Appendix A - Cost Breakdown.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- B406 Paint Barn Decontamination Area Federal contract opportunity
- Solicitation number
- FA302224R0011
About this file
This document is a detailed cost breakdown template for a federal construction contract opportunity. The solicitation is for the renovation and addition to the B406 Paint Hangar Administration and Decontamination area, including the installation of a new fire alarm and mass notification system. The project value is between $1,000,000 and $5,000,000.
The template requires the vendor to provide a detailed cost breakdown across categories such as bonds and insurance, mobilization, architectural and engineering design, materials, equipment, labor, and miscellaneous charges. Vendors must provide the basis and rationale for all proposed pricing to allow the government to evaluate the proposal. A site visit is highly encouraged on August 14, 2024, and all Requests for Information must be submitted by August 19, 2024. Proposals will be submitted electronically.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI - FA302224R0011.pdf | ||
| 406 Draft Geotechnical Report.pdf | ||
| Solicitation Amendment FA302224R00110002 SF 30.pdf | ||
| Solicitation Amendment FA302224R00110001 SF 30.pdf | ||
| Wage Determination DBA MS20240045.pdf | ||
| B406 Form 66.pdf | ||
| Solicitation - FA302224R0011.pdf | ||
| Contractors CUI Training Slides.pptx | PPTX presentation | |
| MFR Contractor CUI Training Acknowledgment for Solicitations.pdf | ||
| SOW Add Alter Paint Barn B406.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Appendix A |
| CONSTRUCTION PRICE PROPOSAL BREAKDOWN |
| VENDOR'S INFORMATION |
| Name: |
| Address: |
| Phone Number: |
| Email: |
| Cage Code: |
| SOLICITATION INFORMATION | ||||
| Title of Project: | ||||
| Solicitation Number: | ||||
| Days proposal good for: | ||||
| BONDS AND INSURANCE | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| Certificate of Insurance | 1 | |||
| Performance Bonds | 1 | |||
| Payment Bonds | 1 | |||
| Bid Bonds | 1 | |||
| MOBILIZATION | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| ARCHITECTURE AND ENGINEERING DESIGN | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| 35% Design's | ||||
| 65% Design's | ||||
| 95% Design's | ||||
| 100% Design's (Construction Set) | ||||
| MATERIAL | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| EQUIPMENT | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| LABOR | HOURS | UNIT OF ISSUE | RATE | AMOUNT |
| MISCELLANEOUS CHARGES | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| CONSTRUCTION PROJECT | GRAND TOTAL | |||
| GENERAL INFORMATION | ||||
| The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit certified cost or pricing data. (Updated Nov. 19, 2013) |
supportable and well-prepared propsal. The basis and rationale for all proposed pricing should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate.