APPENDIX 3 - Submittal Register.pdf

PDF 91 KB Posted

Attached to
FY24 WP-Arvin Gym Equipment
Solicitation number
PANHES-24-P-0000-003922
Issued by

About this file

This document is a submittal register that lists the required submittals for a multiple task project at West Point Military Academy. It covers a wide range of submittals including preconstruction submittals, product data, design data, test reports, certificates, shop drawings, operation and maintenance data, and closeout submittals. Key details include the contract number, specification sections, submittal descriptions, paragraph numbers, classification, reviewer, and required submission and approval dates.

The related federal contract opportunity is a pre-solicitation for the procurement and delivery of gym equipment to support functions at the Arvin Gym Building 727 at West Point. The purpose is to acquire the gym equipment, with installation not required by the contractor. The contracting agency is the Department of the Army Corps of Engineers Engineering Support Center Huntsville.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES

FY 23

West Point_Multiple Task Project

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1List of Contact Personnel

01 20 00 SD-03 Product Data

Weight Certificates

01 30 00 SD-01 Preconstruction Submittals

View Location Map; G, RO

1.4Progress and Completion

Pictures

; G, RO

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 33 16.00 10 SD-01 Preconstruction Submittals

1.5.1 GDesign Quality Control Plan

1.5.2.2Initial Design Conference

1.5.2.5Preconstruction Conference

3.5.1 GDCM Procedures

3.8.4 G ROSubmittal Register

SD-05 Design Data

1.7.1 CDesign and Code Checklists

2.5 CSustainable Design

3.7.3 R __GConference Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES

West Point_Multiple Task Project

01 33 16.00 10 3.9 C GDesign Complete Documents

SD-11 Closeout Submittals

3.8.6 ADD Form 1354

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.2 GPreliminary Sustainability

eNotebook

SD-06 Test Reports

1.5.3.2 GThird Party Certification Design

Compliance Report

SD-11 Closeout Submittals

1.5.3.2 GFinal High Performance and

Sustainable Building Checklist

1.5.3.2 GFinal Sustainability eNotebook

1.5.3.2 GAmended Final Sustainability

eNotebook

1.5.3.2 GAmended Final High

Performance and Sustainable

Building Checklist

3.2 GThird Party Certification

Certificate, Assessment, or

Validation and Compliance Report

01 35 13.43 10 SD-06 Test Reports

3.1 GReport

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES

West Point_Multiple Task Project

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

GAPP - Construction

SD-06 Test Reports

Monthly Exposure Reports; G

Notifications and Reports; G

1.12.2 GAccident Reports

LHE Inspection Reports;G

SD-07 Certificates

Crane Operators/Riggers;G

1.7.3.2 GStandard Lift Plan

1.7.3.3 GCritical Lift Plan

Activity Hazard Analysis (AHA); G

Confined Space Entry Permit;G

Hot Work Permit;G

Certificate of Compliance;G

1.14License Certificates

01 35 29.13 SD-02 Shop Drawings

Work Zones

SD-03 Product Data

1.4Amendments to the APP/SSHP

Site Control Log; G,RO

SSHO's Daily Inspection Logs;

G,RO

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES

West Point_Multiple Task Project

01 35 29.13 Certificate Of Worker/Visitor

Acknowledgement; G,RO

SD-11 Closeout Submittals

1.9Safety And Health Phase-Out

Report

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

3.2.2 G DOAdditional Requirements for

Design Quality Control (DQC) Plan

SD-05 Design Data

3.2.2Discipline-Specific Checklists

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

SD-07 Certificates

AISC Certified Steel Fabricator;

G, RO

Certified Plant; G,RO

1.5 GSpecial Inspector

SD-11 Closeout Submittals

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES

West Point_Multiple Task Project

01 50 00 3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

1.6.1.4 GContractor Computer

Cybersecurity Compliance

Statements

1.6.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

01 58 00 SD-02 Shop Drawings

1.4.1 GSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

01 78 00 SD-03 Product Data

Warranty Management Plan;

G,RO

Warranty Tags; G,RO

Spare Parts Data; G,RO

SD-08 Manufacturer’s Instructions

Instructions; G,RO

SD-10 Operation and Maintenance

Data

3.7Operation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES

West Point_Multiple Task Project

01 78 00 3.3Record Drawings

2.2Record Model

As-Built Record of Equipment and Materials; G,RO

3.4Final Approved Shop Drawings

3.5Construction Contract

Specifications

2.3Certification of EPA Designated

Items

3.9.1Interim DD FORM 1354

3.9.2Checklist for DD FORM 1354

3.9.2High Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals

1.5.1Facility Data Project Execution

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES

West Point_Multiple Task Project

01 78 24.00 10 SD-05 Design Data

3.1 GFacility Data Workbook, Design

3.1 GFacility Document Set, Design

SD-10 Operation and Maintenance

Data

3.2 GFacility Data Workbook, Construction Progress

3.2 GFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.3 GFacility Data Workbook, Construction Final

1.5.3 GFacility Document Set, Construction Final

3.3 GFacility Document Set, Construction Final

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR