ANNEX SWIMMING POOL DRAWIING - Final.pdf
PDF 20 MB Posted
- Solicitation number
- 191V1022R0001
- Issued by
-
Department of State
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abidjan swimming pool construction solicitation - the Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DixonLJ DE Reviewed for Code Compliance
DixonLJ Typewritten Text 22-0040
DixonLJ Typewritten Text 4/5/2022
DEPARTMENT OF STATE
BUREAU OF OVERSEAS BUILDINGS OPERATIONS
CERTIFICATE OF COMPLIANCE
PERMIT NO:
POST:
PROPERTY NO:
PROJECT TITLE:
This is to certify that to the best of my knowledge, information and belief, the
Project, as identified above, has been completed in accordance with the permitted drawings, specifications, and/or Statement of Work.
SIGNATURE
(May be signed digitally via Adobe)
PRINT NAME
TITLE
DATE
GSPublisherVersion 0.6.100.100
BP 90 Bingerville
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 27 22 49 69 43/(225) 07 07 47 00 93/
(225) 07 57 03 13 45
Architect DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Folio Designation
A000 GUARD PAGE
Revision index
A001 A002 A003
PLAN VIEW
Revision
A A
A
Folio Designation
A A004
A005
PHASE
N°
N° 2006/183/147
EXECUTION
Unclassified
Order Number:
A 001POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX,
ABIDJAN- CÔTE D'IVOIRE
A006 A007
A008 A009 A010 A011 A012
191V1021F0003
PLAN VIEW DETAIL A
PLAN VIEW BUILDING PORCH
ROOF PLAN VIEUW BUILDING PORCH DETAIL Z
SECTIONS BUILDING PORCH
DETAILS ROOFING FRAMEWORK BUILDING PORCH
DETAILS ROOFING FRAMEWORK SECTION XX BUILDING PORCH
ELEVATIONS BUILDING PORCH
ELEVATIONS BUILDING PORCH
PLUMBING DIAGRAM BUILDING PORCH
ELECTRICAL DIAGRAM BUILDING PORCH
POOL DETAILS
PLAN VIEW POOLS DETAIL K
SECTIONS POOLS
TYPE PLAN DETAILS OF THE FOOT BATH AND SHOWER
EVACUATION OVERFLOW SWIMMING POOLS AND THE FOOT BATH AND SHOWER
DETAILS OF THE SWIMMING POOL FENCE
SUMMARY
ARCHITECTURAL PLANS
A013 A014 A015 A016
A017 A018
A019 A020 A021 A022 A023
A024 A025
OVERALL PLAN
HOT WATER SUPPLY PLAN COLD WATER BUILDING PORCH
EXISTING DRAWING
SUMMARY
B B
B B
DETAIL OF THE SWIMMING POOL FENCE DETAIL D1
C
C C C
SECTIONS POOLS DETAIL D SECTION P1-P1
D
D D D
E
E E E
G
F F F
Date: March 2022
A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F
A B C D E F
A B C D E F A B C D E F
FLUID NETWORK PLAN
A026 A027 A028 A029
DESCRIPTION SWIMMING POOL RULES PANEL AND FIXING DETAILS
DETAIL OF THE SWIMMING POOL FENCE DETAIL OF POST FIXING
DESCRIPTION SWIMMING POOL RULES
FLUID NETWORK PLAN DETAIL AA030
BA 001
BA 002
GENERAL NOTES INFORMATION
BA STRUCTURAL PLANS
BA 000
A B C D E F
F H G H G H G H
G H G H G H G H G H G H G H G H G H G H G H G H G H G H
G H G H G H
G H G H G H G H
G H G H G H G H G H G H
G H G H G H G H
I I I I I I I I I I I I I I I I I I I I
I I I I
I I I I I
I I
I I I I
GENERAL NOTES INFORMATION
GENERAL NOTES INFORMATION
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architect DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Folio Designation Revision index Revision
Folio Designation
N° 2006/183/147
A 002
BUILDING PORCH STRUCTURAL STEEL WORK DETAILS
BA 004
BUILDING PORCH STRUCTURAL FIXING OF RAFTERS AND BATTERS
BA 005
STRUCTURAL POOL 12,50 x25,00
BA 006
STRUCTURAL POOL 12,50 x25,00 SECTION DETAILS
BA 007
ELECTRICAL PLANSE 000
ELECTRICAL PLAN GROUNDING
E 001
ELECTRICAL PLAN SOCKETS
E 002
ELECTRICAL PLAN LIGTHING
E 003
ELECTRICAL PLAN UNIFILARY SCHEMATIC
E 004
E 006
PHASE
N°
Date: March 2022
Unclassified
Order Number: 191V1021F0003
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX,
ABIDJAN- CÔTE D'IVOIRE
E 005
PLUMBING PLAN WASTE AND BLACK WATER EVACUATION IN CONNECTION WITH THE EXISTING NETWORKP 001
PLUMBING PLANP 000
P 002
AIR CONDITIONING VENTILATION PLAN
E 007
BUILDING PORCH STRUCTURAL STEEL WORK
BA 003
A B C D E F
PLUMBING PLAN HOT AND COLD WATER SUPPLY IN CONNECTION WITH THE EXISTING NETWORKP 003
PLUMBING PLAN HOT AND COLD WATER SUPPLYP 004
PLUMBING PLAN WASTE AND BLACK WATER EVACUATION
LAYOUT OF THE FINISHING WORKSP 000
WOOD, ALUNUMINUM AND METAL JOINERY
IDENTIFICATION PLAN OF THE JOINERY
SP 001
SP 002
SP 003-SP 007 DETAIL OF ALUMINIUM WINDOWS
DETAIL OF WOOD JOINERYSP 008-SP 012
DETAIL OF METAL JOINERYSP 013-SP 015
PLAN OF THE SEALED COATINGSF 000
PLAN OF THE SEALED COATING (SET)SF 001
PLAN OF THE SEALED COATING (BUILDING PORCH)SF 002
PLAN OF THE SEALED COATING (SWIMMING POOL DECK)SF 003
A B C D E F A B C D E F A B C D E F A B C D E F
A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F
A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F
ELECTRICAL PLAN ELECTRICAL CONNECTION PLAN
ELECTRICAL PLAN AIR CONDITIONING AND SWIMMING POOL EQUIPMENT
ELECTRICAL PLAN POWER BALANCE
ELECTRICAL PLAN THERMAL BALANCE
E 008 E 009
A B C D E F
ELECTRICAL PLAN LEGEND
ELECTRICAL PLAN DIVISION PANEL
E 010 E 011
G H
G H G H
G H G H G H G H
G H
G H G H G H G H
G H G H
G H
G H G H G H G H
G H
G H
G H
G H
G H
G H G H
G H
G H
G H G H
G H
HG
I I I I I
I I I I I I I I I I I I I I I I I I I I I I I I I I I
EXECUTION
STRUCTURAL CHILDREN POOL SECTION DETAILSBA 011
BUILDING PORCH FOUNDATION FROM WORK
BUILDING PORCH FULL SLAB COFFRING PLAN
BUILDING PORCH FOUNDATION FROM WORK DETAILS
BA 008
BA 009
BA 010
A B C D E F HG I
A B C D E F HG I
A B C D E F HG I
LIGHTING OF THE POOL DECK
E 012
ARCHITECTURAL PLANS
A 003 Unclassified
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
RO
A
D
EXISTING
BUILDING
RO
A
D
HOUSING
ROAD
ROADROAD
HOUSING HOUSING
H O
U
SIN
G H
O U
SIN
G
H O
U
SIN
G H
O U
SIN
G
HOUSING
HOUSING
HOUSINGHOUSING
HOUSING
ROAD
PATH
Area to build
A 004
1/1000EXISTING DRAWING
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
592,66 m2
3003 3552 1253 02218
1 460 240 850 240 1 010
3 800
200 775 2 770 994
Hose bib
PEX Ø
(Diameter according to the existing)
50,27 m2
18 400 130 2 4885 5 350 30 1 250 30 460 1 6725 1 685 300
18 3 0185 5 350 30 1 250 30 300 160 160 300 30 800 30 350 5 1 6825 300
355 1 310 4625 1 6725 1 6825
312,50 m2
Hose bib
PEX Ø
(Diameter according to the existing)
RO
A
D
EXISTING
BUILDING
RO
A
D
HOUSING
ROAD
ROADROAD
HOUSING HOUSING
H O
U
SIN
G H
O U
SIN
G
H O
U
SIN
G H
O U
SIN
G
HOUSING
HOUSING
HOUSINGHOUSING
HOUSING
ROAD
Principal Pool Children's Pool
Beach
PATH
Detail Z
Detail K
A 005
1/1000OVERALL PLAN
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
592,66 m2
14,42 m2
54,73 m2
12,37 m2
4,99 m2
90,70 m2
4,99 m2
2,06 m2
18.22 m²
14,63 m2
2,31 m2
2,31 m2
3,26 m2
2,31 m2
2,31 m2
3,26 m2
18,22 m²
14,62 m2
18,28 m2
17,35 m2
CG
R
18 400 130 2 662 2 728 1 012
18 2 8905 3675 2 6135 1 0605
400 130 2 662 2 728 1 012
1 460 240 425 425 240 1 010
1 67252 1275
1 67252 1275
3 800
-0.17
-0.17
6,56 m2 floor drain floor drain
Foot bath and shower
Hose bib
PEX Ø
(Diameter according to the existing)
Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%
RAMP
swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)
Phone box
Emergency Shower and
Eyewash Station
Hose bib
Hall
Technical room
(pump room)
Coffee
Storage
Women's Bloc Wc
Men's locker rooms
Ramp slope 4.28%
Ramp slope 4.28%
Janitors closet
Circulation
Technical room
Pool equipment room
Be nc h
Be nc h
Be nc h
Women's locker rooms
Men's Bloc Shower
Wc
Wc
Wc
Wc prm
Wc prm
Circulation
Circulation
C ir cu la tio n
Be nc h
Be nc h
Be nc h
Women's Bloc shower
Urinal
Men's Bloc Wc
WH
50,27 m2
5 350 30 1 250 30 460 1 675
5 350 1 310 300 150 10 10
150 300 30 800 30 355
312,50 m2
Foot bath and shower
Hose bib
PEX Ø
(Diameter according to the existing)
Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%
RAMP
swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)
Principal Pool Children's Pool
Beach
Guerite
PARKING EXISTANT
RO
A
D
EXISTING
BUILDING
RO
A
D
ROADROAD
ROADROAD
HOUSING
HOUSING HOUSING
H O
U
SIN
G H
O U
SIN
G
H O
U
SIN
G H
O U
SIN
G
HOUSING
HOUSING
HOUSINGHOUSING
HOUSING
PATH
DETAIL A
1/1000
PLAN VIEW
A 006
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
592,66 m2
14,42 m2
54,73 m2
12,37 m2
4,99 m2
90,70 m2
4,99 m2
2,06 m2
18.22 m²
14,63 m2
2,31 m2
2,31 m2
3,26 m2
2,31 m2
2,31 m2
3,26 m2
18,22 m²
14,62 m2
18,28 m2
17,35 m2
CG
R
2 728 1 012
3675 2 6135 1 0605
2 728 1 012
1 460 240 425 425 240 1 010
1 67252 1275
1 67252 1275
3 800
-0.17
-0.17
6,56 m2 floor drain floor drain
Foot bath and shower
Hose bib
PEX Ø
(Diameter according to the existing)
Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%
RAMP
swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)
Phone box
Emergency Shower and
Eyewash Station
Hose bib
Hall
Technical room
(pump room)
Coffee
Storage
Women's Bloc Wc
Men's locker rooms
Ramp slope 4.28%
Ramp slope 4.28%
Janitors closet
Circulation
Technical room
Pool equipment room
Be nc h
Be nc h
Be nc h
Women's locker rooms
Men's Bloc Shower
Wc
Wc
Wc
Wc prm
Wc prm
Circulation
Circulation
C irc ul at io n
Be nc h
Be nc h
Be nc h
Women's Bloc shower
Urinal
Men's Bloc Wc
WH
50,27 m2
5 350 30 1 250 30 460 1 675
5 350 1 310 300 150 10 10
150 300 30 800 30 355
312,50 m2
Foot bath and shower
Hose bib
PEX Ø
(Diameter according to the existing)
Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%
RAMP
swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)
Principal Pool Children's Pool
Beach
EXISTING
BUILDING
11 BUILDING PORCH
Legend:
PRINCIPAL POOL
CHILDREN'S POOL
4 FOOT BATH and Shower
5 Swimming Pool Fence
6 concrete wall between both shower columns
1/250
PLAN VIEW
DETAIL A
A 007
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
14,42 m2
12,37 m2
4,99 m2
4,99 m2
2,06 m2
18,22 m2
18,22 m2
CG
R
A
A
C
C
D
D
E
E
F
F
G
G
H
HB
B
1'1'
D-02 Détail
702 420 180 1 148
109 333 242 2345 3835 3575 7825 130 75
75 442 242 201 417 385 755 130 75
24 150 735 150 652 150 735 150 24
90 190 80
202 200
30 600 68 80
515 80
1515 80
251 80
148 80
90 2 680
85 22
85 22
90 22
150 445 90
1235 90
28 242 600 68 80
515 80
1515 80
251 80
148 80
88 130 66
24 150 376 180 179 150 652 150 735 150 24 2 722
190 80
202 200
30 600 18 305 251 305 13 208 133 13 210 13 220 18
18 2055 13 2055 18 842 18 312 13 208 133 13 210 13 220 18 130
1 3505 251 305 13 208 133 13 210 13 160 60 18
460 180 662 1 158 130 250
150 735 150 652 150 735 150
-0.17
-0.17
±0,00
±0,00
±0,00
BB
6,56 m2 floor drain floor drain
Emergency Shower and Eyewash Station
Hose bib
Hall
Technical room (pump room)
Coffee
Storage
Women's Bloc Wc
Men's locker rooms
Ramp slope 4.28%
Ramp slope 4.28%
Janitors closet
Circulation
Technical room
Recent modification
Pool equipment room
Be nc h
Be nc h
Be nc h
Women's locker rooms
Men's Bloc Shower
Wc
Wc
Wc
Wc prm
Wc prm
CirculationCirculation
C irc ul at io n
Be nc h
Be nc h
Be nc h
Women's Bloc shower
Urinal
Men's Bloc Wc
WH
WH
18 60 304 60 18 224 18 600 18 312 13 208 13 210 13 133 160 60 18 130
18 424 18 184 98 560 18 666 13 443 18 130
18 2055 13 2055 18 224 18 600 18 666 13 443 18 130
18 2055 13 2055 18 61 123 40 18 600 18 2815 305 13 305 1775 13 62 13 210 13 278 18
1/100
PLAN VIEW BUILDING PORCH
A 008
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
1 0925 585 1 0925
2 770
2 770 1 0925 585 1 0925
54623551 20652355546
Straw roofing 30 cm thick
1/100
ROOF PLAN VIEUW BUILDING PORCH
DETAIL Z
A 009
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
±0,00 -0.17
+3.09 +3.52
+6.86
+8.79
±0,00 ±0,00
+6.86
Reinforced Concrete PostReinforced Concrete Post
±0,00 -0.17
+3.09 +3.52
+6.86
+8.79
±0,00
+6.86
Venetian blind window with aluminum frame RAL7010
Exterior finishing of the walls in paint (color to be defined)
Finishing of the posts in paint( color to be defined)
Straw roofing 30 cm thick
Sliding Window with Aluminum Frame RAL7010
ELEVATIONS
BUILDING PORCH 1/100
REAR ELEVATION
MAIN ELEVATION
A 010
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
-0.17
+3.09 +3.52
+8.79
±0,00 ±0,00
+8.79
Venetian blind window with aluminum frame RAL7010
Exterior finishing of the walls in paint (color to be defined)
Double sided metal door with 2/10th sheet thickness (color to be defined)
Finishing of the posts in paint( color to be defined)
Straw roofing 30 cm thick
-0.17
+3.09 +3.52
+8.79
±0,00±0,00
Reinforced Concrete Post
Exterior finishing of the walls in paint (color to be defined)
Straw roofing 30 cm thick
Reinforced Concrete Post
ELEVATIONS
BUILDING PORCH 1/100
LEFT LATERAL ELEVATION
RIGHT LATERAL ELEVATION
A 011
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
Straw Covering
Metal Breakdown
Alucobond rim
Metal Breakdown
Alu sheet metal (drip edge)
Laths 4 x4 mm (Thatch binding) Splinters 6mm x4mm
20 mm marine plywood or similar
Waterproofing
Water level -10 cm from the coping
Finishing of the posts in paint( color to be defined)
Exterior finishing of the walls in paint (color to be defined)
Straw Covering
Metal Breakdown
Alucobond rim
Metal Breakdown
Alu sheet metal (drip edge)
Laths 4 x4 mm (Thatch binding) Splinters 6mm x4mm
20 mm marine plywood or similar
Waterproofing
±0,00
+3.09 +3.52
+6.86
+8.79
+6.86
±0,00±0,00 -0.17±0,00 x x
Waterproofing
False ceiling in plasterboard thickness 20 mm
Steel gusset
Straw roofing with fireproof treatment
Metal Breakdown
Laths 4 x4 mm (Thatch binding)
Splinters 6mm x4mm
20 mm marine plywood or similar
Alucobond rim Alu sheet metal (drip edge)
Hall
Coffee
Janitors closet
Pool equipment room
Men's Bloc Shower
Men's Bloc WcMen's locker rooms
Waterproofing
False ceiling in plasterboard thickness 20 mm
Steel gusset
Straw roofing with fireproof treatment
Metal Breakdown
Laths 4 x4 mm (Thatch binding)
Splinters 6mm x4mm
20 mm marine plywood or similar
Alucobond rim Alu sheet metal (drip edge)
HIGH STORAGE
hose bib washer
Detail D 02Detail D 02
DETAILS (L) ROOFING FRAMEWORK
SECTIONS
BUILDING PORCH 1/100
SECTION CC
SECTION BB
A 012
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I x x
Straw roofing with fireproof treatment
Metal Breakdown
Laths 4 x4 mm (Thatch binding)
Splinters 6mm x4mm
20 mm marine plywood or similar
Alucobond rim
Alu sheet metal (drip edge)
Waterproofing
Steel gusset
DETAILS (L) ROOFING FRAMEWORK
BUILDING PORCH 1/100
A 013
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
Straw roofing with fireproof treatment
Metal Breakdown
Laths 4 Cm x4 Cm (Thatch binding)
Splinters 6 Cm x4 Cm
20 mm marine plywood or similar
Waterproofing
Steel gusset
DETAILS ROOFING FRAMEWORK
SECTION XX
A 014
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
14,42 m2
12,37 m2
4,99 m2
4,99 m2
2,06 m2
18,22 m2
18,22 m2
EP
EP EP EP
EP
EP
EP
EPEP
EP
CG
R
EP
EP
702 600 18 312 13 341 13 210 13 220 18
18 2055 13 2055 18 224 18 600 18 666 13 443 18 130
442 18 842 18 312 13 208 133 13 210 13 220 18
2 722
2 722
-0.17
-0.17
±0,00
±0,00
±0,00
-0.32
-0.32
-0.32
-0.32
-0.32
-0.32
-0.32 -0.32
-0.32
-0.32
-0.32
-0.32
-0.32 -0.32 -0.32
-0.32
-0.32
-0.32 -0.32
-0.32-0.32-0.32
-0.32
B
6,56 m2 floor drain floor drain
Emergency Shower and Eyewash Station
Hose bib
Ø bl ac k w at er a nd w as te w at er to th e ex is tin g ne tw or k rainwater Ø160 slope 2% rainwater Ø160 slope 2% rainwater Ø160 slope 2% ra in w at er Ø sl op e 2% ra in w at er Ø sl op e 2%
Ø160 Stormwater to the existing network ra in w at er Ø sl op e 2% ra in w at er Ø sl op e 2%
Hall
Technical room (pump room)
Coffee
Storage
Women's Bloc Wc
Men's locker rooms
Ramp slope 4.28%
Ramp slope 4.28%
Janitors closet
Circulation
Technical room
Pool equipment room
Women's locker rooms
Men's Bloc Shower
Wc
Wc
Wc
Wc prm
Wc prm
CirculationCirculation
C irc ul at io n
Women's Bloc shower
Urinal
Men's Bloc Wc
WH
rainwater Ø160 slope 2% ra in w at er Ø sl op e 2% slope 2% slope 2% slo pe
2% slope 2% slope 2% slope 2% sl op e 2% sl op e 2% sl op e 2% sl op e 2% sl op e 2% rainwater Ø160 slope 2%
WH
18 424 18 224 18 600 18 666 13 443 18 130
LEGEND OF THE SANITARY APPLIANCES
Kitchen sink in chrome with cold/hot water mixing valve
Chrome floor drain Ø75 Water column with cold/hot water mixing valve
Toilet for handicapped
Toilet
Triple sink with cold/hot water faucet
Urinals for men Emergency Shower and Eyewash Station Hose bib shower stall
EP rainwater sight glass (60x60) sewage manhole cover (90x90)
Wastewater & Valves Water Ø125 Water Valves Ø 110 Wastewater Ø100
PLUMBING LEGEND
DIRECTION OF WATER FLOW
Wastewater Ø75
Wastewater & Valves water Ø160 rainwater Ø160
PLUMBING DIAGRAM
A 015
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
14,42 m2
12,37 m2
4,99 m2
4,99 m2
2,06 m2
18,22 m2
18,22 m2
CG
R
-0.17
±0,00
±0,00
±0,00
B
6,56 m2 floor drain floor drain
Shut-off valve manifold
Hot and cold water manifold
Emergency Shower and Eyewash Station
Hose bib
Hall
Technical room (pump room)
Coffee
Storage
Women's Bloc Wc
Men's locker rooms
Ramp slope 4.28%
Ramp slope 4.28%
Janitors closet
Circulation
Technical room
Pool equipment room
P E X Ø
P E X Ø
D ia m e t e r a c c o r d in g t o t h e e x is t in g t o h o s e b ib
P E X Ø t o f o o t b a t h
P E X Ø
Water inlet of the sodeci PVC Ø (Diameter according to the existing)
Be nc h
Be nc h
Be nc h
Women's locker rooms
Men's Bloc Shower
Wc
Wc
Wc
Wc prm
Wc prm
CirculationCirculation
C irc ul at io n
Be nc h
Be nc h
Be nc h
Women's Bloc shower
Urinal
Men's Bloc Wc
WH
P E X Ø
P E X Ø
PEX Ø20
P E X Ø
PEX Ø16
PEX Ø16WH
P E X Ø
PEX pipe Ø20
Shut-off valve manifold
LEGEND
Water inlet from sodeci PVC Ø32
Nurse manifold
PEX pipe Ø16
WH solar water heater
HOT WATER SUPPLY PLAN COLD WATER
A 016
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
14,42 m2
12,37 m2
4,99 m2
4,99 m2
2,06 m2
18,22 m2
18,22 m2
CG
R
-0.17
-0.17
±0,00
±0,00
±0,00
6,56 m2 floor drain floor drain
Emergency Shower and Eyewash Station
Hose bib
Hall
Technical room (pump room)
Coffee
Storage
Women's Bloc Wc
Men's locker rooms
Ramp slope 4.28%
Ramp slope 4.28%
Janitors closet
Circulation
Technical room
Pool equipment room
Be nc h
Be nc h
Be nc h
Women's locker rooms
Men's Bloc Shower
Wc
Wc
Wc
Wc prm
Wc prm
CirculationCirculation
C irc ul at io n
Be nc h
Be nc h
Be nc h
Women's Bloc shower
Urinal
Men's Bloc Wc
WH
TV
TEL
UE
U E
UE
UE
WH
TV
Telephone jack
LEGEND ELECTRICITY
Single switch Waterproof single switch Dual ignition switch
Waterproof socket 16A+Ground Television outlet
TEL
Push button
LED light strip 120 waterproof
Waterproof halogen recessed spotlight Recessed halogen spotlight sanitary wall lamp led 60 with socket type GFI
Waterproof wall lamp Waterproof dual ignition switch
Water HeaterWH
Air Brush
Workstation:
1PC 2P+T 10/16A + 2USB
ELECTRICAL DIAGRAM
A 017
POOL DETAILS
A 018
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
P2 P2
592,66 m2
1 521 120 970 120 1 069
1 460 240 850 240 1 010 3 800
3 800 2 1275 1 6725
5 350 1 310 4575 5
5 350 1 310 300 10 140
140 10 1 510
Foot bath and shower Hose bib swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)
PLACE OF THE RESCUERS
Access ladder to the pool
Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%
Access ladder to the pool
Phone box
50,27 m2
5 350 30 1 250 30 4575 5
5 350 1 310 4575 5 4575 30 800 30 350
350 30 120 1 130 30 460 925 120 625
-1.20 m
-1.20 m
-1.20 m
-1.50 m
-1.20 m
-1.20 m
-1.20 m
-1.50 m
P1 P1
312,50 m2
Foot bath and shower Hose bib swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)
PLACE OF THE RESCUERS
Access ladder to the pool
Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%
Access ladder to the pool
Principal Pool Children's Pool
Beach
5 5 concrete wall between both shower columns
PRINCIPAL POOL 12.5x25.00
Legend:
CHILDREN'S POOL
FOOT BATH and Shower
Swimming Pool Fence4
5 PLACE OF THE RESCUERS
316 stainless steel pool access ladder
Hose Bib
Rescue equipment storage area
Swimming pool rules panel
The description is on a page:
DESCRIPTION SWIMMING POOL RULES PANEL
Phone box
Description:
- Ping buoy
- Sheperd's crook
- Throowline
- First aid kit
PLAN VIEW POOLS
DETAIL K 1/150
A 019
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
0.
25 800 30
84020 0.
±0,00
Platform of the basin in reinforced concrete of 20 cm thickness dosed at 350kg/m3 double layer reinforcement in High Adhesion steel (HA 8 mm)
Reinforced concrete veil dosed at 350kg/m3 and reinforced with high adhesion steel (HA 8 mm).
Crushed stone 20 cm thickness
Anti-slip TRAVERTIN decking including a 350kg/m3 cement mortar screed with a slope for washing water drainage to avoid stagnation.
Non-slip porcelain stoneware curbstone, minimum thickness 2 cm and width 30 cm with curved edges
Platform of the beach in reinforced concrete 350kg/m3 of 15 cm thickness.
Water level -10 cm from the coping
Waterproofing and aesthetic coating in porcelain stoneware tiles Anti-slip algicide (color to be defined) Anti UV
-0.457 m-0.457 m
±0.00 m
Platform of the basin in reinforced concrete of 20 cm thickness dosed at 350kg/m3 double layer reinforcement in High Adhesion steel (HA 8 mm)
Reinforced concrete veil dosed at 350kg/m3 and reinforced with high adhesion steel (HA 8 mm).
D Détail
20 530 1 140 830 20
±0,00 ±0,00 ±0,00 ±0,00
Platform of the basin in reinforced concrete of 20 cm thickness dosed at 350kg/m3 double layer reinforcement in High Adhesion steel (HA 8 mm)
Reinforced concrete veil dosed at 350kg/m3 and reinforced with high adhesion steel (HA 8 mm). Slope 05%
Slope 10%
Crushed stone 20 cm thickness
Waterproofing and aesthetic coating in porcelain stoneware tiles Anti-slip algicide (color to be defined) Anti UV
Anti-slip porcelain stoneware curbstone, minimum thickness 2 cm and width 30 cm with curved edges
Anti-slip TRAVERTIN decking including a 350kg/m3 cement mortar screed with a slope for washing water drainage to avoid stagnation.
Platform of the beach in reinforced concrete 350kg/m3 of 15 cm thickness. Water level -10 cm from the coping
-1.20 m -1.50 m -1.50 m -1.20 m
Platform of the basin in reinforced concrete of 20 cm thickness dosed at 350kg/m3 double layer reinforcement in High Adhesion steel (HA 8 mm)
Reinforced concrete veil dosed at 350kg/m3 and reinforced with high adhesion steel (HA 8 mm). Slope 05%
Slope 10%
SECTIONS POOLS
SECTION P1-P1
1/100
SECTION P2-P2
A 020
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
Anti-slip porcelain stoneware curbstone, minimum thickness 2 cm and width 30 cm with curved edges
Anti-slip
TRAVERTIN
decking including a 350kg/m3 cement mortar screed with a slope for washing water drainage to avoid stagnation.
Platform of the beach in reinforced concrete 350kg/m3 of 15 cm thickness.
WATER
NATURAL
GROUND
SECTIONS POOLS
DETAIL D SECTION P1-P1 1/100
A 021
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
Sewage disposal
Polyvinyl chloride pipe Ø40mm
Evacuation of overflow
Water supply
Foot bath water supply
Water level Finished beach level <8%
<8%
Sewage disposal Overflow evacuationWater supply
Chlorine dosing roller
Reinforced concrete Water inlet Stainless steel part ref:
Water level Finished beach level shaped screed
A A
B
B
Drain stainless steel part ref:
Tile 5x5cm anti-slip
Chlorine dosing roller
Tile 5x5cm anti-slip
SECTION BB
SECTION AA
Finished beach level
Water supply
Shower column
Shower column concrete wall between both shower columns concrete wall between both shower columns concrete wall between both shower columns
Polyvinyl chloride pipe Ø16mm hose
TYPE PLAN
DETAILS OF THE FOOT BATH
AND SHOWER
1/150
A 022
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
EP rainwater sight glass (60x60) sewage manhole cover (90x90)
Wastewater & Valves Water Ø125 Water Valves Ø 110 Wastewater Ø100
PLUMBING LEGEND
DIRECTION OF WATER FLOW
Wastewater Ø75
Wastewater & Valves water Ø160 rainwater Ø160 concrete wall between both shower columns
PRINCIPAL POOL 12.5x25.00
Legend:
CHILDREN'S POOL
FOOT BATH and Shower
Swimming Pool Fence4
5 PLACE OF THE RESCUERS
316 stainless steel pool access ladder
Hose Bib
Rescue equipment storage area
Swimming pool rules panel
The description is on a page:
DESCRIPTION SWIMMING POOL RULES PANEL
Phone box
Description:
- Ping buoy
- Sheperd's crook
- Throowline
- First aid kit
P2 P2
592,66 m2
EPEP
Foot bath and shower Hose bib swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)
PLACE OF THE RESCUERS
Access ladder to the pool
Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%
Access ladder to the pool
Phone box
Ø160 Evacuation of the overflow of the swimming pools towards the existing rainwater pipe or collective sewerage systemEvacuation of the footbath and shower Ø160
50,27 m2
P1 P1
312,50 m2
Foot bath and shower Hose bib swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)
PLACE OF THE RESCUERS
Access ladder to the pool
Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%
Access ladder to the pool
Principal Pool Children's Pool
Beach
5 5
EVACUATION and OF THE OVERFLOW
SWIMMING POOLS AND THE FOOT
BATH and SHOWER 1/150
A 023
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
D-01 Détail
7 25 self-closing hinges
Post of sealing in the concrete
Level of the beach
Recovery of the beach Reinforced concrete of the beach
Solid steel tube 50mm X 50mm
Solid steel tube 25mm X 25mm
Solid steel tube 50mm X 50mm self-latching lock self-closing hinges
Post of sealing in the concrete
Level of the beach
Recovery of the beach Reinforced concrete of the beach
Solid steel tube 50mm X 50mm
Solid steel tube 25mm X 25mm
Solid steel tube 50mm X 50mm self-latching lock
DETAILS OF THE SWIMMING
POOL FENCE
A 024
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I
7 25 self-closing hinges self-latching lock
Solid steel tube 50mm X 50mm
Solid steel tube 25mm X 25mm
Solid steel tube 50mm X 50mm
Post of sealing in the concrete
DETAILS OF THE SWIMMING
POOL FENCE
DETAIL D1
A 025
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I steel mounting plate
Square Steel PoleTube steel post anchor Ø12 mm;
h=14.5 cm min
Solid steel tube 50mm X 50mm point sealing of the posts Ø12mm
In plan
In section Square Steel PoleTube
Reinforced concrete of the beach h
DETAILS OF THE SWIMMING
POOL FENCE
DETAILS OF POST FIXING
A 026
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index Modifications
PHASE
N°
POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE
N° 2006/183/147
PROJECT OWNER
UNITED STATES
EMBASSY
Date: March 2022
Scale
Unclassified
ORDER NUMBER:
191V1021F0003
May 2021 A ORIGINAL PLAN
EXECUTION
August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7
January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)
MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I steel mounting plate
Square Steel PoleTube steel post anchor Ø12 mm;
h=14.5 cm min point sealing of the posts Ø12mm
In plan
In section
Square Steel PoleTube
Reinforced concrete of the beach
All the panels of the swimming pool rules will be fixed in the concrete of the beach and the materials will be anti-corrosive
SWIMMING POOL RULES PANEL :
DESCRIPTION SWIMMING
POOL RULES PANEL AND
FIXING DETAILS 1/50
A 027
HIRAM ARCHITECTES
Email: info@hiramarchitectes.com
(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45
Architecte DEIAU Koffi Thiery DJAHA
Agrement CNOA
PROJECT MANAGER
Date Index…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .