APPENDIX 1 - REQUIRED ATTACHMENTS TO PROPOSAL.pdf
PDF 252 KB Posted
- Attached to
- Water Treatment Plant PLC & HMI Upgrade
- Solicitation number
- S-KA0010-00016645
- Issued by
- Oregon
About this file
This document is an appendix of required attachments to a proposal for the City of Ashland, Oregon's progressive design-build procurement for Project No. 2026-06: Water Treatment Plant PLC & HMI Upgrade. Proposers must submit responses to all evaluation criteria listed in Section 5 of the RFP, along with a completed proposal form, independent contractor certification, and acknowledgment of any addenda received. Key personnel information, including names, titles, and certification numbers, must be provided as required by Section 5 of the RFP. Proposers must be licensed by the State of Oregon Construction Contractors Board before signing the construction agreement, and any prime architect providing architecture or engineering services must be licensed as required under ORS 671.020, ORS 671.030, ORS 672.020, and ORS 672.060.
The proposal form requires proposers to provide company information including business name, Oregon CCB number, business address, telephone, email, and authorized signature. The City of Ashland encourages contracting with minority-owned, woman-owned, and emerging small business (MWESB) enterprises that are state certified, and proposers should indicate certification status in the applicable categories, including minority owned, woman owned, emerging small business, or veteran owned. Contractors must certify their independent contractor status under penalty of perjury, provide a W-9 form with correct taxpayer identification, and demonstrate they meet at least four criteria establishing legitimate independent contractor status, such as maintaining a separate business location, carrying commercial advertising, holding applicable insurance or performance bonds, and performing services for multiple clients.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Progressive Design Build Procurement City of Ashland
RFP 2026-06 Water Treatment Plant PLC & HMI Upgrade Appendix 1
APPENDIX 1. REQUIRED ATTACHMENTS TO PROPOSAL
RFP 2026-06 Proposal Form Page 1 of 2
Proposal Form
The Proposer warrants that the Proposer has carefully reviewed the RFP and that this Proposal represents Proposer’s full response to the requirements described in the RFP. The Proposer further warrants that if this Proposal is accepted, the Proposer will contract with the Owner, agrees to all terms and conditions found in the attached contract and will provide all necessary labor, materials, equipment, and other means required to complete the Work in accordance with the requirements of the RFP and contract documents.
The Proposer acknowledges that the Proposer must be licensed by the State of Oregon Construction Contractors Board before signing the construction agreement or otherwise making an offer to perform the Work. In addition, the Prime Architect providing architecture or engineering services shall be licensed as required and applicable under ORS 671.020, ORS 671.030, ORS 672.020, and ORS 672.060.
REQUIRED RESPONSE DOCUMENTS:
The following information must be returned with your response (Place a check in front of the item indicating inclusion in your response):
RESPONSE TO ALL EVALUATION CRITERIA listed in SECTION 5 Proposal Form Independent Contractor Certification
MWESB INFORMATION:
City encourages contracting with minority owned, woman owned, and emerging small business (MWESB). The State of Oregon offers a certification process. Indicate below if your business is a MWESB and if so, which categories have been state certified. MWESB certified? Yes No If yes, indicate which categories:
Minority Owned Woman Owned Emerging Small Business Veteran Owned
ACKNOWLEDGMENT OF RECEIPT OF ADDENDA TO PROPOSAL DOCUMENTS:
Proposer acknowledges receipt of Addenda and agrees to be bound by their contents.
• Check each RFP addendum received: 1 2 3 4 5 6 7 8 9 10
• Check if not applicable or no addenda were received:
OSEBEELS / OSBGE / ORBAE Nos.:
Provide names, titles, and certification numbers for Key Personnel listed in response to Section SECTION 5 of the RFP. Attach additional pages as needed.
Name Title Certification No.
RFP 2026-06 Proposal Form Page 2 of 2
PROPOSER INFROMATION:
Company Name: Oregon CCB #:
Business Address:
Telephone: Email:
Authorized Signature: Date:
Person Signing Proposal: Title:
RFP 2026-06 Independent Contractor Certification Page 1 of 1
Independent Contractor Certification
CERTIFICATIONS/REPRESENTATIONS: Contractor, by and through its authorized representative, under penalty of perjury, certifies that (a) the number shown on the attached W-9 form is its correct taxpayer ID (or is waiting for the number to be issued to it and (b) Contractor is not subject to backup withholding because: (i) it is exempt from backup withholding, or (ii) it has not been notified by the Internal Revenue Service (IRS) that it is subject to backup withholding as a result of a failure to report all interest or dividends, or (iii) the IRS has notified it that it is no longer subject to backup withholding. Contractor further represents and warrants to City that: (a) it has the power and authority to enter into this Agreement and perform the Work, (b) the Agreement, when executed and delivered, shall be a valid and binding obligation of Consultant enforceable in accordance with its terms, (c) the work under the Agreement shall be performed in accordance with the highest professional standards, and (d) Contractor is qualified, professionally competent, and duly licensed (if applicable) to perform the Work.
Contractor also certifies under penalty of perjury that its business is not in violation of any Oregon tax laws, it is an independent contractor as defined in the Agreement, it is authorized to do business in the State of Oregon, and Contractor has checked four or more of the following criteria that apply to its business.
(1) Contractor carries out the work or services at a location separate from a private residence or is in a specific portion of a private residence, set aside as the location of the business.
(2) Commercial advertising or business cards or a trade association membership are purchased for the business.
(3) Telephone listing is used for the business separate from the personal residence listing.
(4) Labor or services are performed only pursuant to written contracts.
(5) Labor or services are performed for two or more different persons within a period of one year.
(6) Contractor assumes financial responsibility for defective workmanship or for service not provided as evidenced by the ownership of performance bonds, warranties, errors and omission (professional liability) insurance or liability insurance relating to the Work or services to be provided.
Authorized Signature
Date
| APPENDIX 2. Required Attachments to Proposal |
| Proposal Form |
| Independent Contractor Certification |
| Name 1: |
| Name 2: |
| Name 3: |
| Name 4: |
| Name 5: |
| Title 1: |
| Title 2: |
| Title 3: |
| Title 4: |
| Title 5: |
| Certification No 1: |
| Certification No 2: |
| Certification No 3: |
| Certification No 4: |
| Certification No 5: |
| Company Name: |
| Oregon CCB: |
| Business Address: |
| Telephone: |
| Email: |
| Person Signing Proposal: |
| Title: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| No Addenda Checkbox: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
File details come from the government source that posted it. Updated .