About this file

This document includes an appendix and statement of work outlining requirements for preventative and remedial maintenance of diesel generators for the Department of the Navy Naval Sea Systems Command. Key details include the need to perform scheduled preventative maintenance every six months on multiple Caterpillar and MUSE diesel generators located across various berths and dry docks. Services required include fluid testing, maintenance inspections, documentation, and repairs. The contractor must obtain maintenance manuals if not provided and transport all needed parts and personnel. Response is required within fifteen days of notification, and maintenance reports with labor hours, replacement parts, and costs are due within five days of service completion.

View the file

Other files for this federal contract opportunity

Other files attached to Diesel Generator Maintenance, newest first.
File Type Posted
N3904022Q0152 MOD 1.pdf PDF
N390402022Q0152.pdf PDF
Apendix 2.pdf PDF
Attachment 1.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 1 (Rev 1)

Appendix 1 Rev 1 - Page 1 of 9

EMERGENCY POWER SYSTEM DIESEL GENERATOR INVENTORY:

Manufacturer: Caterpillar Caterpillar

Model No.: 3512C C32

Serial/Order No.:

LYH00478 (CESG-1)

YBD00416 (CESG-2)

YBD00417 (CESG-3)

JSJ04832 (CESG-4)

JSJ04833 (CESG-5)

JSJ03844 (CESG-6)

JSJ03845 (CESG-11)

JSJ03842 (CESG-13)

Load Rating:

Standby

1500 kW/1875 kVA 1000 kW/1250 kVA

Power Factor: 0.8 0.8

Frequency: 60 Hz 60 Hz

Full Load in Amperage: 2255 A 1504 A

Output Voltage: 480 VAC 480 VAC

Phase: 3 Phase, Ungrounded

3 Phase, Ungrounded

Current Location 1: Dry Dock – 1, 2, and 3

ON TRAILER

ON TRAILER

Berth 6 Dry Dock 1 (Refueling Complex)

Berth 13

1 Note: Location of equipment is based on time of issuance of this statement of work.

Locations may change during the period of performance without warning. Units shall be identified using unique identification numbers to ensure proper maintenance and documentation. Examples CESG-2 is Located at Dry Dock 2, CESG-6 is located at Berth 6.

Appendix 1 Rev 1 - Page 2 of 5

MODEL NO. SERIAL NO. DG EQUIPMENT ID CURRENT LOCATION1

DQFAC-5868099/H070094769 MP 19588 Berth 11

DQFAC-5781325/A070016080 MP 19432 Berth 6

MUSE DIESEL GENERATOR SPECIFICATIONS

Load Rating Standby 900 kW/1125 kVA

Power Factor: 0.8

Frequency: 60 Hz

Full Load in Amperage: 1353 A

Voltage: 480 V

Phase: 3 Phase, Ungrounded

1 Note: Location of equipment is based on time of issuance of this statement of work.

Locations may change during the period of performance without warning. Units shall be identified using unique identification numbers to ensure proper maintenance and documentation.

A-1. PREVENTIVE MAINTENANCE (PM) (Scheduled).

The Contractor shall perform, at a minimum, all services required at intervals of every six (6) months IAW the applicable Diesel Engine and Generator Set

Operations and Maintenance Manual(s). However, Semi-Annual, Annual and

Triennial PM’s may be performed at any time and in any order based on project schedules and ship conditions. This will be communicated by Temporary

Services Electrical General Foreman (or a designated representative) to the contractor. Note: Semi-annual is defined as every (6) months, but not more than seven months or less than (5) months. Annual is defined as every 12 months, but not more than thirteen months or less than eleven months. Triennial maintenance is to be completed every three years, this is completed as a major maintenance with the additional attributes of tables 2A (CAT) and 2B (MUSE), deviations from this schedule requires approval from the Cognizant Technical Organization listed

Appendix 1 Rev 1 - Page 3 of 5 in paragraph 2.2 (C230 and C990). Types of preventative maintenance; Semi -annual for Caterpillar (Table 1A CAT), Semi – annual for MUSE (Table 1B MUSE), Annual for Caterpillar (Table 2A CAT), Annual for MUSE (Table 2B MUSE), Triennial for Caterpillar (Table 2A CAT + additional attributes section), Triennial for MUSE (Table 2B MUSE + additional attributes section).

A-1.1 It shall be the responsibility of the Temporary Services Electrical General

Foreman (or a designated representative) to notify the Contractor no less than fifteen (15) days prior to the desired preventative maintenance service date.

Semi-annual maintenance shall be conducted every six (6) months beginning with the first day of the contract year. Annual or Triennial maintenance (or any services required at greater intervals) shall be conducted in conjunction with the semi-annual maintenance that immediately precedes a period of extended use

(e.g. submarine engineered overhaul, etc.) or with the last semi-annual maintenance of the Contract Year (if the annual maintenance has not yet been completed). When selecting when to perform maintenance, consideration shall be given to limiting the impact to production and Ship’s Force personnel.

A-1.2 The Contractor shall perform preventative maintenance services as recommended in the manufacturer’s maintenance manual. The Government will provide available maintenance manual(s); however, if the Government does not have the maintenance manual(s), the Contractor shall be responsible for obtaining the maintenance manual(s). All replacement parts, materials, environmental compliance and Contractor personnel transportation used for preventive maintenance services shall be included in the contract unit price for preventive maintenance service.

Appendix 1 Rev 1 - Page 4 of 5

A-1.3 The Contractor shall provide requested maintenance services to the emergency diesel generator and all components within the unit enclosure which includes but is not limited to the diesel engine/generator, integral load bank, fuel system and tanks, electrical/lighting system for the enclosure, heaters, enclosure breakers, , ventilation, air intake louvres and motors, the enclosure itself and any other equipment Temporary Services Engineering Division (Code 230) determines requires repair.

A-1.4 The Contractor shall provide requested fluid testing for the emergency diesel generator internal fuel tank and external fuel tank for microbial, sulfur content, bottom sediment, water bacteria culture and API gravity. Also, shall provide emergency diesel oil system analysis for wear element, infra-red, PQ, particle count, oil viscosity and gas chromatography. Also, shall provide emergency diesel generator coolant analysis for % Glycol, freeze point and boil point, pH, Nitrite, Moly, conductivity, color, appearance, odor, foam and oil. When requested perform a Level II Coolant Analysis or when a Level I Coolant Analysis requires a Level II Coolant Analysis to determine acceptability of Coolant.

A-2. MAINTENANCE SERVICE MEETING AND DOCUMENTATION.

Prior to and after any PM or RM services the Temporary Services Production

Shop (Code 990), the Temporary Services Engineering Division (Code 230), of

PNS and contractor shall perform a formal In/Out Brief. The Contractor shall fill out maintenance service documentation for all PM and RM services provided.

Table 1A CAT/1B MUSE or Table 2A CAT/2B MUSE shall be completed for maintenance records. Each maintenance service document shall contain the information listed below, as applicable to PM or RM services, and completed documentation shall be provided at the Out Brief with signatures from Code 990 and Code 230 acknowledging receipt of report. Also, a report shall be submitted within five (5) working days after completion of the maintenance services to individuals noted in paragraph 2.2. Either electronic or hard copy delivery is acceptable. Any of the below attributes that are not available shall still be addressed in the report.

Appendix 1 Rev 1 - Page 5 of 5

a. PDF copy of the Product Status Report (Caterpillar) of the Electronic Control

Module (ECM).

b. PDF copy of the Fluid Sample Analysis Reports of the Fuel, Oil, and Coolant samples taken.

c. PDF copy of diesel generator parameters for the semi-annual/annual/ triennial maintenance (i.e. Caterpillar Units).

d. Date and time of service call notification and arrival at Government location.

e. Manufacturer, model, serial number and location of the equipment involved.

f. For PM, the labor hours spent and tasks performed.

g. For RM, labor hours and associated labor rates worked.

h. For PM and RM, all replacement parts used by part number, part name, quantity, condition (i.e. “like new” per para 7.0) and cost per unit.

i. Description of malfunction and work/service performed, and corrective action taken if action is a repair.

j. If the diesel generator was run/operated:

(1) Start and stop time (24HR).

(2) Start and stop hour meter reading of equipment.

(3) Reason for operation of the diesel engine.

k. Legibly printed name of Contractor personnel who accomplished work.

l. A total dollar amount due for services rendered based on the above work performed.