Appendix 2 Lot Summary.pdf

PDF 102 KB Posted

Attached to
TRADITIONAL MOWING-GREENVILLE/SPARTANBU
Solicitation number
5400026002
Issued by
Richland County, South Carolina

About this file

This is a Lot Summary document for a Traditional Mowing contract opportunity in Greenville and Spartanburg counties, South Carolina. The contract encompasses nine distinct mowing activities across Interstate, Primary, and Secondary road classifications. Services include routine mowing, guardrail mowing, ditch mowing, and bridge mowing, with estimated total routine acreage of 8,760.78 acres. Routine mowing on Interstate highways (Cycles 1, 3, 4, 5) covers 1,796.69 acres across 15 cycles, while Interstate Cycles 2 and 6 require 3,136.16 acres. Guardrail mowing totals 1,740,913.44 linear feet combined across all road classifications, and secondary road routine mowing accounts for 3,378.38 acres. Primary road routine mowing comprises 2,246.24 acres. The contractor must maintain a minimum daily production rate of 50 acres with a cycle time of 15 days for Interstate work and 25 days for Primary and Secondary routes.

The equipment requirement specifies a minimum of 15 tractors, each with a minimum PTO (Power Take-Off) output of 75 horsepower. No specific pricing terms, set-asides, incumbent information, response dates, due dates, site visits, or bidders' conference details are provided in this summary document. The document serves primarily to outline the scope of work quantities and production requirements across the two-county region.

View the file

Other files

File Type Posted
Notice of Award Posting.pdf PDF
Spartanburg P Road List.xls XLS spreadsheet
Greenville S Road List.pdf PDF
Spartanburg S Road List.xlsx XLSX spreadsheet
Greenville P Road List.pdf PDF
Greenville I Road List.pdf PDF
Spartanburg I Road List.xlsx XLSX spreadsheet
Notice Regarding Award.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 2. LOT SUMMARY

1 Routine Mowing (Interstate) Cycles 1,3,4,5 15 1,796.69 Acre 4 2 Routine Mowing (Interstate) Cycles 2,6 15 3,136.16 Acre 2 3 Guardrail Mowing (Interstate: I, R, RS) 15 976,066.25 Linear Feet 6 4 Ditch Mowing (Interstate: I, R, RS) 15 32.63 Acre 1 5 Bridge Mowing (Interstate: I, R, RS) 15 53.79 Acre 1 6 Routine Mowing (Primary: US, SC) 25 2,246.24 Acre 6 7 Guardrail Mowing (Primary: US, SC) 25 422,086.00 Linear Feet 6 8 Routine Mowing (Secondary: S, SF) 25 3,378.38 Acre 4 9 Guardrail Mowing (Secondary: S, SF) 25 342,761.19 Linear Feet 4

8,760.78 Acre 50 Acre 15 Tractors*

GREENVILLE & SPARTANBURG

Line Item

*Each tractor shall have a minimum PTO output of 75 hp

Estimated Number of

Cycles

Total Routine Acres Minimum Daily Production Rate

Minimum Equipment Requirement

Cycle TimeActivity Route Type

I

P

S

PRODUCTION & EQUIPMENT REQUIREMENTS

Quantity Unit

File details come from the government source that posted it. Updated .