Annex C reference material.xlsx

XLSX spreadsheet 2 MB Posted

Attached to
Procure Switch Extensions for JRB New Orleans Louisiana
Solicitation number
N6883626Q0074
Issued by

About this file

This is a reference material document providing technical specifications and installation requirements for a telecommunications infrastructure project at Joint Reserve Base New Orleans.

The project requires the installation of a 24-strand single-mode fiber optic cable connecting Building 390 to Building 90 through existing manholes and conduits, with no splices permitted between buildings. Mule tape must be left in each conduit alongside the newly installed fiber, with all cables labeled by size and origin/destination buildings. Service loops are to be neatly wrapped within manholes and building entry loops attached to building walls. The infrastructure work includes installing switch extensions in Building 30 and deploying fiber switches, cabinets, Power Distribution Units (PDUs), and ethernet patch panels in Buildings 90 and 390. All fiber connections must use LC connectors, and equipment grounding must be connected to existing building bus bars. The existing Building 390 fiber link to Building 30 requires integration with the new equipment, and existing CAT6 ethernet service drops to telephones are already in place. The reference material includes technical drawings and multiple images illustrating the proposed network layout across all three buildings, though these are noted as examples requiring compatibility with the current switch in Building 30.

View the file

Other files

File Type Posted
Solicitation - N6883626Q0074.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OSP

BUILDINGS 390 AND 90 SWITCH PROECT

250 FTV5HH
250 FT385 FT188 FT75 FT
BLD 390
V2Bld 90
173 FTconduit on building
V3V4
231 FTLEGEND
FIBER PATH
HH = HAND HOLE EXSITING
V = VAULT EXISTING
30 FT SERVICE LOOP
15 FT BUILDING ENTRY SERVICE LOOP
1. Install 24 strand SM fiber through existing manholes from building 390 to building 90 leaving no splices
between buildings
2. Leaving mule tape in each conduit with newly installed fiber.
3. Each fiber cable will be labeled with size / buildings to and from. Service loops will be neatly wrapped in the
manhole not left off the floor. Building entry loops will be attached to the wall of the building.
4. Building 390 has exsisting fiber back to building 30 that will need to be tied into the newly requested equipment

ISP

BUILDING 90 EQUIPMENT ROOM

BUILDING 390 EQUIPMENT ROOM

Proprosed drawing layout is for example only mst be compatible to the current switch in building 30
EQUIPMENT ROOMS 30/390/90

Proposed drawing layout is for example only mst be compatible to the current switch in building 30

1. Install switch extention in building 30
2. Install Fiber switch, cabinet, PDU, and ethernet patch panel in buildings 90 and 390
3. Serivce drops to telephones are already existing CAT6
4. All Fiber conncetions will be LC
5. Equipment grounding needs to be connected to existing building bus bars.

Bldg 30 Building 30

Bldg 390 Building 390

Bldg 90 Building 90 image4.png image5.png image6.png image7.png image8.png image1.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image13.emf image16.png image17.png image18.png image2.png image19.png image3.png image14.emf image15.emf image20.png image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.jpeg image28.jpeg image29.jpeg image30.jpeg

File details come from the government source that posted it. Updated .