This document is an Appendix A that establishes performance, design, fabrication, installation, and test requirements for one (1) vertical lift module (VLM) for the 581st Missile Maintenance Squadron at Hill Air Force Base, Utah. The VLM shall store and retrieve individual small to large sized items located on storage trays. Key requirements include unit dimensions, structural specifications, extractor chain and tray details, storage locations, panels, drive components, controls, obstruction sensors, lighting, fire suppression, and security door specifications. The VLM must be compatible with the Air Force Material Processing System (MPS) for automated retrieval and storage of parts, tools, materials, or components. Quality assurance provisions require inspections, tests, and certifications to demonstrate compliance with the specifications. Additional details are provided on the related federal contract opportunity, which is a Sources Sought notice for a Vertical Lift Module solicitation with the 309th Missile Maintenance Group at Hill Air Force Base. The notice provides instructions for interested small businesses to respond with capability statements by the due date of 9/19/2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX “A”

FOR

VERTICAL LIFT MODULE

AT

HILL AIR FORCE BASE, UTAH

581st Missile Maintenance Squadron

DATE: 9 Jul 2024

PREPARED BY:

ASHLEY GALE

Capital Investment Program Manager

309 MMXG/MXDEC

Offeror: _ Solicitation No. F33600- -R- _

In-Checking Modular Office - Page 8 of

TABLE OF CONTENTS

1. SCOPE1
1.1. General scope1
1.2. Definitions1
2. APPLICABLE DOCUMENTS1
3. REQUIREMENTS1
3.1. System description1
3.2. Characteristics2
3.2.1. Unit dimensions2
3.2.2. Structure2
3.2.3. DEFORMATION2
3.2.4. Extractor2
3.2.4.1. Extractor chain safety factor3
3.2.4.2. Extractor tray sensors3
3.2.4.3. Extractor loading3
3.2.4.4. Extractor free fall3
3.2.4.5. Extractor calibration3
3.2.5. Trays3
3.2.5.1. Tray construction3
3.2.5.2. Tray dimensions3
3.2.5.3. Tray capacity4
3.2.5.4. Tray markings4
3.2.5.5. tray partitions4
3.2.5.6. tray crosswise dividers4
3.2.6. Storage locations4
3.2.7. Pick window5
3.2.8. Panels5
3.2.8.1. Enclosure panels5
3.2.8.2. Maintenance service panel5
3.2.9. Maintenance access5
3.2.10. Service life5
3.2.11. Drive components5
3.2.11.1. Motors5
3.2.11.2. Gear reducers6
3.2.12. Controls6
3.2.13. Obstruction sensors6
3.2.13.1. Load height sensors6
3.2.14. Lighting7
3.2.15. fire Suppression7
3.2.16. Security door7
3.2.17. Software controls7
3.2.17.1. Optimized Tray Placement7
3.2.17.2. tool accountability system COMPATIBLE7
3.2.17.3. RS232 port8
4. QUALITY ASSURANCE PROVISIONS8
4.1. Inspections8
4.2. Tests8
4.3. Certifications9

Appendix A (309 MMXG), Hill AFB, - Page ii

SCOPE

General scope This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for one (1) vertical lift module (VLM) for the 581st MMXS, Building 850 at Hill Air Force Base, (AFB) Utah. The work shall be completed in accordance with this appendix, the cover purchase description (PD), and applicable Air Force (AF) Drawings if any. This appendix covers equipment, materials, and labor necessary to complete installation of the required VLM systems.

Definitions Extractor - A fabricated metal structure attached to a lift mechanism used to transport trays between storage locations and pick window.

Tray live load capacity - Actual amount of load supported by a tray, not including tray weight.

Tray - A container in which items are stored.

VLM - Vertical Lift Module Depth - Measurement from front to back when looking at the front of the VLM.

Width - Measurement from side to side when looking at the front of the VLM.

Height – Measurement from bottom to top inclusive of top cover.

Storage positions - The number of tray storage locations available within a Vertical Lift Module.

VLM System – Description of an operational VLM in fully automated configuration.

APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD.

REQUIREMENTS

Contractors shall submit technical design drawings/diagrams and other pertinent information describing proposed VLM that comply with mandatory specifications/requirements stipulated in the Cover Purchase Description and this Appendix A document.

System description The Contractor shall provide one (1) VLM that shall store and retrieve individual small to large sized items located on respective storage trays. Personnel shall retrieve parts, tools, materials, or components by entering data information into the Air Force Material Processing System (MPS). The VLM shall then respond to appropriate MPS commands and retrieve respective trays where needed components are stored and deliver at the pick window. This also applies to parts binning functions for storage actions.

The VLM shall consist of and not limited to the following major components:

a. Extractor
b. Trays
c. Storage locations
d. Pick window
e. Electronic Controls & Respective Hardware
f. Conduit, wiring, mechanical fasteners, and all other items needed to install a fully operational VLM system.
g. Operational sensors that monitor all functions of the VLM as it applies to safety and automated processes.

Characteristics Unit dimensions The external dimensions of the VLM shall be a nominal 162 + 2 inches deep, 210 + 2 inches wide, and 240 + 2 inches high.

Structure The VLM shall have a steel structure that supports the fully loaded system without the use of enclosure panels for structural support. Vertical closed-section racking corner posts with a minimum of 4” X 4” X 12’square structural tubing shall be used. Tray Rails shall be a minimum of 13 gauge CR Steel formed and welded to vertical frame members. Horizontal spreaders shall be a minimum 3.5” X 3.5” X 12’ square structural tubing. Tray supports shall be factory welded. The VLM shall be securely anchored to the concrete floor in a manner that unit distortion shall not occur. The VLM shall be designed such that the weight of a fully loaded unit shall be distributed over the warehouse floor with a maximum live load capacity of 300 pounds per square foot. Base plates shall not extend past the external dimensions of the VLM.

Deformation No VLM structural member shall exhibit elastic deformation greater than 0.10 percent of the distance between the ends of the member when loaded to capacity. No portion of the VLM shall exhibit permanent deformation.

Extractor The extractor shall be used to extract and transport trays between storage locations and the pick window. The extractor horizontal drive shall be a single drive motor configuration, 2 Horse Power or greater 60 FPM minimum travel speed. As a minimum, the extractor shall include the following:

· End Plates ½ CR Steel Plate

· Cross members 7 Ga CR Steel– Formed and boxed

· Long Rails 6061 Aluminum 10” Structural channel

· Vertical Rack and pinion drive – External Tooth Spur Gear with 2 ½’” width & depth – Steel.

· Vertical drive shaft 2 ¾” diameter - Steel

· Horizontal drive shaft 2” diameter - Steel

· Speed: 30” per second minimum vertical lift speed

· Dual #60 extractor chain with drive dogs

Extractor safety factor Each extractor lift mechanism shall have a minimum 6 to 1 safety factor based on yield strength.

Extractor tray sensors Sensors shall be used to ensure that tray movement operations are loaded onto or off the extractor in such a manner that it will not move vertically unless the tray being stored or retrieved is outside of the extractor movement envelope.

Extractor loading The extractor shall be capable of supporting the live load capacity of a loaded tray. Uneven loading shall have no effect on extractor speed or movement operations. Rack & Pinion vertical lifting mechanism shall be utilized. Vertical lift must be minimum dual 7.5 HP motors.

Extractor free fall The extractor shall be prevented from free falling in a manner such that tray components will not be damaged in any event, such as power failure.

Extractor calibration The extractor shall automatically calibrate its location as necessary to ensure continuously accurate storage and retrieval of trays. The extractor shall be easily recalibrated if tray locations are changed or in the event the unit loses electrical power.

Trays The number of trays shall be 20 based on specified height clearance spacing requirements. Spacing shall be 15 trays @ 12” clearance for each, and six (6) trays @ 18” clearance for each.

Tray construction All trays shall be welded box steel 2” X 6” construction with corrugated floors, to provide continuous support for the capacity stated in 3.2.5.3. The rails and stiles shall be a minimum of 11 gauge CR Steel formed and welded. Tray bottom shall be a minimum of 16 gauge 62” Depth x 3.13 pitch corrugated steel. Additionally, each tray shall have a protective coating over all surfaces to prevent metal to metal component storage contact. Trays must be fully assembled and completed at manufacturing facility.

Tray dimensions Tray dimensions are based on inside dimensions. Dimensions are considered to be usable space. The minimum depth of each tray shall be 40 inches. The minimum width of each tray shall be 192 inches. The height of all tray side walls shall be a minimum 5-inch perimeter walls.

Tray capacity Each tray shall have a minimum live load capacity of 2,000 pounds with no deformation greater than 0.10 percent.

Tray markings Each tray shall be marked with its associated number beginning with number "1" and progressing through all VLM trays. The number shall be contrasting to the tray color and shall be located in a position which is visible to personnel on a fully loaded tray. The numbers shall be located such that normal operations do not damage the labels. The numbers shall be permanently affixed to the trays.

Storage locations Metal storage rails shall be used to support stored trays and be configured with rollers or glides including the pick window. The storage rails shall allow tray placement on a minimum of 4” center locations. The storage rails shall enable safe storage of trays loaded to maximum capacity without deformation.

Storage window The storage window width shall be the width of the tray plus a minimum of 1 inch on either side. The lower edge of the storage window shall be located between 36 + 2 inches from the floor. The storage window shall be located on the front of the VLM.

Panels Enclosure panels VLM outer panels shall be bolted solid metal to ensure security protection and fire suppression. The panels shall be bolted from the outside to permit removal for maintenance, shelf adjustment or emergency access. Solid metal panels shall be installed to enclose the top of each VLM.

Maintenance service panel A removable or hinged service panel shall provide for maintenance access to operating parts such as motors, brakes, and other respective components. The panel shall be equipped with safety interlock switches to prevent the VLM from operating when the service panel is open. The bottom of the service panel shall be located a minimum of 18 + 6 inches above the floor.

Maintenance access All parts requiring periodic maintenance shall be easily accessible either by way of service panel or other access point.

Service life All equipment furnished shall be new and of high quality to ensure the completed VLM system is designed to operate a minimum of 20 years. This shall be demonstrated from historical verifiable performance data respective to vendor specific operational VLM in the private sector or government.

Drive components Motors Vertical lift motors must be a minimum dual 7.5 HP motor configuration for 30 inches per second retrieve/store time under maximum load at continuous duty. Motors shall not exceed their fully-rated load when at specified maximum capacity under the most severe conditions likely to be encountered. All motors shall be designed for continuous duty at ambient temperature, 40 to 110 degrees Fahrenheit. Motors shall be drip proof and designed to operate on 480 VAC, 40 Amp, 3 phase electrical power. Motors shall have an electronically controlled soft start-stop & shall be equipped with an overload device. Additionally, all motors & controls shall be located 18” above the floor required under explosive applications.

Gear reducers Gear reducers shall not permit oil to leak. The maximum input horsepower rating of the gear reducer shall not be less than the horsepower of the attached drive motor. Motor and reducer frames shall be compatible.

Controls VLM shall have a permanent control cluster that is either a push button or membrane type. The control cluster shall be located on a swivel arm attached to either side and shall be no higher than 42 inches from the floor. As a minimum, the control cluster shall contain an alpha numeric keypad to activate movement of the extractor, maintenance functions, and operational status. Emergency stop buttons shall be located on each side of the VLM. The control cluster shall have a visual display which indicates the current tray number on the extractor. The VLM shall have an "on/off" key lock switch to control the unit's electrical power.

Obstruction sensors Sensors shall be mounted on the VLM at the pick window to stop movement of the extractor if an object extends through the sensor plane opening, or the extractor movement area. If this condition occurs, operations shall abort and either an audible tone or error message shall be visually displayed on the control panel.

Load height sensors Sensors shall be mounted at the pick window to measure load height of the tray. This shall be used by the VLM controller to ensure there is adequate height clearance to store the load. If there is not adequate height to store the load, the storage procedure shall be aborted and an error message transmitted either audibly or visually displayed on the control panel.

Lighting The VLM shall have overhead lighting, which shall measure not less than 50 foot-candles at the pick window. The lighting shall be continuous along the length of the pick window.

fire Suppression Two sprinkler heads shall be installed on the VLM top cap. The sprinkler heads and piping shall be designed to provide a minimum of 180 GPM with a single connection point. Piping for VLM located side-by-side shall utilize the same piping. Fire suppression drawings and calculations shall be provided and approved before installation of the VLM. Drawings shall show an installation diagram and connection point to existing fire suppression system. Contractor is responsible for installation of complete fire suppression system and connectivity.

Security door A motorized Roll-Up type metal security door shall be provided to enclose the pick window opening when the VLM is not in use. When closed, the door shall prevent access to components inside the unit. It shall be of sufficient strength and durability such that extraordinary means are required to gain access to the VLM when the door is closed. The security door shall be lockable using a key lock switch for up and down control. A minimum of two sets of keys shall be provided for each lock. The door shall be an integral part of the VLM and shall allow unobstructed access to the pick window. The opening mechanism shall be motorized dual chain driven inclusive of sprockets and other mechanical devices to support smooth operation of the doors opening and closing.

Software controls system COMPATIBLity The VLM shall accept retrieve & store commands from Air Force Material Processing System MPS/D230. Additionally, if operational error codes occur resulting from a malfunction, they shall be transmitted to MPS with current status information.

RS232 port The micro controller shall be a programmable modular configuration with RS-232 protocol port. The controller shall have a command driven interface with asynchronous responses communicating through an ASCII RS232C 9 pin connection. Tray positioning will be directed from Air Force automation control host system MPS/D230 using ASCII commands. Commands shall include current status, retrieve/move and store/move. In addition, if a tray is currently at the pick window, a retrieval command for a new tray will cause the existing pan to be automatically stored and the new tray retrieved. A command to store a tray currently in the pick window without retrieving a tray shall be supported. The controller shall respond when commands are completed and not require continuous polling to determine completion status. Inclusion of the error code in the completion message is required. The actual failure or completion code shall be available for lookup through the interface.

Delivery & Assembly The Government shall be responsible for all necessary facility preparation work. The Contractor shall provide the Government drawings, asset/facility location, and/or requirements related to electrical power, plumbing, and fire suppression no later than 60 days prior to scheduled delivery date.

The Contractor shall provider all necessary equipment and personnel to receive and offload materials. At time of delivery, a representative from the VLM manufacturer shall be on-site to ensure all components are free from defect and undamaged after unloading. Assembly shall be performed by manufacturer-trained installers. Contractor shall provide manuals in accordance with CDRL A109, Commercial Off-The-Shelf (COTS) Manuals & Associated Supplemental Data at the time of delivery.

QUALITY ASSURANCE PROVISIONS

Inspections The VLM shall be inspected to verify each meets all requirements of sections 1, 2, and 3 of this appendix and cover purchase description. These inspections shall be completed as part of system checkout and again as a part of the quality conformance testing. Acceptance is inclusive of all inspections and operational tests for conformance to Appendix A and cover documents as the final approval for acceptability of the VLM.

REMEDIAL & SUSTAINMENT MAINTENANCE

Remedial and ongoing maintenance sustainment of the VLM, Carousels, and other types of storage aids at Hill Air Force is performed by a specific servicing repair contractor under contract agreement. All new storage aids delivered to Hill Air Force Base are subject to repair and maintenance under provisions of this contract. The Manufacturer shall agree to provide access support inclusive of technical maintenance data, replacement parts, and VLM processor control software. Additionally, training shall be provided to the incumbent servicing repair entity inclusive of all operational and maintenance aspects of the VLM.

4.3 TESTS

The following tests shall be performed on the system as part of the system acceptance testing and again as a part of quality conformance testing for final acceptance.

A) Upon completion of installation, the Contractor shall perform a functional acceptance test demonstrating full performance per manufacturer’s specification(s) on the VLM Prior to acceptance testing, the Contractor shall provide a written copy of the acceptance test procedures for government approval in accordance with CDRL A063, Acceptance Test Plan. Upon approval of the acceptance test procedures, the Contractor shall schedule an acceptance test meeting with the PM and other Government technical representatives. All testing shall be completed until the VLM passes all test to the satisfaction of the Government team. Once the acceptance process is complete, the Contractor shall provide an acceptance test report for the VLM in accordance with CDRL A064, Acceptance Test Report.

Certifications The Contractor shall provide certification that the following requirements have been met. All certifications shall be provided in accordance with CDRL A158, Certificate of Compliance.

No.
Paragraph
Certifications
1
3.2.2.
The Contractor shall certify that the weight of the fully loaded VLM is adequately distributed to not exceed the capacity of the floor as specified.
2
3.2.4.1.
The Contractor shall certify that all extractor support mechanisms have a minimum 6-to-1 safety factor based on yield strength.
3
3.2.10.
The Contractor shall certify that the Vertical Lift Modules are designed to function a minimum of 20 years.

warranty The Contractor shall ensure a standard commercial warranty is included with the VLM. A copy shall be provided to the Government upon asset acceptance.

Data CDRLs Contractor shall provide a minimum of two (2) copies of contract information data, one (1) hard (paper) copy and one (1) electronic copy, in accordance with the corresponding requirement for each Data Item below:

CDRL
Title
Data Item Description
PWS / Appendix Paragraph
A063
Acceptance Test Plan
DI-QCIC-80553
Appendix A, 4.3A
A064
Acceptance Test Report
DI-QCIC-81891
Appendix A, 4.3A
A109
Commercial Off-The-Shelf (COTS) Manuals & Associated Supplemental Data
DI-TMSS-80527
Appendix A, 3.3
A158
Certificate of Compliance
DI-MISC-81356
Appendix A, 4.3

Appendix A (309 MMXG), Hill AFB - Page 1