This is a Performance Work Statement (PWS) for portable toilet and handwashing station rental/leasing services at Fort Gregg-Adams, VA, with a base period from April 1, 2025 to March 31, 2026, plus four one-year options through March 31, 2030. The contractor must provide clean, sanitary portable toilets and handwashing stations to support field operations, including delivery, setup, maintenance, cleaning, and waste disposal services. There is a 15-day phase-in period from March 15-31, 2025.
The PWS requires the contractor to maintain units between 0730-1600 Monday through Friday (excluding federal holidays), with units placed throughout Fort Gregg-Adams' 5,907 acres supporting approximately 22,750 military, civilian and contractor personnel plus 5,450 resident family members. Key requirements include: non-recirculating outdoor toilets with urinals and minimum 200-usage capacity, two-roll toilet paper dispensers, proper ventilation, and the contractor's name displayed on units. The contractor must provide all equipment, supplies, permits, and qualified personnel, maintain proper safety/environmental compliance, and respond to emergency service needs. The related contract opportunity (W91QF525R0002) indicates this is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside being procured by the Mission and Installation Contracting Command at Fort Gregg-Adams.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex A—Overarching Performance Work Statement (PWS)
Portable Toilet/Wash Station Contract
Fort Gregg-Adams, VA
2025 – 2030 Base + 4 Year Contract
Table of Contents
| 1.0 | INTRODUCTION …………………………………………………..…………………………4 | |
| 1.1 | Background …………………...…………………………………..……………………4 | |
| 1.2 | Objectives ……………………………………………...…………..…………………. 4 | |
| 1.3 | Climatic Conditions …………...………………………………..……………………..4 | |
| 1.4 | Facility Access …………...……….………………………………......…….…………5 | |
| 1.5 | Traffic Flow .……………………….………………………………………….…..……5 | |
| 1.6 | Drainage ………………………………………………………………………………5 | |
| 1.7 | Restoration of Landscape Damage ……………………………………......………...5 | |
| 1.8 | Dust Suppression ……………………………………………………………......…….5 | |
| 1.9 | Utility Location …………………………………………………………………...……..5 | |
| 1.10 | Excavation Permits …………………………..………...………………...…………...5 | |
| 2.0 | REQUIREMENTS ……………………………………………….…………………………….5 | |
| 2.1 | Description of Services………………………………………………………………...5 | |
| 2.2 | General Information…………………………………………………………….....…..6 | |
| 2.3 | Emergency Services.…………….………………………………...…….……………8 | |
| 2.4 | Contract Administration and Management...…………………………………….….8 | |
| 2.5 | Work Management.............................................................................................12 | |
| 2.6 | Demand Maintenance Orders (DMOs) ………………………………………...…14 | |
| 2.7 | Preventive Maintenance Orders (PMOs)………………..…………………………15 | |
| 2.8 | Operations Work Orders (OWOs) ……………………..……………………………16 | |
| 2.9 | Project Work Orders (PWOs) ……………………………………...………………16 | |
| 2.10 | Warranty Program ………………………………..……………………………..17 | |
| 2.11 | Technical Document Library Operation …………………………………………18 | |
| 2.12 | Maintain As-Builts…………………………………………………………………….18 | |
| 2.13 | Historic Property or Archeological Site ………………………………………….18 | |
| 2.14 | Security ……………………………………,,,………………………………………18 | |
| 2.15 | Security Training ……………………………………………………………………19 | |
| 2.16 | Safety ……………………………………………………………………………….20 | |
| 2.17 | Training, Physical Requirements, or other Expertise Required ……………….21 | |
| 2.18 | Recycled Content Materials ………………………………………………………22 | |
| 2.19 | Contingency Plans …………………………………………………………………25 | |
| 3.0 | PERFORMANCE REQUIREMENTS AND STANDARDS………………………………26 | |
| 3.1 | Quality Assurance……………………………..…………………………………….26 | |
| 3.2 | Quality Control Plan……………………………………………………………...….27 | |
| 3.3 | Customer Feedback Program...........................................................................27 | |
| 4.0 | PERFORMANCE TASK REQUIREMENTS……………………………...………………27 | |
| 5.0 | COMMON LEVELS OF SUPPORT (CLS)……………………………………..………....28 | |
| 6.0 | DELIVERABLES ………………………………………………………..………………..29 | |
| 7.0 | RELATED DOCUMENTS ………..…………………...………….………………………...33 | |
| 7.1 | Definitions and Acronyms ……………………………………….......……………...33 | |
| 7.2 | Applicable Directives, Publications …………..……………..………...….………..46 | |
| 7.3 | Technical Exhibit (TE) Index …………….…………………………………….……50 | |
| 7.4 | Government-Furnished Facilities (GFF) and Equipment (GFE)…………..…….51 | |
| 7.5 | Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE) ….…53 | |
| 7.6 | U.S. Department of Labor Wage Determination (DOL WD)……….………..…...54 | |
| 7.7 | Enterprise Contractor Manpower Reporting Application (ECMRA)……..……...54 | |
| 7.8 | ECMRA Reporting Labor Hours ………………………..………………….…….54 |
1.0 Introduction.
This is a non-personnel services, Indefinite Delivery, Indefinite Quantity (IDIQ) contract to provide long and short term RENTING/LEASING Portable Toilet and Handwashing Stations. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the Government.
1.1 Background.
Fort Gregg-Adams is located in Virginia, Prince George County, consists of approximately 5907 acres and 440 buildings. The population base consists of approximately 22,750 military, Government civilian, and Contactor personnel, as well as 5450 resident family members.
1.2 Objectives.
To provide clean, sanitary, and effective use of portable toilets, handwashing stations, and cleaning services to maintain a high degree of sanitation in a field environment. The Contractor shall ensure all work accomplished in the performance of this PWS meets all maintenance and repair standards consistent with the original equipment manufacturer’s recommendations; all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the applicable publications listed in Section 7.0, Related Documents.
1.2.1 The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conforms to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract. Without additional expense to the Government, the Contractor shall obtain/ensure subcontractors obtain all licenses, and permits required to perform this work under this contract. The intent is to establish work requirements that are performance-based and results oriented. This approach is intended to allow the Contractor to determine the best and most cost effective ways to fulfill base operations and their component needs, emphasizing innovation and commercial best practices.
1.3 Climatic Conditions.
The average annual rainfall is 46 inches; with the wettest months being February-July. The average annual snowfall is 6 inches, with snowfall expected during the period of January-March. The average frost-free period (growing season) during the year is about 276 days. The first killing frost may be expected about November, and the last killing frost generally occurs in February. The average annual maximum and minimum temperatures are approximately 91 and 29 degrees Fahrenheit, respectively. Monthly normal temperatures ranged from a low of 29 degrees in the month of July to a high of 91 degrees in the month of July, summer temperatures often reach 91 degrees Fahrenheit, while sub-freezing weather is common during the winter months.
1.4 Facility Access.
The Contractor shall provide all information required for background checks to meet installation access requirements to be accomplished by the Installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy.
Contractor personnel performing work under this contract must have a clean background check at time of submission, and must maintain this level of security required for the life of the contract. General: Contractor employees, and all associated sub-contractors, shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative).
1.5 Traffic Flow.
The Contractor shall maintain the free flow of vehicular and pedestrian traffic while conducting maintenance and repair activities. The Contractor shall notify the Contracting Officer (KO) and the designated Government representative (such as a Contracting Officer’s Representative (COR), in writing, a minimum of 14 business days in advance of any scheduled closure of streets. Emergency road closures shall be coordinated in conjunction with the KO or designated Government representative/COR, and will have to be presented in public information sessions on a monthly basis.
1.6 Drainage. N/A
1.7 Restoration of Landscape Damage. N/A
1.8 Dust Suppression. N/A
1.9 Utility Location. N/A
1.10 Excavation Permits. N/A
2.0 Requirements
2.1 Description of Services. See Section 5.0 for the specific Common Level of Support (CLS).
2.1.1 Non-Personal Services.
The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 Period of Performance (PoP). The Period of Performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance is as follows:
| Phase in Period 15 Mar 2025 – 31 Mar 2025 | ||
| Base Period | 01 Apr 2025 – 31 Mar 2026 | |
| Option Period I | 01 Apr 2026 – 31 Mar 2027 | |
| Option Period II | 01 Apr 2027 – 31 Mar 2028 | |
| Option Period III | 01 Apr 2028 – 31 Mar 2029 | |
| Option Period IV | 01 Apr 2029 – 31 Mar 2030 |
2.2 General Information.
2.2.1 Transition (Phase In/Out).
There will be a one (1) one month Phase-in transition period, from 15 Mar 2025 – 31 Mar 2025, to minimize any decreases in productivity, to prevent possible negative impacts on additional services and to allow time to drop off and set up portable toilet units. During the Phase-in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date. The contractor shall have adequate personnel on board during the first 30 days of the contract during the Phase-in/Phase Out periods. A site map will be provided at contract award. There will also be a (1) one month Phase-out transition period, from 15 Mar 2030 to 31 Mar 2030 for transition from the worksite and allow adequate time for equipment retrieval.
2.2.2 Phase-out.N/A
2.2.3 Place of Performance and Hours of Operation.
2.2.3.1 Place of Performance (expanded description).
The work to be performed under this requirement will be performed throughout the entire area occupied by Fort Gregg-Adams and at any pertinent locations in and around Fort Gregg-Adams.
2.2.3.2 Hours of Operation.
The Contractor shall conduct business, between the hours of 0730 to 1600, Monday through Friday, excluding Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. Most facilities will have work performed outside normal duty hours as not to impact operations.
2.2.3.3 Installation Closures.
When an unforeseen installation closure occurs on a regularly scheduled day of work, the type of contract Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.
2.2.3.4 Inclement Weather Delay.
If the Contractor determines unsafe weather conditions for continued operations, the Contractor shall notify the KO or designated Government representative/COR two (2) hours prior to curtailing operations due to inclement weather. The Contractor shall obtain KO/COR approval to resume operations.
2.2.3.5 The Contractor shall coordinate with DPW in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations. The Contractor may be called upon to deliver a wide variety of services to the installation through an emergency Demand Maintenance Order (DMO)/Project Work Order (PWO) in support of emergency response. The Contractor shall be required to provide all normal services during an emergency response unless otherwise directed by the KO, however emergency response requirements will take precedence over normal DMO/PWO activities.
2.2.3.6 Federal Holidays.
The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).
| New Year’s Day | Labor Day |
| Martin Luther King Jr.’s Birthday | Columbus Day |
| President’s Day | Veteran’s Day |
Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
2.2.3.7 Travel/Temporary Duty. N/A
2.3 Emergency Services.
2.3.1 Emergency Medical Treatment.
The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or designated Government representative/COR no later than (NLT) two (2) hours of the incident by email or telephone. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel. However, the Government will provide, on an emergency basis, medical services for injuries incurred while an employee is performing under the contract. The Contractor shall reimburse the Government for emergency medical services provided, upon receipt of invoice from the medical facility. Reimbursement shall be made to the US Government.
2.3.2 Accident Reporting.
The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact. The Contractor shall provide a verbal report to the KO or designated Government representative/COR within one (1) hour of each such occurrence. A completed typed original plus one (1) copy of ENG Form 3394 United States Army Corps of Engineers Accident Investigation Report (or equivalent reporting form) shall be delivered to the KO or designated Government representative/COR within five (5) business days of occurrence, whenever an accident involving personal injury or Government owned property occurs.
2.4 Contract Administration and Management.
2.4.1 Post Award Conference/Performance Evaluation Meetings.
The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor’s performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
2.4.2 The following provides the roles and their respective authority during the performance of the contract:
2.4.2.1 Contracting Officer (KO).
The KO is the only person authorized to make any changes in any of the requirements listed on this PWS; notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviations from the terms and conditions shall be effected without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.
2.4.2.2 Contracting Officer’s Representative (COR).
The KO will appoint a COR during the performance of this requirement. Additional Government personnel may be designated to assist in contract oversight IAW (Army Regulation) AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR and shall be trained and appointed IAW Department of Defense Instruction (DoDI) 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification. The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform IAW the responsibilities and duties identified in the appointment letter.
2.4.2.3 COR Authority.
A letter of designation will be issued to the COR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.4.2.4 COR or Designated Government Representative Functions.
The COR or designated Government representative shall monitor all technical aspects of the contract and assists in contract administration. The COR or designated Government representative is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and provides direction or assistance for site entry requests of Contractor personnel.
2.4.2.4.1 The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.4.3 Contractor Key Personnel.
Shall be designated in writing to the KO at the start of the contract. These key personnel shall be available 24/7/365 including Federal holidays. These individuals designated as key personnel shall be able to understand, speak, read, and write the English language. The following personnel are considered Key Personnel by the Government:
2.4.3.1 Project Manager.
The Contractor shall provide an experienced Project Manager to conduct overall management coordination and be the central point of contact for performance of work specified in this Performance Work Statement (PWS). The Contractor or designated individual shall be empowered with sufficient authority to enable him or her to meet conditions that arise in the day to day operations without undue delay. The name of this person or persons who can act for the Contractor shall be submitted in writing to the Contracting Officer (KO), and Contracting Officers Representative (COR), five (5) days prior to contract start. Any changes in this person or persons who can act for the Contractor shall be submitted in writing to the KO and COR within 24 hours of such change throughout the terms of this contract. All employees shall be able to understand, speak, read, and write the English language.
2.4.3.2 Operations and Maintenance Superintendent (O&M Superintendent) N/A
2.4.3.3 Quality Control Manager (QCM) N/A
2.4.3.4 Quality Control Inspectors (QCI) N/A
2.4.4 Contractor Requirements.
2.4.4.1 100345 Residency.
All Contractor employees shall be legal U.S. residents. The Contractor shall immediately remove any employee that is not a legal U.S. resident. The Contractor personnel shall be able to communicate clearly in the English language.
2.4.4.2 Qualification Standards.
1.1.1. The Contractor will maintain all certifications necessary to conduct these waste disposal services as outlined in County, State, and National regulatory guidance and laws and present them if necessary for verification by the Government
2.4.4.3 Contractor Identification.
The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed. Contractor owned/leased vehicles and equipment should be identified.
2.4.4.4 Standards of Conduct.
Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation. The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
2.4.4.5 Contractor Hiring Restrictions.
The Contractor shall not hire or sub-contract with off-duty or former Government employees whose employment would result in a conflict with DoD Directive 5500.7-R, Standards of Conduct.
2.4.5 Business Relations.
The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the KO/COR corrective action plans, timely identification of issues, and effective management of subcontractors. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.4.6 Manual Operations. N/A
2.4.7 Interactive Customer Evaluation (ICE). N/A
2.5 Work Management.
Applicable to all CLS. All coordination requirement in this section and inherent to this Contract shall take into consideration the DPW and their operations. Work requirements and timelines shall include coordination with the DPW or COR.
2.5.1 Coordination. N/A
2.5.2 Work Clearance. N/A
2.5.3 Work Status.
The status of all assigned work shall be available to the designated Government representative/COR within one (1) hour of Contractor receipt of request during normal working hours, and 8 hours at all other times. For emergency DMOs, the Contractor shall respond within 2 hours to any inquiries from the KO, COR, Quality Assurance Representatives (QAR), and DPW management.
2.5.4 General Fund Enterprise Business System (GFEBS). N/A
2.5.5 Work Standards.
2.5.6 Disposal.
2.5.7 Environmental Requirements.
The Contractor shall meet all requirements of the Fort Gregg-Adams Environmental Special Conditions
2.5.7.1 Particulate Matter. N/A
2.5.7.2 Construction (Storm Water) permits. N/A
2.5.7.3 Utility Clearances. N/A
2.5.7.7 Actions and Delivery. N/A
2.5.7.10 Energy Conservation Standards. N/A
2.6 Demand Maintenance Orders (DMOs).
2.6.1 Directorate of Public Work (DPW). N/A
2.6.2 DMO Call Receipt and Entry. N/A
2.6.3 Completed Work.
The Contractor to complete work to meet the requirements of the PWS. All completed work will be randomly inspected by COR for completion.
2.6.4 Materials.
The Contractor shall be responsible for all materials required for work.
2.7 Preventive Maintenance (PMs).
2.7.5 Operations & Maintenance (O&M) Library. N/A
2.8 Operations Work Orders (OWOs). N/A
2.9 Project Work Orders (PWOs). N/A
2.9.1. DA Form 4283. N/A
2.9.2 Conversion of DMO to PWO. N/A
2.9.3 Conversion during Execution. N/A
2.9.4 Conversion Prior to Execution. N/A
2.9.5 Cost Estimates for DMO Generated PWOs. N/A
2.9.6 Preparation of Detailed Estimates. N/A
2.9.7 Subcontract Work. N/A
2.9.8 Specialty Subcontracting Work. N/A
2.9.9 Execution of PWO Work. N/A
2.9.10 Wage Rates for PWOs. N/A
2.9.11 PWO Bi-weekly Meetings. N/A
2.9.12 PWO Records. N/A
2.9.13 PWO Reporting Requirements. N/A
2.10 Warranty Program. N/A
2.10.1 Warranty Enforcement Manager. N/A
2.10.2 Warranty Management. N/A
2.10.4 Warranty Records. N/A
2.10.5 Exception. N/A
2.11 Technical Document Library Operation. N/A
2.12 Maintain As-Builts. N/A
2.13 Historic Property or Archaeological Site. N/A
2.13.1 Repair and Replacement.
The Contractor shall repair or replace parts with products similar in appearance to the original.
2.14 Security
2.14.1 Access and General Protection/Security Policy and Procedures.
The Contractor and all associated subcontractors employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by DoD, Headquarters Department of the Army (HQDA), and local policy. The KO/COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.
2.14.2 Rules, regulations, direction, and requirements issued by the Commander apply to the Contractor. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as required by the KO. Regulations, manuals, and technical documents applicable to this Contract are listed in Section 6.0 of this PWS. Control for classified publications requirements can be located in AR 380-5, Department of The Army Information Security Program, and secured in a filing type cabinet with a built-in locking device with tumblers and General Services Administration (GSA) approved security container.
2.14.3 Government Vehicles. N/A
2.14.4 Contractor Vehicle Registration. Currently there is no requirement to register Contractor owned vehicles with the Provost Marshal or DES. However, the Contractor shall maintain a list of all Contractor-owned or operated vehicles and trailers operating on the installation at all time. The list may be used in case of emergency and/or other contingency. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.14.4.1 Contractor and all associated subcontractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by DES) IAW Army Directive 2014-05. The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office or DES, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
2.14.5 Contractor and Vendor Access.
Contractor or vendor-furnished vehicles and equipment must enter the Installation through the designated secure access control points (ACP). Under the present Installation FPCON, vehicle and equipment operators and passengers must possess a valid United States National or State issued identification to access the Installation. Vehicle and equipment operators must also possess and be ready to show a valid state driver's license, current vehicle registration, and proof of state required minimum liability insurance. As determined by the Installation FPCON, an elevated FPCON may require additional security screening and/or limited Installation access.
2.14.5.1 All Contractor personnel requesting access to Fort Gregg-Adams will enter through the designated Visitor Control Center (VCC). All Contractor personnel will be required to present a United States National or State issued identification that is capable of being scanned for valid entry. All Contractor personnel and their vehicles, equipment, and packages are subject to inspection or examination (search) at entry/exit of the Fort Gregg-Adams.
2.14.6 Physical Security. N/A
2.15 Security Training.
2.15.1 Anti-Terrorism (AT) Level I Training.
IAW AR 525-13, Antiterrorism, all Contractor employees, including sub-contractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of the requirement into the contract, whichever applies. The Contractor shall submit certificates of completion electronically for each affected contract employee and subcontractor employee to the KO or designated Government Representative/COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site: https://jko.jten.mil. or https://atlevel1.dtic.mil/at
2.15.1 iWATCH Training.
The Contractor shall brief the local iWATCH program (training standards provided by the Rock Island’s ATO) to all of Contractor’s employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Fort Gregg-Adams, Police Department and the COR. The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR electronically within 30 calendar days of completion.
2.15.2 Operational Security (OPSEC) Awareness Training.
IAW AR 530-1, Operations Security, Contractor employees shall complete Level I OPSEC Awareness training within 30 calendar days after contract award and within five (5) calendar days of new employees commencing performance. Completion certificates will be made available to Government within ten (10) business of completion electronically or upon request from the Government. All Contractor personnel shall complete Level I OPSEC Awareness training annually. Level I OPSEC training is available at the following website: http://cdse.edu/catalog/elearning/GS130.html.
2.15.3 If applicable, the Contractor shall identify to the KO or designated Government representative/COR a POC to receive force protection/threat related advisories via NIPR email from the installation AT and OPSEC officers for the duration of the contract.
2.15.4 DoD Cybersecurity Awareness Training. N/a
2.16 Safety.
The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.16.1 Safety Plan.
The Contractor shall develop and implement a safety plan for its employees. The Contractor shall submit electronically the safety plan to the KO/COR for review and acceptance within 30 business days after contract award. Revisions shall be submitted to the KO/COR five (5) business days prior to the effective date of change.
2.16.2 Occupational Safety and Health (OSHA).
The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards and all pertinent provisions 29 CFR Part 1910, Part 1917.152, Part 1915.501-509, and Part 1926; Federal and State environmental regulations; DoD and DA regulations and instructions, AR 385-10; and the U.S. Army Corps of Engineers’ Safety and Health Requirements Manual (EM-385-1-1). The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives. The Contractor shall establish medical surveillance, industrial hygiene, and individual protective equipment programs sufficient to meet requirements delineated in OSHA standards.
2.16.3 Reporting of Fire and Safety Hazards.
The Contractor shall train personnel to recognize fire and safety hazards and encourage personnel in the performance of their duties to report fire and safety hazards and unsafe conditions to their supervisor. NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work, provides guidance for persons, including outside Contractors and property managers, who manage, supervise, and perform hot work. It covers provisions to prevent loss of life and property from fire or explosion as a result of hot work.
2.16.3.1 A Hot Work Permit Log shall be issued by the Fort Gregg-Adams Fire Department Station #3; it will be maintained and presented to the KO or designated Government representative/COR upon request. The Contractor shall take corrective action to remedy reported deficiencies IAW the terms of this contract. The KO and COR shall be notified of deficiencies beyond the terms of this contract.
2.17 Training, Physical Requirements, or other Expertise Required.
2.17.1 Certified.
The Contractor shall ensure all its employees and associated subcontractors are certified or licensed in the specific areas as required by the state of Virginia. The Contractor shall ensure its employees are certified or licensed in the appropriate Environmental Protection Agency (EPA) areas required. The Contractor shall furnish, in writing, to the Contracting Officer evidence of qualifications for each of his maintenance and service employees prior to commencing work under this contract. Technicians qualifications shall consist of 1 year relevant work experience cleaning and inspecting kitchen exhaust systems. All employees assigned by the Contractor to perform the work under this contract shall be physically able to do the assigned work.
2.17.2 New Facilities Equipment Training. N/A
2.17.3 Asbestos Awareness Training. N/A
2.17.4 Child Abuse Prevention, Identification, and reporting. N/A
2.18 Recycled Content Materials.
2.18.1 Green Procurement. N/A
2.18.2 Environmental Requirements
2.18.2.2 A monthly C&D Waste Management Report N/A
2.18.3 Environmental Compliance.
The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules and plans. The Contractor shall use, store and dispose of all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, Federal and State laws, and according to manufacturers’ recommendations. The Contractor shall be financially liable for all fines and associated costs for non-compliance with local, Federal and State laws regarding hazardous waste management including but not limited to: hazardous materials spillage, improper handling and transportation and improper waste disposal. The Contractor shall make all environmental and hazardous material records available the next duty day upon request from the KO or designated Government representative/COR.
2.18.3.1 For materials that have Safety Data Sheets (SDS) associated with them, the Contractor shall submit the SDS to the KO or designated Government representative/COR for approval five (5) business after contract award. The Contractor shall adhere to all applicable requirements of the Installation Hazardous Waste Management Plan. The Contractor shall provide all materials, labor, training, transportation, and equipment for the handling and storage of hazardous materials.
2.18.3.2 Employees handling hazardous or toxic materials shall be properly trained under 29 CFR 1910.1200 Hazard Communication (HAZCOM) and documentation of training provided to the KO and COR within 30 calendar days of the start of the contract. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are provided to the KO and COR within 24 hours prior to employees commencing performance.
2.18.4 Hazardous Waste.
The Installation is regulated by the EPA as a large quantity generator of hazardous wastes and holds the appropriate permit issued under Part A of the Resource Conservation and Recovery Act (RCRA).
2.18.4.1 All hazardous waste as defined in 40 CFR Part 261 (Identification and Listing of Hazardous Waste) is subject to RCRA provisions. All such waste generated by the Contractor on the Installation from Government processes, equipment, or materials shall be stored in approved containers and disposed of IAW the Installation Hazardous Waste Management Plan available for review in the Technical Reference Library.
2.18.4.2 RCRA waste items associated with Installation demolition and renovation activities include: mercury switches in thermostats, lead-based paint chips, paint-related materials (paint thinning, drying, removing, and reducing compounds), solvents (methyl ethyl ketone, methyl chloride, acetone, and methanol), fluorescent bulbs, batteries, and fire extinguishers. RCRA waste items associated with Installation new construction activities include: all waste items mentioned in the preceding sentence, contaminated rags (depending on chemical saturation), adhesives, and all aerosol cans.
2.18.4.3 Non-RCRA waste items subject to state regulations associated with demolition and renovation activities include: ballasts, transformers, capacitors, contaminated soil from spills, and contaminated rags (containing oil and grease only). Non-RCRA waste items subject to state regulations associated with new construction activities include: all waste items mentioned in the preceding sentence, adhesives (non-RCRA), epoxy (non-RCRA), water-based paint, and water contaminated with paint from cleaning paint brushes and rollers.
2.18.4.4 All other wastes generated by the Contractor shall be disposed of by a third party Contractor IAW applicable State and Federal Standards. All waste generation on Fort Gregg-Adams must be handled under a single EPA ID Number per AR 200-1, Environmental Protection and Enhancement. The Contractor’s shall collect all Hazardous Waste for disposal by the 3rd party.
2.18.5 Environmental Management System (EMS).
Conformance with Environmental Management System (EMS): Fort Gregg-Adams has implemented an Environmental Management System (EMS) to proactively deal with the environmental impacts of its processes, activities and services. All personnel performing work for or on behalf of Fort Gregg-Adams must be aware of and understand Fort Gregg-Adams Environmental Policy. The policy can be found at https://home.army.mil/lee/application/files/7915/3546/0377/Environmental_Special_Conditions.pdf
2.18.51 The Contractor is also responsible to ensure that no goods and services used by the Contractor or any of its subcontractors deviate from Fort Gregg-Adams’s Environmental Policy.
2.18.5.2 Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable Federal, State, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), and Fort Gregg-Adams regulations. Contractor shall immediately report any conflicts between applicable Federal, State, local environmental laws, statutes, Executive Orders, AR 200-1, and any specifications within this contract to the KO and COR and the DPW-ED. Any questions regarding EMS may be directed to the Installation EMS Coordinator or Contracting Officer’s Representative.
2.18.6 Perform Hazardous Material Work. N/A
2.18.7 Spill Plan. N/A
2.18.8 Energy and Utilities Conservation Programs. N/A
2.18.9 Contractor Participation. N/A
2.19 Contingency Plans. N/A
2.19.1 General.
The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Part IV of this PWS.
2.19.2 Disaster Contingency Plan. N/A
2.19.3 Mobilization Contingency Plan. N/A
2.19.4 Labor Dispute Contingency Plan.
This plan shall establish procedures and identify responsible personnel to provide the services below, with no interruption in the event of a labor dispute:
a. Identify and address critical Preventive Maintenance and inspection tasks.
b. Process and execute emergency and urgent service and work orders.
The plan shall establish procedures and time frame to secure replacement personnel in the event of a strike, and shall also record the Contractor’s experience with and establish Contractor procedures for collective bargaining. The Contractor shall submit a Labor Contingency Plan 30 business days after contract award date.
2.19.4.1 The services shown in TE 2, Fort Gregg-Adams Mission Essential Services, are identified as essential during the performance of this contract.
2.19.5 Emergency Utilities Operating Procedures. N/A
2.19.5.1 Other Emergency Services to include, but not be limited to: N/A
3.0 Performance Requirements and Standards.
3.1 Quality Assurance.
The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). The Performance Requirements Summary (PRS) defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the PRS. The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.
3.2 Quality Control Plan (QCP).
Quality control is the responsibility of the Contractor. The Contractor shall develop, implement and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure no recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The plan shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the KO and the COR electronically for acceptance within 30 business days after contract award. The Contractor shall submit any proposed changes in the QCP to the KO and COR for written approval five (5) business days prior to implementation.
3.2.1 Quality Control Files.
The Contractor shall maintain files of all inspections or tests conducted by the Contractor, to include any corrective actions taken. These files shall be subject to Government review at the COR’s discretion during the contract term, to include any extensions of contract term. The Quality Control Files will be the property of the Government and shall be turned over to the Government upon completion or termination of the contract.
3.3 Customer Feedback Program.
The Contractor shall establish and operate a customer feedback program as part of the QCP.
4.0 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs)
Required Services
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| Incentive (Positive and/or Negative) |
# 1.
Contractor shall ensure all work accomplished meets all maintenance standards listed in applicable Federal, State, and local laws, regulations and directives to include, but not limited to applicable publications in Section 7, Related Documents.
| The Contractor shall provide services IAW PWS TE 1 |
| 2% Deviation from performance Standard; |
% calculated by dividing the number of defects by the number of observations.
| Random Sampling and Customer Complaints; Inspections and complaint validations performed by the COR. |
| Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System; Contractor shall re-perform the service. |
# 2.
. The Contractor shall develop and maintain a Quality Control Plan approved by the KO.
| The Contractor shall provide a QCP IAW PWS, TE1 |
| Zero Deviation from performance standard |
| Review and acceptance by the by the KO on submission of QCP and each revised QCP. |
| Non-conforming services will result in Non-Conforming Reports issued and a potential negative CPARS narrative. |
# 4.
Damages caused by Contractor employees shall be repaired at no cost to the Government
| The Contractor shall notify the COR and return the damaged area to its previous condition AW PWS, TE1 |
| Zero Deviation from performance standard |
| COR will review 100% of damage reports |
| Non-conforming services will result in Non-Conforming Reports issued and a potential negative CPARS narrative. |
#5.
. Fully Qualified Mechanic Qualified mechanic with 1 year experience.
PWS TE1
Zero Deviation from performance standard
| .!00% Inspection |
| Non-conforming services will result in Non-Conforming Reports issued and a potential negative CPARS narrative. |
#6.
Provide Reports
Required reports submitted after cleaning.
IAW PWS TE1
One error/quarter
100% Inspection
5.0 Common Levels of Support (CLS)
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions of the Base Operations specified below. This shall be done IAW all the terms, conditions, general and special provisions, specifications, drawings, attachments, and exhibits contained herein or incorporated by reference.
The Contractor shall ensure that all work meets or exceeds the specifications for the listed CLS.
| CLS |
| Service Title |
| Attachment No. |
| 411 |
| Facility Maintenance – Vertical |
| Attachment TE 1 |
| 6.0 | Deliverables |
| Deliverable | |
| Frequency | |
| # of Copies | |
| Medium/Format | |
| Distribution |
A001 (PWS, para. 2.3.1) Emergency Medical Treatment
| Immediate. Not later than two (2) hours after the incident |
| N/A |
| Email or Telephone |
| KO or designated Government representative/COR |
A002 (PWS, para. 3.2) Quality Control Plan
Initial: within 30 days of contract award Proposed Changes: Written approval five (5) business days prior to implementation
| 1 Electronic Copy |
| Electronic |
| KO or designated Government representative/COR |
A003 (PWS, para. 2.4.3.1) Key Personnel – Provide name of Project Manager
| Submit Project Manager and alternates |
| 1 Electronic Copy |
| Electronic |
| KO or designated Government representative/COR |
A004 (PWS, para.
2.5.8) Reporting Requirements Monthly, Submit NLT 5 days after end of month Annual, upon completion of the basic year and each option year
| 1 Electronic Copy |
| Electronic |
| KO or designated Government representative/COR |
A005 (PWS, para. 2.15.1, 2.15.2) Training Completion Certificates Certificates filed within 30 calendar days after completion.
1 Copy of Certificate
Electronic
KO or designated Government representative/COR
A006 (PWS, para. 2.16.1) Safety Plan
Review and Acceptance: 10 days of commencement of work Revisions: five (5) calendar days prior to effective date of change
| 1 Electronic Copy |
| Electronic |
| KO or designated Government representative/COR |
A007 (PWS, para. 2.18) Recycled or Recovered Products Reports
| Annual, upon completion of the basic year and each option year |
| 1 Electronic Copy |
| MS Word Report IAW requirements at: FAR 52.223-9 Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items |
KO or designated Government representative/COR
A008 (PWS, para. 2.18.3.1) Material Safety Data Sheets (MSDS) for approval on all materials Five (5) days before delivery of the material
1 Electronic Copy of each sheet
See FAR 52.223-3 Hazardous Material Identification and Material Safety Data
KO or designated Government representative/COR
A009 (PWS, para. 2.18.3) Environmental Compliance, All environmental and hazardous material records
| Beginning of the next duty day after the Government’s request to view the records |
| Make records available |
| Coordinate with COR |
| KO or designated Government representative/COR |
A019 (CLS 411, para. 1.3.1) Reporting Requirements
| Within 5 days after the end of the month |
| 1 Electronic Copy |
| Electronic |
| KO or designated Government representative/COR |
7.0 Related Documents.
7.1 Definitions and Acronyms
7.1.1 Definitions.
7.1.1.1 Acceptable Quality Level (AQL). The AQL is the maximum percent defective (or the number of defects per hundred units) for the purposes of sampling inspection can be considered satisfactory.
7.1.1.2 Annually. Once per year, 365 calendar days.
7.1.1.3 Ashes. N/A
7.1.1.4 Bulk Waste. Large items of solid waste such as household appliances, furniture, auto parts, pallets, shelving, piping, stone, concrete rubble, brick, lumber, toys, and other wastes; the size or weight of which, precludes or complicates the handling by normal collection, processing, or disposal methods.
7.1.1.5 Bulky Waste. The waste placed at the collection point or curbside that doesn't fit or is too heavy to be placed in the routine collection container. These wastes include but are not limited to: lumber, scrap metals, bricks, blocks, concrete rubble, stones, toys, furniture, appliances, logs, limbs, televisions, cabinets, automotive components, power equipment, crates, wheels, de-rimmed tires, electronics and their components, etc.
7.1.1.6 Cannibalize. N/A
7.1.1.7 Child, Youth and School Services (CYS). Overarching naming convention for Child Development Center (CDC), Youth Activity Center, and School Age Services (SAS). CYS is used when referencing all programs.
7.1.1.8 Cleaning. Removing stains, soil, and dirt; accomplished by chemical or mechanical means.
7.1.1.9 Clean Agent System…