Appendix 5 MINC Proposal Work Breakdown Structure Template.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Mission-Integrated Network Control (MINC) Federal contract opportunity
Solicitation number
HR001121S0028
Issued by
Defense Advanced Research Projects Agency

About this file

This document contains a work breakdown structure template and cost estimate for a proposed project in response to a Mission-Integrated Network Control (MINC) program solicitation. The template provides an illustrative work plan organized by task over three phases, showing labor hours by skill level and costs for prime, subcontractor, consultant and material resources totaling an estimated $181,000 over 984 hours for the prime contractor. The related federal contract opportunity seeks proposals for the MINC program managed by the Defense Advanced Research Projects Agency. The objective is to develop capabilities for an "always-on" network overlay, cross-network optimization of information flows, and mission-driven determination of critical data delivery to ensure timely connectivity between distributed mission services in contested environments. Proposals are due under a pre-solicitation notice to create an integrated network control solution embracing optionality, diversity and rapid adaptability for all-domain warfare network orchestration.

View the file

Other files for this federal contract opportunity

Other files attached to Mission-Integrated Network Control (MINC), newest first.
File Type Posted
Mission Integrated Network Control_Amendment 2.pdf PDF
MINC Consolidated Questions and Answers 20210617.pdf PDF
MINC Consolidated Questions and Answers 20210614.pdf PDF
MINC Questions and Answers 20210602.pdf PDF
Mission Integrated Network Control_Amendment 1.pdf PDF
MINC Questions and Answers 20210527.pdf PDF
20210504 MINC Proposers Day - DARPA MINC.pdf PDF
StandardCostProposalSpreadsheetMultipleTAs_08-2020-2_MINC.xlsx XLSX spreadsheet
HR001121S0028.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAA LOE Template

DurationIntensityLabor Hours
SOW Task(months)(hrs/mo)Srskill setMidskill setJrskill setTotalSubC-Srskill setSubC-Midskill setSubC-Jrskill setConsltTotal
1.1.0<Phase 1 Task 1 name>713524068024944- 02001,144Notes
1.1.1<Subtask 1.1.1 name>49080Engineer280Engineer- 0360- 02005601Numbers are illustrative, see the second tab for a template without numbers
1.1.2<Subtask 1.1.2 name>3195160Software Dev400Software Dev24Software Dev584- 0- 05842Numbers in blue are inputs, numbers in black are computed by formulas
1.2.0<Phase 1 Task 2 name>63851084001,8002,3081,400- 03,7083Task lines roll-up subtask numbers, so each Total Hours row should only sum the task lines
1.2.1<Subtask 1.2.1 name>365648Data Scientist320Data Scientist1,600Data Scientist1,968600Software Dev- 02,568Adding more tasks will require editing the Total Hours formulas
1.2.2<Subtask 1.2.2 name>311360SME III80SME II200SME I340800Engineer- 01,1404Pasting into proposal as a picture will produce the best results
:::::::::::5If you have more than 12 tasks and subtasks per phase, you can break the table into
Phase 1 Total Hours3481,0801,8243,2521,4002004,652into multiple parts at phase boundaries (e.g., Phase 3 and totals would appear on 2nd page)
Phase 1 Costs First column is prime, second isTravel$ 44,000$ 12,000$ 2,000$ 58,000
total subcontractor, third is total consultant, fourth is totalMaterials & Equipment$ 8,000$ - 0$ - 0$ 8,000
2.1.0<Phase 2 Task 1 name>8100176560648001001001,000
2.1.1<Subtask 2.1.1 name>75196Data Scientist240Data Scientist24Data Scientist360100Engineer100560
2.1.2<Subtask 2.1.2 name>411080Software Dev320SME II40Software Dev440- 0- 0440
2.2.0<Phase 2 Task 2 name>64171805201,8002,5001,240- 03,740
2.2.1<Subtask 2.2.1 name>4435140Data Scientist400Data Scientist1,200Data Scientist1,740400Software Dev- 02,140
2.2.2<Subtask 2.2.2 name>419040SME II120Software Dev600SME II760840Engineer- 01,600
:::::::::::
Phase 2 Total Hours3561,0801,8643,3001,3401004,640
Phase 2 Costs First column is prime, second isTravel$ 47,000$ 12,000$ 2,000$ 61,000
total subcontractor, third is total consultant, fourth is totalMaterials & Equipment$ 4,000$ - 0$ - 0$ 4,000
3.1.0<Phase 3 Task 1 name>971120400120640100100840
3.1.1<Subtask 3.1.1 name>39340Software Dev200Data Scientist40Data Scientist280100Engineer100480
3.1.2<Subtask 3.1.2 name>66080Software Dev200SME II80Software Dev360- 0- 0360
3.2.0<Phase 3 Task 2 name>64601608001,8002,7601,200- 03,960
3.2.1<Subtask 3.2.1 name>437080SME II400Data Scientist1,000Data Scientist1,480600Software Dev- 02,080
3.2.2<Subtask 3.2.2 name>342780SME II400Software Dev800SME II1,280600Engineer- 01,880
:::::::::::
Phase 3 Total Hours2801,2001,9203,4001,3001004,800
Phase 3 Costs First column is prime, second isTravel$ 48,000$ 12,000$ 2,000$ 62,000
total subcontractor, third is total consultant, fourth is totalMaterials & Equipment$ - 0$ - 0$ - 0$ - 0
Project Total Hours9843,3605,6089,9524,04040014,092
Total Project Costs First column is prime, second isTravel$ 139,000$ 36,000$ 6,000$ 181,000
total subcontractor, third is total consultant, fourth is totalMaterials & Equipment$ 12,000$ - 0$ - 0$ 12,000

Template no numbers

DurationIntensityLabor Hours
SOW Task(months)(hrs/mo)Srskill setMidskill setJrskill setTotalSubC-Srskill setSubC-Midskill setSubC-Jrskill setConsltTotal
1.1.0<Phase 1 Task 1 name>n.a.- 0- 0- 0- 0- 0- 0- 0Notes
1.1.1<Subtask 1.1.1 name>n.a.- 0- 0- 0- 01Numbers are illustrative, see the second tab for a template without numbers
1.1.2<Subtask 1.1.2 name>n.a.- 0- 0- 0- 02Numbers in blue are inputs, numbers in black are computed by formulas
1.2.0<Phase 1 Task 2 name>n.a.- 0- 0- 0- 0- 0- 0- 03Task lines roll-up subtask numbers, so each Total Hours row should only sum the task lines
1.2.1<Subtask 1.2.1 name>n.a.- 0- 0- 0Adding more tasks will require editing the Total Hours formulas
1.2.2<Subtask 1.2.2 name>n.a.- 0- 0- 04Pasting into proposal as a picture will produce the best results
:::::::::::5If you have more than 12 tasks and subtasks per phase, you can break the table into
Phase 1 Total Hours- 0- 0- 0- 0- 0- 0- 0into multiple parts at phase boundaries (e.g., Phase 3 and totals would appear on 2nd page)
Phase 1 Costs First column is prime, second isTravel$ - 0
total subcontractor, third is total consultant, fourth is totalMaterials & Equipment$ - 0$ - 0$ - 0
2.1.0<Phase 2 Task 1 name>n.a.- 0- 0- 0- 0- 0- 0- 0
2.1.1<Subtask 2.1.1 name>n.a.- 0- 0
2.1.2<Subtask 2.1.2 name>n.a.- 0- 0- 0- 0
2.2.0<Phase 2 Task 2 name>n.a.- 0- 0- 0- 0- 0- 0- 0
2.2.1<Subtask 2.2.1 name>n.a.- 0- 0- 0
2.2.2<Subtask 2.2.2 name>n.a.- 0- 0- 0
:::::::::::
Phase 2 Total Hours- 0- 0- 0- 0- 0- 0- 0
Phase 2 Costs First column is prime, second isTravel
total subcontractor, third is total consultant, fourth is totalMaterials & Equipment$ - 0$ - 0$ - 0
3.1.0<Phase 3 Task 1 name>n.a.- 0- 0- 0- 0- 0- 0- 0
3.1.1<Subtask 3.1.1 name>n.a.- 0- 0
3.1.2<Subtask 3.1.2 name>n.a.- 0- 0- 0- 0
3.2.0<Phase 3 Task 2 name>n.a.- 0- 0- 0- 0- 0- 0- 0
3.2.1<Subtask 3.2.1 name>n.a.- 0- 0- 0
3.2.2<Subtask 3.2.2 name>n.a.- 0- 0- 0
:::::::::::
Phase 3 Total Hours- 0- 0- 0- 0- 0- 0- 0
Phase 3 Costs First column is prime, second isTravel
total subcontractor, third is total consultant, fourth is totalMaterials & Equipment$ - 0$ - 0$ - 0$ - 0
Project Total Hours- 0- 0- 0- 0- 0- 0- 0
Total Project Costs First column is prime, second isTravel$ - 0$ - 0
total subcontractor, third is total consultant, fourth is totalMaterials & Equipment$ - 0$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .