AP-6-234_Installation Instructions.pdf

PDF 2 MB Posted

Attached to
6640--LAB; PHLEBOTOMY EQUIPMENT; CV ACTIVATION Federal contract opportunity
Solicitation number
36C26220Q1445
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

View the file

Other files for this federal contract opportunity

Other files attached to 6640--LAB; PHLEBOTOMY EQUIPMENT; CV ACTIVATION, newest first.
File Type Posted
36C26220Q1445.docx DOCX document
AP-6-60_Apollo6 Wall Mount Spec Sheet - Instructions.pdf PDF
Apollo Pole Top Connection Options.pdf PDF
AP-6-234_Pre Installation.pdf PDF
Trapezed Mounting Plate Example.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Apollo6 Floor to Ceiling Assembly

PLEASE READ

Hole specification – Base mount

Hole & Torque Specification

1. Mark hole locations on floor and drill as per depths in diagram. NOTE: Duct cover orientation will face large opening of floor mount.

2. Tighten anchor bolt to 80Nm.

Drilling Proceedure www.integ.it

3. Using a laser level, mark and cut hole in ceiling for Apollo6 to pass through

Ceiling Mount *This page is for reference only*

Apollo6 Beam reversed Ceiling brace/support

Apollo6 Beam reversed Ceiling Mount assembled with Beam and mounted to ceiling with ceiling plate

Ceiling Plate lock up with 2 x Keyway locks against lugs

Fasteners not supplied. Ensure suitable fasteners are used to support bracket.

M10 nuts, already installed in Beam extrusion.

Caution: Ceiling brace/support must be structurally fixed

Ceiling brace/support details

Note: The ceiling brace will be fixed in place later on after the Apollo6 is vertical.

Apollo6 not to be fitted to the ceiling mount yet, it is fitted during step 4 of the “Making it vertical” page.

www.integ.it

Attaching the connector + base mount *Skip this page if no connector extrusion is required*

Step 1. Take one length of Apollo6 and insert the connector into the end with 4 holes, lining 2 holes on one side up.

Secure Connector to Apollo6 using 4 x M10 x 20 screws and 4 x M10 nuts. Make sure they are done up tight.

Step 2. Repeat Step1 with remaining Apollo6.

Should now be secured with a total of 8 fasteners.

Step 3. Repeat step 1 & 2 for any other connectors.

To insert nuts, slide in slots of Apollo6

Nuts can also be inserted via the slots machined on either side of the Apollo6 www.integ.it

Assemble horizontally until instructed to lift vertical

Step 4. Locate the Apollo6 with 2 x 11mmØ (7/16”Ø) holes machined toward the end.

This end will become the bottom of the unit when vertical.

Making it vertical

Step 1. Before lifting the Apollo6 ensure that the ceiling plate is temporarily locked towards the top of the post by using the keyway locks. This will rest below the ceiling. Snap only the top duct cover in place.

Duct cover

Step 2. The post can now be lifted vertically. Slide the top through the ceiling hole and lower the bottom over the already secure floor mount. See orientation note above.

Step 3. Insert and tighten 2 x M10 nuts at the bottom of the post to secure the post to the floor mount. Snap bottom duct cover in place.

Step 4. Attach the ceiling support and tighten the M10 nuts to secure the top of the Apollo6. (See page 3 for nut locations on ceiling supports).

Step 5.Slide the ceiling plate up to the roof and tighten in new location using the grub keyway locks.

Ceiling Plate

Dummy ceiling

Floor

Keyway lock www.integ.it

Channel to remain open for correct orientation of extrusions

Complete Assembly www.integ.it

Step 1. Ensure all fasteners are tight and post is secure

Step 2. Attach any arms + accessories to complete assembly. Must not be loaded with over 80kg (176lbs)

Ceiling cover plate – below false ceiling

Celing mount bracket – secured to structural ceiling

Example of ceiling mount setup

Integ

Integ, Proudly made by Modtec Industries

Modtec Industries Limited Modtec Industries Australia PTY Limited ABN 22 997 983 407 Ph. +64 9 426 6380 Ph. 1800 681 329 (Aust toll free) Fax. +64 9 426 9449 20 Curley Ave Silverdale, Auckland 0932, New Zealand P.O. Box 14 Silverdale, Auckland 0932, New Zealand www.integ.it Email: info@integinternational.com

Want to interact with us differently? Join us on Facebook or follow us on Twitter (@Integit).

Although considerable effort has been made to ensure the safety during the above installations in these guidelines, the act of installation is outside of the control of Modtec Industries Ltd. Accordingly, Modtec

Industries Ltd will not be responsible for the failure of any installation.

Integ, Proudly made by Modtec Industries P.O. Box 14, Silverdale Auckland 0932 New Zealand

March 2013, rev 1

SAM0997