Appendix 2 Lot Summary.pdf
PDF 102 KB Posted
- Attached to
- TRADITIONAL MOWING-GREENVILLE/SPARTANBU
- Solicitation number
- 5400026002
- Issued by
- Richland County, South Carolina
About this file
This is a Lot Summary document for a Traditional Mowing contract opportunity in Greenville and Spartanburg counties, South Carolina. The contract encompasses nine distinct mowing activities across Interstate, Primary, and Secondary road classifications. Services include routine mowing, guardrail mowing, ditch mowing, and bridge mowing, with estimated total routine acreage of 8,760.78 acres. Routine mowing on Interstate highways (Cycles 1, 3, 4, 5) covers 1,796.69 acres across 15 cycles, while Interstate Cycles 2 and 6 require 3,136.16 acres. Guardrail mowing totals 1,740,913.44 linear feet combined across all road classifications, and secondary road routine mowing accounts for 3,378.38 acres. Primary road routine mowing comprises 2,246.24 acres. The contractor must maintain a minimum daily production rate of 50 acres with a cycle time of 15 days for Interstate work and 25 days for Primary and Secondary routes.
The equipment requirement specifies a minimum of 15 tractors, each with a minimum PTO (Power Take-Off) output of 75 horsepower. No specific pricing terms, set-asides, incumbent information, response dates, due dates, site visits, or bidders' conference details are provided in this summary document. The document serves primarily to outline the scope of work quantities and production requirements across the two-county region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice of Award Posting.pdf | ||
| Spartanburg P Road List.xls | XLS spreadsheet | |
| Greenville S Road List.pdf | ||
| Spartanburg S Road List.xlsx | XLSX spreadsheet | |
| Greenville P Road List.pdf | ||
| Greenville I Road List.pdf | ||
| Spartanburg I Road List.xlsx | XLSX spreadsheet | |
| Notice Regarding Award.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 2. LOT SUMMARY
1 Routine Mowing (Interstate) Cycles 1,3,4,5 15 1,796.69 Acre 4 2 Routine Mowing (Interstate) Cycles 2,6 15 3,136.16 Acre 2 3 Guardrail Mowing (Interstate: I, R, RS) 15 976,066.25 Linear Feet 6 4 Ditch Mowing (Interstate: I, R, RS) 15 32.63 Acre 1 5 Bridge Mowing (Interstate: I, R, RS) 15 53.79 Acre 1 6 Routine Mowing (Primary: US, SC) 25 2,246.24 Acre 6 7 Guardrail Mowing (Primary: US, SC) 25 422,086.00 Linear Feet 6 8 Routine Mowing (Secondary: S, SF) 25 3,378.38 Acre 4 9 Guardrail Mowing (Secondary: S, SF) 25 342,761.19 Linear Feet 4
8,760.78 Acre 50 Acre 15 Tractors*
GREENVILLE & SPARTANBURG
Line Item
*Each tractor shall have a minimum PTO output of 75 hp
Estimated Number of
Cycles
Total Routine Acres Minimum Daily Production Rate
Minimum Equipment Requirement
Cycle TimeActivity Route Type
I
P
S
PRODUCTION & EQUIPMENT REQUIREMENTS
Quantity Unit
File details come from the government source that posted it. Updated .