This document outlines the technical evaluation factors for solicitation number N7027223Q0023 from the Department of the Navy Naval Supply Systems Command. The contractor will be evaluated on its ability to perform preventive and corrective maintenance on two Eaton 9390 power wave UPS systems according to OEM drawings and technical manuals. The contractor must provide a 12-month warranty on all replaced components, documentation of calibration results within five business days, and meet 100% of calibration and specification standards. The contractor must also be an authorized Eaton Power Systems service provider and provide distant support.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS ANNEX A rev.2 P.docx | DOCX document | |
| ANNEX C PRICE BREAKDOWN OPTIONS.xlsx | XLSX spreadsheet | |
| BNLS REDACTED J.pdf | ||
| 23Q0023 JAX UPS RFQ_.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANNEX B
TECHNICAL ACCEPTABILITY REVIEW
Contractor’s technical offer will be assessed based on the RFQ PWS/SOW identified technical requirements. The following will be applied for determination of acceptability:
Contractor Designation Number: _________________________________
| # |
| Requirement |
| Compliant (C) |
| Non-Compliant (NC) |
| Requires Clarification |
(RC)
| 1 |
| The ability to perform preventive and corrective maintenance on two EATON 9390 power wave UPS systems |
| 2 |
| Provide a 12-months warranty on all replaced components. |
| 3 |
| Verify EATON UPS specifications with the same procedures as used in production IAW OEM drawings and technical manual specifications. |
| 4 |
| Provide documentation of calibration results to DET JAX within five business days. |
| 5 |
| Contractor will meet 100% of the calibration and specification standards outlined in OEM drawings and technical manuals. |
| 6 |
| Be an authorized Eaton Power Systems service provider |
| 7 |
| Provide distant support. |
File details come from the government source that posted it. Updated .