Appendix 2 Price Form Instructions.pdf

PDF 260 KB Posted

Attached to
DRAWER SLIDES
Solicitation number
BPM055523
Issued by
Allegany County, Somerset County, Maryland

About this file

This document is Price Form Instructions effective July 2024 for the State of Maryland's procurement for Drawer Slides to be supplied to three correctional facilities: Maryland Correctional Enterprises (MCE) Furniture Manufacturing Plant at Jessup Correctional Institution, Eastern Correctional Institution's Furniture Restoration Plant in Westover, and Western Correctional Institution's Furniture Plant in Cumberland. The solicitation requires bidders to submit samples with their bids. The instructions establish the framework for how bidders must complete and submit pricing information through the designated Price Form without alterations.

The pricing requirements mandate that all unit and extended prices be entered in dollars and cents with clear decimal points, represent actual per-unit costs without contingencies, and be rounded to the nearest cent. All pricing must be fully loaded to include labor, profit, overhead, general operating, administrative expenses, and all other costs necessary to perform the work, with no additional compensation available beyond the submitted amounts. Every editable field on the Price Form must be completed; partial or incomplete bids will be rejected. Any changes or corrections must be initialed and dated, or a new Price Form must be submitted through eMMA. Bidders are responsible for ensuring accurate calculations and correct entries, as incorrect submissions may result in bid rejection under COMAR 21.05.02.12. Sample amounts used for calculations are typically estimates for evaluation purposes only, and unless otherwise stated, no minimum or maximum unit quantities or usage levels are guaranteed under the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 2. Price Form Instructions Effective Date: July 2024

Appendix 2. Price Form Instructions

Each Bidder/Offeror shall submit its response via the Price Form in accordance with the instructions specified herein. Do not alter the Price Form; otherwise, the Bid may be determined to be not responsive or the Proposal may be determined to be not reasonably susceptible of being selected for award. If the Price Form contains a signature box, it must be signed and dated by an individual who is authorized to bind the Bidder/Offeror to the prices entered on the Price Form.

Follow these instructions carefully when completing your Price Form:

A) All Unit and Extended Prices must be clearly entered in dollars and cents, e.g., $24.15. Make your decimal points clear and distinct.

B) All Unit Prices must be the actual price per unit the State will pay for the specific item or service identified in this IFB/RFP and may not be contingent on any other factor or condition in any manner.

C) All calculations shall be rounded to the nearest cent, e.g., .344 shall be .34 and .345 shall be .35.

D) Any goods or services required through this IFB/RFP which are proposed to be provided at No Cost to the State must be clearly entered in the Unit Price, if appropriate, and Extended Price with $0.00.

E) Every editable field in the Price Form shall be completed. Any changes or corrections made to the Price Form by the Bidder/Offeror prior to submission due date shall be initialed and dated, if required, or submitted as a new Price Form through eMMA. Partial or incomplete Bids/Proposals will be rejected unless otherwise stated in the solicitation.

F) Except as instructed on the Price Form, nothing shall be entered on or attached to the Price Form that proposes conditions or contingencies on the prices. Conditions may render the Bid not responsive or the Proposal not reasonably susceptible for being selected for award.

G) It is imperative that the prices included on the Price Form have been entered correctly and calculated accurately by the Bidder/Offeror and that the respective total prices agree with the entries on the Price Form. Any incorrect entries or inaccurate calculations by the Bidder/Offeror will be treated as provided in COMAR 21.05.02.12 and may cause the Bid/Proposal to be rejected.

H) All pricing, including labor rates, entered in the Price Form must be fully loaded prices that include all costs/expenses associated with the provision of services required by the IFB/RFP. Examples may include all labor, profit/overhead, general operating, administrative, and all other expenses and costs necessary to perform the work set forth in the solicitation. No other amounts will be paid to the Contractor.

J) Unless indicated elsewhere in the IFB/RFP, sample amounts used for calculations on the Price Form are typically estimates for evaluation purposes only. Unless stated otherwise in the IFB/RFP, a minimum or maximum number of units or usage in the performance of the Contract is not guaranteed.

K) Failure to adhere to any of these instructions may result in the Bid being determined not responsive or the Proposal being determined not reasonably susceptible of being selected for award.

File details come from the government source that posted it. Updated .