Appendix_2_Price_Form_Instructions.pdf

PDF 192 KB Posted

Attached to
ALUMINUM COILS
Solicitation number
BPM050910
Issued by
Anne Arundel County, Maryland

About this file

The document is a Price Form Instructions appendix effective July 2024, providing detailed guidance for bidders/offerors submitting pricing responses to a state procurement solicitation. The instructions outline comprehensive requirements for completing a price form, emphasizing the need for precise, accurate, and fully loaded pricing that includes all associated costs such as labor, overhead, administrative expenses, and profit.

The pricing instructions mandate that all unit and extended prices must be entered clearly in dollars and cents, with specific rules for rounding calculations, handling no-cost items, and completing every editable field. The document warns that failure to adhere to these instructions may result in a bid being deemed non-responsive or not reasonably susceptible for award. All pricing must be fully inclusive, with no additional amounts to be paid beyond what is specified in the price form, and sample calculation amounts are typically for evaluation purposes only, with no guaranteed minimum or maximum usage promised.

View the file

Other files

File Type Posted
Appendix_1_Abbreviations___Definitions.pdf PDF
IFB_BPM050910.pdf PDF
Attachment_B_-_Price_Form_BPM050910.xls XLS spreadsheet
Exhibit-2.-Sample-Contract.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 2. Price Form Instructions Effective Date: July 2024

Appendix 2. Price Form Instructions

Each Bidder/Offeror shall submit its response via the Price Form in accordance with the instructions specified herein. Do not alter the Price Form; otherwise, the Bid may be determined to be not responsive or the Proposal may be determined to be not reasonably susceptible of being selected for award. If the Price Form contains a signature box, it must be signed and dated by an individual who is authorized to bind the Bidder/Offeror to the prices entered on the Price Form.

Follow these instructions carefully when completing your Price Form:

A) All Unit and Extended Prices must be clearly entered in dollars and cents, e.g., $24.15. Make your decimal points clear and distinct.

B) All Unit Prices must be the actual price per unit the State will pay for the specific item or service identified in this IFB/RFP and may not be contingent on any other factor or condition in any manner.

C) All calculations shall be rounded to the nearest cent, e.g., .344 shall be .34 and .345 shall be .35.

D) Any goods or services required through this IFB/RFP which are proposed to be provided at No

Cost to the State must be clearly entered in the Unit Price, if appropriate, and Extended Price with $0.00.

E) Every editable field in the Price Form shall be completed. Any changes or corrections made to the

Price Form by the Bidder/Offeror prior to submission due date shall be initialed and dated, if required, or submitted as a new Price Form through eMMA. Partial or incomplete Bids/Proposals will be rejected unless otherwise stated in the solicitation.

F) Except as instructed on the Price Form, nothing shall be entered on or attached to the Price Form that proposes conditions or contingencies on the prices. Conditions may render the Bid not responsive or the Proposal not reasonably susceptible for being selected for award.

G) It is imperative that the prices included on the Price Form have been entered correctly and calculated accurately by the Bidder/Offeror and that the respective total prices agree with the entries on the Price Form. Any incorrect entries or inaccurate calculations by the Bidder/Offeror will be treated as provided in COMAR 21.05.02.12 and may cause the Bid/Proposal to be rejected.

H) All pricing, including labor rates, entered in the Price Form must be fully loaded prices that include all costs/expenses associated with the provision of services required by the IFB/RFP. Examples may include all labor, profit/overhead, general operating, administrative, and all other expenses and costs necessary to perform the work set forth in the solicitation. No other amounts will be paid to the

Contractor.

J) Unless indicated elsewhere in the IFB/RFP, sample amounts used for calculations on the Price

Form are typically estimates for evaluation purposes only. Unless stated otherwise in the IFB/RFP, a minimum or maximum number of units or usage in the performance of the Contract is not guaranteed.

K) Failure to adhere to any of these instructions may result in the Bid being determined not responsive or the Proposal being determined not reasonably susceptible of being selected for award.

[[Add additional instructions as needed to assist Bidders/Offerors in the completion of the Bid Form.

Also, verify the instructions above are appropriate for the type of prices being solicited. If inappropriate, delete any conflicting instructions.]]

Appendix 2. Price Form Instructions Effective Date: July 2024

Attachment B - Price Form

Complete the Pricel Form only as provided in the Price Form Instructions. Do not amend, alter or leave blank any items on the Price Form.

[[The Price Form should be included as a separate Excel document and should contain formulas that automatically calculate the Bidder’s/Offeror’s Total Bid/Proposal Price. All cells except those in which the Bidder/Offeror enters its line item prices and its signatory information must be locked. A generic sample is provided below. Add the template below on the Excel document for signatures. Reference the

Price Form document here.]]

See separate Excel Price Form labeled xxxxx.xls.

[[Include the signature block below at the end of the Price Form.]]

Submitted by:

Signature of Authorized Representative Date

Printed Name and Title:

Telephone:

Email address:

Bidder Company Name:

Bidder Company Address:

Location(s) from which goods/services will be provided/performed (City/State):

FEIN:

eMMA #:

File details come from the government source that posted it. Updated .