Bui l di ng Requi r ement s

UFC 4- 010- 06 Cyber secur i t y of Faci l i t y- Rel at ed Cont r ol Systems

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval and f or i nf or mat i on onl y. Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Sal vage Pl an; G

SECTI ON 01 11 00 Page 3

1. 3 WORK COVERED BY CONTRACT DOCUMENTS

1. 3. 1 Pr oj ect Descr i pt i on

The wor k i nvol ved i n t he Access Cont r ol s Poi nt ( ACP) Pr ogr am gener al l y i ncl udes t he l abor , mat er i al s and equi pment necessar y t o pr ovi de qui ck r esponse f or f aci l i t y r epai r , r enewal , r enovat i on, conver si on, al t er at i on, addi t i ons, const r uct i on, equi pment pr ocur ement and i nst al l at i on ser vi ces on i nst al l ed equi pment / syst ems at Gover nment i nst al l at i ons and f aci l i t i es. Most of t he pr oj ect s ar e consi der ed smal l i n dept h and br eadt h wi t h r espect t o f aci l i t i es wi t h t he l ar gest st r uct ur e expect ed t o be a Vi s i t or Cont r ol Cent er ( VCC) . Wor k al so i ncl udes i nci dent al ener gy savi ngs pr oj ect s. Ot her i nci dent al r el at ed wor k i s r equi r ed. The Cont r act or may be r equi r ed t o sur vey t he pr obl em ar eas, eval uat e and r ecommend sol ut i ons, devel op and i mpl ement wor k pl ans and desi gns i n a t i mel y manner wi t hi n negot i at ed cost s. Typi cal pr oj ect s may i ncl ude, but ar e not l i mi t ed t o t he f ol l owi ng t ype of wor k t hat wi l l be i dent i f i ed i n each SOW.

1. 3. 1. 1 Geotechnical

Geot echni cal i nvest i gat i ons, as necessar y, t o det er mi ne t he condi t i ons f or t he act ual l ocat i ons of f oot i ngs, ot her f oundat i ons and si t e pavi ng f eat ur es and ot her s i t e f eat ur es.

1. 3. 1. 2 Ci v i l Si t e and Ut i l i t i es

Topogr aphi c sur veyi ng, gr adi ng and ear t hwor k, sur f ace and subsur f ace st or m dr ai nage and dr ai nage cont r ol st r uct ur es, st or m wat er management , er osi on and sedi ment cont r ol , c l ear i ng and gr ubbi ng, pavi ng and sur f aci ng f or r oads, par ki ng ar eas, and si dewal ks, par ki ng l ayout , pavement mar ki ngs, t r af f i c cont r ol and si gnage, gat es and f enci ng, cur bs and gut t er s, r ai l r oad cr ossi ngs, dewat er i ng, l andscapi ng, seedi ng and soddi ng, r i pr ap, geot echni cal i nvest i gat i ons, s l ope st abi l i zat i on, f oundat i ons, bor i ngs, t r enchi ng, pi l es and cai ssons, spi l l cont ai nment , ber ms, demol i t i on, and wet l ands del i neat i on. Sani t ar y sewer s, di schar ge t o wast e t r eat ment f aci l i t i es, sept i c t anks wi t h dr ai ns, por t abl e t oi l et s, wel l s, wat er t r eat ment f aci l i t i es, wat er di st r i but i on syst ems, pot abl e and f i r e wat er suppl i es i ncl udi ng wel l s, pi pi ng, pumps, val ves, spr i nkl er s, wat er use anal yses, l eakage anal yses, hazar dous wast e anal yses, and di sposal of wast e pr oduct s.

1. 3. 1. 3 Architectural

Encl osur es, shel t er s, bui l di ng syst ems, mobi l e bui l di ngs, chi mneys, gr out , mor t ar , concr et e, br i ck, concr et e masonr y uni t s ( CMUs) , wat er pr oof i ng, i nsul at i on, caul k i ng and seal ant s, r oof i ng, gut t er s, dr ai ns, met al decki ng, j oi st s, s i di ng and ext er i or sur f aci ng, l evel l er s, docks, r amps, st ai r s, shel v i ng, wi ndows, door s, pai nt i ng, f i ni shes, l ouver s, awni ngs, shut t er s, panel s, gr i l l s , cei l i ngs, acoust i cal ar eas, wal l s, panel i ng, f l oor i ng ( conduct i ve and nonconduct i ve) , car pet i ng, t i l es, bui l der ' s har dwar e, s i gnage, met al s, woods and pl ast i cs, mi l l wor k, t her mal and moi st ur e pr ot ect i on, l ead based pai nt abat ement , f i r epr oof i ng, equi pment syst emi zat i on l ayout s, bui l di ng f i x t ur es, and handi cap syst emi zat i on.

LEED, sust ai nabi l i t y and ot her r el at ed r equi r ement s ar e par t of t he ar chi t ect ur al wor k.

SECTI ON 01 11 00 Page 4

1. 3. 1. 4 I nt er i or Desi gn

1. 3. 1. 4. 1 St r uct ur al I nt er i or Desi gn ( SI D)

St r uct ur al I nt er i or Desi gn i ncl udes al l i nt er i or and ext er i or bui l di ng r el at ed el ement s and component s gener al l y par t of t he bui l di ng i t sel f , such as wal l f i ni shes, cei l i ngs f i ni shes, f l oor cover i ngs, mar ker / bul l et i n boar ds, bl i nds, s i gnage, bui l t i n casewor k and al l ext er i or bui l di ng f i ni shes. Devel op t he SI D i n conj unct i on wi t h t he f ur ni t ur e f oot pr i nt .

1. 3. 1. 4. 2 Fur ni t ur e, Fi xt ur es and Equi pment ( FF&E)

Ut i l i ze t he FF&E l ayout or desi gn f or t he sel ect i on, l ayout , speci f i cat i on and document at i on of t he i nf r ast r uct ur e necessar y t o suppor t t he FF&E.

1. 3. 1. 5 Structural

St r uct ur al desi gn and anal ysi s of bui l di ng syst ems and anci l l ar y st r uct ur es ( concr et e, masonr y, st eel , et c. ) , f oundat i ons, under wat er st r uct ur es, r ei nf or ced concr et e, equi pment mount i ng, shock i sol at i on, r ei nf or ced masonr y, wood, j oi st s, decks, st r uct ur al f r amed syst ems, sei smi c eval uat i ons of exi st i ng st r uct ur es, connect i ons, non- bui l di ng st r uct ur es, wel di ng pr ocedur es, det ai l i ng of st r uct ur al component s and har dened ( pr ot ect i ve) st r uct ur es, ear t hquake consi der at i on of ut i l i t y syst ems; non- bui l di ng st r uct ur es such as el evat ed t anks, ver t i cal t anks on gr ound, hor i zont al t anks, r et ai ni ng wal l s and bur i ed st r uct ur es; anchor age and suppor t of mechani cal and el ect r i cal equi pment ; and appl i cat i ons of i ndust r y bui l di ng codes and st andar ds.

1. 3. 1. 6 Plumbing

Pl umbi ng f i xt ur es, speci al equi pment / syst ems, st er i l i zat i on syst ems, f uel di st r i but i on ( i . e. , pr opane, nat ur al gas, and sl ur r i es) , pet r ol eum oi l l ubr i cant s ( POL) , st or age t anks f or f uel , gas, wat er and sewage; pi pi ng syst ems, f i r e suppr essi on ( wat er , chemi cal , and gas) , f uel use and l eak anal yses, st er i l i zer s, compr essed ai r pr oduct i on and di st r i but i on syst ems, i ndust r i al gas di st r i but i on syst ems, exhaust syst ems, st eam syst ems, pi pe i nsul at i on, and pl umbi ng syst ems i nvol v i ng wat er , sol i ds, and hazar dous waste.

1. 3. 1. 7 Heat i ng, Vent i l at i on and Ai r Condi t i oni ng ( HVAC)

Heat i ng, vent i l at i on, and ai r - condi t i oni ng ( HVAC) syst ems and component s, cent r al pl ant and ut i l i t y di st r i but i on st udi es, hi gh t emper at ur e wat er syst ems, chi l l er s, r ef r i ger ant s, cool i ng t ower s, ai r handl i ng equi pment , ot her equi pment , compr essed ai r syst ems, ai r duct desi gn, ener gy conser vat i on, heat t r ansf er sur f aces, f ur naces, ai r di st r i but i on, val ves, pumps and associ at ed pi pi ng and duct s; conveyi ng syst ems, el evat or s, dumbwai t er s, movi ng wal ks, box conveyor s, hoi st s and cr anes, l i f t s , escal at or s, boi l er s, mat er i al handl i ng syst ems, dr yer s, st eam l i nes, t r ansi ent t ubes, shr edder s, mechani cal r oom and ar ea f l oor pl ans, equi pment schedul es, and cont r ol s.

1. 3. 1. 8 Fi r e Pr ot ect i on and Li f e Saf et y

Li f e saf et y, f i r e pr ot ect i on syst ems, i ndust r i al saf et y and hygi ene, i nf l ammat or y gases, hazar dous condi t i ons, asbest os and/ or l ead based pai nt eval uat i on and r emoval and encapsul at i on, l i ght f i x t ur es cont ai ni ng PCB eval uat i on and r emoval , bl ast di st ances, and Fai l ur e Mode and Ef f ect i ve

SECTI ON 01 11 00 Page 5

Anal yses ( FMEA) , Occupat i onal Saf et y and Hazar ds Act ( OSHA) and Amer i can Di sabi l i t y Act ( ADA) eval uat i ons.

1. 3. 1. 9 El ect r i cal Wor k

El ect r i cal di st r i but i on and net wor k bal anci ng ( aer i al and under gr ound) , t r ansmi ssi on l i nes, pol es ( t el ephone and power ) , t ower s, swi t chgear , aut omat i c t r ansf er swi t ches, sur ge pr ot ect i on devi ces, power qual i t y met er s, duct s, r aceways, condui t s, t ubi ng, connect or s, wi r es, cabl e, cabl e t r ays, out l et boxes, cabi net s and encl osur es, suppor t s, f i ber opt i cs cabl e and equi pment , manhol es, concr et e pads, i nsul at or s, l i ght i ng ar r est or s, t r ansf or mer s, capaci t or s, swi t ches, r el ays, f uses, gr oundi ng, l i ght ni ng pr ot ect i on, cat hodi c pr ot ect i on, ser vi ce ent r ances, panel boar ds, c i r cui t br eaker s, mot or cont r ol cent er s, speci al equi pment / syst ems, t ar get i ng syst ems, r esi st ance heat i ng, st ar t er s, uni nt er r upt ed power suppl i es ( UPS) , beacons, bat t er i es, gener at or s, sol ar syst ems, r ecept acl es, l i ght i ng f i x t ur es, l amps, bal l ast s, equi pment connect i ons, speci al out l et s, di sconnect swi t ches, spl i ces, t er mi nat i ons, cont r ol syst ems, mi nor r evi s i ons t o el ect r oni c secur i t y syst ems, ut i l i t i es moni t or i ng and cont r ol syst ems ( UMCS) , and si mi l ar mi cr opr ocessor envi r onment al cont r ol syst ems, audi o and vi sual communi cat i on syst ems, t el ephone syst ems, i nst r ument at i on syst ems, and f i r e det ect i on and al ar m syst ems, and mass not i f i cat i on systems.

1. 3. 1. 10 Ant i t er r or i sm and For ce Pr ot ect i on

Unl ess ot her wi se speci f i ed i n t he SOW ver i f y t hi s pr oj ect ' s compl i ance wi t h Ant i t er r or i sm ( AT) r equi r ement s, t o i ncl ude t he nul l or not appl i cabl e s i t uat i on. The Desi gner of Recor d ( DOR) or Cont r act or shal l c l ear l y st at e t he appl i cabl e expl osi ve wei ght s and l evel s of pr ot ect i on r equi r ed by UFC 4- 010- 01 and conf i r m t hat t he mi ni mum AT st andar ds f or t he appl i cabl e l evel of pr ot ect i on ar e met per t he UFC. Regar dl ess of any excl usi ons st at ed i n t he DOR' s pr oposal , compl i ance wi t h AT r equi r ement s i s mandat or y f or new const r uct i on pr oj ect s and r enovat i on/ r epai r pr oj ect s as appl i cabl e per UFC 4- 010- 01 Sect i on 1- 8. The UFC 4- 010- 01 st andar ds appl y t o exi st i ng bui l di ngs when t r i gger ed as speci f i ed i n UFC 4- 010- 01 Sect i on 1- 8. I f t he bui l di ng i s i nhabi t ed per UFC 4- 010- 01, and wi ndows and/ or gl azed ext er i or door s ar e r epl aced, t he r equi r ement s i n UFC 4- 010- 01 St andar ds 10 and 12 need t o be met , i ncl udi ng r equi r ement s f or wi ndow gl azi ng, wi ndow f r ames, f r ame connect i ons and st r uct ur al el ement s suppor t i ng t he wi ndows. The Maj or I nvest ment t r i gger i s met when t he cost s of bui l di ng r enovat i ons/ r epai r exceed 50% of t he pl ant r epl acement val ue of t he exi st i ng bui l di ng i n accor dance wi t h UFC 3- 701- 01. The cost s t o r epl ace/ r epai r / upgr ade i nst al l ed bui l di ng equi pment as def i ned i n AR 420- 1 Sect i on 4- 58 shal l be i ncl uded i n t he bui l di ng r enovat i on/ r epai r cost s. I nst al l ed bui l di ng equi pment i ncl udes r eal pr oper t y equi pment t hat i s f i xed t o t he bui l di ng and i s an i nt egr al par t of t he bui l di ng.

I nst al l ed bui l di ng equi pment does not i ncl ude movabl e equi pment ( per AR 420- 1, Sect i on 4- 60) or f i xed equi pment t hat may be sever ed or r emoved f r om t he bui l di ng wi t hout dest r oyi ng t he usef ul ness of t he f aci l i t y ( per AR 420- 1, Sect i on 4- 59) . The i nst al l at i on does not have t he aut hor i t y t o wai ve i t s own AT r equi r ement s unl ess i t has r ecei ved an appr oved wai ver or except i on t hr ough t he pr ocess out l i ned i n Al l Ar my Act i v i t i es ( ALARACT) message 254/ 2011 f or Ar my Act i v i t i es or , f or ot her agenci es' act i v i t i es, t he gui dance i ssued i n accor dance wi t h Sect i on 1- 1. 3. 3 or UFC 4- 010- 01.

Pr oposal s shal l addr ess t he appl i cabi l i t y of AT per UFC 4- 010- 01 Sect i on 1- 8 and cl ear l y st at e any measur es r equi r ed t o meet appl i cabl e pr ovi s i ons of t he AT st andar ds. I f t he UFC appl i es, check al l of t he st andar ds and pr ovi de a nar r at i ve i n t he next submi t t al or Wor k Pl an or Desi gn t hat

SECTI ON 01 11 00 Page 6 expl ai ns how each appl i cabl e st andar d i s met .

1. 3. 1. 11 Cybersecurity

I ncor por at i ng cyber secur i t y i n t he desi gn of al l f aci l i t y- r el at ed cont r ol syst ems i n or der t o addr ess appr opr i at e Ri sk Management Fr amewor k ( RMF) secur i t y cont r ol s dur i ng al l pl anni ng, desi gn and const r uct i on, r enovat i on, and r epai r . Cont r ol syst ems i ncl ude f aci l i t y r el at ed Pl at f or m I nf or mat i on Technol ogy ( PI T) syst ems t hat i ncl ude but ar e not l i mi t ed t o I ndust r i al Cont r ol Syst ems ( I CS) , Ut i l i t y Moni t or i ng and Cont r ol Syst ems ( UMCS) , El ect r oni c Secur i t y Syst ems ( ESS) , Bui l di ng Aut omat i on Syst ems ( BAS) , Super vi sor y Cont r ol and Dat a Acqui s i t i on ( SCADA) syst ems, and si mi l ar cont r ol syst ems.

1. 3. 1. 12 Syst ems Wor k

Human f act or s engi neer i ng; upgr ade assessment s, equi pment i nvent or i es and O&M document at i on t o obt ai n suppor t ; and ener gy syst em sur veys.

1. 3. 1. 13 Mi cr opr ocessor Cont r ol Syst ems

Bui l di ng Aut omat i on Syst ems ( BAS) , Ener gy Moni t or i ng Cont r ol Syst ems ( EMCS) , Ut i l i t y Moni t or i ng and Cont r ol Syst ems ( UMCS) and si mi l ar mi cr opr ocessor cont r ol syst ems.

1. 3. 1. 14 Telecommunications

I nt er i or and ext er i or t el ecommuni cat i ons i nf r ast r uct ur e t hat t ypi cal l y i ncl udes t el ecommuni cat i ons spaces, pat hways, cabl i ng and i nt er connect i ng component s necessar y t o suppor t t he i nf r ast r uct ur e f or voi ce, dat a and vi deo communi cat i on syst ems. I ncl udes cl assi f i ed i nf r ast r uct ur e. For Aut omat ed I nst al l at i on Ent r y ( AI E) syst ems t he cabl i ng shal l be separ at ed i nt o power , s i gnal and communi cat i ons. Si gnal and communi cat i ons cabl i ng ar e consi der ed as par t of t el ecommuni cat i ons cabl i ng. The t el ecommuni cat i ons cabl i ng shal l be separ at ed f ur t her i nt o s i gnal ( secur i t y, cont r ol s, AI E, ESS, et c. ) and communi cat i ons ( dat a, voi ce, et c. ) . The power , s i gnal and communi cat i ons cabl i ng shal l be separ at ed f r om t he power cabl i ng i n separ at e equi pment r ooms, condui t , handhol es, panel s, panel boar ds, manhol es, et c. For r enovat i on pr oj ect s, separ at e t he power , s i gnal and t o t he ext ent pr act i cabl e.

1. 3. 1. 15 Security

El ect r oni c secur i t y syst em ( ESS) , i nt r usi on det ect i on syst em ( I DS) , access cont r ol syst em ( ACS) , i nt egr at i on wi t h cyber secur i t y, t el ecommuni cat i ons and cont r ol s, f enci ng, vaul t s, pr ot ect i ve l i ght i ng, secur i t y syst ems, l ocks, ar ms r ooms, cont r ol l ed subst ances, ent r ances, guar d f aci l i t i es, c l assi f i ed mat er i al , pat r ol r oads, c l ear zones, r est r i ct ed ar eas, sur vei l l ance and penet r at i on r esi st ance.

1. 3. 1. 16 Cost Engi neer i ng

Li f e cycl e cost i ng, benef i t - cost anal yses, economi c anal ysi s and ot her cost est i mat i ng ser vi ces.

1. 3. 1. 17 Systems

Human f act or s engi neer i ng; upgr ade assessment s, equi pment i nvent or i es and O&M document at i on t o obt ai n suppor t ; and ener gy syst em sur veys.

SECTI ON 01 11 00 Page 7

1. 3. 1. 18 Ener gy Conser vat i on and Renewabl e Ener gy

New and/ or upgr ades t o exi st i ng syst ems wi t h t he expect at i on t hat ener gy uni t s or cost s wi l l be saved or ener gy wi l l be gener at ed vi a r enewabl e syst ems. Al l Ener gy Conser vat i on Measur es ( ECMs) desi gned by t he cont r act or v i a r esul t i ng t ask or der s shal l i nt er f ace wi t h exi st i ng syst ems and equi pment at t he i nst al l at i on or f aci l i t y , as det er mi ned t o be r equi r ed. Coor di nat i on and compat i bi l i t y r equi r ement s shal l be i dent i f i ed dur i ng t he desi gn/ r evi ew pr ocess of i ndi v i dual ener gy pr oj ect s. The f ol l owi ng ar e a l i s t of some common ener gy pr ogr ams suppor t ed by t hi s cont r act . Thi s i s not an al l i ncl usi ve l i s t : Ener gy Engi neer i ng Anal ysi s Pr ogr am ( EEAP) , Ener gy Conser vat i on I nvest ment Pr ogr am ( ECI P) , Resour ce Ef f i c i ency Manager ( REM) , Ener gy Savi ngs Per f or mance Cont r act ( ESPC) , Ut i l i t y Ener gy Savi ngs Cont r act ( UESC) , Met er i ng Cont r act , and any ot her pr ogr am or cont r act wi t h t he obj ect i ve t o conser ve ener gy or r esour ce.

1. 3. 2 Location

Thi s cont r act may appl y t o var i ous Depar t ment of Def ense ( DOD) i nst al l at i ons and f aci l i t i es l ocat ed wi t hi n t he cont i nent al Uni t ed St at es ( CONUS) and out si de t he cont i nent al Uni t ed ( OCONUS) , t he Nat i onal Guar d, and, pur suant t o appl i cabl e aut hor i t i es f or i nt er agency and i nt er gover nment al suppor t , t o f eder al agenci es, st at e and l ocal gover nment s on a case speci f i c basi s. Cont r act s and t ask or der s may be awar ded f or wor k t o be per f or med t hr ough- out t he Uni t ed St at es, i ncl udi ng Al aska, Hawai i , and al l US t er r i t or i es, f or t he f ol l owi ng Gover nment agenci es: Depar t ment of Def ense, Depar t ment of Homel and Secur i t y, Vet er an' s Admi ni st r at i on, St at e Depar t ment , Depar t ment of I nt er i or , Depar t ment of Ener gy, Depar t ment of Tr anspor t at i on, and st at e and l ocal gover nment s. The exact l ocat i on wi l l be shown i n t he SOW.

1. 4 OCCUPANCY OF PREMI SES

Bui l di ng( s) wi l l or wi l l not be occupi ed dur i ng per f or mance of t he wor k.

Occupancy wi l l be addr essed i n t he t ask or der speci f i c SOW. Occupancy not i f i cat i ons wi l l be post ed i n a pr omi nent l ocat i on i n t he wor k ar ea.

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur es, means of access, space f or st or age of mat er i al s and equi pment and use of appr oaches, cor r i dor s, and st ai r ways.

1. 5 EXI STI NG WORK

I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 6 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h

SECTI ON 01 11 00 Page 8

I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Cont act and coor di nat e wi t h t he l ocal ut i l i t y l ocat i ng ser vi ce pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 6. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer as st at ed i n t he SOW pr i or t o st ar t i ng excavat i on wor k.

1. 7 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT

Pur suant t o Cont r act Cl ause " FAR 52. 245- 1, Gover nment Pr oper t y" , t he Gover nment may f ur ni sh mat er i al s and equi pment f or i nst al l at i on by t he Cont r act or . Quant i t i es i ndi cat ed i n t he SOW wi t h an ast er i sk ar e est i mat es. I t i s t he i nt ent i on of t he Gover nment t o f ur ni sh al l quant i t i es of t he i t ems r equi r ed t o compl et e t he wor k as speci f i ed, and t he var i ous quant i t i es wi l l be adj ust ed when necessar y. Quant i t i es st at ed f or t he i t ems not mar ked wi t h an ast er i sk ar e al l t hat wi l l be f ur ni shed by t he Gover nment . Pr ovi de any addi t i onal quant i t i es t hat ar e r equi r ed.

1. 7. 1 Del i ver y Schedul e

Not i f y t he Cont r act i ng Of f i cer i n wr i t i ng at l east t he number of cal endar days i dent i f i ed i n t he SOW i n advance of t he dat e on whi ch t he mat er i al s and equi pment ar e r equi r ed. Pi ck up mat er i al s and equi pment no l at er t han 30 cal endar days af t er such dat e. When mat er i al s and equi pment ar e not pi cked up by t he 30t h day, t he Cont r act or wi l l be char ged f or st or age at t he r at e per mont h or f r act i on t her eof as desi gnat ed i n t he SOW.

1. 7. 2 Del i ver y Locat i on

The SOW wi l l i ncl ude t he l ocat i on of t he mat er i al s and t he l ocat i on t o whi ch t hey wi l l be del i ver ed.

1. 8 GOVERNMENT- I NSTALLED WORK

The SOW wi l l i ncl ude a descr i pt i on of any Gover nment - i nst al l ed wor k.

1. 9 SALVAGE MATERI AL AND EQUI PMENT

The SOW i dent i f i es any i t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged and t o r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he st or age ar ea.

When t he SOW i dent i f i es t hat mat er i al s ar e t o be sal vaged pr ovi de a S

SECTI ON 01 11 00 Page 9 al vage Pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Use a syst em of pr oper t y cont r ol t hat i s appr oved by t he Cont r act i ng Of f i cer . St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .

1. 10 CERTI FI CATI ON OF WORK

Unl ess ot her wi se i ndi cat ed i n t he SOW, act i ve r egi st er ed pr of essi onal engi neer s, ar chi t ect s, and i ndust r i al hygi eni st s shal l cer t i f y Wor k Pl an and Desi gn document at i on wi t h t hei r s i gnat ur e and st amp al l ef f or t s, ensur i ng pr oper usage of codes and st andar ds. Each dr awi ng sheet shal l be cer t i f i ed. The cover sheet of t he speci f i cat i on sheet shal l be cer t i f i ed.

Desi gn document at i on shal l be cer t i f i ed by t he appr opr i at e desi gn di sci pl i ne. The cont r act or shal l pr ovi de cer t i f i cat i on i n accor dance wi t h t he st at e and l ocal r equi r ement s when r equi r ed i . e. ; New Yor k St at e r equi r es New Yor k St at e cer t i f i ed pr of essi onal s.

The cont r act or shal l use onl y per sonnel who possess cur r ent EPA, st at e and l ocal ( as necessar y) , accr edi t at i ons and l i censes as Asbest os I nspect or s, Asbest os Management Pl anner s and Asbest os Pr oj ect Desi gner s, as appr opr i at e, f or t he asbest os wor k def i ned i n t hi s Cont r act . The cont r act or shal l empl oy onl y Accr edi t ed Lead Ri sk Assessor ( s) ( i nspect or s) t o per f or m t he LBP wor k def i ned i n t hi s Cont r act . These accr edi t ed asbest os per sonnel shal l be accr edi t ed i n t he st at e t hat t he wor k i s bei ng conduct ed ( as appl i cabl e) .

1. 11 DEFINITIONS

Def i ni t i ons of some of t he var i ous del i ver abl es ar e i ncl uded her ei n.

1. 11. 1 Si t e I nvest i gat i on

The si t e i nvest i gat i on i s an i nspect i on of a s i ngl e ACP or syst em of ACPs or a por t i on of an ACP syst em at an i nst al l at i on or f aci l i t y t o eval uat e ar eas and t o obt ai n speci f i c i nf or mat i on per t ai ni ng t o a pr oposed act i on.

Val i dat i on of t he SOW shal l al so be accompl i shed dur i ng t he i ni t i al s i t e meet i ng. Thi s r equi r es Cont r act or and Gover nment management par t i c i pat i on. Dur i ng t he pr ocess of ver i f i cat i on of t he SOW each i t em shal l be r evi ewed by t he at t endees and agr eed t o.

The Si t e I nvest i gat i on Repor t wi l l i ncl ude an I nt er i m Desi gn. The r equi r ement s f or t he Si t e I nvest i gat i on and Si t e I nvest i gat i on Repor t ar e i ncl uded i n mor e det ai l i n SECTI ON 01 33 16. 00 10 DESI GN DATA ( DESI GN

AFTER AWARD) .

1. 11. 2 Wor k Pl an

The Wor k Pl an i s used t o det ai l pr oj ect f eat ur es, wor k pr act i ces, et c.

wher e i t i s not pr act i cabl e t o devel op a f ul l set of Desi gn Document s.

The Wor k Pl an i s mi ni mal desi gn document at i on r equi r ed f or t he Gover nment t o moni t or t he Cont r act or ' s ef f or t s wi t h r egar d t o scope, schedul es ( phasi ng) , cost s, codes, and st andar ds i n or der t o per f or m an ACP act i on t o i nst al l , const r uct and/ or cor r ect a f aci l i t i es r epai r and/ or r enewal s i t uat i on. The l evel of det ai l i n t he Wor k Pl an i s cont i ngent upon t he ef f or t del i neat ed i n t he scope of wor k, scope of wor k val i dat i on, and i nf or mat i on gat her ed dur i ng t he si t e v i s i t by t he cont r act or dur i ng t he Si t e I nvest i gat i on. The det ai l may i ncl ude sket ches, dr awi ngs, cr i t er i a, SECTI ON 01 11 00 Page 10 manuf act ur er s ' dat a, cat al og cut s, s i mpl e schedul es, et c. Ther e coul d be some desi gn wor k t hat i s r equi r ed t o be cer t i f i ed by an ar chi t ect or engi neer ( Desi gner of Recor d) , however , i t woul d be mi ni mal . The r equi r ement s f or t he Wor k Pl an ar e i ncl uded i n mor e det ai l i n SECTI ON 01

33 16. 00 10 DESI GN DATA ( DESI GN AFTER AWARD) .

1. 11. 3 Desi gn Submi t t al Package

The Desi gn Submi t t al Package, Desi gn Document s and si mi l ar i s def i ned i n

SECTI ON 01 33 16. 00 10 DESI GN DATA ( DESI GN AFTER AWARD) .

1. 11. 4 Access Cont r ol Poi nt s ACP) Pr oj ect

The ACP pr oj ect i s a pr oj ect under t aken t o deconst r uct , const r uct , r enovat e, r epai r and ACP syst em or syst em component s or t o pl ace equi pment at a l ocat i on t hat i s ut i l i zed t o cont r ol vehi cul ar and/ or pedest r i an access. Det ai l s t aken f r om a si t e sur vey, s i t e v i s i t , f easi bi l i t y st udy, or r el at ed sour ces. The pr oj ect s may i nvol ve changes t o oper at i ons, f aci l i t i es r epai r and r enewal , deconst r uct i on, demol i t i on, const r uct i on, oper at i ons and mai nt enance and ot her pr act i ces as st at ed i n t he t ask or der . The Cont r act or i s act i vat ed by a t ask or der or cont r act based on t he f aci l i t y r equi r ement s.

1. 11. 5 ACP Act i on

The ACP act i on i s t he act i on t aken t o const r uct , r enovat e, r epai r , or pr ovi de equi pment t o ensur e st andar d compl i ant r esour ces ar e i n pl ace f or secur i t y f or ces, al l as st at ed i n t he t ask or der s. I t r esul t s f r om t he i mpl ement at i on of a desi gn submi t t al package and/ or a wor k pl an or ot her document s as pr ovi ded.

1. 11. 6 Task Or der

A t ask or der i s a di r ect i ve i ssued t o t he Cont r act or by t he Cont r act i ng Of f i cer whi ch st at es t he r equi r ement s f or t he ACP act i ons t o be per f or med under a Mul t i pl e Awar d Task Or der Cont r act ( MATOC) t ype cont r act . Tasks ar e def i ned as i ndi v i dual ef f or t s t o be per f or med by a Cont r act or , whi ch ar e cont ai ned i n a t ask or der .

1. 11. 7 Task El ement s

Each t ask or der may consi st of up t o t hr ee phases of wor k known as t ask el ement s. These el ement s ar e 1) Si t e I nvest i gat i on, 2A) Wor k Pl an, 2B Desi gn Submi t t al and 3) ACP Act i on. Not e t hat t he Cont r act or shal l not pr oceed t o t he next t ask el ement unt i l t he agr eed upon cont r act r equi r ement s have been met f or t he cur r ent t ask el ement and as di r ect ed t o do so by t he Cont r act i ng Of f i cer .

1. 12 EXI STI NG WORK

I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, SECTI ON 01 11 00 Page 11 exi st i ng wor k shal l be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 13 SECURI TY REQUI REMENTS

Cont r act Cl ause FAR 52. 204- 2 Al t I I , Secur i t y Requi r ement s appl i es.

Pr ovi de si t e secur i t y ( f enci ng, l i ght i ng, or guar d ser vi ce) as r equi r ed by each SOW. However , at a mi ni mum, t he Cont r act or shal l mai nt ai n t he s i t e and al l ot her cont r act or - cont r ol l ed ar eas i n such a manner as t o mi ni mi ze t he r i sk of t hef t , vandal i sm, i nj ur y, or acci dent . The Cont r act or shal l compl y wi t h s i t e secur i t y r egul at i ons.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

3. 1 ACTI VI TI ES UNDER ACCESS CONTROL POI NTS ( ACP) PROJECTS

The act i v i t i es t o be per f or med by t he Cont r act or under a cont r act or t ask or der and subsequent SOWs ar e descr i bed i n gener al t er ms bel ow ( t hi s l i s t i s not al l - i ncl usi ve) . The speci f i c t asks and t ask el ement s t o be per f or med wi l l be i dent i f i ed i n each SOW. Gener al l y, cost s associ at ed wi t h each t ask el ement wi l l be negot i at ed and agr eed upon pr i or t o st ar t of ef f or t ; however , upon di r ect i on of t he Cont r act i ng Of f i cer by i ssuance of a t i me- and- mat er i al s ( T&M) or der , t he Cont r act or shal l i mmedi at el y st ar t t he f i r st t ask el ement and usual l y t he or der wi l l be negot i at ed t o a f i r m- f i xed pr i ce as soon as possi bl e. The Cont r act i ng Of f i cer r eser ves t he r i ght t o modi f y dut i es and t i me per i ods i n t he t asks. At t he compl et i on of each appr oved cont r act or t ask or der , t he r esul t s, document ed and concept ual , become t he pr oper t y of t he Gover nment .

3. 1. 1 El ement 1 Si t e I nvest i gat i on

Upon NTP a si t e i nvest i gat i on shal l be i ni t i at ed. Pr i or t o any si t e i nvest i gat i on an Abbr evi at ed Acci dent Pr event i on Pl an ( AAPP) shal l be submi t t ed f or Gover nment appr oval . The Cont r act or shal l pr epar e and submi t a Si t e I nvest i gat i on Repor t . Per f or m t he si t e sur veys and si t e i nvest i gat i on and pr epar e t he Si t e I nvest i gat i on Repor t i n accor dance wi t h

SECTI ON 01 33 16. 00 10 DESI GN DATA ( DESI GN AFTER AWARD) .

3. 1. 2 El ement 2A Wor k Pl an

The Wor k Pl an shal l be devel oped by t he Cont r act or i n accor dance wi t h t he l evel of ef f or t speci f i ed by t he SOW. The Wor k Pl an compl ement s t he Desi gn Submi t t al . The Desi gn Submi t t al i s par t of t he Wor k Pl an. The Wor k Pl an, wi t h Desi gn Submi t t al , shal l al ways be t r ansmi t t ed as a s i ngl e submi t t al i t em. The Wor k Pl an expl ai ns t he why, what , how, when. . . f or t he pr oj ect . The Wor k Pl an i s not i nt ended t o be a l engt hy document and shal l be pr epar ed as ef f i c i ent l y and ef f ect i vel y as i s pr act i cabl e and appr opr i at e f or t he dept h and br eadt h of t he par t i cul ar pr oj ect . abl e f or a mi nor pr oj ect . A mi nor pr oj ect , such as t hose consi st i ng mai nl y of a mot or or pump r epl acement , LED l i ght i ng upgr ades, passi ve vehi c l e bar r i er s, f aci l i t y ar chi t ect ur al f i ni shes upgr ades, t el ecommuni cat i ons wor k, handhel d AI E i nf r ast r uct ur e, or pr oj ect s of s i mi l ar compl exi t y, may consi st of s i mpl e sket ches, cat al og cut s, manuf act ur er ' s dat a and si mi l ar and i ncl ude onl y l i mi t ed engi neer ed ( s i gned by t he Desi gner or Recor d) anal ysi s, speci f i cat i ons and dr awi ngs. Some mi nor or r el at ed ar chi t ect or

SECTI ON 01 11 00 Page 12 engi neer i ng ser vi ces may be r equi r ed. Regar dl ess of t he s i ze of t he ACP Act i on t he Wor k Pl an shal l pr ovi de adequat e det ai l t o ef f ect i vel y descr i be and car r y out t he ACP act i on pr ocess. The Desi gner of Recor d ( DOR) shal l be i nvol ved, as appl i cabl e and as r equi r ed. Submi t as speci f i ed i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and SECTI ON 01 33 16. 00 10 DESI GN

DATA ( DESI GN AFTER AWARD) .

3. 1. 3 El ement 2B Desi gn Submi t t al

Pr epar e t he Desi gn Submi t t al i n accor dance wi t h SECTI ON 01 33 16. 00 10

DESI GN DATA ( DESI GN AFTER AWARD) .

3. 1. 4 El ement 3 ACP Act i on

Begi n wor k on t he ACP act i on ( physi cal demol i t i on, deconst r uct i on, r enovat i on, r epai r , i nst al l at i on, const r uct i on, et c. ) of t he f aci l i t y or i nst al l at i on i n accor dance wi t h t he appr oved wor k pl an or t he desi gn compl et e submi t t al s and f ol l ow on appr oved submi t t al s, or as ot her wi se di r ect ed by t he Cont r act i ng Of f i cer , f ol l owi ng t he appr oved pr oj ect schedule.

3. 2 REQUI REMENTS AND CRI TERI A

The Cont r act or shal l compl y wi t h t he f ol l owi ng cr i t er i a and r equi r ement s and t he cr i t er i a and r equi r ement s i ncl uded i n ot her Sect i ons of t he Di v i s i on 01 Speci f i cat i ons and t he SOW.

3. 2. 1 The f ol l owi ng over al l cr i t er i a and r equi r ement s appl y t o t hi s cont r act act i on.

3. 2. 1. 1 Ar my ECBs

Various Ar my ECBs ar e appl i cabl e or r el evant and appr opr i at e t o wor k at Ar my i nst al l at i ons and shal l be consi der ed as cont r act r equi r ement s. The SOW may al so i ncl ude ECBs f r om t he ot her DoD Agenci es ( Navy, USMC) . ECBs can be f ound at :

http://www.wbdg.org/ffc/dod/engineering-and-construction-bulletins-ecb

3. 2. 1. 2 UFC 1- 200- 01

Compl y wi t h t he speci f i c and t he r ef er enced cr i t er i a and r equi r ement s cont ai ned i n UFC 1- 200- 01. Appendi x A Ref er ences t o UFC 1- 200- 01 i ncl udes var i ous cr i t er i a and r equi r ement s t hat may be appl i cabl e or r el evant and appr opr i at e t o t hi s pr oj ect . See t he SOW f or addi t i onal cr i t er i a and r equi r ement s not cont ai ned or r ef er enced i n UFC 1- 200- 01.

3. 2. 1. 3 UFC 4- 010- 06

Compl y wi t h t he speci f i c and t he r ef er enced cr i t er i a and r equi r ement s cont ai ned i n UFC 4- 010- 06 deal i ng wi t h cyber secur i t y.

3. 3 LEVEL OF EFFORT

The t ype and magni t ude of t he pr oj ect s wi l l var y gr eat l y. The cont r act or i s expect ed t o pr epar e t he l evel of desi gn and document at i on appr opr i at e t o t he s i ze and compl exi t y of t he pr oj ect .

- - End of Sect i on - -

SECTI ON 01 11 00 Page 13

SECTI ON 01 11 00 Page 14

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00. 10

STATEMENT OF WORK

11/18

PART 1 GENERAL

1. 1 PROJECT OBJECTI VES

1. 1. 1 Pr oj ect Descr i pt i on

1. 1. 2 Locat i on

1. 1. 3 Consi st ency Wi t h St at e And Local Requi r ement s

1. 1. 4 Sust ai nabi l i t y

1. 1. 5 I nnovat i on

1. 2 SECTI ON ORGANI ZATI ON

PART 2 I NTRODUCTI ON

2. 1 DESI GN REQUI REMENTS

2. 2 ACP DEFI NI TI ON

2. 3 ACP CLASSI FI CATI ONS

2. 4 ACP FUNCTI ONS

2. 4. 1 Si t e Funct i ons

2. 4. 2 Bui l di ng Funct i onal Ar eas

2. 5 ACP WAI VERS

2. 6 MANDATORY CRI TERI A

2. 7 DEFEAT OF VEHI CLE THREAT SCENARI OS

2. 7. 1 Of f i ce Of Pr ovost Mar shal Gener al ( OPMG) Vehi c l e Thr eat

Scenarios

2. 7. 1. 1 Vehi c l e Thr eat Scenar i o #1

2. 7. 1. 2 Vehi c l e Thr eat Scenar i o #2

2. 7. 1. 3 Vehi c l e Thr eat Scenar i o #3

2. 7. 1. 4 Vehi c l e Thr eat Scenar i o #4

2. 7. 2 Thr eat Vehi c l e Char act er i st i cs

2. 7. 2. 1 Accel er at i on Rat e

2. 7. 2. 2 Decel er at i on Rat e

2. 7. 2. 3 Fr i ct i on Fact or s

2. 7. 2. 4 Maxi mum Vel oci t y

2. 7. 2. 5 Vehi c l e Mass

2. 8 TRAFFI C AND TRANSPORTATI ON ENGI NEERI NG

2. 8. 1 Tr af f i c Engi neer i ng St udy ( TES)

2. 8. 2 Tr anspor t at i on Engi neer i ng

2. 8. 3 Tur ni ng Movement s

2. 9 APPROACH ZONE

2. 9. 1 Ent r y Gat e

2. 9. 1. 1 Si gnage

2. 9. 1. 2 I mpact Resi st ance

2. 9. 2 Passi ve Vehi c l e Bar r i er s

2. 9. 2. 1 Gener al

2. 9. 2. 2 Capaci t y ( Ki net i c Ener gy Def eat / Mi t i gat i on Capabi l i t y)

1. 9. 2. 2 Capaci t y ( Ki net i c Ener gy Def eat / Mi t i gat i on Capabi l i t y)

2. 9. 3 Vi s i t or Cont r ol Cent er ( VCC)

SECTI ON 01 11 00. 10 Page 1

2. 9. 4 Li ght i ng

2. 10 ACCESS CONTROL ZONE

2. 10. 1 Passi ve Vehi c l e Bar r i er s

2. 10. 2 I d Check Ar ea

2. 10. 2. 1 I D Check Ar ea I s l ands

2. 10. 2. 2 I D Check Ar ea Canopy

2. 10. 2. 3 Tur n- Ar ounds

2. 10. 2. 4 Sear ch Ar ea

2. 10. 3 Guar d Faci l i t i es

2. 10. 4 Command and Cont r ol

2. 10. 5 Cl osed Ci r cui t Tel evi s i on ( CCTV)

2. 10. 6 El ect r oni c Secur i t y

2. 10. 7 Aut omat i on

2. 10. 8 Back- Up Power

2. 10. 9 Li ght i ng

2. 11 RESPONSE ZONE

2. 11. 1 Passi ve Vehi c l e Bar r i er s

2. 11. 2 Act i ve Vehi c l e Bar r i er s ( AVB)

2. 11. 3 Over wat ch

2. 11. 4 Back- Up Power

2. 11. 5 Li ght i ng

2. 11. 6 Communi cat i ons

2. 11. 7 I nf or mat i on Connect i v i t y

2. 12 COORDI NATI NG FACI LI TY TYPES

2. 13 STANDARD DESI GN DRAWI NGS AND I NFORMATI ON

2. 14 OUTSI DE CONTI NENTAL UNI TED STATES ( OCONUS)

PART 3 SCOPE

3. 1 ACCESS CONTROL POI NTS

3. 1. 1 I D Check Ar ea

3. 1. 2 Bal l i s t i c Resi st ance

3. 1. 3 Canopi es

3. 1. 4 ACP Funct i onal Ar ea Faci l i t i es

3. 1. 5 St and- Of f Di st ance

3. 1. 6 Equi pment

PART 4 ACCESS CONTROL POI NTS

4. 1 4. 1 GENERAL REQUI REMENTS

4. 1. 1 Faci l i t y Descr i pt i on

4. 1. 2 Accessi bi l i t y Requi r ement s

4. 1. 3 Bui l di ng Ar eas

4. 1. 4 Hour s of Oper at i on

4. 1. 5 Bal l i s t i c Requi r ement s

4. 1. 6 Mandat or y Requi r ement s

4. 1. 7 Faci l i t y Goal s

4. 1. 8 Adapt Bui l d Model

4. 1. 9 Out si de Cont i nent al Uni t ed St at es ( OCONUS)

4. 2 FUNCTI ONAL AND OPERATI ONAL REQUI REMENTS

4. 2. 1 Gener al

4. 2. 2 Pr i mar y Spaces ( Funct i onal Ar eas)

4. 2. 3 Combi nat i ons/ Squar e Foot Li mi t at i ons For Var i ous Funct i onal

Areas

4. 3 SI TE FUNCTI ONAL REQUI REMENTS

4. 3. 1 Gener al

4. 3. 2 Soi l s

4. 3. 2. 1 Geot echni cal Repor t f or Request f or Pr oposal ( RFP)

4. 3. 2. 2 Geot echni cal Eval uat i on Repor t

SECTI ON 01 11 00. 10 Page 2

4. 3. 3 Vehi c l e Pavement s

4. 3. 4 Par ki ng

4. 3. 5 Access Roadways, Dr i ves and I s l ands

4. 4 SI TE AND LANDSCAPE REQUI REMENTS

4. 4. 1 Si t e St r uct ur es

4. 4. 2 Landscapi ng/ Har dscapi ng

4. 4. 3 Si t e Desi gn Requi r ement s

4. 4. 4 Mi ni mum Ant i - Ter r or i sm St andar ds For ACP Bui l di ngs

4. 5 CI VI L SI TE REQUI REMENTS

4. 6 ARCHI TECTURAL REQUI REMENTS

4. 6. 1 Ar chi t ect ur al Funct i onal Requi r ement s

4. 6. 1. 1 Two ( 2) Pr ocessor Vi s i t or Cont r ol Cent er ( When Appl i cabl e)

4. 6. 1. 2 Thr ee ( 3) Pr ocessor Vi s i t or Cont r ol Cent er ( When

Applicable)

4. 6. 1. 3 Si x ( 6) Pr ocessor Vi s i t or Cont r ol Cent er ( When Appl i cabl e)

4. 6. 1. 4 Ni ne ( 9) Pr ocessor Vi s i t or Cont r ol Cent er ( When Appl i cabl e)

4. 6. 1. 5 I D Check Canopy

4. 6. 1. 6 Vehi c l e I D Check Guar d Boot h

4. 6. 1. 7 Sear ch Funct i on Bus Shel t er ( When Appl i cabl e)

4. 6. 1. 8 Smal l Sear ch Ar ea Bui l di ng( s) ( When Appl i cabl e)

4. 6. 1. 9 Lar ge Sear ch Ar ea Bui l di ng ( When Appl i cabl e)

4. 6. 1. 10 Tr uck Sear ch Ar ea Canopy ( When Appl i cabl e)

4. 6. 1. 11 Passenger Vehi c l e Sear ch Ar ea Canopy ( When Appl i cabl e)

4. 6. 1. 12 Command and Cont r ol

4. 6. 1. 13 Lat r i nes

4. 6. 1. 14 St andal one St or age

4. 6. 1. 15 Communi cat i ons and Secur i t y wi t h Mechani cal / El ect r i cal

Equi pment Bui l di ng ( Separ at e Bui l di ng)

4. 6. 1. 16 Pedest r i an I D Check ( When Appl i cabl e)

4. 6. 1. 17 Over wat ch Bui l di ng

4. 6. 1. 18 Gat ehouse #1 ( Exampl e Combi nat i on, See dr awi ng Sheet No.

A- 100G1 and At t achment B- 1 - Concept Gat ehouse Layout )

4. 6. 1. 19 Gat ehouse wi t hout Out si de St or age ( Exampl e Combi nat i on , See dr awi ng Sheet No. A- 100G2 and At t achment B- 1 - Concept Gat ehouse Layout )

4. 6. 1. 20 Command and Cont r ol wi t h Sear ch and Mechani cal / El ect r i cal ( Exampl e Combi nat i on, See dr awi ng on Sheet No. A- 100CS)

4. 6. 1. 21 Command and Cont r ol wi t h Vi s i t or Cont r ol Cent er ( Exampl e Combi nat i on, See dr awi ng on Sheet No. A- 100CV)

4. 6. 1. 22 Vi s i t or Cont r ol wi t h Sear ch Funct i on ( Exampl e Combi nat i on, See dr awi ng on Sheet No. A- 100VS)

4. 6. 1. 23 Command and Cont r ol wi t h Sear ch, Pedest r i an I D Check ( Ent r apment Ar ea) and Mechani cal / El ect r i cal r oom ( Exampl e Combi nat i on, See dr awi ng on Sheet No. A- 100CSP)

4. 6. 1. 24 Command and Cont r ol wi t h Pedest r i an I D Check and Vi s i t or Cont r ol Cent er ( Exampl e Combi nat i on, See dr awi ng on Sheet No.

A-100PVC)

4. 6. 1. 25 Pedest r i an Ent r apment Ar ea I D Check and Vi s i t or Cont r ol Cent er ( Exampl e Combi nat i on, See dr awi ng on Sheet No. A- 100PV)

4. 6. 1. 26 Over wat ch Bui l di ng wi t h Command and Cont r ol ( Exampl e Combi nat i on, See dr awi ng Sheet No. A- 100O)

4. 6. 2 Fi ni shes and I nt er i or Speci al t i es

4. 6. 2. 1 Gener al

4. 6. 2. 2 Fi ni shes

4. 6. 2. 3 Casewor k

4. 6. 2. 4 Mi ni mum Fi ni sh Requi r ement s

4. 6. 2. 5 I nt er i or Speci al t i es

4. 7 STRUCTURAL REQUI REMENTS

4. 7. 1 Gener al

SECTI ON 01 11 00. 10 Page 3

4. 7. 2 Loadi ngs

4. 7. 3 Sei smi c Desi gn

4. 7. 4 Bal l i s t i c Resi st ant Desi gn

4. 7. 5 Ant i t er r or i sm Desi gn

4. 7. 6 Canopi es

4. 7. 6. 1 Wi nd Loadi ng

4. 7. 6. 2 Lat er al For ce Resi st i ng Syst em

4. 8 THERMAL PERFORMANCE

4. 9 PLUMBI NG REQUI REMENTS

4. 9. 1 Sani t ar y Sewer ( Wher e Connect i on i s Possi bl e)

4. 9. 1. 1 Sear ch Ar ea Bui l di ng and Sear ch f unct i on

4. 9. 1. 2 Vi s i t or Cont r ol Cent er & ( Faci l i t i es i ncl udi ng Vi s i t or ' s

Processing)

4. 9. 1. 3 Faci l i t i es I ncl udi ng Command and Cont r ol f unct i on

4. 9. 1. 4 I D Check Guar d Boot h and Pedest r i an I D Check or

( Pedest r i an I D Check " r oom" f unct i on)

4. 9. 1. 5 Over wat ch Bui l di ng

4. 9. 2 Sani t ar y Sewer ( Wher e Connect i ons ar e not Possi bl e)

4. 9. 3 Dr i nki ng Wat er

4. 9. 4 Si z i ng

4. 9. 4. 1 St andar ds And Codes

4. 9. 4. 2 Hot Wat er Syst ems

4. 9. 4. 3 Si z i ng Hot Wat er Syst ems

4. 9. 4. 4 Wat er Ef f i c i ent Pl umbi ng Fi xt ur es

4. 9. 4. 5 Dr ai nage Syst ems

4. 10 COMMUNI CATI ONS AND SECURI TY SYSTEMS

4. 10. 1 Communi cat i on and Si gnal / Secur i t y

4. 10. 1. 1 I nst al l at i on Requi r ement s

4. 10. 1. 2 Means of Communi cat i on

4. 10. 1. 3 Communi cat i on Handhol e

4. 10. 1. 4 Si gnal / Secur i t y Handhol e

4. 10. 2 I nf or mat i on Connect i v i t y

4. 10. 3 Cl osed Ci r cui t Tel evi s i on ( CCTV)

4. 10. 4 El ect r oni c Secur i t y

4. 10. 4. 1 Dur ess Al ar ms

4. 10. 4. 2 I nt r usi on Det ect i on

4. 10. 4. 3 Tamper Swi t ches

4. 10. 5 Aut omat i on

4. 10. 6 Access Cont r ol Poi nt Cont r ol Syst em

4. 10. 7 Act i ve Vehi c l e Bar r i er Cont r ol Syst em

4. 10. 8 Cabl e Tel evi s i on ( CATV)

4. 10. 9 Gener al Requi r ement s

4. 11 ELECTRI CAL REQUI REMENTS

4. 11. 1 Ext er i or Li ght i ng

4. 11. 2 I nt er i or Li ght i ng

4. 11. 3 Gener al Power Requi r ement s

4. 11. 4 Back- Up Power

4. 11. 5 Li ght ni ng Pr ot ect i on Syst em

4. 12 HEATI NG VENTI LATI NG AND AI R CONDI TI ONI NG ( HVAC)…