Annex 1-2_10312023.docx
DOCX document 88 KB Posted
- Solicitation number
- N6247324RG001
About this file
This performance work statement outlines cultural resources services required by the Naval Facilities Engineering Command Southwest under an indefinite-delivery, indefinite-quantity multiple award contract. Services include records searches, fieldwork, analysis and reporting for archaeological surveys, evaluations, data recoveries, integrated cultural resources management plans, and other documentation to comply with federal historic preservation regulations. Work will primarily be conducted in Arizona, California, Colorado, Nevada, New Mexico, and Utah but may also occur elsewhere. Task orders will be issued on both a fixed-price and non-fixed-price basis, with the latter requiring fair opportunity price proposals. The document establishes qualification requirements for key personnel and describes submittal, review, reporting, safety, and other administrative procedures for contracted cultural resources work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ENCL (3)_QuestionSheet.doc | DOC document | |
| Annex 18.4_10312023.docx | DOCX document | |
| Annex 18.3_10312023.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C - Descriptions and Specifications
0100000 – General Information
| Spec Item |
| Title |
| Description |
| 1 |
| General Information |
| 1.1 |
| Outline of Services |
| Except where otherwise stated, the Contractor shall furnish all labor, management, supervision, tools, materials, travel, lodging/subsistence, equipment, and transportation to provide cultural resources related studies, investigation, preparation of historic and archaeological documents, and implementation of plans in accordance with Sections 106 and 110 of the National Historic Preservation Act of 1966, as amended. |
This is an IDIQ contract for work with no pre-established fixed contract prices (Annex 18, Spec Item 3.0) and pre-established fixed contract prices (Annex 18, Spec Item 4.0). Work under this contract will be ordered by issuance of written Task Order (TO) by the Contracting Officer (KO). Task Orders may be based on the following procedures: (1) to the firm providing the lowest price based on Exhibit Line Items Numbers (ELINs) (Annex 18, Spec Item 4); or (2) through price or best value competition for work requirements not covered by the fixed priced ELINs (Annex 18, Spec Item 3).
The Performance Work Statement (PWS) is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The “Note to Spec Writer” (as seen below) refers to insertions at the Task Order level, not to/in the basic contract.
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff (N/A) Annex 4 Public Safety (N/A) Annex 5 Air Operations (N/A) Annex 6 Port Operations (N/A) Annex 7 Ordnance (N/A) Annex 8 Range Operations (N/A) Annex 9 Health Care Support (N/A) Annex 10 Supply (N/A) Annex 11 Personnel Support (N/A) Annex 12 Morale, Welfare, and Recreation Support (N/A) Annex 13 Galley (N/A) Annex 14 Housing (N/A) Annex 15 Facilities Support (N/A) Annex 16 Utilities (N/A) Annex 17 Base Support Vehicles and Equipment (N/A) Annex 18 Environmental
| 1.2 |
| Project Location |
| The work shall be performed primarily at various locations throughout the States of Arizona, California, Colorado, Nevada, New Mexico, and Utah. The majority of the work is expected to be performed in California. However, on occasion work may also be performed in other locations within the continental 48 states and will be competed under Annex 18, Spec Item 3, Non Pre-Established Fixed Price Work of the resulting contracts. |
1.3
| Background Information |
| Background information considered appropriate for the project study area(s) and historic property(ies) will be provided in each individual Task Order. |
| 1.4 |
| Verification of Workload and Conditions |
| Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J in each Task Order provides attachments, such as maps, figures, and tables to represent the type, quantity, and location of services to be provided. However, Offerors are encouraged to visit the project site during the site visit for Offerors as part of the Offeror’s due diligence to assess the nature of work and conditions under which work is to be performed. |
| 1.5 |
| Related Information |
| There are four (4) types of “Related Information” that can be found in the “Description and Related Information” columns of the specification as follows: |
Informational Notes as used throughout this PWS provides additional information to Offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
| 1.6 |
| Navy Approach to Service Contracting |
| The Department of Navy (DoN) spends billions of dollars each year to provide base operations support services (BOSS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Systems Command (NAVFAC) has focused increased attention on re-engineering service contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management, and financial management regulations. The Navy also supports the following principles: |
| 1.6.1 |
| Partnering Philosophy |
| The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because a partner’s success drives the Navy's successful mission completion. Within the bounds of acquisition policy, the Navy intends to work to find solutions that will be beneficial to both the Government and its partners. |
| 1.6.2 |
| Contractor's Knowledge |
| The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority, and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives illustrates this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level. |
| 1.6.3 |
| Industry Best Practices |
| The third principle is that the Navy will adopt industry-best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results). |
| 1.7 |
| Standard Template |
| Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations. |
The standard template contains 18 standard Annexes. Annex 1 will contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. For this solicitation, Annexes 1, 2, and 18 are applicable. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will contain General Information. Specification item 2 will contain management and administrative requirements. Annex 18, Specification item 3 contains Indefinite Delivery-Indefinite Quantity (IDIQ) work requirements with No Pre-Priced Fixed Contract Prices. Annex 18, Specification Item 4 contain the IDIQ work requirements with Pre-Established Fixed Contract Prices (see Exhibits A through E in Section J). All costs associated with Annexes 1 and 2 must be priced and distributed within Annex 18, Specification Item 4.
| 1.8 |
| Navy PBSC Approach |
| The Navy’s approach to performance-based service contracting (PBSC) includes four (4) component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan. |
| 1.9 |
| General Contract Requirements |
| In accordance with the 48 Federal Register 44738-39 (September 29, 1983) requirements and Archaeological Resources Protection Act (ARPA) guidelines, the Contractor must have employees with knowledge and experience in military architecture, prehistoric and historic archaeology, and architectural history for Arizona, California, Colorado, Nevada, New Mexico, and Utah. The Contractor shall have employees that possess the minimum educational and experience required for such work included as Annex 2, Specification Item 2.6.3.1. |
The Contractor shall have experience in cultural resources (prehistoric and historical archaeology and built environment historic resources) investigations for complying with Sections 110 and 106 of the National Historic Preservation Act of 1966 (NHPA), as amended and the preparation of cultural resources management documents. Documents to be prepared include, but are not limited to, Archeological Surveys, Historic Resources Survey and Evaluation/Eligibility Investigations, Archeological Evaluation/Eligibility Investigations, Mitigation: Archeological Data Recovery, Mitigation: Sparse Lithic Scatter Program, Integrated Cultural Resources Management Plans (ICRMP), Archeological Monitoring services, Cultural Landscape Studies, Historic Structure Reports (HSR), Design Guidelines/Historic Building Maintenance Plans, Historic or Archaeological Research Designs, Context Studies (Historic or Prehistoric), HABS/HAER/HALS Documentation, Regional Research Designs and Studies, Historic Context Studies, and Historic Building Maintenance Plans, specifically in Arizona, California, Colorado, Nevada, New Mexico, and Utah. The Contractor and subcontractor(s) shall have employees with at least 5 years’ experience and expertise in the areas of prehistoric and historical archaeology, history, military history, and architectural history in Arizona, California, Colorado, Nevada, New Mexico, and Utah. The Contractor shall have the ability to conduct specialized studies in support of compliance cultural resources investigations either conducted by the Contractor’s key personnel or by subcontractors with demonstrated experience and expertise in the fields of lithic technology, ceramic analysis, ceramic sourcing (INAA analysis), lipid residue analysis, faunal analysis, physical anthropology, pollen and phytolith analysis, macrobotanical studies, protein residue analysis, obsidian hydration and sourcing, radiocarbon (14C) analysis, geomorphology, geophysical archaeology, historical archaeology, history, historic architecture, architectural history, and landscape history. The Contractor is required to use only personnel that have experience and expertise required to complete the Task Order. The Government will approve the Contractor’s personnel proposed for each Task Order before the Contractor is authorized to begin work on the Task Order. Any changes or substitutions in personnel will require Government approval before work can proceed. The Contractor shall provide information on experience and expertise in accordance with Annex 2, Specification Items 2.3.4.1.2 and 2.6.3.1.
| 1.10 |
| Technical Proposal Certification |
| The contractor warrants that its proposal incorporated herein by reference including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during execution thereof. The Contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives. The Contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objective. |
| 1.11 |
| Applicable Laws, Regulations, and Reference Documents |
| The following are all applicable publications, manuals, directives, and instructions referenced by this contract. The Contractor is required to perform all work in accordance with these publications. The Contractor shall abide by the newest version, supplement, or edition as it is issued. If during the performance of the contract the contractor requires a copy of the any following documents contact the Contracting Officer’s Representative. |
A review copy of the reference documents outlined below are available at the Naval Facilities Engineering Systems Command, Southwest by contacting the COR at (619) 705-5522.
A. Reference Documents:
1. Secretary of the Interior’s Guidelines, Federal Register, Vol. 48, No. 190, Thursday, September 29, 1983, pages 44738-44739.
2. Secretary of the Interior’s Standards for Historic Preservation Projects National Park Service, Department of the Interior 1985.
3. Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for the Treatment of Cultural Landscapes 1996.
4. Identification of Historic Properties: A Decision-making Guide for Managers Advisory Council on Historic Preservation and National Park Services, Department of the Interior.
5. National Register Site Forms (NPS 10-900 series).
6. National Register Bulletin 15 How to Apply the National Register Criteria for Evaluation.
7. National Register Bulletin 16A How to Complete the National Register of Historic Places Registration Form.
8. National Register Bulletin 16B How to Complete the National Register Multiple Property Documentation Form.
9. National Register Bulletin 18 How to Evaluate and Nominate Designed Historic Landscapes.
10. National Register Bulletin 22 Guidelines for Evaluating and Nominating Properties that have Achieved Significance within the Last Fifty Years.
11. National Register Bulletin 24 Guidelines for Local Surveys: A Basis for Preservation Planning.
12. National Register Bulletin 30 Guidelines for Evaluating and Documenting Rural Historic Landscapes.
13. National Register Bulletin 38 Guidelines for Evaluating and Documenting Traditional Cultural Properties.
14. National Register Bulletin 39 Researching Historic Properties.
15. National Register Bulletin 42 Guidelines for Identifying, Evaluating, and Registering Historic Mining Properties.
16. National Register Bulletin 43 Guidelines for Evaluating and Documenting Historic Aviation Properties.
17. Preservation Briefs Number 36 Protecting Cultural Landscapes.
18. Public Participation in Section 106 Review Advisory Council on Historic Preservation.
19. Arizona’s Marine Corps Air Station (MCAS) Yuma Archaeological Survey and Report Standards (August 2018 – Revised May 2022).
20. Arizona’s MCAS Yuma Archaeological Site Record.
21. Arizona SHPO’s Survey Report Summary Form (SRSF) – 2018 Revision.
22. Arizona SHPO’s Survey Report Standards.
23. Arizona SHPO’s Interim SHPO-ASM Reporting Guidance.
24. Arizona SHPO’s Guidance Points.
25. Arizona State Museum Archaeological Site Recording Manual (December 1993).
26. California Historic Resources Information System (CHRIS) Manual.
27. California SHPO’s Guidelines for Archaeological Research Designs (GARD).
28. California SHPO’s Archeological Resource Management Reports (ARMR) Format.
29. California SHPO’s Instructions for Recording Historic Resources (March 1995).
30. California SHPO’s California Archeological Resource Identification and Data Acquisition Program: Sparse Lithic Scatter (February 1988).
31. Colorado’s Cultural Resource Survey Manual Guidelines for Identification: History and Archaeology (2007).
32. Colorado’s Cultural Resource Survey Forms Table.
33. Colorado’s File Access Request Form.
34. Colorado’s Limited-Results Cultural Resource Survey Form.
35. Colorado’s Walking the Line: Guidance for Identification, Evaluation, and File Recordation of Historic Linear Sites.
36. Colorado’s Cultural Resources Survey Management Data Form and Instructions (1400).
37. Colorado’s Cultural Resource Survey Prehistoric Archaeological Component Form and Instructions (1401).
38. Colorado’s Historical Archaeological Component Form, Instructions, Commonly Encountered Historical Archaeological Resources, and Historic Artifact Guide (1402).
39. Colorado’s Architectural Inventory Form, Instructions, Lexicon Table Introduction, Lexicon Table, and Historical & Architectural Photography (1403).
40. Colorado’s Historic Cultural Landscapes Form and Instructions (1404).
41. Colorado’s Cultural Resource Re-Visitation Form and Instructions (1405).
42. Colorado’s Rock Art Component Form and Instructions (1407).
43. Colorado’s Isolated Find Record and Instructions (1408).
44. Colorado’s Linear Component Form and Instructions (1418).
45. Colorado’s Survey Management Information Form (1421).
46. Nevada SHPO’s Nevada Cultural Resource Information System (NVCRIS) Digital Submission Guidelines.
47. Nevada SHPO’s How to Request Resource Numbers from NVCRIS.
48. Nevada SHPO’s Blank geodatabase for NVCRIS Site Requests.
49. Nevada SHPO’s Instructions for the Architectural Resource Assessment Form (2017).
50. Nevada SHPO’s Architectural Resource Assessment (ARA) Form (2017).
51. Nevada SHPO’s Historic District Resource Assessment (RA) Form (2017).
52. Nevada Bureau of Land Management (BLM) Guidelines and Standards for Archaeological Inventory (2012).
53. Nevada’s Intermountain Antiquities Computer System (IMACS) site form.
54. New Mexico’s Administrative Code 4.10.19.
55. New Mexico’s Historic Cultural Properties Instruction (HCPI) Manual.
56. New Mexico’s Archaeological Records Management Section (ARMS) User Agreement.
57. New Mexico’s Cultural Resources Information System (NMCRIS) and NMCRIS Appendix A.
58. Utah’s Archaeology Site Form Manual.
59. Utah’s Historic Architecture Guide.
60. Utah’s Historic Artifact Guide.
61. Utah’s Historic Site Short Form.
62. Utah SHPO’s Cultural Resource Compliance Guidance (2022).
63. Utah SHPO’s Reconnaissance Level Survey Form (2020).
64. NAVFAC SW Environmental Work Instruction #4.
B. Laws and Regulations
1. National Historic Preservation Act of 1966, as amended.
2. Archeological Resources Protection Act of 1979, as amended.
3. Native American Graves Protection and Repatriation Act (NAGPRA).
4. Curation of Federal Owned Archaeological Collection (36 CFR 79).
5. National Historic Landmarks Program (36 CFR 65).
6. National Register of Historic Places (36 CFR 60).
7. Criteria for Inclusion in the National Register of Historic Places (36 CFR 60.4).
8. Protection of Archaeological Resources (43 CFR Part 7).
9. Section 106 Process, Protection of Historic Properties (36 CFR 800).
C. Policies, Instructions, and Orders:
1. DoD Policy on Native American consultation.
2. SECNAVINST 4000.35B. Department of the Navy Cultural Resources Program.
3. SECNAVINST 11010.14B DON Policy for Consultation with Federally Recognized Indian Tribes, Alaska Native Tribal Entities, and Native Hawaiian Organizations.
4. OPNAVINST 5090.1E Environmental Readiness Program.
5. OPNAV M-5090.1 Environmental Compliance and Protection Manual, Chapter 13.
6. Presidential Memorandum for Heads of Executive Departments and Agencies, Government to Government Relations with Native American Tribal Governments.
7. Executive Order 11593, Protection and Enhancement of the Cultural Environment.
8. Executive Order 13007, Indian Sacred Sites.
D. Guidelines:
1. Secretary of the Interior’s Standards and Guidelines for Archaeology and Historic Preservation.
2. Guidelines for Federal Agency Responsibilities under Section 110 of the NHPA.
3. Secretary of the Interior’s Standards for Treatment of Historic Properties (36 CFR 68).
4. Secretary of the Interior’s Standards for Rehabilitation (36 CFR 67).
5. Secretary of the Interior’s Standards for Architectural and Engineering Documentation.
0200000 - Management and Administration
| Spec Item |
| Title |
| Description |
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| As used throughout this contract, the following terms shall have the meanings set forth below. Additional definitions are in the "definitions" clause below. |
A. Where "as shown", "as indicated", "as detailed", or words of similar import are used, reference is made to this specification and the drawings accompanying this specification unless stated otherwise.
B. Where "as directed", "as required", "as permitted", "approval", "acceptance", or words of similar import are used, reference is made to the direction, requirement, permission, approval, or acceptance of the Administrative Contracting Officer (ACO) is intended unless stated otherwise.
| 2.1.1 |
| Administrative Contracting Officer (ACO) |
| The individual designated, or his/her designated representative, by the Contracting Officer (KO) to administer the contract. |
| 2.1.2 |
| Advisory Council on Historic Preservation (ACHP) |
| The agency established pursuant to Title II of the National Historic Preservation Act of 1966, as amended, (NHPA), that is to be afforded a reasonable opportunity under Section 106 and 110(f) of NHPA to comment with regard to proposed federal, federally licensed, or federally assisted undertakings that may affect properties which are included in or eligible for inclusion in the National Register of Historic Places (NRHP) and that reviews Federal programs pursuant to Section 202(a)(6) of NHPA. |
| 2.1.3 |
| Auger Probe |
| A Contoured subsurface testing technique used to determine the presence or absence of archaeological material within the horizontal and vertical plane as well as help characterize the content of the cultural material and the soil itself. |
| 2.1.4 |
| Backhoe Trench |
| A linear trench approximately 0.66 meters (m) wide by a maximum of 30 m in length and a maximum depth of 3 m. |
| 2.1.5 |
| Carbon-14 (radiocarbon or C14) Dating |
| A method for determining the age of organic material by measuring the extent to which the radioactive isotope carbon-14 has decayed into stable nitrogen-14, comparing the observed carbon 14 fraction with the known half-life of 5568 +/- 30 years. |
| 2.1.6 |
| Contractor |
| That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term “Contractor” as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor is responsible for fulfillment of the contract and shall insure that subcontractors comply with the provisions, terms and conditions of this contract. |
| 2.1.7 |
| Contract Discrepancy Report (CDR) |
| A report, sent by the Government to the Contractor, which the Contractor is required to complete when performance is unsatisfactory. The CDR requires the Contractor to explain to the KO, in writing and within 10 calendar days, why performance is unsatisfactory, how performance shall be returned to satisfactory levels, and how recurrence of the problem shall be prevented in the future. |
| 2.1.8 |
| Contractor |
Representative A person(s) designated by the Contractor to be his/her authorized representative. One (1) such person shall serve as the Government's principal point of contact.
| 2.1.9 |
| Contracting Officer (KO) |
| That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the KO. |
| 2.1.10 |
| Facilities |
| Industrial property for production, maintenance, research, development, or testing, including real property and rights, therein, buildings, structures, improvements, and built-in equipment. |
| 2.1.11 |
| Frequency of Service |
| Unless otherwise noted, services designated with the following frequencies shall be performed at intervals specified: |
A. Annual (A). Services performed once during each 12 month period of the contract at intervals of 335 to 395 days.
B. Semi-Annual (SA). Services performed twice during each 12 month period of the contract at intervals of 160 to 200 calendar days.
C. Biennial (BA). Services performed once every 2 years on a date or during the month specified.
D. Quarterly (Q). Services performed 4 times during each 12 month period of the contract at intervals of 80 to 100 calendar days.
E. Monthly (M). Services performed 12 times during each 12 month period of the contract at intervals of 28 to 31 calendar days.
F. Bimonthly (BM). Services performed 6 times during each 12 month period of the contract at intervals of 58 to 63 days.
G. Weekly (W). Services performed 52 times during each 12 month period of the contract at intervals of 6 to 8 days.
H. Biweekly (BW). Services performed 26 times during each 12 month period of the contract at intervals of 13 to 15 days.
I. Daily (D). Services performed 261 times during each 12 month period of the contract, once each day, Monday through Friday, including holidays unless otherwise noted.
| 2.1.12 |
| Geographic Information System (GIS) |
| GIS data shall be stored in the Navy Data Model GIS Database, and shall follow the “Navy IGI&S Standards & Specifications for Vector GIS Deliverables,” unless otherwise specified in the individual Task Order. See Spec Item 2.5.5 for additional information. |
| 2.1.13 |
| Hand/power Auger Testing |
| An auger hole is approximately 10 centimeters (cm) to 20 cm in diameter and to a maximum depth of 20 feet (ft) controlled subsurface testing technique used to determine the presence or absence of archaeological material and to help characterize the content of the cultural material and the soil. |
| 2.1.14 |
| Historic Property |
| Any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places; such terms include but are not limited to boundary markers, monuments, mileposts, fountains, sculptures and statuary. |
| 2.1.15 |
| Interested Party |
| Those organizations and individuals that are concerned with the effects of an undertaking on historic properties. |
| 2.1.16 |
| Internet Navy Facility Assets Data Store (iNFADS) |
The Department of the Navy’s tool for storing, managing, and reporting real property inventory.
| 2.1.17 |
| National Historic Preservation Act of 1966, as amended (NHPA) |
| Enacted to Establish a Program for the Preservation of Additional Historic Properties throughout the Nation, and for Other Purposes, Approved October 15, 1966 (Public Law 89-665; 80 STAT.915; 16 U.S.C. 470, et seq.) as amended by Public Law 91-243, Public Law 93-54, Public Law 94-422, Public Law 94-458, Public Law 96-199, Public Law 96-244, Public Law 96-515, Public Law 98-483, Public Law 99-514, Public Law 100-127, and Public Law 102-575). |
| 2.1.18 |
| Obsidian Hydration Dating |
| A method for determining the age of obsidian artifacts or debitage by measuring the thickness of a specimen’s hydration rim (layer of water penetration) and comparing the rim depth with the established hydration rate for the particular climatic-geographic area (effective hydration temperature) and type of obsidian. |
| 2.1.19 |
| Property Type |
| A grouping of properties defined by common physical and associative attributes (See National Register Bulletin 15). |
| 2.1.20 |
| Quality Assurance (QA) Program |
| A program implemented by the Government to evaluate the output quality and responsiveness of the Contractor to ensure that the Government receives the services for which public funds are expended. It is emphasized that the Government's quality assurance program is not a substitute for the quality control program implemented and administered by the Contractor. |
| 2.1.21 |
| Contracting Officer Representative (COR)/Navy Technical Representative (NTR) |
| An individual designated in writing by the KO to perform specific technical or administrative functions. The COR/NTR is responsible for monitoring performance and the technical management of the effort required hereunder, and should be contacted regarding questions or problems of a technical nature. The COR/NTR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract. The COR is assigned at the basic contract level and the NTR is assigned at the Task Order level. |
| 2.1.22 |
| Quality Control (QC) |
| A method used by the Contractor to control the quality of goods produced and services provided. |
| 2.1.23 |
| Quality Assurance (QA) |
| A method used by the Government to provide some measure of control over the quality of purchased goods and services received. |
| 2.1.24 |
| Records and Literature Search |
| Identifies previous cultural resources documentation, studies, reports, and the location of historic records and collections including the review of site forms and National Register forms that will be used as a basis for developing the research design in the new report. |
| 2.1.25 |
| Research Design |
| Explicit statements of the theoretical and methodological approaches to be followed in an archaeological study. An historic built environment research design will have different requirements (see Annex 18, Specification Item 18.4.8.1). The following are minimum amounts acceptable: |
A. Discuss the theoretical basis of the proposed research. Cite or discuss the research paradigms under which the investigators are operating. For an historical archaeological site, a detailed historic context identifying the themes, significance thresholds, and integrity requirements that characterize NRHP-eligibility shall be included.
B. Summarize previous research. A summary of important research questions pertinent to the study area or identified resources should be presented, with particular emphasis on the identification or relevant data gaps.
C. Present testable hypothesis or state the goals of the research. Any useful theoretical approach should be capable of generating testable hypotheses. A research design should present important research questions recognized for the region and relevant to the study, based on previous research.
D. Identify the test implication of the hypotheses. Describe expected archaeological resources types, patterns, and data categories anticipated, as they relate to test implications.
| 2.1.26 |
| Shovel Test Pit (STP) |
| STPs typically measure to between 30 cm to 50 cm in diameter and are excavated to a minimum depth of 30 cm or to a sub-stratum that cannot be penetrated. STPs may be excavated in bulk or in designated levels. |
| 2.1.27 |
| Site |
| A discrete and potentially interpretable locus of cultural materials, where “discrete” means spatially bounded by at least relative changes in material densities. “Interpretable” refers to the presence of material densities of a quality and quantity sufficient to attempt and sustain inferences about behavior, and “materials” refers to artifacts, ecofacts, and features. |
| 2.1.28 |
| State Historic Preservation Officer (SHPO) |
| Administers the State program of Federal assistance for historic preservation within the State. The SHPO shall advise, assist, and consult with the appropriate Federal agency(s) in accordance with NHPA on Federal undertakings that may affect historic properties. |
| 2.1.29 |
| Station Contact (SC) |
| A representative from a specified Department of Defense installation designated as the point of contact for access and site issues for the Contractor while working on a given Task Order. |
| 2.1.30 |
| Task Order (TO) |
| A Task Order is a document (DD Form 1155) prepared by a KO that is issued unilaterally for IDIQ work to be performed in accordance with Annex 18, Spec Item 4.0 (Exhibit A – E, ELINS) or bilaterally for non-pre-established price work in accordance with Annex 18, Spec Item 3. Any changes to a Task Orders shall only be made by the KO. |
| 2.1.31 |
| Test or Excavation Unit |
| Unless otherwise specified in the Task Order, a Test Unit is measured as a one-meter (1m) square excavated in 10 cm levels until sterile soil is reached and then excavated to a depth of 10 cm beyond. The Alternative Test Unit Specification for Deflated/Eroded Prehistoric Archaeological Sites/Loci is measured as a two-meter (2m) square excavated through light brushing or scrapping to intuitive depths in order to define shallow archaeological features. |
| 2.1.32 |
| Traditional Cultural Property (TCP) |
| A property that is eligible for inclusion in the National Register because of its association with cultural practices or beliefs of a living community that 1) are rooted in that community’s history, and 2) are important in maintaining the continuing cultural identity of the community. |
| 2.1.33 |
| Undertaking |
| Any project, activity, or program that can result in changes in the character or use of historic properties, if any such historic properties are located within the area of potential effects. The project, activity, or program must be under the direct or indirect jurisdiction of a Federal agency or licensed or assisted by a Federal agency. Undertakings include new and continuing projects, activities, or programs and any of their elements not previously considered under Section 106 of the NHPA. |
| 2.1.34 |
| U.S. Army Corps of Engineers (USACE), Safety and Health Requirements Manual EM 385 1-1 (EM 385 1-1) (as amended) |
A manual that prescribes the safety and health requirements for all USACE operations that must be met by both Government and Contractor employees.
| 2.2 |
| General Information |
| 2.2.1 |
| Government Regular Working Hours |
| The Government's regular (normal) working hours are from 0730 to 1630 Monday through Friday except federal holidays and other days specifically designated by the KO. |
| 2.2.1.1 |
| Observed Federal Holidays |
| The Government observes the following holidays: New Year’s Day, Martin Luther King Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. |
| 2.2.1.2 |
| Restriction to Contractor Working Hours |
| All work is to be performed during the Governments regular (normal) working hours unless prior permission is obtained. No overtime is authorized unless directed by the Contracting Officer. Overtime must be approved in advance and authorized in the Task Order or modification by the KO. |
| 2.2.2 |
| Wage Determinations |
| Wage Determinations are issued by the Department of Labor as required by the Service Contract Act. Refer to NAVFAC CLAUSE H1, for the applicable Service Contract Labor Standards Wage Determinations and Section I for FAR Clause 52.222-41 Service Contract Act of 1965. |
| 2.2.3 |
| Government Furnished Property, Materials, and Services |
| The Government will furnish or make available to the Contractor certain Government owned materials for use in connection with this contract. Any Government furnished property, materials, and services will be identified in the individual Task Orders issued under the resulting contracts. |
| 2.2.3.1 |
| Government-Furnished Facilities (GFF) |
The Government will not furnish or make available to the Contractor any facilities.
| 2.2.3.2 |
| Government-Furnished Equipment (GFE) |
The Government will not furnish or make available to the Contractor any tools and equipment.
| 2.2.3.4 |
| Availability of Utilities |
| The Government will not furnish utility services. |
| 2.2.4 |
| Contractor-Furnished Items |
| Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, facilities, incidental engineering, transportation, lodging/subsistence, and services to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and PCB’s shall not be brought on site. The KO may at any time require samples, Material Safety Data Sheets (MSDS), and manufacturer’s data cut sheets of materials used in this contract. |
| 2.2.4.1 |
| Curation Supplies and Materials |
| If required as part of the Task Order Spec Item, the Contractor shall provide all new professional quality curation supplies and materials as required by 36 CFR Part 79 and the curation facility or repository procedures. |
| 2.3 |
| General Administrative Requirements |
| The Contractor shall manage the total work effort and assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, inventory, analysis, quality control, and for meeting professional industry standards for cultural resources. |
| 2.3.1 |
| Directives |
| Applicable Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other directives, instructions, and regulations are specified in Annex 1. |
| 2.3.2 |
| Work Control |
| The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work with the quality standards established herein. |
| 2.3.3 |
| Work Schedule |
| The Contractor shall schedule and arrange work so as to cause the least inconvenience and interference with the normal occurrence of Government business and mission. All work shall be performed and completed in accordance with the time frames established for each item of work upon issuance of the Task Order. The Contractor’s initial work schedule shall indicate the days of the week for services will be performed. The schedule shall list the type of work to be performed, the areas to be worked, and the estimated time to complete the work in each area. Task duration shall be listed in calendar days. When the scheduled services fall on a holiday, alternate dates shall be specified. The initial work schedule shall be submitted to the KO for approval no later than at the Task Order Kickoff Meeting. Once approved, all work shall be performed in strict compliance with the work schedule to facilitate the Government’s inspection of the work. Changes to the work schedule shall be submitted for KO approval at least three (3) working days prior to performance. Except as may otherwise be specified, all work shall be performed during the Government’s regular working hours, as specified in Annex 2, Spec Item 2.2.1. If the Contractor desires to carry on work after regular working hours, or on Saturdays, Sundays, or holidays, then the Contractor shall obtain prior written approval in advance for all overtime and irregular work schedules from the KO. |
| 2.3.4 |
| Required Conferences and Meetings |
| The Contractor shall attend the following meetings and shall provide one (1) digital copy of meeting minutes to the KO and NTR within 5 days after the meeting. |
| 2.3.4.1 |
| Kickoff Meeting |
| Prior to commencing work for each Task Order, the Contractor shall attend a Kickoff Meeting. The date and time will be mutually agreed upon by the Contractor and the KO/NTR. The purpose of this meeting is to clarify the project specific requirements and schedule, make an introduction of personnel, arrange access to the facilities, arrange for the transfer of information and maps to be provided by the Navy, and visit the project site area for purposes of preparing the work plan and any associated safety documentation. The meeting shall be either held at the activity/installation, at NAVFAC Southwest (NAVFAC SW), or by teleconference (if necessary) or as otherwise specified in the Task Order. |
| 2.3.4.1.1 |
| Site Visit |
| Prior to commencing fieldwork, the Contractor shall visit the site as specified in the Task Order. If not conducted at the time of the Kickoff Meeting, the date and time will be mutually agreed upon by the Contractor and the KO/NTR. |
| 2.3.4.1.2 |
| Personnel and Qualifications |
| The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Specific qualifications are required in performing work under particular Spec Items. Personnel shall also be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can read, write and understand printed regulations, detailed written orders, operating procedures, training instructions, and materials. |
Upon award of the contract and each Task Order, and prior to scheduling the Kickoff Meeting, the Contractor shall provide a list of the names and qualifications of persons proposed to work on the project.
| 2.3.4.2 |
| Advanced Draft and/or Draft Submittal Teleconferences (if needed) |
| Upon completion of the Government’s review of the Advanced Draft and/or Draft submittals, the Government may require the Contractor to participate in a teleconference held at a date and time selected by mutual consent between the Contractor and the NTR. This meeting will be held not more than ten (10) calendar days after the Contractor’s receipt of Government comments, unless agreed to by the KO. The purpose of this conference(s) will be to discuss/explain the Government’s in-house review of both the submittal and the Contractor’s method for rectifying significant issues. Submittal dates will not be altered to account for this period unless requested by the Contractor and agreed to by the KO. |
| 2.3.5 |
| Insurance |
| Within 15 days after the award of this contract, the Contractor shall furnish the KO with a Certificate of Insurance as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with FAR 52.228 INSURANCE WORK ON A GOVERNMENT INSTALLATION clause, Section I. |
A. The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage.
1. Comprehensive General Liability: $500,000 per occurrence.
2. Automobile Liability: $200,000 per person; $500,000 per occurrence; $20,000 per occurrence for property damage.
3. Workmen's Compensation: As required by Federal and State worker's compensation and occupational disease statutes.
4. Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers.
5. Other as required by State Law.
B. The Certificate of Insurance shall provide for 30 days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned INSURANCE clause.
| Th2.3.6 |
| Contractor Quality Control (QC) |
| The Contractor shall establish and maintain a complete “Contractor Quality Control Program” and the provisions of this clause. |
A. The Contractor shall establish and maintain a Quality Control Program in accordance with the FAR 52.2464, "INSPECTION OF SERVICES FIXED PRICE" clause, Section E, to ensure that the work performed under the contract conforms to the contract requirements. Upon award of this contract, the Contractor shall submit a Quality Control Plan (QCP) to the KO for approval. A general description of the Contractor's QC program shall be available for Government review during the pre-award survey.
B. The Contractor's QCP shall provide top Contractor management with an effective and efficient means of identifying and correcting problems throughout the entire scope of operations.
C. The QCP shall include:
1. A description of the Contractor's quality control system. The system must cover all contract services, specify work to be inspected on either a scheduled or unscheduled basis, and describe how inspections are to be conducted.
2. The name(s) and qualifications of the individual(s) responsible for performing the quality control inspections, and the extent of their authority.
3. Provisions for recording the results of inspections and for recording corrective action taken.
4. Provisions to update and revise the QCP during the performance of the contract.
D. A file of all QC inspections, both performed and scheduled, inspection results, and dates and details of corrective actions taken shall be maintained by the Contractor through the term of this contract. The file shall be the property of the Government and made available to the ACO during regular working hours. The file shall be turned over to the ACO within five (5) days of completion/termination of the contract.
E. The Contractor is required to submit a current Quality Control Plan to the Contracting Officer for review by the Government within 15 days after award of the contract.
| 2.3.7 |
| Government Quality Assurance (QA) |
| In accordance with the FAR 52.2464, "INSPECTION OF SERVICES FIXED PRICE" clause, Section E, each phase of the services rendered under this contract are subject to Government inspection, during the Contractor's operations and after completion of the tasks. The Government's Quality Assurance Surveillance Program is not a substitute for QC by the Contractor; QC is the responsibility of the Contractor. All submittals shall be closely reviewed by the contractor’s technical editor, quality control/quality assurance officer, and/or the project manager prior to submittal to the government. The Contractor shall provide a signed document review sheet with each submittal, documenting each level of review the submittal received. Submittals that are determined to be technically deficient or contain grammatical and typographical errors will be rejected and returned immediately for revision at the contractor’s expense. No submittal is final unless found acceptable by the NTR. The Government reserves the right to choose the inspection methods used in implementing its QA Program and to vary the inspection methods used during the work, without notice to the Contractor. |
| 2.4 |
| Technical Requirements for Cultural Resource Services |
| For all cultural resources services, the Contractor shall conduct a records and literature search, fieldwork, data collection and analysis, and report preparation. Field work, data collection and analysis, and report preparation specifications are included in Annex 18, Spec Item 3 and Annex 18 Spec Item 4, respectively, according to the type of cultural resources service identified in the Task Order. Native American involvement may be required where archaeological sites are involved and there is the potential for Traditional Cultural Properties and/or sacred sites. The level of Native American involvement will be determined through Government to Government consultation as required per each individual Task Order. Certain types of services shall be divided into very small, small, medium, large, and extra large. Requirements for records and literature search for required submittals are listed in Annex 2, Spec Item 2.5.1. |
| 2.5 |
| Format, Submission, and Review of Deliverables |
| Except where specified below and in Annex 18, Spec Item 3 and Annex 18, Spec Item 4, respectively, all deliverables shall be submitted in the format specified below. |
| 2.5.1 |
| Records and Literature Search |
| The Contractor shall conduct records, literature, and document searches updating the existing records including National Register listings. Relevant information from the internet Navy Facility Assets Data Store (iNFADS) will be provided in the Task Order when available. The records and literature search shall be conducted for the study area as defined in each Task Order and within up to a one-mile (1mi) radius of the study area. Records and literature searches for work in states not listed below shall conform to the respective SHPO requirements and will be identified by the NTR and identified in the Task Order or competed scope of work. For records searches for states other than California, Arizona, Colorado, Nevada, New Mexico, and Utah, the request for proposal/Task Order will contain additional information as applicable. |
A. California: The records and literature search may be conducted at the designated Information Center for that county and shall access the California Historical Resources Information System (CHRIS) as well as any other museums or institutions known to have these types of records including but not limited to the installation, local city or county archives, federal archives, local historical societies and archives, as appropriate. The requirements for CHRIS are described in the CHRIS Manual (See Annex 1, Spec Item 1.11). The Contractor shall be required to submit a user agreement to access CHRIS. Specific examples of other museums or institutions known to have these types of records include the San Diego Museum of Man, University of California Los Angeles, National Archives at Laguna Nigel, San Diego Historical Society Archives, and the Naval History and Heritage Command, US Navy Seabee Museum at Naval Base Ventura County.
B. Arizona: The records and literature search shall be conducted at the Arizona State Museum (ASM), the Arizona SHPO, Northern Arizona Museum, and Bureau of Land Management, as appropriate. The Contractor shall also conduct records and literature searches at any other organizations, institutions, or agencies necessary to conduct a complete and thorough search.
2.5.1 Continued Records and Literature Search Continued C. Colorado: The records and literature search shall be conducted through the Colorado State Historic Preservation Office to search the state Cultural Resources Database.
D. Nevada: The records and literature search shall be conducted at the University of Nevada Las Vegas, the Nevada Museum for archaeological inventories, and the Nevada SHPO for the state architectural/historic inventory. The Contractor shall also conduct searches at any other organizations, institutions, or agencies necessary to conduct a complete and thorough search.
F. New Mexico: The records and literature search shall be conducted through the state’s Archaeological Records Management Section (ARMS) of the New Mexico Cultural Resource Information System (NMCRIS) database. The Contractor shall also enter into an ARMS User Agreement required to access New Mexico’s records repository (ARMS) (See Annex 1, Spec Item 1.11).
G. Utah: The Utah Division of State History collects archaeological site files and reports for the State of Utah in accordance with Utah Code 9-8-304 and the State History's Antiquities Section can facilitate a search of the records in accordance with SHPO Cultural Resource Compliance Guidance.
| 2.5.2 |
| Format |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .