Ann St Park Phase II Bid Set.pdf
PDF 9 MB Posted
- Attached to
- Ann Street Park Phase II Improvements
- Solicitation number
- Not on record
- Issued by
- Pike County, Pennsylvania
About this file
This is a bid set of construction plans prepared by Barry Isett & Associates Inc. for Ann Street Park Phase II Improvements in Milford Borough, Pike County, Pennsylvania. The project encompasses the construction of a new 2-5 playground with associated site work and amenities. Deliverables include site excavation and grading, demolition of existing non-compatible structures, installation of underground electrical utilities, stormwater underdrain systems in playground areas, concrete curb edging for safety surfaces, certified installation of new playground equipment and safety surfacing, an ADA-accessible concrete walkway, a prefabricated wood gazebo on a gravel base, four-foot aluminum fencing, site furnishings, landscaping, and lawn restoration of disturbed areas. Specific design elements detailed in the plans include filling in an existing gazebo step with new wood framing and decking to provide wheelchair access from the concrete walkway, with ADA-compliant access specifications requiring no gaps, edges, or borders exceeding 1/4 inch. The sealed bid submission deadline is 3:00 PM prevailing time on Monday, August 10, 2026, via the PennBid Program. Bidding documents became available online at no cost through PennBid beginning at 12:00 PM on Monday, July 13, 2026. A pre-bid meeting is scheduled for 1:00 PM on Monday, July 22, 2026, at the project site located at West Ann Street, Milford, PA 18337, with attendance encouraged for all prospective bidders.
All bids must be accompanied by a bid bond with a corporate surety authorized to do business in Pennsylvania in the amount of 10 percent of the total bid amount. The successful bidder shall furnish a Performance and Payment Bond in the amount of 100 percent of the contract value. Prevailing Wage Rates apply to this project. Funding assistance has been provided by the Department of Conservation and Natural Resources Bureau of Recreation and Conservation through the Keystone Recreation, Park, and Conservation Fund of the Commonwealth of Pennsylvania and the Commonwealth Financing Authority. Bids will be opened online at the Engineer's Office immediately following the due date and time, with an abstract of bids received made available to bidders through PennBid following the opening.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract Documents and Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOB:
1004926.000
COPYRIGHT 2026
DRAWN:
CGO
SCALE:
AS NOTED
DATE:
07/10/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1. 2. 3. 4. 5. 6. 7.
8. 9.
AN
N
S
TR
EE
T
PA
R
K
- P
H
AS
E
IM
PR
O
VE
M
EN
TS
M
IL
FO
R D
B O
R O
U G
H
PI
KE
C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LT
I-
DIS
CIP
LIN
E
EN
GI
NE
ER
S
AN
D
CO
NS
UL
TA
NT
S
OF 8
TI
TL
E
SH
EE
T
BARRYISETT&associatesINC
MULTI- DISCIPLINE ENGINEERS AND CONSULTANTS
PLANS FOR THE CONSTRUCTION OF
ANN STREET PARK- PHASE TWO IMPROVEMENTS
WEST ANN STREET
MILFORD , PIKE COUNTY, PA 18337
BID SET
JULY 10, 2026
PLANS PREPARED BY
Know what's below.
before you dig.Call
R
TS-1
COPYRIGHT 2026
DRAWN:
CGO
SCALE:
AS NOTED
DATE:
07/10/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1. 2. 3. 4. 5. 6. 7.
8. 9.
AN
N
S
TR
EE
T
PA
R
K
- P
H
AS
E
IM
PR
O
VE
M
EN
TS
M
IL
FO
R D
B O
R O
U G
H
PI
KE
C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LT
I-
DIS
CIP
LIN
E
EN
GI
NE
ER
S
AN
D
CO
NS
UL
TA
NT
S
OF 8
EX
IS
TI
N
G F
EA
TU
R
ES
D
EM
O
LI
TI
O N
P
LA
N
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
EF-1
1"=10'
U E
U E
COPYRIGHT 2026
DRAWN:
CGO
SCALE:
AS NOTED
DATE:
07/10/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1. 2. 3. 4. 5. 6. 7.
8. 9.
AN
N
S
TR
EE
T
PA
R
K
- P
H
AS
E
IM
PR
O
VE
M
EN
TS
M
IL
FO
R D
B O
R O
U G
H
PI
KE
C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
OF 8
SI
TE
-L
AN
D
SC
AP
E
PL
AN
Know what's below.
before you dig.Call
R
SP-1
1"=10' 24"
FILL IN STEP OF EXISTING GAZEBO
WITH NEW WOOD FRAMING AND
DECKING TO PROVIDE WHEELCHAIR
ACCESS TO GAZEBO FROM
CONCRETE WALKWAY
COPYRIGHT 2026
DRAWN:
CGO
SCALE:
AS NOTED
DATE:
07/10/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1. 2. 3. 4. 5. 6. 7.
8. 9.
AN
N
S
TR
EE
T
PA
R
K
- P
H
AS
E
IM
PR
O
VE
M
EN
TS
M
IL
FO
R D
B O
R O
U G
H
PI
KE
C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
OF 8
G R
AD
IN
G U
TI
LI
TY
P
LA
N
Know what's below.
before you dig.Call
R
GU-1
1" = 10'
ACCESS TO GAZEBO FROM CONCRETE
WALKWAY SHALL BE ADA COMPLIANT
WITH NO GAPS, EDGES, OR BORDERS
EXCEEDING 1/4"
COPYRIGHT 2026
DRAWN:
CGO
SCALE:
AS NOTED
DATE:
07/10/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1. 2. 3. 4. 5. 6. 7.
8. 9.
AN
N
S
TR
EE
T
PA
R
K
- P
H
AS
E
IM
PR
O
VE
M
EN
TS
M
IL
FO
R D
B O
R O
U G
H
PI
KE
C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
OF 8
ER
O
SI
O
N S
ED
IM
EN
T
C O
N
TR
O L
PL
AN
Know what's below.
before you dig.Call
R
ES-1
1" = 10'
COPYRIGHT 2026
DRAWN:
CGO
SCALE:
AS NOTED
DATE:
07/10/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1. 2. 3. 4. 5. 6. 7.
8. 9.
AN
N
S
TR
EE
T
PA
R
K
- P
H
AS
E
IM
PR
O
VE
M
EN
TS
M
IL
FO
R D
B O
R O
U G
H
PI
KE
C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LT
I-
DIS
CIP
LIN
E
EN
GI
NE
ER
S
AN
D
CO
NS
UL
TA
NT
S
OF 8
ES-2
STANDARD CONSTRUCTION DETAIL #4-1
COMPOST FILTER SOCK
COMPOST SOCK WASHOUT DETAIL #3-18
STANDARD CONSTRUCTION DETAIL #4-16
FILTER BAG INLET PROTECTION - TYPE M INLET
ER
O
SI
O
N S
ED
IM
EN
T
C O
N
TR
O L
D
ET
AI
LS
COPYRIGHT 2026
DRAWN:
CGO
SCALE:
AS NOTED
DATE:
07/10/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1. 2. 3. 4. 5. 6. 7.
8. 9.
AN
N
S
TR
EE
T
PA
R
K
- P
H
AS
E
IM
PR
O
VE
M
EN
TS
M
IL
FO
R D
B O
R O
U G
H
PI
KE
C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LT
I-
DIS
CIP
LIN
E
EN
GI
NE
ER
S
AN
D
CO
NS
UL
TA
NT
S
OF 8
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
AS NOTED
DE-1
7 OF
107700-00-001 BLUE POST W/CAP 124i AL DB
ANN STREET PARK
MILFORD BOROUGH
Funding assistance has been provided by the:
Department of Conservation and Natural Resources
Bureau of Recreation and Conservation
PHASE TWO IMPROVEMENTS
Keystone Recreation, Park, and Conservation Fund
Commonwealth of Pennsylvania, Commonwealth Financing Authority
RD BO
COPYRIGHT 2026
DRAWN:
CGO
SCALE:
AS NOTED
DATE:
07/10/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1. 2. 3. 4. 5. 6. 7.
8. 9.
AN
N
S
TR
EE
T
PA
R
K
- P
H
AS
E
IM
PR
O
VE
M
EN
TS
M
IL
FO
R D
B O
R O
U G
H
PI
KE
C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
OF 8
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
AS NOTED
DE-2
| Sheets and Views |
| 1 TITLE SHEET |
| EF-1 EXISTING FEATURES - DEMOLITION PLAN |
| SP-1 SITE - LANDSCAPE PLAN |
| GU-1 GRADING - UTILITY PLAN |
| ES-1 EROSION AND SEDIMENT CONTROLS PLAN |
| 1004926.000_AnnSt_Ph2_4_ES_Plan - ES-2 |
| DE-1 CONSTRUCTION DETAILS |
| 1004926.000_AnnSt_Ph2_Details - DE-2 |
File details come from the government source that posted it. Updated .