ANK TW A Extension - 100% Plans (11x17).pdf

PDF 21 MB Posted

Attached to
ANK Taxiway 'A' Extension (Phase 1)
Solicitation number
Taxiway A Extension (Phase 1)
Issued by
Cheyenne County, Colorado

About this file

The provided file is a set of 100% Plans (11x17) for the Taxiway 'A' Extension project at the Salida Airport - Harriet Alexander Field (ANK) in Colorado. The project involves constructing approximately 2,050 feet of additional Taxiway A and a new connector Taxiway A5 to Runway 6-24. The plans detail the construction of new structural taxiway pavement adjacent to the existing taxiway connector A4 pavement section, with a key-in section. The project scope includes new pavement markings for the extension and new connector, as well as new airfield signage and taxiway edge reflectors.

The plans appear to be technical documentation showing the full engineering design for the taxiway extension, including precise measurements, layout, and construction specifications. While specific pricing details are not visible in this document, the project is likely funded through state or federal airport infrastructure grants. The extension aims to improve airport infrastructure and runway accessibility, potentially enhancing the airport's operational efficiency and capacity for aircraft movement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .