App C Supplement - Resurfacing FY25 Ph4 - Published 09.10.2025.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
City of Huntsville Streets Resurfacing FY2025 Phase 4
Solicitation number
81-2025-55
Issued by
Madison County, Alabama

About this file

This document is an Appendix C Supplement Schedule of Bid Quantities for the City of Huntsville's Street Resurfacing Project for Fiscal Year 2025, Phase 4, issued on September 10, 2025. The project involves resurfacing fifty streets throughout the city, with a total contract duration of 280 days from the Notice to Proceed. The bid schedule includes numerous line items for road resurfacing, milling, traffic control elements, and infrastructure improvements, with specific quantities for various materials and services such as 27,522 tons of 1/2" wearing surface mix, 2,650 tons of binder mix, milling of approximately 307,411 square yards, and installation of traffic control features like speed tables, loops, and traffic markers.

The bid is structured as a unit price contract, with all items considered "in-place" and requiring inclusion of all labor, equipment, materials, and removals. The project specifications indicate specific requirements for road treatments, such as limestone roads being edge-lined and tied in, and brown mix roads being completely milled. Base failures will be excavated 6-8 inches deep and backfilled with binder, with final subgrade work determined by an on-site inspector. While the bid sheet shows $0.00 for pricing, this is likely a placeholder for bidders to complete, and the total project appears to be funded through the City of Huntsville's municipal infrastructure budget for fiscal year 2025.

View the file

Other files

File Type Posted
Project Manual - Published 09.10.2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX C

APPENDIX C Supplement Schedule of Bid Quantities
City of Huntsville Street Resurfacing-2025 Phase 4
Project #81-2025-55
Issued: September 10, 2025
Submit in Digital Format ONLY
UNIT BID SHEET
All roads that are limestone will be edge lined and tie in milled. All roads with brown mix will be completely milled. . All asphalt will be considered complete when site is restored.All base failures will be excavated/milled 6-8" deep and backfilled with binder. Further subgrade work will be determined at the time of construction by the onsite inspector. There will be no separate pay item for excavating the base failure to 8 inches.
ITEM#DESCRIPTIONBID QTYBID UNITBID PRICEBID AMOUNT
1424A 1/2" Mix 4 Wearing Surface Layer in Place (15% RAP after cleaning and tacking) 1-1/12" Thick27522TON$0.00

2 414B 1" Mix Binder (Base Failure 8") Layer in Place (15%RAP) 2550 TON $0.00

3 414B 1" Mix Binder (Binder Layer >8") Layer in Place (15% RAP) 100 TON $0.00

4 424A 1/2" Mix 4 Wearing Surface (Leveling) Layer in Place (15% RAP after cleaning and tacking) 100 TON $0.00

5 Milling 0-2" Total Mill 302411 SY $0.00

6 Milling 2-4" Total Mill 5,000 SY $0.00

7 Manhole Riser 139 EA $0.00

8 Manhole Adjustment 4 EA $0.00

9 Install 22' Flat Topped Speed Table 12 EA $0.00

10 Speed Cushions/Removal Only 12 EA $0.00

11 Delineaters 10 EA $0.00

12 Raised Traffic Markers 473 EA $0.00

13 Q Loops 1 EA $0.00

14 D Loops 1 EA $0.00

15 Bike Loops 1 EA $0.00

16 Solid Class 2 Traffic Stripe 0.520 MI $0.00

17 Broken Class 2 Traffic Stripe 0.700 MI $0.00

18 Dotted Class 2 TrafficStripe 150.000 LF $0.00

19 Traffic Control Legends 70.000 SF $0.00

20 Traffic Control Markings 1517.000 SF $0.00

21 Temporary Solid Traffic Stripe 1.060 MI $0.00

22 Temporary Broken Traffic Stripe 1.400 MI $0.00

23 Temporary Traffic Markings 100.000 SF $0.00

24 Temporary Traffic Legends 100.000 SF $0.00

25SpecialtyTraffic Control Markings ALDOT Index #70301,70302,70308,70311 (COLOR)100.000SF$0.00
TOTAL ITEMS 1-27$0.00
ADDITIONAL ITEMS
26Mobilization1LS$0.00

27 NO2. Crushed Stone 0-6" 200 TON $0.00

TOTAL ADDITIONAL ITEMS$0.00
TOTAL BASE BID$0.00
ALL ITEMS SHALL BE CONSIDERED IN-PLACE. PRICES SHALL INCLUDE ALL LABOR, EQUIPMENT,MATERIALS, AND REMOVALS AS REQUIRED FOR CONSTRUCTION OF THE REQUIRED WORK.
COMPANY NAME:
AUTHORIZED REPRESENTATIVE NAME:
COMPLETION DATE:

File details come from the government source that posted it. Updated .