ANVIL DS - Attachment 1 - Scheduel B Pricing Schedule .xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- USCGC ANVIL - USCG 68A BARGE DOCKSIDE REPAIRS
- Solicitation number
- 70Z08526QIBCT0022
About this file
This is a pricing schedule (Schedule B) for dockside availability and repairs for the USCGC ANVIL (WLIC-75A) and associated USCG 68A Barge (68013) during FY2026. The schedule itemizes 35 discrete line items representing maintenance, inspection, repair, and replacement work required across both vessels and associated equipment.
The work scope encompasses comprehensive vessel maintenance including fire prevention requirements, tank cleaning and inspection (potable water, sewage holding, MP fuel stowage), exhaust piping commercial cleaning for main diesel engines and ship service diesel generators, compressed air system servicing, hull fitting inspections and testing, and watertight door and scuttle renewal. Additional items include boiler exhaust stack uptakes cleaning, boat boom service, piping repairs and renewals (sewage, grey water, fuel oil, firemain, potable water), steering system relief valve testing, external deck drain piping repair, window drain pan installation, TCTO Water Mist Fire Protection System retrofit, lead-based paint and asbestos-containing material spot abatement, and barge-specific equipment services (crossdeck winch, spud winches, spud wells inspection). The pricing template includes provision for composite labor rates (330 hours), GFP reporting, and 5 laydays. Most line items are priced on a "JOB" basis with one unit quantity, representing fixed-price work packages for the dockside availability period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
USCGC ANVIL (WLIC-75A) DOCKSIDE AVAILABILITY FY2026
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | JOB | 1 | ||
| D-002 | Tanks, Potable Water, Clean and Inspect - Tender | JOB | 1 | ||
| D-003 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | 1 | ||
| D-004 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | 1 | ||
| D-005 | Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean | JOB | 1 | ||
| D-006 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift - Tender | JOB | 1 | ||
| D-007 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | ||
| D-008 | Boat Boom, Inspect and Service - Tender | JOB | 1 | ||
| D-009 | Sewage Holding Tanks, Clean and Inspect - Tender | JOB | 1 | ||
| D-010 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| D-011 | Grey Water Piping, Clean and Flush | JOB | 1 | ||
| D-012 | Temporary Services, Provide - Tender | 1 | |||
| D-013 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - Barge | JOB | 1 | ||
| D-014 | Barge, Diesel Engine Exhaust Piping, Commercial Clean | JOB | 1 | ||
| D-015 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift - Barge | JOB | 1 | ||
| D-016 | Hull Fittings (Mooring and Towing), Inspect and Test - Barge | JOB | 1 | ||
| D-017 | Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge | JOB | 1 | ||
| D-018 | Crossdeck Winch, Inspect & Service | JOB | 1 | ||
| D-019 | Spud Winches, Inspect & Service - Barge | JOB | 1 | ||
| D-020 | Spud Wells, Inspect - Barge | JOB | 1 | ||
| O-021 | Temporary Services, Provide - Barge | 1 | |||
| D-022 | Watertight Doors and Scuttles, External, Renew | JOB | 1 | ||
| D-023 | Window Drain Pan, Install | JOB | 1 | ||
| D-024 | Window Drain Line and Fitting, Renew | JOB | 1 | ||
| D-025 | External Deck Drain Piping, Repair | JOB | 1 | ||
| D-026 | Fire Pump Foundation, Repair (Barge) | JOB | 1 | ||
| D-027 | Fuel Oil (FO) Piping, Renew | JOB | 1 | ||
| D-028 | Firemain (FM) Piping, Renew | JOB | 1 | ||
| D-029 | Barge Fuel Oil (FO) Umbilical Piping, Renew | JOB | 1 | ||
| D-030 | Potable Water System Valves, Renew | JOB | 1 | ||
| D-031 | Steering System Relief Valves, Test | JOB | 1 | ||
| D-032 | TCTO (TN3000.4) Water Mist Fire Protection System, Retrofit | JOB | 1 | ||
| D-033 | Aft Ladder Well, Renew | JOB | 1 | ||
| D-034 | Stack Exhaust Decking, Renew | JOB | 1 | ||
| O-035 | Lead-Based Paint and Asbestos-Containing Material, Perform Spot Abatement | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 330 | ||
| D-00B | GFP Report | NSP | EA | ||
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
File details come from the government source that posted it. Updated .