ANNEX SWIMMING POOL DRAWIING - Final.pdf

PDF 20 MB Posted

Attached to
Semi-Olympic swimming pool, Paddle pool, yard, pool cabana and restroom construction services at the U. S. Embassy Annex
Solicitation number
191V1022R0001
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DixonLJ DE Reviewed for Code Compliance

DixonLJ Typewritten Text 22-0040

DixonLJ Typewritten Text 4/5/2022

DEPARTMENT OF STATE

BUREAU OF OVERSEAS BUILDINGS OPERATIONS

CERTIFICATE OF COMPLIANCE

PERMIT NO:

POST:

PROPERTY NO:

PROJECT TITLE:

This is to certify that to the best of my knowledge, information and belief, the

Project, as identified above, has been completed in accordance with the permitted drawings, specifications, and/or Statement of Work.

SIGNATURE

(May be signed digitally via Adobe)

PRINT NAME

TITLE

DATE

GSPublisherVersion 0.6.100.100

BP 90 Bingerville

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 27 22 49 69 43/(225) 07 07 47 00 93/

(225) 07 57 03 13 45

Architect DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Folio Designation

A000 GUARD PAGE

Revision index

A001 A002 A003

PLAN VIEW

Revision

A A

A

Folio Designation

A A004

A005

PHASE

N°

N° 2006/183/147

EXECUTION

Unclassified

Order Number:

A 001POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX,

ABIDJAN- CÔTE D'IVOIRE

A006 A007

A008 A009 A010 A011 A012

191V1021F0003

PLAN VIEW DETAIL A

PLAN VIEW BUILDING PORCH

ROOF PLAN VIEUW BUILDING PORCH DETAIL Z

SECTIONS BUILDING PORCH

DETAILS ROOFING FRAMEWORK BUILDING PORCH

DETAILS ROOFING FRAMEWORK SECTION XX BUILDING PORCH

ELEVATIONS BUILDING PORCH

ELEVATIONS BUILDING PORCH

PLUMBING DIAGRAM BUILDING PORCH

ELECTRICAL DIAGRAM BUILDING PORCH

POOL DETAILS

PLAN VIEW POOLS DETAIL K

SECTIONS POOLS

TYPE PLAN DETAILS OF THE FOOT BATH AND SHOWER

EVACUATION OVERFLOW SWIMMING POOLS AND THE FOOT BATH AND SHOWER

DETAILS OF THE SWIMMING POOL FENCE

SUMMARY

ARCHITECTURAL PLANS

A013 A014 A015 A016

A017 A018

A019 A020 A021 A022 A023

A024 A025

OVERALL PLAN

HOT WATER SUPPLY PLAN COLD WATER BUILDING PORCH

EXISTING DRAWING

SUMMARY

B B

B B

DETAIL OF THE SWIMMING POOL FENCE DETAIL D1

C

C C C

SECTIONS POOLS DETAIL D SECTION P1-P1

D

D D D

E

E E E

G

F F F

Date: March 2022

A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F

A B C D E F

A B C D E F A B C D E F

FLUID NETWORK PLAN

A026 A027 A028 A029

DESCRIPTION SWIMMING POOL RULES PANEL AND FIXING DETAILS

DETAIL OF THE SWIMMING POOL FENCE DETAIL OF POST FIXING

DESCRIPTION SWIMMING POOL RULES

FLUID NETWORK PLAN DETAIL AA030

BA 001

BA 002

GENERAL NOTES INFORMATION

BA STRUCTURAL PLANS

BA 000

A B C D E F

F H G H G H G H

G H G H G H G H G H G H G H G H G H G H G H G H G H G H

G H G H G H

G H G H G H G H

G H G H G H G H G H G H

G H G H G H G H

I I I I I I I I I I I I I I I I I I I I

I I I I

I I I I I

I I

I I I I

GENERAL NOTES INFORMATION

GENERAL NOTES INFORMATION

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architect DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Folio Designation Revision index Revision

Folio Designation

N° 2006/183/147

A 002

BUILDING PORCH STRUCTURAL STEEL WORK DETAILS

BA 004

BUILDING PORCH STRUCTURAL FIXING OF RAFTERS AND BATTERS

BA 005

STRUCTURAL POOL 12,50 x25,00

BA 006

STRUCTURAL POOL 12,50 x25,00 SECTION DETAILS

BA 007

ELECTRICAL PLANSE 000

ELECTRICAL PLAN GROUNDING

E 001

ELECTRICAL PLAN SOCKETS

E 002

ELECTRICAL PLAN LIGTHING

E 003

ELECTRICAL PLAN UNIFILARY SCHEMATIC

E 004

E 006

PHASE

N°

Date: March 2022

Unclassified

Order Number: 191V1021F0003

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX,

ABIDJAN- CÔTE D'IVOIRE

E 005

PLUMBING PLAN WASTE AND BLACK WATER EVACUATION IN CONNECTION WITH THE EXISTING NETWORKP 001

PLUMBING PLANP 000

P 002

AIR CONDITIONING VENTILATION PLAN

E 007

BUILDING PORCH STRUCTURAL STEEL WORK

BA 003

A B C D E F

PLUMBING PLAN HOT AND COLD WATER SUPPLY IN CONNECTION WITH THE EXISTING NETWORKP 003

PLUMBING PLAN HOT AND COLD WATER SUPPLYP 004

PLUMBING PLAN WASTE AND BLACK WATER EVACUATION

LAYOUT OF THE FINISHING WORKSP 000

WOOD, ALUNUMINUM AND METAL JOINERY

IDENTIFICATION PLAN OF THE JOINERY

SP 001

SP 002

SP 003-SP 007 DETAIL OF ALUMINIUM WINDOWS

DETAIL OF WOOD JOINERYSP 008-SP 012

DETAIL OF METAL JOINERYSP 013-SP 015

PLAN OF THE SEALED COATINGSF 000

PLAN OF THE SEALED COATING (SET)SF 001

PLAN OF THE SEALED COATING (BUILDING PORCH)SF 002

PLAN OF THE SEALED COATING (SWIMMING POOL DECK)SF 003

A B C D E F A B C D E F A B C D E F A B C D E F

A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F

A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F A B C D E F

ELECTRICAL PLAN ELECTRICAL CONNECTION PLAN

ELECTRICAL PLAN AIR CONDITIONING AND SWIMMING POOL EQUIPMENT

ELECTRICAL PLAN POWER BALANCE

ELECTRICAL PLAN THERMAL BALANCE

E 008 E 009

A B C D E F

ELECTRICAL PLAN LEGEND

ELECTRICAL PLAN DIVISION PANEL

E 010 E 011

G H

G H G H

G H G H G H G H

G H

G H G H G H G H

G H G H

G H

G H G H G H G H

G H

G H

G H

G H

G H

G H G H

G H

G H

G H G H

G H

HG

I I I I I

I I I I I I I I I I I I I I I I I I I I I I I I I I I

EXECUTION

STRUCTURAL CHILDREN POOL SECTION DETAILSBA 011

BUILDING PORCH FOUNDATION FROM WORK

BUILDING PORCH FULL SLAB COFFRING PLAN

BUILDING PORCH FOUNDATION FROM WORK DETAILS

BA 008

BA 009

BA 010

A B C D E F HG I

A B C D E F HG I

A B C D E F HG I

LIGHTING OF THE POOL DECK

E 012

ARCHITECTURAL PLANS

A 003 Unclassified

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

RO

A

D

EXISTING

BUILDING

RO

A

D

HOUSING

ROAD

ROADROAD

HOUSING HOUSING

H O

U

SIN

G H

O U

SIN

G

H O

U

SIN

G H

O U

SIN

G

HOUSING

HOUSING

HOUSINGHOUSING

HOUSING

ROAD

PATH

Area to build

A 004

1/1000EXISTING DRAWING

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

592,66 m2

3003 3552 1253 02218

1 460 240 850 240 1 010

3 800

200 775 2 770 994

Hose bib

PEX Ø

(Diameter according to the existing)

50,27 m2

18 400 130 2 4885 5 350 30 1 250 30 460 1 6725 1 685 300

18 3 0185 5 350 30 1 250 30 300 160 160 300 30 800 30 350 5 1 6825 300

355 1 310 4625 1 6725 1 6825

312,50 m2

Hose bib

PEX Ø

(Diameter according to the existing)

RO

A

D

EXISTING

BUILDING

RO

A

D

HOUSING

ROAD

ROADROAD

HOUSING HOUSING

H O

U

SIN

G H

O U

SIN

G

H O

U

SIN

G H

O U

SIN

G

HOUSING

HOUSING

HOUSINGHOUSING

HOUSING

ROAD

Principal Pool Children's Pool

Beach

PATH

Detail Z

Detail K

A 005

1/1000OVERALL PLAN

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

592,66 m2

14,42 m2

54,73 m2

12,37 m2

4,99 m2

90,70 m2

4,99 m2

2,06 m2

18.22 m²

14,63 m2

2,31 m2

2,31 m2

3,26 m2

2,31 m2

2,31 m2

3,26 m2

18,22 m²

14,62 m2

18,28 m2

17,35 m2

CG

R

18 400 130 2 662 2 728 1 012

18 2 8905 3675 2 6135 1 0605

400 130 2 662 2 728 1 012

1 460 240 425 425 240 1 010

1 67252 1275

1 67252 1275

3 800

-0.17

-0.17

6,56 m2 floor drain floor drain

Foot bath and shower

Hose bib

PEX Ø

(Diameter according to the existing)

Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%

RAMP

swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)

Phone box

Emergency Shower and

Eyewash Station

Hose bib

Hall

Technical room

(pump room)

Coffee

Storage

Women's Bloc Wc

Men's locker rooms

Ramp slope 4.28%

Ramp slope 4.28%

Janitors closet

Circulation

Technical room

Pool equipment room

Be nc h

Be nc h

Be nc h

Women's locker rooms

Men's Bloc Shower

Wc

Wc

Wc

Wc prm

Wc prm

Circulation

Circulation

C ir cu la tio n

Be nc h

Be nc h

Be nc h

Women's Bloc shower

Urinal

Men's Bloc Wc

WH

50,27 m2

5 350 30 1 250 30 460 1 675

5 350 1 310 300 150 10 10

150 300 30 800 30 355

312,50 m2

Foot bath and shower

Hose bib

PEX Ø

(Diameter according to the existing)

Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%

RAMP

swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)

Principal Pool Children's Pool

Beach

Guerite

PARKING EXISTANT

RO

A

D

EXISTING

BUILDING

RO

A

D

ROADROAD

ROADROAD

HOUSING

HOUSING HOUSING

H O

U

SIN

G H

O U

SIN

G

H O

U

SIN

G H

O U

SIN

G

HOUSING

HOUSING

HOUSINGHOUSING

HOUSING

PATH

DETAIL A

1/1000

PLAN VIEW

A 006

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

592,66 m2

14,42 m2

54,73 m2

12,37 m2

4,99 m2

90,70 m2

4,99 m2

2,06 m2

18.22 m²

14,63 m2

2,31 m2

2,31 m2

3,26 m2

2,31 m2

2,31 m2

3,26 m2

18,22 m²

14,62 m2

18,28 m2

17,35 m2

CG

R

2 728 1 012

3675 2 6135 1 0605

2 728 1 012

1 460 240 425 425 240 1 010

1 67252 1275

1 67252 1275

3 800

-0.17

-0.17

6,56 m2 floor drain floor drain

Foot bath and shower

Hose bib

PEX Ø

(Diameter according to the existing)

Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%

RAMP

swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)

Phone box

Emergency Shower and

Eyewash Station

Hose bib

Hall

Technical room

(pump room)

Coffee

Storage

Women's Bloc Wc

Men's locker rooms

Ramp slope 4.28%

Ramp slope 4.28%

Janitors closet

Circulation

Technical room

Pool equipment room

Be nc h

Be nc h

Be nc h

Women's locker rooms

Men's Bloc Shower

Wc

Wc

Wc

Wc prm

Wc prm

Circulation

Circulation

C irc ul at io n

Be nc h

Be nc h

Be nc h

Women's Bloc shower

Urinal

Men's Bloc Wc

WH

50,27 m2

5 350 30 1 250 30 460 1 675

5 350 1 310 300 150 10 10

150 300 30 800 30 355

312,50 m2

Foot bath and shower

Hose bib

PEX Ø

(Diameter according to the existing)

Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%

RAMP

swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)

Principal Pool Children's Pool

Beach

EXISTING

BUILDING

11 BUILDING PORCH

Legend:

PRINCIPAL POOL

CHILDREN'S POOL

4 FOOT BATH and Shower

5 Swimming Pool Fence

6 concrete wall between both shower columns

1/250

PLAN VIEW

DETAIL A

A 007

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

14,42 m2

12,37 m2

4,99 m2

4,99 m2

2,06 m2

18,22 m2

18,22 m2

CG

R

A

A

C

C

D

D

E

E

F

F

G

G

H

HB

B

1'1'

D-02 Détail

702 420 180 1 148

109 333 242 2345 3835 3575 7825 130 75

75 442 242 201 417 385 755 130 75

24 150 735 150 652 150 735 150 24

90 190 80

202 200

30 600 68 80

515 80

1515 80

251 80

148 80

90 2 680

85 22

85 22

90 22

150 445 90

1235 90

28 242 600 68 80

515 80

1515 80

251 80

148 80

88 130 66

24 150 376 180 179 150 652 150 735 150 24 2 722

190 80

202 200

30 600 18 305 251 305 13 208 133 13 210 13 220 18

18 2055 13 2055 18 842 18 312 13 208 133 13 210 13 220 18 130

1 3505 251 305 13 208 133 13 210 13 160 60 18

460 180 662 1 158 130 250

150 735 150 652 150 735 150

-0.17

-0.17

±0,00

±0,00

±0,00

BB

6,56 m2 floor drain floor drain

Emergency Shower and Eyewash Station

Hose bib

Hall

Technical room (pump room)

Coffee

Storage

Women's Bloc Wc

Men's locker rooms

Ramp slope 4.28%

Ramp slope 4.28%

Janitors closet

Circulation

Technical room

Recent modification

Pool equipment room

Be nc h

Be nc h

Be nc h

Women's locker rooms

Men's Bloc Shower

Wc

Wc

Wc

Wc prm

Wc prm

CirculationCirculation

C irc ul at io n

Be nc h

Be nc h

Be nc h

Women's Bloc shower

Urinal

Men's Bloc Wc

WH

WH

18 60 304 60 18 224 18 600 18 312 13 208 13 210 13 133 160 60 18 130

18 424 18 184 98 560 18 666 13 443 18 130

18 2055 13 2055 18 224 18 600 18 666 13 443 18 130

18 2055 13 2055 18 61 123 40 18 600 18 2815 305 13 305 1775 13 62 13 210 13 278 18

1/100

PLAN VIEW BUILDING PORCH

A 008

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

1 0925 585 1 0925

2 770

2 770 1 0925 585 1 0925

54623551 20652355546

Straw roofing 30 cm thick

1/100

ROOF PLAN VIEUW BUILDING PORCH

DETAIL Z

A 009

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

±0,00 -0.17

+3.09 +3.52

+6.86

+8.79

±0,00 ±0,00

+6.86

Reinforced Concrete PostReinforced Concrete Post

±0,00 -0.17

+3.09 +3.52

+6.86

+8.79

±0,00

+6.86

Venetian blind window with aluminum frame RAL7010

Exterior finishing of the walls in paint (color to be defined)

Finishing of the posts in paint( color to be defined)

Straw roofing 30 cm thick

Sliding Window with Aluminum Frame RAL7010

ELEVATIONS

BUILDING PORCH 1/100

REAR ELEVATION

MAIN ELEVATION

A 010

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

-0.17

+3.09 +3.52

+8.79

±0,00 ±0,00

+8.79

Venetian blind window with aluminum frame RAL7010

Exterior finishing of the walls in paint (color to be defined)

Double sided metal door with 2/10th sheet thickness (color to be defined)

Finishing of the posts in paint( color to be defined)

Straw roofing 30 cm thick

-0.17

+3.09 +3.52

+8.79

±0,00±0,00

Reinforced Concrete Post

Exterior finishing of the walls in paint (color to be defined)

Straw roofing 30 cm thick

Reinforced Concrete Post

ELEVATIONS

BUILDING PORCH 1/100

LEFT LATERAL ELEVATION

RIGHT LATERAL ELEVATION

A 011

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

Straw Covering

Metal Breakdown

Alucobond rim

Metal Breakdown

Alu sheet metal (drip edge)

Laths 4 x4 mm (Thatch binding) Splinters 6mm x4mm

20 mm marine plywood or similar

Waterproofing

Water level -10 cm from the coping

Finishing of the posts in paint( color to be defined)

Exterior finishing of the walls in paint (color to be defined)

Straw Covering

Metal Breakdown

Alucobond rim

Metal Breakdown

Alu sheet metal (drip edge)

Laths 4 x4 mm (Thatch binding) Splinters 6mm x4mm

20 mm marine plywood or similar

Waterproofing

±0,00

+3.09 +3.52

+6.86

+8.79

+6.86

±0,00±0,00 -0.17±0,00 x x

Waterproofing

False ceiling in plasterboard thickness 20 mm

Steel gusset

Straw roofing with fireproof treatment

Metal Breakdown

Laths 4 x4 mm (Thatch binding)

Splinters 6mm x4mm

20 mm marine plywood or similar

Alucobond rim Alu sheet metal (drip edge)

Hall

Coffee

Janitors closet

Pool equipment room

Men's Bloc Shower

Men's Bloc WcMen's locker rooms

Waterproofing

False ceiling in plasterboard thickness 20 mm

Steel gusset

Straw roofing with fireproof treatment

Metal Breakdown

Laths 4 x4 mm (Thatch binding)

Splinters 6mm x4mm

20 mm marine plywood or similar

Alucobond rim Alu sheet metal (drip edge)

HIGH STORAGE

hose bib washer

Detail D 02Detail D 02

DETAILS (L) ROOFING FRAMEWORK

SECTIONS

BUILDING PORCH 1/100

SECTION CC

SECTION BB

A 012

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I x x

Straw roofing with fireproof treatment

Metal Breakdown

Laths 4 x4 mm (Thatch binding)

Splinters 6mm x4mm

20 mm marine plywood or similar

Alucobond rim

Alu sheet metal (drip edge)

Waterproofing

Steel gusset

DETAILS (L) ROOFING FRAMEWORK

BUILDING PORCH 1/100

A 013

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

Straw roofing with fireproof treatment

Metal Breakdown

Laths 4 Cm x4 Cm (Thatch binding)

Splinters 6 Cm x4 Cm

20 mm marine plywood or similar

Waterproofing

Steel gusset

DETAILS ROOFING FRAMEWORK

SECTION XX

A 014

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

14,42 m2

12,37 m2

4,99 m2

4,99 m2

2,06 m2

18,22 m2

18,22 m2

EP

EP EP EP

EP

EP

EP

EPEP

EP

CG

R

EP

EP

702 600 18 312 13 341 13 210 13 220 18

18 2055 13 2055 18 224 18 600 18 666 13 443 18 130

442 18 842 18 312 13 208 133 13 210 13 220 18

2 722

2 722

-0.17

-0.17

±0,00

±0,00

±0,00

-0.32

-0.32

-0.32

-0.32

-0.32

-0.32

-0.32 -0.32

-0.32

-0.32

-0.32

-0.32

-0.32 -0.32 -0.32

-0.32

-0.32

-0.32 -0.32

-0.32-0.32-0.32

-0.32

B

6,56 m2 floor drain floor drain

Emergency Shower and Eyewash Station

Hose bib

Ø bl ac k w at er a nd w as te w at er to th e ex is tin g ne tw or k rainwater Ø160 slope 2% rainwater Ø160 slope 2% rainwater Ø160 slope 2% ra in w at er Ø sl op e 2% ra in w at er Ø sl op e 2%

Ø160 Stormwater to the existing network ra in w at er Ø sl op e 2% ra in w at er Ø sl op e 2%

Hall

Technical room (pump room)

Coffee

Storage

Women's Bloc Wc

Men's locker rooms

Ramp slope 4.28%

Ramp slope 4.28%

Janitors closet

Circulation

Technical room

Pool equipment room

Women's locker rooms

Men's Bloc Shower

Wc

Wc

Wc

Wc prm

Wc prm

CirculationCirculation

C irc ul at io n

Women's Bloc shower

Urinal

Men's Bloc Wc

WH

rainwater Ø160 slope 2% ra in w at er Ø sl op e 2% slope 2% slope 2% slo pe

2% slope 2% slope 2% slope 2% sl op e 2% sl op e 2% sl op e 2% sl op e 2% sl op e 2% rainwater Ø160 slope 2%

WH

18 424 18 224 18 600 18 666 13 443 18 130

LEGEND OF THE SANITARY APPLIANCES

Kitchen sink in chrome with cold/hot water mixing valve

Chrome floor drain Ø75 Water column with cold/hot water mixing valve

Toilet for handicapped

Toilet

Triple sink with cold/hot water faucet

Urinals for men Emergency Shower and Eyewash Station Hose bib shower stall

EP rainwater sight glass (60x60) sewage manhole cover (90x90)

Wastewater & Valves Water Ø125 Water Valves Ø 110 Wastewater Ø100

PLUMBING LEGEND

DIRECTION OF WATER FLOW

Wastewater Ø75

Wastewater & Valves water Ø160 rainwater Ø160

PLUMBING DIAGRAM

A 015

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

14,42 m2

12,37 m2

4,99 m2

4,99 m2

2,06 m2

18,22 m2

18,22 m2

CG

R

-0.17

±0,00

±0,00

±0,00

B

6,56 m2 floor drain floor drain

Shut-off valve manifold

Hot and cold water manifold

Emergency Shower and Eyewash Station

Hose bib

Hall

Technical room (pump room)

Coffee

Storage

Women's Bloc Wc

Men's locker rooms

Ramp slope 4.28%

Ramp slope 4.28%

Janitors closet

Circulation

Technical room

Pool equipment room

P E X Ø

P E X Ø

D ia m e t e r a c c o r d in g t o t h e e x is t in g t o h o s e b ib

P E X Ø t o f o o t b a t h

P E X Ø

Water inlet of the sodeci PVC Ø (Diameter according to the existing)

Be nc h

Be nc h

Be nc h

Women's locker rooms

Men's Bloc Shower

Wc

Wc

Wc

Wc prm

Wc prm

CirculationCirculation

C irc ul at io n

Be nc h

Be nc h

Be nc h

Women's Bloc shower

Urinal

Men's Bloc Wc

WH

P E X Ø

P E X Ø

PEX Ø20

P E X Ø

PEX Ø16

PEX Ø16WH

P E X Ø

PEX pipe Ø20

Shut-off valve manifold

LEGEND

Water inlet from sodeci PVC Ø32

Nurse manifold

PEX pipe Ø16

WH solar water heater

HOT WATER SUPPLY PLAN COLD WATER

A 016

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

14,42 m2

12,37 m2

4,99 m2

4,99 m2

2,06 m2

18,22 m2

18,22 m2

CG

R

-0.17

-0.17

±0,00

±0,00

±0,00

6,56 m2 floor drain floor drain

Emergency Shower and Eyewash Station

Hose bib

Hall

Technical room (pump room)

Coffee

Storage

Women's Bloc Wc

Men's locker rooms

Ramp slope 4.28%

Ramp slope 4.28%

Janitors closet

Circulation

Technical room

Pool equipment room

Be nc h

Be nc h

Be nc h

Women's locker rooms

Men's Bloc Shower

Wc

Wc

Wc

Wc prm

Wc prm

CirculationCirculation

C irc ul at io n

Be nc h

Be nc h

Be nc h

Women's Bloc shower

Urinal

Men's Bloc Wc

WH

TV

TEL

UE

U E

UE

UE

WH

TV

Telephone jack

LEGEND ELECTRICITY

Single switch Waterproof single switch Dual ignition switch

Waterproof socket 16A+Ground Television outlet

TEL

Push button

LED light strip 120 waterproof

Waterproof halogen recessed spotlight Recessed halogen spotlight sanitary wall lamp led 60 with socket type GFI

Waterproof wall lamp Waterproof dual ignition switch

Water HeaterWH

Air Brush

Workstation:

1PC 2P+T 10/16A + 2USB

ELECTRICAL DIAGRAM

A 017

POOL DETAILS

A 018

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

P2 P2

592,66 m2

1 521 120 970 120 1 069

1 460 240 850 240 1 010 3 800

3 800 2 1275 1 6725

5 350 1 310 4575 5

5 350 1 310 300 10 140

140 10 1 510

Foot bath and shower Hose bib swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)

PLACE OF THE RESCUERS

Access ladder to the pool

Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%

Access ladder to the pool

Phone box

50,27 m2

5 350 30 1 250 30 4575 5

5 350 1 310 4575 5 4575 30 800 30 350

350 30 120 1 130 30 460 925 120 625

-1.20 m

-1.20 m

-1.20 m

-1.50 m

-1.20 m

-1.20 m

-1.20 m

-1.50 m

P1 P1

312,50 m2

Foot bath and shower Hose bib swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)

PLACE OF THE RESCUERS

Access ladder to the pool

Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%

Access ladder to the pool

Principal Pool Children's Pool

Beach

5 5 concrete wall between both shower columns

PRINCIPAL POOL 12.5x25.00

Legend:

CHILDREN'S POOL

FOOT BATH and Shower

Swimming Pool Fence4

5 PLACE OF THE RESCUERS

316 stainless steel pool access ladder

Hose Bib

Rescue equipment storage area

Swimming pool rules panel

The description is on a page:

DESCRIPTION SWIMMING POOL RULES PANEL

Phone box

Description:

- Ping buoy

- Sheperd's crook

- Throowline

- First aid kit

PLAN VIEW POOLS

DETAIL K 1/150

A 019

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

0.

25 800 30

84020 0.

±0,00

Platform of the basin in reinforced concrete of 20 cm thickness dosed at 350kg/m3 double layer reinforcement in High Adhesion steel (HA 8 mm)

Reinforced concrete veil dosed at 350kg/m3 and reinforced with high adhesion steel (HA 8 mm).

Crushed stone 20 cm thickness

Anti-slip TRAVERTIN decking including a 350kg/m3 cement mortar screed with a slope for washing water drainage to avoid stagnation.

Non-slip porcelain stoneware curbstone, minimum thickness 2 cm and width 30 cm with curved edges

Platform of the beach in reinforced concrete 350kg/m3 of 15 cm thickness.

Water level -10 cm from the coping

Waterproofing and aesthetic coating in porcelain stoneware tiles Anti-slip algicide (color to be defined) Anti UV

-0.457 m-0.457 m

±0.00 m

Platform of the basin in reinforced concrete of 20 cm thickness dosed at 350kg/m3 double layer reinforcement in High Adhesion steel (HA 8 mm)

Reinforced concrete veil dosed at 350kg/m3 and reinforced with high adhesion steel (HA 8 mm).

D Détail

20 530 1 140 830 20

±0,00 ±0,00 ±0,00 ±0,00

Platform of the basin in reinforced concrete of 20 cm thickness dosed at 350kg/m3 double layer reinforcement in High Adhesion steel (HA 8 mm)

Reinforced concrete veil dosed at 350kg/m3 and reinforced with high adhesion steel (HA 8 mm). Slope 05%

Slope 10%

Crushed stone 20 cm thickness

Waterproofing and aesthetic coating in porcelain stoneware tiles Anti-slip algicide (color to be defined) Anti UV

Anti-slip porcelain stoneware curbstone, minimum thickness 2 cm and width 30 cm with curved edges

Anti-slip TRAVERTIN decking including a 350kg/m3 cement mortar screed with a slope for washing water drainage to avoid stagnation.

Platform of the beach in reinforced concrete 350kg/m3 of 15 cm thickness. Water level -10 cm from the coping

-1.20 m -1.50 m -1.50 m -1.20 m

Platform of the basin in reinforced concrete of 20 cm thickness dosed at 350kg/m3 double layer reinforcement in High Adhesion steel (HA 8 mm)

Reinforced concrete veil dosed at 350kg/m3 and reinforced with high adhesion steel (HA 8 mm). Slope 05%

Slope 10%

SECTIONS POOLS

SECTION P1-P1

1/100

SECTION P2-P2

A 020

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

Anti-slip porcelain stoneware curbstone, minimum thickness 2 cm and width 30 cm with curved edges

Anti-slip

TRAVERTIN

decking including a 350kg/m3 cement mortar screed with a slope for washing water drainage to avoid stagnation.

Platform of the beach in reinforced concrete 350kg/m3 of 15 cm thickness.

WATER

NATURAL

GROUND

SECTIONS POOLS

DETAIL D SECTION P1-P1 1/100

A 021

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

Sewage disposal

Polyvinyl chloride pipe Ø40mm

Evacuation of overflow

Water supply

Foot bath water supply

Water level Finished beach level <8%

<8%

Sewage disposal Overflow evacuationWater supply

Chlorine dosing roller

Reinforced concrete Water inlet Stainless steel part ref:

Water level Finished beach level shaped screed

A A

B

B

Drain stainless steel part ref:

Tile 5x5cm anti-slip

Chlorine dosing roller

Tile 5x5cm anti-slip

SECTION BB

SECTION AA

Finished beach level

Water supply

Shower column

Shower column concrete wall between both shower columns concrete wall between both shower columns concrete wall between both shower columns

Polyvinyl chloride pipe Ø16mm hose

TYPE PLAN

DETAILS OF THE FOOT BATH

AND SHOWER

1/150

A 022

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

EP rainwater sight glass (60x60) sewage manhole cover (90x90)

Wastewater & Valves Water Ø125 Water Valves Ø 110 Wastewater Ø100

PLUMBING LEGEND

DIRECTION OF WATER FLOW

Wastewater Ø75

Wastewater & Valves water Ø160 rainwater Ø160 concrete wall between both shower columns

PRINCIPAL POOL 12.5x25.00

Legend:

CHILDREN'S POOL

FOOT BATH and Shower

Swimming Pool Fence4

5 PLACE OF THE RESCUERS

316 stainless steel pool access ladder

Hose Bib

Rescue equipment storage area

Swimming pool rules panel

The description is on a page:

DESCRIPTION SWIMMING POOL RULES PANEL

Phone box

Description:

- Ping buoy

- Sheperd's crook

- Throowline

- First aid kit

P2 P2

592,66 m2

EPEP

Foot bath and shower Hose bib swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)

PLACE OF THE RESCUERS

Access ladder to the pool

Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%

Access ladder to the pool

Phone box

Ø160 Evacuation of the overflow of the swimming pools towards the existing rainwater pipe or collective sewerage systemEvacuation of the footbath and shower Ø160

50,27 m2

P1 P1

312,50 m2

Foot bath and shower Hose bib swimming pool rules panel(03) swimming pool rules panel(01) swimming pool rules panel(04) swimming pool rules panel(02)

PLACE OF THE RESCUERS

Access ladder to the pool

Access ramp to the pool for people with reduced mobility in concrete with guardrail Slope 5%

Access ladder to the pool

Principal Pool Children's Pool

Beach

5 5

EVACUATION and OF THE OVERFLOW

SWIMMING POOLS AND THE FOOT

BATH and SHOWER 1/150

A 023

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

D-01 Détail

7 25 self-closing hinges

Post of sealing in the concrete

Level of the beach

Recovery of the beach Reinforced concrete of the beach

Solid steel tube 50mm X 50mm

Solid steel tube 25mm X 25mm

Solid steel tube 50mm X 50mm self-latching lock self-closing hinges

Post of sealing in the concrete

Level of the beach

Recovery of the beach Reinforced concrete of the beach

Solid steel tube 50mm X 50mm

Solid steel tube 25mm X 25mm

Solid steel tube 50mm X 50mm self-latching lock

DETAILS OF THE SWIMMING

POOL FENCE

A 024

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I

7 25 self-closing hinges self-latching lock

Solid steel tube 50mm X 50mm

Solid steel tube 25mm X 25mm

Solid steel tube 50mm X 50mm

Post of sealing in the concrete

DETAILS OF THE SWIMMING

POOL FENCE

DETAIL D1

A 025

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I steel mounting plate

Square Steel PoleTube steel post anchor Ø12 mm;

h=14.5 cm min

Solid steel tube 50mm X 50mm point sealing of the posts Ø12mm

In plan

In section Square Steel PoleTube

Reinforced concrete of the beach h

DETAILS OF THE SWIMMING

POOL FENCE

DETAILS OF POST FIXING

A 026

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index Modifications

PHASE

N°

POOL PROJECT FOR THE AMERICAN EMBASSY ANNEX, ABIDJAN- CÔTE D'IVOIRE

N° 2006/183/147

PROJECT OWNER

UNITED STATES

EMBASSY

Date: March 2022

Scale

Unclassified

ORDER NUMBER:

191V1021F0003

May 2021 A ORIGINAL PLAN

EXECUTION

August 2021 B MODIFIED PLANS FOLLOWING COMMENTS October 2021 D MODIFIED PLANS FOLLOWING COMMENTS 6 November 2021 E MODIFIED PLANS FOLLOWING COMMENTS 7

January 2022 F MODIFIED PLANS FOLLOWING COMMENTS 8 February 2022 G MODIFIED PLANS FOLLOWING COMMENTS 9 (adding an emergency shower, eyewash station and floor drain in the pool equipment room)

MODIFIED PLANS FOLLOWING COMMENTS 10 (Modification of the disabled toilets, access to the changing rooms and addition of a room janitors closet)09 February 2022 H MODIFIED PLANS FOLLOWING COMMENTS 11 (Modifications related to the overall layout of the men's and women's locker room blocks according to the OBO dispistion and standards)23 February 2022 I steel mounting plate

Square Steel PoleTube steel post anchor Ø12 mm;

h=14.5 cm min point sealing of the posts Ø12mm

In plan

In section

Square Steel PoleTube

Reinforced concrete of the beach

All the panels of the swimming pool rules will be fixed in the concrete of the beach and the materials will be anti-corrosive

SWIMMING POOL RULES PANEL :

DESCRIPTION SWIMMING

POOL RULES PANEL AND

FIXING DETAILS 1/50

A 027

HIRAM ARCHITECTES

Email: info@hiramarchitectes.com

(225) 22 49 69 43/(225) 07 47 00 93/ (225)57 03 13 45

Architecte DEIAU Koffi Thiery DJAHA

Agrement CNOA

PROJECT MANAGER

Date Index…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .