Ann St Park Phase II Bid Set.pdf

PDF 9 MB Posted

Attached to
Ann Street Park Phase II Improvements
Solicitation number
Not on record
Issued by
Pike County, Pennsylvania

About this file

This is a bid set of construction plans prepared by Barry Isett & Associates Inc. for Ann Street Park Phase II Improvements in Milford Borough, Pike County, Pennsylvania. The project encompasses the construction of a new 2-5 playground with associated site work and amenities. Deliverables include site excavation and grading, demolition of existing non-compatible structures, installation of underground electrical utilities, stormwater underdrain systems in playground areas, concrete curb edging for safety surfaces, certified installation of new playground equipment and safety surfacing, an ADA-accessible concrete walkway, a prefabricated wood gazebo on a gravel base, four-foot aluminum fencing, site furnishings, landscaping, and lawn restoration of disturbed areas. Specific design elements detailed in the plans include filling in an existing gazebo step with new wood framing and decking to provide wheelchair access from the concrete walkway, with ADA-compliant access specifications requiring no gaps, edges, or borders exceeding 1/4 inch. The sealed bid submission deadline is 3:00 PM prevailing time on Monday, August 10, 2026, via the PennBid Program. Bidding documents became available online at no cost through PennBid beginning at 12:00 PM on Monday, July 13, 2026. A pre-bid meeting is scheduled for 1:00 PM on Monday, July 22, 2026, at the project site located at West Ann Street, Milford, PA 18337, with attendance encouraged for all prospective bidders.

All bids must be accompanied by a bid bond with a corporate surety authorized to do business in Pennsylvania in the amount of 10 percent of the total bid amount. The successful bidder shall furnish a Performance and Payment Bond in the amount of 100 percent of the contract value. Prevailing Wage Rates apply to this project. Funding assistance has been provided by the Department of Conservation and Natural Resources Bureau of Recreation and Conservation through the Keystone Recreation, Park, and Conservation Fund of the Commonwealth of Pennsylvania and the Commonwealth Financing Authority. Bids will be opened online at the Engineer's Office immediately following the due date and time, with an abstract of bids received made available to bidders through PennBid following the opening.

View the file

Other files

File Type Posted
Contract Documents and Specification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOB:

1004926.000

COPYRIGHT 2026

DRAWN:

CGO

SCALE:

AS NOTED

DATE:

07/10/2026

P MGR:

APPRD:

BNS

CHK:

SMG

DSGN:

BNS

BNS

R

EV

IS

IO

N S

D

AT

E

BY

SHEET:

1. 2. 3. 4. 5. 6. 7.

8. 9.

AN

N

S

TR

EE

T

PA

R

K

- P

H

AS

E

IM

PR

O

VE

M

EN

TS

M

IL

FO

R D

B O

R O

U G

H

PI

KE

C

O U

N

TY

, P A

BA

RR

Y

IS

ET

T& as so ci at es

INC

MU

LT

I-

DIS

CIP

LIN

E

EN

GI

NE

ER

S

AN

D

CO

NS

UL

TA

NT

S

OF 8

TI

TL

E

SH

EE

T

BARRYISETT&associatesINC

MULTI- DISCIPLINE ENGINEERS AND CONSULTANTS

PLANS FOR THE CONSTRUCTION OF

ANN STREET PARK- PHASE TWO IMPROVEMENTS

WEST ANN STREET

MILFORD , PIKE COUNTY, PA 18337

BID SET

JULY 10, 2026

PLANS PREPARED BY

Know what's below.

before you dig.Call

R

TS-1

COPYRIGHT 2026

DRAWN:

CGO

SCALE:

AS NOTED

DATE:

07/10/2026

P MGR:

APPRD:

BNS

CHK:

SMG

DSGN:

BNS

BNS

R

EV

IS

IO

N S

D

AT

E

BY

SHEET:

1. 2. 3. 4. 5. 6. 7.

8. 9.

AN

N

S

TR

EE

T

PA

R

K

- P

H

AS

E

IM

PR

O

VE

M

EN

TS

M

IL

FO

R D

B O

R O

U G

H

PI

KE

C

O U

N

TY

, P A

BA

RR

Y

IS

ET

T& as so ci at es

INC

MU

LT

I-

DIS

CIP

LIN

E

EN

GI

NE

ER

S

AN

D

CO

NS

UL

TA

NT

S

OF 8

EX

IS

TI

N

G F

EA

TU

R

ES

D

EM

O

LI

TI

O N

P

LA

N

Know what's below.

before you dig.Call

R

Know what's below.

before you dig.Call

R

EF-1

1"=10'

U E

U E

COPYRIGHT 2026

DRAWN:

CGO

SCALE:

AS NOTED

DATE:

07/10/2026

P MGR:

APPRD:

BNS

CHK:

SMG

DSGN:

BNS

BNS

R

EV

IS

IO

N S

D

AT

E

BY

SHEET:

1. 2. 3. 4. 5. 6. 7.

8. 9.

AN

N

S

TR

EE

T

PA

R

K

- P

H

AS

E

IM

PR

O

VE

M

EN

TS

M

IL

FO

R D

B O

R O

U G

H

PI

KE

C

O U

N

TY

, P A

BA

RR

Y

IS

ET

T& as so ci at es

INC

MU

LTI-

DISC

IPLIN

E

ENG

INEE

RS

AND

CO

NSU

LTA

NTS

OF 8

SI

TE

-L

AN

D

SC

AP

E

PL

AN

Know what's below.

before you dig.Call

R

SP-1

1"=10' 24"

FILL IN STEP OF EXISTING GAZEBO

WITH NEW WOOD FRAMING AND

DECKING TO PROVIDE WHEELCHAIR

ACCESS TO GAZEBO FROM

CONCRETE WALKWAY

COPYRIGHT 2026

DRAWN:

CGO

SCALE:

AS NOTED

DATE:

07/10/2026

P MGR:

APPRD:

BNS

CHK:

SMG

DSGN:

BNS

BNS

R

EV

IS

IO

N S

D

AT

E

BY

SHEET:

1. 2. 3. 4. 5. 6. 7.

8. 9.

AN

N

S

TR

EE

T

PA

R

K

- P

H

AS

E

IM

PR

O

VE

M

EN

TS

M

IL

FO

R D

B O

R O

U G

H

PI

KE

C

O U

N

TY

, P A

BA

RR

Y

IS

ET

T& as so ci at es

INC

MU

LTI-

DISC

IPLIN

E

ENG

INEE

RS

AND

CO

NSU

LTA

NTS

OF 8

G R

AD

IN

G U

TI

LI

TY

P

LA

N

Know what's below.

before you dig.Call

R

GU-1

1" = 10'

ACCESS TO GAZEBO FROM CONCRETE

WALKWAY SHALL BE ADA COMPLIANT

WITH NO GAPS, EDGES, OR BORDERS

EXCEEDING 1/4"

COPYRIGHT 2026

DRAWN:

CGO

SCALE:

AS NOTED

DATE:

07/10/2026

P MGR:

APPRD:

BNS

CHK:

SMG

DSGN:

BNS

BNS

R

EV

IS

IO

N S

D

AT

E

BY

SHEET:

1. 2. 3. 4. 5. 6. 7.

8. 9.

AN

N

S

TR

EE

T

PA

R

K

- P

H

AS

E

IM

PR

O

VE

M

EN

TS

M

IL

FO

R D

B O

R O

U G

H

PI

KE

C

O U

N

TY

, P A

BA

RR

Y

IS

ET

T& as so ci at es

INC

MU

LTI-

DISC

IPLIN

E

ENG

INEE

RS

AND

CO

NSU

LTA

NTS

OF 8

ER

O

SI

O

N S

ED

IM

EN

T

C O

N

TR

O L

PL

AN

Know what's below.

before you dig.Call

R

ES-1

1" = 10'

COPYRIGHT 2026

DRAWN:

CGO

SCALE:

AS NOTED

DATE:

07/10/2026

P MGR:

APPRD:

BNS

CHK:

SMG

DSGN:

BNS

BNS

R

EV

IS

IO

N S

D

AT

E

BY

SHEET:

1. 2. 3. 4. 5. 6. 7.

8. 9.

AN

N

S

TR

EE

T

PA

R

K

- P

H

AS

E

IM

PR

O

VE

M

EN

TS

M

IL

FO

R D

B O

R O

U G

H

PI

KE

C

O U

N

TY

, P A

BA

RR

Y

IS

ET

T& as so ci at es

INC

MU

LT

I-

DIS

CIP

LIN

E

EN

GI

NE

ER

S

AN

D

CO

NS

UL

TA

NT

S

OF 8

ES-2

STANDARD CONSTRUCTION DETAIL #4-1

COMPOST FILTER SOCK

COMPOST SOCK WASHOUT DETAIL #3-18

STANDARD CONSTRUCTION DETAIL #4-16

FILTER BAG INLET PROTECTION - TYPE M INLET

ER

O

SI

O

N S

ED

IM

EN

T

C O

N

TR

O L

D

ET

AI

LS

COPYRIGHT 2026

DRAWN:

CGO

SCALE:

AS NOTED

DATE:

07/10/2026

P MGR:

APPRD:

BNS

CHK:

SMG

DSGN:

BNS

BNS

R

EV

IS

IO

N S

D

AT

E

BY

SHEET:

1. 2. 3. 4. 5. 6. 7.

8. 9.

AN

N

S

TR

EE

T

PA

R

K

- P

H

AS

E

IM

PR

O

VE

M

EN

TS

M

IL

FO

R D

B O

R O

U G

H

PI

KE

C

O U

N

TY

, P A

BA

RR

Y

IS

ET

T& as so ci at es

INC

MU

LT

I-

DIS

CIP

LIN

E

EN

GI

NE

ER

S

AN

D

CO

NS

UL

TA

NT

S

OF 8

C O

N

ST

R U

C

TI

O N

D

ET

AI

LS

AS NOTED

DE-1

7 OF

107700-00-001 BLUE POST W/CAP 124i AL DB

ANN STREET PARK

MILFORD BOROUGH

Funding assistance has been provided by the:

Department of Conservation and Natural Resources

Bureau of Recreation and Conservation

PHASE TWO IMPROVEMENTS

Keystone Recreation, Park, and Conservation Fund

Commonwealth of Pennsylvania, Commonwealth Financing Authority

RD BO

COPYRIGHT 2026

DRAWN:

CGO

SCALE:

AS NOTED

DATE:

07/10/2026

P MGR:

APPRD:

BNS

CHK:

SMG

DSGN:

BNS

BNS

R

EV

IS

IO

N S

D

AT

E

BY

SHEET:

1. 2. 3. 4. 5. 6. 7.

8. 9.

AN

N

S

TR

EE

T

PA

R

K

- P

H

AS

E

IM

PR

O

VE

M

EN

TS

M

IL

FO

R D

B O

R O

U G

H

PI

KE

C

O U

N

TY

, P A

BA

RR

Y

IS

ET

T& as so ci at es

INC

MU

LTI-

DISC

IPLIN

E

ENG

INEE

RS

AND

CO

NSU

LTA

NTS

OF 8

C O

N

ST

R U

C

TI

O N

D

ET

AI

LS

AS NOTED

DE-2

Sheets and Views
1 TITLE SHEET
EF-1 EXISTING FEATURES - DEMOLITION PLAN
SP-1 SITE - LANDSCAPE PLAN
GU-1 GRADING - UTILITY PLAN
ES-1 EROSION AND SEDIMENT CONTROLS PLAN
1004926.000_AnnSt_Ph2_4_ES_Plan - ES-2
DE-1 CONSTRUCTION DETAILS
1004926.000_AnnSt_Ph2_Details - DE-2

File details come from the government source that posted it. Updated .