Appendix A 100 percent Drawings Sealed.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25723B0009
About this file
This package includes construction documents and specifications for replacing chillers at an energy center for the Department of Veterans Affairs facility in Bonham, Texas. The project involves demolishing an existing chiller and associated piping and installing a new 800-ton chiller, new 75HP chilled water pumps, and related equipment and controls. Electrical work includes disconnecting and removing wiring for the existing chiller and pumps to prepare for new wiring and controls to support the replacement equipment. O'Brien Engineering prepared the documents for project number 549-20-700 with an anticipated bid date in April 2021.
The related federal contract opportunity is solicitation number 36C25723B0009 to replace the chillers at the energy center in Bonham, Texas for project number 549A4-20-700 through the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The package provides specifications and drawings to support the solicitation for upgrading the chiller system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OEI VABM CHILLER REPLACEMENT REV MECH ELEC 120722.pdf | ||
| 36C25723B0009 0008.docx | DOCX document | |
| 36C25723B0009 0007.docx | DOCX document | |
| 36C25723B0009 0006.docx | DOCX document | |
| 36C25723B0009 0005.docx | DOCX document | |
| 36C25723B0009 0004.docx | DOCX document | |
| Figure 2 - Chilled Water Plant Flow Diagram.pdf | ||
| 36C25723B0009 0003.docx | DOCX document | |
| 36C25723B0009 0002.docx | DOCX document | |
| S04 PreBid Sign in Sheet.pdf | ||
| 36C25723B0009 0001.docx | DOCX document | |
| 36C25723B0009_1.docx | DOCX document | |
| Appendix B 100 percent Project Specifications Sealed.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name:
Issue Date: APRIL 27, 2021
Contract No.: TBD
Project No.: 549-20-700
Project Address: 1201 E. 9TH STREET
BONHAM, TEXAS 75418
100% ISSUE FOR BID
PROJECT
LOCATION
VICINITY MAP
U.S. DEPARTMENT OF
VETERAN AFFAIRS
SAM RAYBURN MEMORIAL VETERANS
CENTER
KP
TRUE
NORTH
KEY PLAN
SCALE: NTS
CENTRAL
ENERGY
PLANT (CEP)
EAST 9TH ST.
L Y N
N
S T
SAM
RAYBURN
MEMORIAL
G-001
COVER SHEET / SHEET INDEX
JL JM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 92399
JAMES E. LYLES, JR.
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
FULLY SPRINKLERED
04.27.2021
EXISTING PIPING
DOMESTIC COLD WATER
FD
PIPE SLOPE
ANCHOR
STRAINER
FLOOR DRAIN
THERMOMETER
THERMOWELL
MAKE-UP WATER
PRESSURE GAUGE & COCK
PRESSURE GAUGE
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
DIRECTION OF FLOW
PIPING LEGEND
(NOT ALL SYMBOLS ARE NECESSARILY USED)
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HOT WATER HEATING RETURN
HOT WATER HEATING SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
MANUAL AIR VENT
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REGULATOR
CHR
CHS
HWR
HWS
REFRIGERANT LIQUID
REFRIGERANT SUCTION
LOW PRESSURE STEAM (15 PSIG & BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
RL
RS
LPS
CR
CWR
CWS
UNION
BALL VALVE
FLOW MEASURING DEVICE
PIPE FLANGE
FM
THREE-WAY CONTROL VALVE
COMBINATION BALANCE & STOP VALVE
CHECK VALVE
BUTTERFLY VALVE
GLOBE VALVE
GATE VALVE
SD
DUCT SMOKE DETECTOR
CFMTYPE
EXHAUST AIR DEVICE
A
DIFFUSER OR GRILLE DESIGNATION
CONDENSATE DRAIN
CD
M
FD
MOTORIZED CONTROL DAMPER
ITEM TO BE REMOVED
MECHANICAL LEGEND
DEMOLISH
T
RETURN AIR DEVICE
FIRE DAMPER
SUPPLY DIFFUSER
FLEXIBLE DUCTWORK
VOLUME DAMPER
F/SD
FIRE/SMOKE DAMPER
CONDENSATE RETURN UNIT CRU
ELBOW
DOWN DN
T
TEMPERATURE SENSOR MOUNTED ABOVE CEILING
ADJACENT TO RETURN OR EXHAUST GRILLE
TEMPERATURE SENSOR (MOUNT 48" ABOVE
FLOOR WHERE NOT SHOWN ABOVE CEILING)
CFM
S
SMOKE DETECTOR
POINT OF CONNECTION
TO EXISTING
INTAKE AIR FLOW
DISCHARGE AIR FLOW
RECTANGULAR ELBOW W/ TURNING VANES
DUCTWORK
EXISTING TO REMAIN
(NOT ALL SYMBOLS ARE NECESSARILY USED)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
COMPLETED INSTALLATIONS SHALL CONFORM TO ALL APPLICABLE FEDERAL CODES,
STATE AND LOCAL ORDINANCES AND THE SPECIFICATIONS. IF ANY CONFLICTS OCCUR, THE
MOST STRINGENT SHALL APPLY.
PIPING AND DUCT LAYOUT IS ONLY SCHEMATIC, EXACT LOCATION OF PIPES AND DUCTS
SHALL BE COORDINATED WITH BLDG. STRUCTURE, AND WORK OF OTHER CONTRACTORS
PRIOR TO START OF ANY CONSTRUCTION OR DEMOLITION.
EXISTING WORK SHOWN ON PLANS IS FROM PREVIOUS ENGINEERING DOCUMENTS AND
FIELD OBSERVATION. ACTUAL CONDITIONS MAY VARY, AND CONTRACTOR MUST FIELD
VERIFY EXISTING WORK. MAKE MINOR ADJUSTMENTS NECESSARY TO COMPLETE WORK. IF
EXISTING CONDITIONS PROHIBIT WORK, NOTIFY THE ARCHITECT FOR REDIRECTION AS
REQUIRED. CONTRACTOR SHALL FIELD VERIFY THAT THE EXISTING DUCTWORK IS
ADEQUATE FOR NO MORE THAN 0.30" W.C. OF STATIC PRESSURE PER 100 FEET FOR
MEDIUM PRESSURE DUCTWORK BASED ON THE CFM'S INDICATED ON THE PLANS AND THAT
THE EXISITNG DIFFUSER NECK SIZES MEET THE REQUIREMENTS AS INDICATED FOR NEW
DIFFUSERS. REPORT ANY DISCREPANCIES TO THE COR OR DESIGN ENGINEER FOR
RESOLUTION.
THE CONTRACTOR IS RESPONSIBLE FOR ALL WARRANTIES
ON THE EQUIPMENT INSTALLED.
ENSURE THE EXECUTION OF ALL WARRANTIES FOR EQUIPMENT AND INSTALLATION AS
PRESCRIBED BY THE OWNER.
ALL DUCTS AND PIPES ARE ABOVE CEILING AND TIGHT TO BOTTOM OF STRUCTURE UNLESS
OTHERWISE NOTED.
ELEVATIONS, WHERE SHOWN, ARE CENTER OF PIPE AND BOTTOM OF DUCT UNLESS
OTHERWISE NOTED.
COORDINATE SIZE AND LOCATION OF ALL RECESSES AND OPENINGS REQUIRED FOR HVAC
WORK.
LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP — OR DOWNSTREAM AS
RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.
LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS
PANELS, CONTROLS AND VALVING.
LOCATE TEMPERATURE AND PRESSURE GAUGES INSTALLED IN MECHANICAL ROOMS FOR
UNOBSTRUCTEO ACCESS TO VIEWING.
VERIFY CONDITION OF ALL EXISTING LIFE SAFETY DEVICES (FIRE DAMPERS, DUCT
DETECTORS, ETC.) WITHIN LIMITS OF CONSTRUCTION. REPAIR OR REPLACE IF FOUND TO
BE DAMAGED OR NON-FUNCTIONAL, NOTIFY COR AND REQUEST DIRECTION.
PROVIDE ALL DUCTWORK TRANSITIONS TO ACCOMMODATE ALL FIRE, FIRE / SMOKE
DAMPERS, & TERMINAL BOXES. REFER TO MANUFACTURER’S DATA FOR EQUIPMENT
CONNECTION SIZES.
MECHANICAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT AND
COMPONENTS REQUIRING THE ATTENTION OF OTHER CONTRACTORS. THIS INCLUDES BUT
IS NOT LIMITED TO ELECTRICAL REQUIREMENTS, CONDUIT FOR CONTROL WIRE, T-STAT,
FIRE ALARM DEVICES, FIRE SPRINKLERS NEAR EQUIPMENT, AND PLUMBING
CONDENSATE DRAINS.
PIPING
SUPPORT ALL STEEL PIPE AT INTERVALS OF NOT MORE THAN 10 ’-0", COPPER PIPE AT
INTERVALS OF NOT MORE THAN 8 ’-0”.
CONTROLS
INSTALL CONTROL DEVICES AS REQUIRED ON ALL UNITS. VERIFY ALL EQUIPMENT IS
FUNCTIONAL AND PROPER, COMPLETE WORKING CONDITION, AND PROPER BALANCE IS
ACHIEVED BEFORE COMPLETION. COORDINATE WITH OWNER ’S REPRESENTATIVE ON
EXISTING EQUIPMENT.
PROVIDE ALL CONTROLS AND CONTROLLERS, INCLUDING STARTERS AND CONTACTORS,
NECESSARY FOR A COMPLETE AND OPERATIONAL HVAC SYSTEM. INCLUDE ALL
ELECTRICAL WORK NECESSARY TO COMPLY WITH THIS REQUIREMENT. COORDINATE
POWER SOURCE CONNECTIONS PRIOR TO ORDERING EQUIPMENT OR BEGINNING WORK.
COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH ALL TRADES
BEFORE ORDERING.
PROVIDE ALL CONTROLS COMPATIBLE WITH EXISTING "SIEMENS" ENERGY MANAGEMENT
SYSTEM.
14.
1.
1.
2.
3.
4.
GENERAL MECHANICAL NOTES
1. DEMOLITION SHALL EXTEND TO POINTS OF CONNECTION WITH LIVE SERVICES, PANELBOARDS, OR OTHER APPLICABLE TERMINATION POINTS. DEMOLITION SHALL NOT PERMIT
ABANDONMENT OF ANY SYSTEM OR A COMPONENT OF ANY SYSTEM, UNLESS SPECIFICALLY NOTED AS "ABANDON" OR "TO REMAIN."
2. DEMOLITION OF SYSTEMS SHALL INCLUDE UNITS, SUPPORT SYSTEMS, SYSTEM ACCESSORIES, SYSTEM CONTROLS, \MRING AND CONDUIT FOR POWER AND CONTROLS, ASSOCIATED
PIPING, DUCTWORK, SUPPORTS, ETC. IN THEIR ENTIRETY, UNLESS SPECIFICALLY OTHERWISE NOTED.
3. ALL REMOVED EQUIPMENT SHALL BE MAINTAINED IN GOOD CONDITION. REMOVED EQUIPMENT NOT INDICATED FOR REUSE SHALL REMAIN THE PROPERTY OF THE OWNER. SHOULD
THE OWNER DECLINE POSSESSION OF ANY EQUIPMENT, SAID EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL DELIVER ALL REMOVED
EQUIPMENT TO THE OWNER.
4. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE ALL CONTRACTOR PROPERTY FROM THE SITE. DEMOLITION AND/OR RELOCATION OF CONTROLS FOR UNITS TO REMAIN SHALL
INCLUDE, BUT NOT BE LIMITED TO:
CONTROL VALVES AND DAMPERS - PROVIDE NEW DDC ACTUATORS AS REQUIRED, ALL HVAC CONTROL PANELS.
5. NEW CONTROL SYSTEM SHOP DRAWINGS SHALL INCLUDE ALL EXISTING DEVICES, DAMPERS, CONTROL VALVES, ETC. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
6. EXISTING INFORMATION SHOWN ON THE PLANS IS DERIVED FROM ORIGINAL DESIGN AND MODIFICATION PLANS FOR THE SITE MADE AVAILABLE TO THE ENGINEER. ADDITIONAL
UNDOCUMENTED MODIFICATIONS HAVE BEEN MADE AT THE SITE. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, AND SIZES OF EXISTING DUCTWORK AND PIPING TO
REMAIN OR BE MODIFIED PRIOR TO BEGINNING ANY WORK. CONTRACTOR SHALL REPORT ANY MAJOR DISCREPANCIES TO THE COR FOR RECOMMENDED ACTION.
GENERAL MECHANICAL DEMOLITION NOTES
PUMP CHEMICAL SHOT FEEDER
C
M-001
MECHANICAL NOTES &
ABBREVIATIONS
MW JM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 123765
MAHNAZ FEKRAZADAN
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
L Y
N
S
T
L Y
L Y
V
E
T
E
R
A
B
L
V
D
E C
W
S
E C
W
S
E
C
W
S
E
C
W
S
E C
W
S
E
C
W
S
LEGEND
VA BUILDING NUMBER
CHILLED WATER PIPE
E
C
W
S
E C
W
S
E
C
W
S
E
C
W
S
E
C
W
S
E
C
W
S
MS100
JLMSCALE: 1"=75' MW
KEYED NOTES:
1. UNDERGROUND PIPING.
2. CHILLED WATER SUPPLY PIPING LOCATIONS SHOWN FOR
REFERENCE AND BASED OFF INFORMATION OBTAINED FROM THE VA
STAFF.
CHILLER PLANT SITE PLAN
SCALE: 1" = 75'
0 150'75' 225'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 123765
MAHNAZ FEKRAZADAN
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
FULLY SPRINKLERED
04.27.2021
NORTH
SCALE: 1" = 75'
CHILLER PLANT SITE PLAN
MECHANICAL EQUIPMENT ROOM
AB 20
(E) CH-1
CHP-1 CHP-2 CHP-3 CHP-4
(E) CH-3
12"12"
CWS
CHS
CWS
CWS
C H
S
CHR
CHR
CHR
CHR
CT-1
CT-3
CT-2
E Q
U A
L I Z
A T
I O
N
CWP-1 CWP-2 CWP-3 CWP-4
FCU-1
LLHX-1
75 HP
CWR
CONCRETE PAD
PUMP VFDs
CWS
(E) CH-2
12"
60 HP75 HP75 HP
2 2 2
3 3 3 3
CHR
2 2 2 2
FM
X
CHP PUMP ELEC
SWITCHES
C H
E
L E
C
S
W I T
C H
E S
10"
D N
C
24"X12"
X
12" 12" 10" 10"
M-101
MWMA
KEYED NOTES:
1. DEMOLISH EXISTING CHILLER (CH-3) AND ASSOCIATED
PIPING TO MAIN LINES AS SHOWN. CAP SUPPLY/RETURN
LINES WITH BLIND FLANGE. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONTROL VALVES. IF THEY ARE IN GOOD
WORKING CONDITION, VALVES MAY BE REUSED..
2. DEMOLISH CHILLED WATER PUMP AND ALL ASSOCIATED
PIPING TO ISOLATION VALVES IN VERTICAL PIPE AS SHOWN.
THIS INCLUDES VIBRATION ISOLATION AND METAL BASE.
MECHANICAL CONTRACTOR SHALL FIELD VERIFY AS
REQUIRED.
3. CONCRETE PAD SHALL BE DEMOLISHED AND PREPARED
FOR NEW CONCRETE PAD.
4. EXIST. CHEMICAL FEEDWATER TANK SHALL BE
DEMOLISHED.
5. EXISTING EXHAUST DUCT UP TO THE ROOF CONNECTED TO
EXHAUST FAN TO REMAIN.
DEMOLITION MECHANICAL
FLOORPLAN
GENERAL NOTES:
1. REFER TO SHEET M-001 FOR GENERAL MECHANICAL
NOTES, LEGENDS AND ABBREVIATION.
2. REFER TO SHEET MS100 FOR LOCATION OF THIS BUILDING
(BLDG 23) AND FOR WORK IN OTHER BUILDINGS.
SCALE:
" = 1'-0"
0 2' 4' 12'8'
SCALE:
" = 1'-0"
DEMOLITION MECHANICAL FLOORPLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 123765
MAHNAZ FEKRAZADAN
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
CHR
CH-3
(E) CH-1
CHP-1 CHP-2 CHP-3 CHP-4
CWS
CHS
C H
S
CHR
CHR
CT-1
CT-3
CT-2
E Q
U A
L I Z
A T
I O
N
CWP-1 CWP-2 CWP-3 CWP-4
FCU-1
LLHX-1
CWR
CONCRETE PAD
(E) CH-2
CWS
CWS
CHR
CHR
CWS
1 2 3 4 5
E
D
C
B
A
3 3 3
C
W R
12"
CWS
10" CHS
10"
CHR
M-102
JMMA
KEYED NOTES:
1. PROVIDE NEW 800-TON CHILLER AND ASSOCIATED PIPING
AND CONTROLS TO TIE INTO EXISTING SYSTEM. MECHANICAL
CONTRACTOR SHALL FIELD VERIFY AS REQUIRED. SEE
SHEET M-501 AND M-601 FOR SCHEDULE AND DETAILS.
2. PROVIDE NEW 75 HP CHILLED WATER PUMPS. SEE SHEET
M-501 AND M-601 FOR SCHEDULE AND DETAILS. CONNECT TO
EXISTING SYSTEM. REFER TO ELECTRICAL DRAWINGS FOR
DETAILS ON WIRING, CONTROLS AND VFD.
3. CONSTRUCT NEW CONCRETE EQUIPMENT PADS. PROVIDE
VIBRATION ISOLATORS FOR PUMPS. REFER TO DETAILS ON
SHEET M-501.
4. PROVIDE A NEW CHEMICAL SHOT FEEDER TREATMENT
SYSTEM FOR THE CHILLED WATER AT THE PUMP. NEW TANK
SHALL BE THE SAME SIZE OF EXISTING TANK. PROVIDE WITH
NECESSARY SHUT OFF VALVES, AND SYSTEM CONNECTIONS.
(MIN 125 PSIG WORKING PRESSURE.)
PROPOSED MECHANICAL
FLOORPLAN
SCALE:
" = 1'-0"
0 2' 4' 12'8'
NORTH
SCALE:
" = 1'-0"
PROPOSED MECHANICAL FLOORPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 123765
MAHNAZ FEKRAZADAN
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
CONCRETE PAD
CH-3
10" CHILLED WATER RETURN
TO EVAPORATOR INLET
10" CHILLED WATER SUPPLY
FROM EVAPORATOR OUTLET
(E) EXHAUST
DUCT TO ROOF
12" CONDENSER WATER SUPPLY
TO CONDENSER INLET
(E) FLOOR
(E) 40"X24" SUPPLY
DUCTWORK
C
W R
C
W S
C
H R
C
H S
(E)18" CWR & CWS
(E)12" CHR
(E) 12" CHS
12" CONDENSER WATER RETURN
TO CONDENSER OUTLET
CONCRETE PAD
(E) FLOOR
10" CHS&CHR,
12" CWS & CWR
CHS
CHR
CWSCWR
CH-3
18"
FCU-1
EXHAUST FAN TO ROOF EXTERIOR WALL
EXISTING EXHAUST DUCT
EXISTING SUPPLY DUCT
12"
M-301
JMMA
KEYED NOTES:
1. CONTRACTOR SHALL FIELD VERIFY ALL PIPE AND EQUIPMENT
LOCATIONS PRIOR TO CONSTRUCTION.
CHILLER INSTALLATION SECTIONS
SCALE:
" = 1'-0"
0 1' 2' 6'4'
NORTH
SCALE:
" = 1'-0"
END VIEW - CHILLER (CH-3)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 123765
MAHNAZ FEKRAZADAN
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
FULLY SPRINKLERED
04.27.2021
SCALE:
" = 1'-0"
SIDE VIEW - CHILLER (CH-3)
NOTE: NOT ALL EXISTING PIPING
AND EQUIPMENT ARE
SHOWN IN THE DETAIL.
TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE
CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER INSULATION
SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
m m
M
A X mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[1-1/4]
[7]
[7]
[1-1/2]
[9]
[8]
[2]
[10]
[8]
[2-1/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
N.T.S.
TYPICAL PIPE HANGERS
NOTES:
SEE SPECIFICATION SECTION "PUMPS" FOR Y STRAINER OPTION.
PRESSURE GAGE
PUMP
FLOOR
CONCRETE BASE
(SEE DETAIL)
1/2" [15mm]
MECHANICAL COUPLINGS (6"
[150mm] MIN. SPACING)
(TYPICAL)
SUCTION DIFFUSER WITH
BUILT-IN STRAINER
DRAIN
1" [25mm] MIN. DIA.
PIPE STAND
OPTIONAL STRAINER
CHECK VALVE
BUTTER OR BALL
SHUT OFF VALVE, TYP.
N.T.S.
DOUBLE SUCTION FLOOR-MOUNTED
PUMPS - CONNECTIONS WITH
MECHANICAL COUPLINGS
N.T.S.
VIBRATION ISOLATION BASES
N.T.S.
WATER COOLED CHILLER -
PIPING CONNECTIONS
TYPICAL STRUCTURAL
STEEL MEMBER FOR
EQUIPMENT
TYPE"B"
WELDED STEEL BASE
TYPE "1"
CONCRETE INERTIA BASE
NUMBER OF ISOLATION
UNITS AS REQUIRED
NUMBER OF ISOLATION
UNITS AS REQUIRED
TYPICAL STRUCTURAL
STEEL MEMBER FOR
EQUIPMENT
ALL WELDED
STEEL FRAMEWORK
SECTION A-A
STRUCTURAL
STEEL FRAME
SPRING
ISOLATOR
ANCHOR
BOLT
REINFORCING BARSSLEEVE
E
Q
U
I
P
M
E
D
R
I
V
E
N
A
A
E
Q
U
I
P
M
E
D
R
I
V
E
N
M
O
T
O
R
S
H
A
F
T
M
O
T
O
R
S
H
A
F
T
NOTE:
1. DRAIN ALL LOW POINTS OF SYSTEMS TO
NEAREST FLOOR DRAIN.
2. PROVIDE MARINE WATER BOXES FOR
BOTH CONDENSER AND EVAPORATOR.
3. COLLECT VENT PIPES FROM ALL
REFRIGERANT PRESSURE RELIEF
DEVICES AND EXTEND TO EXTERIOR OF
BUILDING IN ACCORDANCE WITH ASHRAE
STANDARD 15. HEADER SIZE TO EQUAL
OR EXCEED TOTAL AREA OF DEVICES
CONNECTED TO THE HEADER.
4. PROVIDE MODULATING BUTTERFLY
VALVES ON BOTH CHWR & CWR. VALVES
CONTROLLED BY ECC.
5. FOR PIPING 6" AND BELOW, MECHANICAL
COUPLINGS ARE OPTIONAL. ABOVE 6",
WELDED PIPE WITH FLANGES IS THE
ONLY APPROVED JOINING METHOD.
PIPE HANGERS
(TYP)
COND
WATER FLOW
MEASURING DEVICE
TO COOLING
TOWER
THERMOMETER
(TYP.)
VIBRATION
ISOLATION AS
SPECIFIED
6" [150mm] HIGH
CONCRETE PAD
(TYP.)
CWR
VENT PIPE
COND
EVAPEVAP
FLOW
SWITCH, TYP
PRESSURE
RELIEF DEVICE
CONDENSER END EVAPORATOR END
FROM COOLING
TOWER
BUTTERFLY CONTROL
VALVE, TYP.
FLOOR
DRAIN
FLOOR
DRAIN
FS
FS
MARINE
WATER
BOX TYP.
CWS
CHS
CHR
POINT OF CONNECTION
M-501
MECHANICAL DETAILS
MA MW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 123765
MAHNAZ FEKRAZADAN
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
M-601
MECHANICAL SCHEDULES
MA MW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 123765
MAHNAZ FEKRAZADAN
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
FULLY SPRINKLERED
04.27.2021
SCALE: NONE
MECHANICAL SCHEDULES
CH-1 CH-2 CH-3
CHR
CHS
CHR
AS-1
ET-1
EXPANSION TANK
CHP-1 CHP-2 CHP-3 CHP-4
CHS
CHR
SERVING VA BONHAM
BLDGS 1,2,3,24,29
WATER TREATMENT
TANKS
CHS
CHR
CHS
MOTORIZED CONTROL VALVE
CHR
CWP-1 CWP-2 CWP-3 CWP-4
LLHX-1
C H
S
CWS
CWS
C W
S
CWS
CWS
CWR CWR
CWR
CWR
C W
R
PROJECT AREA
(E) CT-1
10" 10" 10" 10" 10" 10" 10" 10"
12"16"16"16"
10"10"10"10"
400T
(E) CT-2
400T
(E) CT-3
400T
(E) CT-4
400T
1"
1"
16"
C W
S
12"
12"
8" 8" 8" 8" 8" 8" 8" 8"
C H
R
CHEMS
CHEMR
8"
8"
CWR
16"
16"
16" 12"
16"16"
8" 12" 12" 12"
8" 10" 10" 10"
10"
12"
12" 12"
8"
8" 8"
12"
12"
12"
12"12"12"12"
CWS
10"
14"
14"
CWS
12"
CHEMICAL
SHOT FEEDER
CHEMS
C H
E M
R
M-602
MECHANICAL DIAGRAMS
MA MW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 123765
MAHNAZ FEKRAZADAN
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
FULLY SPRINKLERED
04.27.2021
SCALE: NONE
CHILLED WATER FLOW DIAGRAM
ELECTRICAL ABBREVIATIONS
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND
TRANSPORTATION OFFICIALS
A-AMP AMPERE
ABV ABBREVIATION
AC ABOVE COUNTER
AF AMP FUSE; AMP FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG ABOVE GROUND
AL ALUMINUM
AIC AMPS INTERRUPTING CAPACITY (SYM RMS)
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AS AMP SWITCH
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAGE
AUX AUXILIARY
BAS BUILDING AUTOMATION SYSTEM
BLDG BUILDING
C CONDUIT
CB CIRCUIT BREAKER
CKT CIRCUIT
CL CENTER LINE
CONC CONCENTRIC
CONT CONTINUOUS
COR CONTRACTING OFFICER'S REPRESENTATIVES
CPT CONTROL POWER TRANSFORMER
CT CURRENT TRANSFORMER
CU COPPER
DEMO DEMOLITION
DET DETAIL
DIM DIMENSION
DISC DISCONNECT
DWG DRAWING
E EAST
ECB ENCLOSED CIRCUIT BREAKER
ELEC ELECTRICAL OR ELECTRIC
ENCL ENCLOSURE
ENT ENTRANCE
EQUIP EQUIPMENT
EXC EXCAVATE
EXIST EXISTING
EXP EXPOSED
EXT EXTERIOR
FDN FOUNDATION
FHWA FEDERAL HIGHWAY ADMINISTRATION
FIG FIGURE
FIN FINISH
FLEX FLEXIBLE
FOUO FOR OFFICIAL USE ONLY
FUT FUTURE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GND OR GRD GROUND
G.O. GANG OPERATED
GOVT GOVERNMENT
GRC GALVANIZED RIGID STEEL CONDUIT
HID HOST INTERFACE DEVICE
IT INFORMATION TECHNOLOGY
J-BOX JUNCTION BOX
K KEY
KCMIL THOUSANDS OF CIRCULAR MILS
KV KILOVOLTS
KVA KILOVOLT AMPERES
KW KILOWATT
KWH KILOWATT HOURS
KVAR KILOVOLT AMPERES REACTIVE
LPR LICENSE PLATE READER
LTG LIGHTING
MASH MANUAL FOR ASSESSING SAFETY HARDWARE
MGB MAIN GROUND BAR
MH MANHOLE
MSS MAIN SWITCH STATION
MTS MANUAL TRANSFER SWITCH
N NORTH
NACE NATIONAL ASSOCIATION OF CORROSION
ENGINEERS
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN, NUMBER
OD OUTSIDE DIAMETER
O.C.A. ON CENTER
PART PARTIAL HOMERUN
PCR PROXIMITY CARD READER
PIV PERSONAL IDENTITY VERIFICATION
PNL PANEL
PF POWER FACTOR
PFCS POWER FACTOR CORRECTION STATION
PH PHASE
POE+ POWER OVER ETHERNET PLUS
PSS PRIMARY SWITCH STATION
PVC POLYVINYL CHLORIDE
RECP RECEPTACLE
REF REFERENCE
REQD REQUIRED
RM ROOM
S SOUTH
SEC SECONDARY
SPEC SPECIFICATIONS
ST SWITCH STATION
SW SWITCH
SWGR SWITCHGEAR
SYM SYMMETRICAL
SYS SYSTEM
TEL TELEPHONE
TMGB TELECOMMUNICATIONS MAIN GROUNDING
BUSBAR
TP TAMPER PROOF
TXDOT TEXAS DEPARTMENT OF TRANSPORTATION
TYP TYPICAL
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
UPS UNINTERRUPTIBLE POWER SUPPLY
URD UNDERGROUND RESIDENTIAL DISTRIBUTION
V VOLT
VA VOLT AMPERE
VT VOLTAGE TRANSFORMER
W WEST
WAP WIRELESS APPLICATION PROTOCOL
WP WEATHERPROOF
WPF WATER PROOF
XMFR TRANSFORMER
(NOT ALL ABBREVIATIONS REQUIRED FOR THIS PROJECT)
1. CONTRACTOR IS ENCOURAGED TO VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING
EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BIDDING WORK, ORDERING
MATERIALS, AND/OR STARTING ANY CONSTRUCTION WORK.
2. UNLESS NOTED OTHERWISE, THE GOVERNMENT HAS FIRST RIGHT OF REFUSAL FOR ALL MATERIALS
REMOVED. IF GOVERNMENT REFUSES MATERIALS TO BE REMOVED, DISPOSE OF ALL WASTE MATERIAL IN
APPROVED MANNER AND LOCATION, COORDINATE MATERIALS FOR SALVAGE AND RECYCLING WITH COR. THE
CONTRACTOR SHALL USE ONLY DESIGNATED PATHWAYS AS ESTABLISHED TO REMOVE ITEMS AND
MATERIALS FROM THE PROJECT BUILDING AND SITE.
3. ALL BUILDING SYSTEMS SERVING OCCUPIED AREAS OF THE FACILITY SHALL REMAIN FULLY OPERATIONAL AT
ALL TIMES. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL EXISTING BUILDING SYSTEMS INCLUDING ALL
SYSTEMS PASSING THROUGH AND ADJACENT TO AREAS REQUIRED; INCLUDING, BUT NOT LIMITED TO, WIRING, CONDUITS, PIPING, DUCTWORK, AND OTHER UTILITIES THAT SERVE OCCUPIED AREAS.
4. COORDINATE WITH COR AND COMPLY WITH THEIR REGULATIONS FOR NOISE AND VIBRATION.
5. PROVIDE SEALANT AROUND ALL ELECTRICAL OUTLETS, PLUMBING FIXTURES, PIPING, AND EQUIPMENT
ABUTTING OR PENETRATING A WALL OR PARTITION INCLUDING FIRESTOPPING AT FIRE RATED ASSEMBLES.
6. UNLESS OTHERWISE NOTED, ALL WIRES AND CABLES SHALL BE CONTINUOUS WITHOUT SPLICES OR TAPS IN
CONDUIT RUNS. ALL WIRING SHALL BE IN CONDUIT OR AS NOTED. ALL SPLICES SHALL BE MADE AT OUTLET
BOXES, PULL BOXES OR JUNCTION BOXES. AT ALL JOINTS, CONDUCTORS SHALL BE SPLICED OR JOINED AS
TO BE MECHANICALLY AND ELECTRICALLY SECURE.
7. IDENTIFICATION OF NEUTRAL, GROUNDING OF CIRCUITS, AND NUMBER OF WIRES IN CONDUIT SHALL COMPLY
IN ALL RESPECTS WITH THE REQUIREMENTS OF THE NEC.
8. ALL BOXES AND ENCLOSURES SHALL BE SET PLUMB, SQUARE AND SECURELY FASTENED. BOXES IN FINISHED
WALLS SHALL BE FLUSH WITH FINISH SURFACE. ALL PULL AND JUNCTION BOXES SHALL BE SIZED PER NEC
ARTICLE 314.
9. ALL ELECTRICAL WORK SHALL BE IN STRICT COMPLIANCE WITH THE CURRENT EDITION OF THE NEC AS
ADOPTED BY THE LOCAL JURISDICTION INCLUDING ANY LOCAL AMENDMENTS, ORDINANCES, AND
INTERPRETATIONS. ELECTRICAL WORK SHALL ALSO COMPLY WITH ANY APPLICABLE FEDERAL AND STATE
REGULATIONS.
10. COORDINATE INSTALLATION OF CONDUIT WITH OTHER TRADES AND EQUIPMENT SUPPLIERS AS REQUIRED
PRIOR TO ROUGH-IN.
11. WIRE SHALL NOT BE DRAWN INTO CONDUIT UNTIL ALL WORK WHICH COULD CAUSE INJURY TO THE
CONDUCTORS IS COMPLETE.
12. PROVIDE AND MAINTAIN ELECTRICAL SAFETY AND WORKING CLEARANCES IN FRONT OF AND AROUND ALL
ELECTRICAL PANELS AND DISTRIBUTION EQUIPMENT IN ACCORDANCE WITH NEC.
13. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND CORE DRILLING ALL PENETRATIONS
THROUGH FLOORS, WALLS, ETC. STRUCTURAL ELEMENTS SHALL NOT BE PENETRATED UNLESS APPROVED
BY STRUCTURAL ENGINEER.
14. IT IS NOT INTENDED THAT THE PLANS INDICATE ALL CONDUIT ROUTES, PULL BOXES, ETC. ELECTRICAL
CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING ACTUAL CONDUIT ROUTING, QUANTITY, AND
LOCATION OF PULL BOXES WITHIN ACCESSIBLE LOCATIONS. PROVIDE SCREW-COVER PULL BOXES IN
CONDUIT RUNS AS REQUIRED TO LIMIT NUMBER OF BENDS TO NO MORE THAN THREE (3) OR 270 DEGREES
TOTAL. SIZE PULL BOXES IN ACCORDANCE WITH NEC. DOCUMENT ON RECORD DRAWINGS THE SIZE AND
LOCATION OF PULL BOXES USED IN FEEDER CONDUIT RUNS. AN EXCEPTION IS TELECOMMUNICATIONS, WHICH LIMITS BENDS TO TWO AND MAXIMUM PULL DISTANCE OF 100'.
15. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION ABOUT QUALITY AND GENERAL INSTALLATION
REQUIREMENTS OF ELECTRICAL CONSTRUCTION MATERIALS, ITEMS, AND DEVICES.
16. CONDUIT RUNS SHOWN ARE FOR REFERENCE AND BIDDING PURPOSES. VERIFY EXISTING FIELD CONDITIONS
AND DETERMINE SHORTEST AND LEAST DISRUPTIVE ROUTE FOR CONDUIT RUNS. COORDINATE WITH OTHER
TRADES AND CONFIRM ROUTE SELECTION WITH COR PRIOR TO BID. ANY DEVIATIONS FROM DRAWINGS
SHALL BE SHOWN IN DETAIL ON AS-BUILT DRAWINGS BY CONTRACTOR.
17. FOR QUALITY ASSURANCE, ALL EQUIPMENT SHALL BE UL LISTED AND BEAR THE INSPECTION LABEL OF
UNDERWRITER LABORATORIES, INC. MATERIALS SHALL ALSO BE APPROVED AND CONFORM TO ANSI AND U.S.
STANDARDS. PERFORM WORK IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CONTRACTOR
ASSOCIATION (NECA) "STANDARD OF INSTALLATION."
18. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC. SIZE AND LOCATION OF EQUIPMENT AND WIRING ARE SHOWN
TO SCALE WHERE POSSIBLE, BUT MAY BE DISTORTED FOR CLARITY ON THE DRAWINGS. FINAL LOCATIONS OF
OUTLETS AND EQUIPMENT SHALL BE AS SHOWN IN ENLARGED DETAILS OR AS APPROVED BY THE COR.
19. THE PLANS DO NOT INDICATE ALL THE NECESSARY BENDS, OFFSETS, PULL BOXES AND OBSTRUCTIONS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL HIS WORK TO CONFORM TO THE
STRUCTURE, MAINTAIN HEADROOM, AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
20. GROUNDING OF THE ELECTRICAL SYSTEM SHALL BE BY MEANS OF AN INSULATED GROUNDING CONDUCTOR
INSTALLED WITH FEEDER CONDUCTORS IN ALL CONDUITS WHETHER OR NOT INDICATED ON DRAWINGS.
GROUNDING CONDUCTORS SHALL BE SIZED IN ACCORDANCE WITH NEC TABLE 250.122. PROVIDE GROUNDING
CONDUCTOR IN ALL TELEPHONE AND DATA SERVICE CONDUITS.
21. PROVIDE ALL CUTTING AND PATCHING REQUIRED FOR THE PROPER INSTALLATION OF THE NEW ELECTRICAL
WORK. ALL PATCHING SHALL BE OF THE SAME MATERIALS, WORKMANSHIP, AND FINISH AND SHALL
ACCURATELY MATCH ALL ADJACENT WORK. CONTRACTOR TO PATCH, AND REPAIR WALL AND CEILING
SURFACES TO A "LIKE NEW" FINISH. COORDINATE WITH COR.
22. CLEAN ALL AREAS OF WORK UPON COMPLETION, INCLUDING BUT NOT LIMITED TO: ALL EXISTING EQUIPMENT, PANELS, FIXTURES, LIGHTS, BOXES, WIRING, WINDOWS, BLINDS, AND REGISTERS. CONTRACTOR TO REPLACE
ANY CEILING TILES DAMAGED IN THE COURSE OF WORK.
23. VERIFY AND CORRECT ALL PANEL SCHEDULES OF PANELS THAT ARE BEING INSTALLED OR MODIFIED.
PROVIDE TYPED PANEL SCHEDULES. HAND WRITTEN PANEL SCHEDULES ARE NOT ALLOWED. INCLUDE FINAL
PANEL SCHEDULES AS PART OF AS-BUILT DRAWINGS.
24. ALL WIRING SHALL BE AT A MINIMUM #12 AWG.
25. COMPLETE EACH CONDUIT RUN BEFORE INSTALLING CONDUCTORS. REAM AND DEBUR CONDUIT ENDS TO
PROTECT CONDUCTOR INSULATION.
26. (PART) ANNOTATION INDICATES MULTIPLE CONNECTIONS TO THE SAME HOMERUN. CONNECT TO IDENTIFIED
CIRCUIT BEFORE ENTERING PANELBOARD.
GENERAL NOTES
E-001
ELECTRICAL GENERAL NOTES &
ABBREVIATIONS
TM JM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 68486
TIMOTHY J. MUECK
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
CHR
CHP-1 CHP-2 CHP-3 CHP-4
(E) CH-3
75 HP 60 HP75 HP75 HP
PANEL 1-LA
PUMP ELEC SWITCHES
CHILLER
ELEC.
SWITCHES
PUMP VFDs
E-101
JMTJM
KEYED NOTES:
1. DISCONNECT AND DEMOLISH EXISTING CHILLER (CH-3)
ELECTRICAL WIRING AND CONDUIT, VFDS, AND
ASSOCIATED ELECTRICAL EQUIPMENT. PREPARE FOR NEW
ELECTRICAL WIRING, CONDUIT, CONTROLS AND, VFDs.
2. DISCONNECT AND DEMOLISH EXISTING PUMP ELECTRICAL
WIRING AND CONDUIT, VFDS, AND ASSOCIATED
ELECTRICAL EQUIPMENT TO PUMP ELECTRICAL SWITCHES.
PREPARE FOR NEW ELECTRICAL WIRING, CONDUIT,
CONTROLS AND, VFDs.
3. EXISTING ELECTRICAL GEAR PRESENTLY SERVING
CHILLERS AND PUMPS. REMOVE CHP-4 CIRCUIT BREAKER.
WILL REPLACE WITH ONE FOR 75 HP MOTOR VFD.
DEMOLITION ELECTRICAL PLAN
SCALE:
" = 1'-0"
0 2' 4' 12'8'
SCALE:
" = 1'-0"
DEMOLITION ELECTRICAL PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 68486
TIMOTHY J. MUECK
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
FULLY SPRINKLERED
04.27.2021
GENERAL NOTES:
1. REFER TO SHEET E-001 FOR GENERAL ELECTRICAL NOTES
& ABBREVIATIONS FOR THIS PROJECT.
CHR
1 2 3 4 5
E
D
C
B
A
MECHANICAL EQUIPMENT ROOM
AB 20
CHR
CT-1
CT-3
CT-2
E Q
U A
L I Z
A T
I O
N
CWP-1 CWP-2 CWP-3 CWP-4
LLHX-1
(E) CH-2
2 222
PANEL 1-LA
CHP-1 CHP-2 CHP-3 CHP-4
PUMP VFDs
C H
E
L E
C
S
W I T
C H
E S
PUMP ELEC SWITCHES
CH-3
(E) CH-1
E-102
JMTM
ELECTRICAL POWER PLAN
SCALE:
" = 1'-0"
0 2' 4' 12'8'
NORTH
SCALE:
" = 1'-0"
ELECTRICAL POWER PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACE CHILLERS AT
ENERGY CENTER
BONHAM, TEXAS
Project Director
Revisions:
549-20-700
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Byron Rowland, COR Sam Rayburn Memorial Veterans Center Bonham, TX 75418
TEXAS P.E. NO. 68486
TIMOTHY J. MUECK
INTERIM REVIEW AND ARE NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
DATE: 12 APRIL 2021
THESE DOCUMENTS ARE FOR
www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
ISSUE FOR BIDCONSULTANT
Revisions: Date:
FULLY SPRINKLERED
04.27.2021
KEYED NOTES:
1. CONTRACTOR SHALL INSTALL NEW WIRING WITH NEW
CHILLER. INSTALL WIRES, CONDUITS,SWITCHES, SENSORS,
INSTRUMENTATION, AND CIRCUIT BREAKERS FOR SYSTEM
FUNCTION.
2. CONTRACTOR SHALL INSTALL ALL NEW WIRING WITH NEW
75 HP PUMPS. INSTALL WIRES, CONDUITS, SWITCHES,
SENSORS, INSTRUMENTATION, AND CIRCUIT BREAKERS
FOR PUMP / MOTOR TO FUNCTION.
3. INSTALL NEW VFDs FOR CHILLER AND PUMPS.
4. EXISTING ELECTRICAL GEAR PRESENTLY SERVING
CHILLERS AND PUMPS. INSTALL 125 AMP/3 PHASE CIRCUIT
BREAKER FOR CHP-4.
GENERAL NOTES:
1. REFER TO SHEET E-001 FOR GENERAL ELECTRICAL NOTES
& ABBREVIATIONS FOR THIS PROJECT.
2. INSTALL IN ACCORDANCE WITH THE NATIONAL ELECTRICAL
CODE (NFPA 70).
| 549-20.700.G-001 - COVER SHEET - INDEX |
| 549-20.700.M-001- MECHANICAL NOTES AND ABBREVIATIONS |
| 549-20.700.MS100 - CHILLER PLANT SITE PLAN |
| 549-20.700.M-101 - DEMOLITION MECHANICAL FLOORPLAN |
| 549-20.700.M-102 - PROPOSED MECHANICAL FLOORPLAN |
| 549-20-700.M-301 - CHILLER INSTALLATION SECTIONS |
| 549-20-700.M-501 - MECHANICAL DETAILS |
| 549-20-700.M-601 - MECHANICAL SCHEDULES |
| 549-20-700.M-602 - MECHANICAL DIAGRAMS |
| 549-20.700.E-001 - ELECTRICAL NOTES AND ABBREVIATIONS |
| 549-20.700.E-101 - DEMOLITION ELECTRICAL PLAN |
| 549-20.700.E-102 - ELECTRICAL POWER PLAN |