Appendix A - Cost Breakdown.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Repair Kiddie Pool
Solicitation number
FA302226R0002
Issued by

About this file

This is a cost breakdown template for a construction project solicitation. Solicitation FA302226R0002 is issued by the Department of the Air Force Air Education and Training Command for the repair of a kiddie pool located at Columbus Air Force Base in Building 948 (B948). The kiddie pool, originally constructed in the early 1960s with modifications in the 1990s and 2010s, requires repairs to address fiberglass leaks at the perimeter where the basin meets the concrete deck, an undersized skimmer that restricts water flow to jets and sprayers, and an undersized deck drainage channel. The template requires vendors to submit detailed pricing organized by cost categories including bonds and insurance, mobilization, architecture and engineering design (at 35%, 65%, 95%, and 100% completion levels), materials, equipment, labor hours, miscellaneous charges, and Mississippi state tax. Vendors must provide vendor information (name, address, phone, email, NAICS code, CAGE code), proposed period of performance, number of days the proposal is valid, and supporting documentation justifying the reasonableness of all proposed costs. A mandatory site visit is scheduled for May 26, 2026 at 9:00 AM CST, with registration required by May 18, 2026. Access to drawings and CUI-controlled documentation requires completion of CUI training and approval via SAM.gov.

View the file

Other files

File Type Posted
Solicitation - FA302226R0002.pdf PDF
Contractors CUI Training Slides.pptx PPTX presentation
MFR CUI Contractor Training Acknowledgment July 2024.pdf PDF
Wage Determination.pdf PDF
Design Bulid SOW.pdf PDF
EAL Form.pdf PDF
EEPZ248229 -- AF Form 66.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAFB

Appendix A - COLUMBUS AIR FORCE BASE
INSTRUCTIONS: Please provide information that properly reflects the total cost of the project. Refer to the Statement of Work and Sections L and M in the solicitation to ensure that your proposal meets the requirementsof this project.
SOLICITATION NUMBER:
CONSTRUCTION PRICE PROPOSAL BREAKDOWN
VENDOR'S INFORMATION
Name:
Address:
Phone Number:
Email:
NAICS Code
Cage Code:
SOLICITATION INFORMATION
Title of Project: Repair Kidde Pool, B948
Solicitation Number: FA302226R0002
Proposed Period of Performance:
Number of Days Proposal and Price are Valid:
BONDS AND INSURANCEQTYUNIT OF ISSUEPRICETOTAL
Certificate of Insurance1
Performance Bonds1
Payment Bonds1
Bid Bonds1
subtotal
MOBILIZATIONQTYUNIT OF ISSUEPRICETOTAL
subtotal
ARCHITECTURE AND ENGINEERING DESIGNQTYUNIT OF ISSUEPRICETOTAL
35% Design
65% Design
95% Design
100% Design (Construction Set)
subtotal
MATERIALQTYUNIT OF ISSUEPRICETOTAL
subtotal
EQUIPMENTQTYUNIT OF ISSUEPRICETOTAL
subtotal
LABORHOURSUNIT OF ISSUERATEAMOUNT
subtotal
MISCELLANEOUS CHARGESQTYUNIT OF ISSUEPRICETOTAL
Misissippi State Tax
subtotal
CONSTRUCTION PROJECTTOTAL PROJECT PRICE
GENERAL INFORMATION
The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal that reflects the total cost of the project. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate.

File details come from the government source that posted it. Updated .