ANK New Fuel Farm - Addendum No. 1_2.10.25.pdf
PDF 1 MB Posted
- Attached to
- ANK New Fuel Farm
- Solicitation number
- Not on record
- Issued by
- Cheyenne County, Colorado
About this file
This document is Addendum No. 1 for the ANK New Fuel Farm project at the Salida Airport - Harriet Alexander Field, issued by Dibble engineering firm on February 10, 2025. The addendum provides updated bid schedule pages and includes pre-bid conference minutes for a new airport fuel farm construction project. The base bid involves site preparation and installation of two 12,000-gallon double-wall fuel tanks for Jet-A and AVGAS, including a self-service over-wing dispensing skid, aboveground piping, containment measures, and electrical infrastructure. The project will be locally funded by Chaffee County, the City of Salida, CDOT Aeronautics, and a DOLA grant. The bid is scheduled to be received electronically through BidNet Direct by 2:00 PM (MT) on February 25, 2025, with an anticipated contract award within 90 calendar days.
The project is divided into multiple phases, including civil site work, fueling infrastructure installation, and potential removal of existing fuel tanks as an alternate bid. Each phase has specific liquidated damages of $500 per day for missed completion timelines. The total project time is estimated at approximately 169 calendar days, including phases for site preparation, pavement construction, tank installation, system commissioning, and optional existing infrastructure removal. Bidders are required to submit comprehensive documentation, including a bid bond of 5% of the total bid, and must include all applicable state, local, and county taxes in their unit prices. The contractor will be responsible for obtaining necessary permits, including an OPS Installation Permit and local fire department notifications, with all associated permitting costs considered incidental to the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salida Airport – Harriet Alexander field
ANK New Fuel Farm Dibble Project No: 1019401.08
Sponsor Project No: TBD
ANK New Fuel Farm Addendum No. 1 Page 1
ADDENDUM No. 1
February 10, 2025
TO ALL PROSPECTIVE OFFERORS RESPONDING TO INVITATION FOR BID FOR CONSTRUCTION
OF THE NEW FUEL FARM project at the Salida Airport – Harriet Alexander Field, as outlined in the aforementioned Invitation For Bids (IFB) published on the Rocky Mountain E-Purchasing System https://www.bidnetdirect.com/public/solicitations/4942092312/abstract on January 23rd, 2025.
I. General
1. The Bidders are made aware that they must acknowledge receipt of all
Addenda (within the Contract Documents, Division I, Page B-2) as part of the bid submittal process. The Bidding Documents and subsequent addenda will be made available through BidNet Direct.
2. The Meeting Minutes and Attendance Sheet from the Pre-Bid Conference Meeting held on
February 6, 2025, at 10:00 am are attached.
3. All bids must be received electronically through BidNet Direct prior to 2:00 PM (MT) on
Tuesday, February 25th, 2025.
II. Changes to the Contract Documents
1. Division I Bid Schedule, REMOVE BID SCHEDULE pages and Replace with the attached BID SCHEDULE pages B5 through B-19. The only change made to these pages is the page numbers have been updated.
john.cessar Image john.cessar Text Box 02/10/25 https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.bidnetdirect.com%2Fpublic%2Fsolicitations%2F4942092312%2Fabstract&data=05%7C02%7Cjohn.cessar%40dibblecorp.com%7C64c42b80c65c4945c37308dd3c9162a8%7Ce978d1e4af314393aa9f7e93edc74670%7C0%7C0%7C638733317306405606%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=B3PF08YXuPHBOffbLlEgFQ6apedYc06fodlINTNXk5U%3D&reserved=0
Salida Airport - Harriet Alexander Field (ANK)
New Fuel Farm
Pre-Bid Conference Minutes ANK New Fuel Farm Page 1
Pre-Bid Conference Minutes
Thursday, February 6th, 2025, at 10:00 A.M. (MT)
1. Conference Call-In Information:
a. Date/Time: Thursday, February 6th, 2025, at 10:00 am (MT)
b. Toll number: (480) 378-0989
c. Conference ID: 207421514#
2. Project Team
a. Sponsor Staff
Zech Papp Airport Manager Don Reimer Chaffee County, Administrator Beth Helmke Chaffee County, Deputy Director of Administration Christy Doon City of Salida, City Administrator
b. Engineer/Construction Administration John Cessar Dibble, Senior Project Manager Jenna LoBello Dibble, Senior Project Engineer Michael Swearingen Dibble, Assistant Engineer Jim Hodge Dibble, Project Coordinator Jared Bass Dibble, Aviation Group Leader Catherine Alcorn CR Engineers, President Shane Woodard CR Engineers, Inspector Seth Newbold Argus, Project Manager
3. Bidding Process and Timeline
a. Bid Advertisement…………………………………………….………..January 23rd 2025
1. Advertised in the Rocky Mountain E-Purchasing System https://www.bidnetdirect.com/public/solicitations/4942092312/abstract
b. Non-Mandatory Pre-Bid Conference……………………………. February 6th, 2025, at 10:00 am (MT)
c. Last Day for Questions…………….………..……..………………… February 10th, 2025, at 3:00 pm (MT)
1. Any questions received after this date may not be answered.
2. All questions (excluding those asked at the Pre-Bid Conference) must be submitted through Bidnet Direct.
d. Final addendum will be posted February 17, 2025.
e. Bid Deadline …………………………………………………………….. February 25th, 2025, by 2:00 pm
(MT)
f. Anticipated Award of Contract (Bid Hold).…………………… 90 Calendar Days
g. Bid Submittal Location:
1. Electronically submitted on Bidnet Direct.
h. Bid Bond: …………………………………………………………………..5% of total bid (Base Bid and Add Alt No. 1)
i. All Addenda must be acknowledged and included in Bid Submittal at the time of Bid.
Acknowledgement location is in Division I, page B-2, Section 8.
Pre-Bid Conference Minutes ANK New Fuel Farm Page 2
j. Bid Schedule included in Division I, pages B-5 thru B-19. (Bid Schedule Pages will be renumbered and issued in Addendum No. 1)
4. Project Overview
a. This project will be locally funded by Chaffee County, the City of Salida, CDOT Aeronautics, and a DOLA grant.
b. Project Scope of Work:
• Base Bid (Schedule I): Site preparation and installation of new above ground tanks and associated infrastructure. (Locally Funded)
Civil
• Construct new fueling apron asphalt pavement section
• Construct new fueling apron concrete pavement section
• Site grading and drainage
• Seeding
Fueling
• Aboveground Fuel Storage: Facility will include two 12,000-gallon double-wall fuel tanks (UL-2085) for Jet-A and AVGAS 100LL, with aboveground piping to a self-service over-wing dispensing skid.
• Fuel Dispensing Skid: A 30gpm over-wing dispenser with a 24/7 credit card system will be provided.
• Jet-A Bulk Loading System: A 200gpm skid will include a pump, filtration, meter, overfill prevention, grounding verification, and recirculation capabilities.
• AVGAS Bulk Loading System: A separate 200gpm skid with similar features as the Jet-A system will handle bulk fuel loading, unloading, and recirculation capabilities.
• Aboveground Piping: All piping and infrastructure will be installed aboveground to minimize the need for secondary containment and cathodic protection.
• Containment Measures: Tanks and dispensing skid will be placed on a curbed concrete containment pad per EPA 40 CFR Part 112 SPCC regulations, with double-walled tanks providing secondary containment.
• Truck Containment System: A singular truck loading/unloading containment system will include a drive-in curbed pad, remote containment basin, underground containment piping, and pump-out capabilities per EPA 40 CFR Part 112 SPCC regulations.
Electrical
• Install new 200-amp, 277/2870 Volt three phase service entrance section and pad mounted utility (Xcel Energy) transformer to power the new fuel farm subpanel. Construct an underground electrical feeder to fuel farm site.
• Install fuel farm site lighting equipped with L-810 Obstruction light per pole.
• Add Alt No. 1 (Schedule II): Removal of existing fuel tanks and associated infrastructure (Locally Funded)
c. Total Project Time (reference attached Airport Site Plan):
• An Administrative Notice to Proceed will be issued prior to the Construction Notice to Proceed for procurement of long lead items.
Pre-Bid Conference Minutes ANK New Fuel Farm Page 3
• Phase 1A - 45 Calendar Days (Base Bid): Phase 1A will consist of excavation, grading & drainage, subgrade placement, and placement of concrete pavement for the aircraft fueling pad & pavement markings, spill containment structures, and storage tank foundations.
• Phase 1B – 30 Calendar Days (Concurrent w/ Phase 1A – Base Bid): Phase 1B will consist of excavation, grading & drainage, subgrade placement, and placement of structural pavement associated with the construction of the Fueling Apron and tie-in to Taxiway A4.
• Phase 2 – 90 Calendar Days (Base Bid): Phase 2 will consist of the placement of the fuel storage tanks, electrical infrastructure installation, plumbing and pipe fitting, and dispensing system installation.
• Phase 3 – 30 Calendar Days (Base Bid): Phase 3 will consist of fuel system calibration, testing, inspection, and final commissioning of the new Fuel Farm.
• Base Bid Final Completion/Punchlist Reconciliation – 14 Calendar Days (Base Bid): The Contractor will be authorized 14 calendar days to complete all punchlist items and provide verification of all Quality Control (QC). Once all work has been inspected and accepted, the Base Bid portion of the project will move into Final Completion status.
• Phase 4 – 14 Calendar Days (Add Alt No. 1 – If Awarded): Phase 4 will consist of the demolition of the existing Fuel Farm infrastructure and removal of underground storage tanks. Phase 4 cannot begin until the new Fuel Farm is fully operational and open to aircraft.
• Add Alt No. 1 Final Completion/Punchlist Reconciliation – 5 Calendar Days (Add Alt No. 1 – If Awarded): The Contractor will be authorized 5 calendar days to complete all punchlist items and provide verification of all Quality Control (QC). Once all work has been inspected and accepted, the Add Alt No. 1 portion of the project will move into Final Completion status.
5. Liquidated Damages (Reference General Provisions, Section 80-08)
Phase Description Liquidated Damages
Allowed Construction Time
Phase 1A Civil Site Work and Infrastructure Installation
$500/Day 45 Calendar Days
Phase 1B Fueling Apron Pavement and
Taxiway A4 Tie-In $500/Day
30 Calendar Days (Concurrent w/ Phase)
1A
Phase 2 New Fuel Farm Storage Tank and Supporting Infrastructure
Installation
$500/Day 90 Calendar Days
Phase 3 New Fuel farm Commissioning $500/Day 30 Calendar Days
Base Bid Final Completion/Punch List Reconciliation
Base Bid Final Completion/Punch List Reconciliation
$500/Day 14 Calendar Days
Phase 4 (If Awarded Existing Fuel Farm Demolition and Storage tank Removal
$500/Day 14 Calendar Days (If Awarded)
Add Alt No. 1 Final Completion/Punch List Reconciliation
$500/Day 5 Calendar Days (If
Awarded)
Pre-Bid Conference Minutes ANK New Fuel Farm Page 4
6. Bid Documents
a. Reference Division 1, Instructions to Bidders, pages IB-1 thru IB-3.
b. Bid Schedule in Division 1, Bid Proposal, pages B-5 thru B-19. Pay close attention to the measurement and payment sections of the following:
• Division II, Special Provisions
• Division III, General Provisions
• Division IV, General Technical Specifications
• There are some construction work items and materials that are considered incidental to the project or other Bid Items. All potential bidders should conduct a close review of the project plans and technical specifications.
7. Special Requirements
a. All forms listed in Division I, Special Notice to Bidders (items (a.) through (h.) must be completed and submitted at time of bid.
i. List of Items required at time of Bid:
A. Non-Collusion Affidavit: Bidder Information, page NCA-1
B. Completed Bid Proposal (Base Bid and Add Alt No. 1) – Schedule of Bid Items:
Division I, page B-5 thru B-19 (Bid Schedule page numbers in the Contract Documents will be updated via Addendum No. 1)
C. Bid Bond: Division I, page BB-1
D. Prequalification Form: Division I, page PF-1
E. Contractor’s Questionnaire: Division I, page CQ-1
F. Authorized Signature Form: Division I, page AS-1
G. Certificate of Insurability: Division I, page CIS-1
H. Acknowledgement of any and all Addenda: Division I, page B-2
8. Airfield Safety and Security
a. Review Division II, Special Provisions, Section 60.
1. Airport security requirements
2. Construction vehicle requirements
3. Barricade requirements
b. Contractor is required to provide a Safety Plan Compliance Document (SPCD), reference Appendix A – Construction Safety and Phasing Plan for items to be addressed by SPCD.
9. General Construction Items
a. Mobilization:
1. Refer to Division IV, Technical Specifications, Item C-105.
2. Mobilization is limited to 8% of the total bid, (Division III, General Provisions, Section 20- 03).
Pre-Bid Conference Minutes ANK New Fuel Farm Page 5
10. Addenda
a. At least one Addendum will be issued after the Pre-Bid Conference that will include the meeting minutes to the Pre-Bid Conference, answers to contractor questions to date, and any changes or updates to the plans and contract documents.
b. All Addenda will be posted on BidNet Direct. It is the full responsibility of any bidder wishing to submit a bid to obtain and acknowledge any and all addenda.
c. All Addenda must be acknowledged by the Bidder at the time of bid within their respective Bid Package submitted before the established deadline.
11. Bidder Questions
a. Question: Is this a Buy American Project?
Answer: Buy American requirements do not apply to this project because this project is not receiving FAA funds.
b. Question: Did the project plans get shared with Colorado State Oil to see if they are approved?
Answer: In accordance with the Colorado Department of Labor and Public Safety, Division of Oil and Public Safety (OPS), Storage Tank Regulations Section 3-2-3 “Application for Permit for Aboveground Storage Tank (AST)s,” an application must be submitted to OPS and approved before beginning construction. The contractor will be responsible for submitting this permit application and paying all fees associated with permitting and initial registration of the tanks/fuel system. Tank permitting/registration includes but is not limited to the following:
• An OPS Installation Permit
• Local Fire Department Notification of the Installation
• An Installation Inspection Request
• Payment of the installation application/inspection fee
• Documentation of secondary tightness testing
• Registration within 30 days of putting regulated substances into the tanks
It is the contractor’s responsibility to apply and pay for all associated local, state and federal permits that may be required to construct the ANK New Fuel Farm. These costs are incidental to the project and should be accounted for at the time of bid.
c. Question: Does the Phase 2 – 90 Calendar Day period start after the fuel tanks arrive?
Answer: Yes, the 90 Calendar-Day contract time for Phase 2 will take place after the fuel tanks arrive. Once all the fuel tanks, pipes, pumps, and other associated infrastructure are on site, the Contractor will have 90 Calendar days to assemble everything and reach substantial completion for the Fuel Farm.
d. Question: Will the Airport work with the Contractor on the Notice to Proceed (NTP) timing regarding the lead times and procurement of equipment?
Answer: Yes, the Airport will work with the Contractor on the Construction NTP timing, pending delivery of the fuel tank equipment. The Administrative NTP will be used to get the
Pre-Bid Conference Minutes ANK New Fuel Farm Page 6
Contractor under contract and allow for the procurement of equipment. Once equipment is ordered, the Contractor will provide the Airport with the information regarding equipment lead times and shipment dates. This information will then be used for the timing of the issuance of the Construction NTP.
e. Question: Can the Contractor work on different phases concurrently?
Answer: Yes, the Contractor will have the opportunity to work on different phases concurrently. The contract time for each phase of work will still be tracked separately.
f. Question: Is there a Final Completion date that is required to be met by?
Answer: There is not a set Final Completion date yet, however this date will be set after the equipment lead times are known and the Construction NTP is issued.
g. Question: Is this a tax-exempt project?
Answer: All state, local, and county taxes need to be included in the bid unit prices. Refer to Instruction to Bidders, Section 5.
Dibble Project No: 1019104.08
Salida Airport – Harriet Alexander Field (ANK) Page - 1
New Fuel Farm - Pre-Bid Meeting
Pre-Bid Meeting Attendee List
Project: Salida Airport – Harriet Alexander Field: New Fuel Farm
Date: February 6th, 2025 Time: 10:00 AM MST
Location: Salida Airport Terminal & Remote Conference Call
NAME (PRINT) REPRESENTING PHONE E-MAIL
Zech Papp – In Person ANK Airport 719-539-3720 zpapp@chaffeecounty.org
Daniel Tom Chaffee County 719-530-5591 dtom@chaffeecounty.org
Beth Helmke Chaffee County 719-539-2218 bhelmke@chaffeecounty.org
Drew Nelson City of Salida 719-539-4555 drew.nelson@cityofsalida.com
Kaitlyn Westendorf CDOT 303-512-5258 kaitlyn.westendorf@state.co.us
John Cessar Dibble 720-399-9783 john.cessar@dibblecorp.com
Jenna LoBello – Virtual Dibble 602-957-3888 jenna.lobello@dibblecorp.com
Kurt Dalton – Virtual Dibble 720-598-2211 kurt.dalton@dibblecorp.com
Jim Hodge – Virtual Dibble 720-248-0853 jim.hodge@dibblecorp.com
Mike Swearingen – Virtual Dibble 720-399-9796 mike.swearingen@dibblecorp.com
Catherine Alcorn CR Engineers 480-816-5541 calcorn@creng.com
Shane Woodard CR Engineers 480-816-5541 swoodard@creng.com
Seth Newbold Argus 816-874-8255 seth.newbold@argusco.com
Salida Airport – Harriet Alexander Field (ANK) Page - 2
Jared Bass – Virtual Dibble 720-279-8465 jared.bass@dibblecorp.com
Daniel Schnelle – Virtual Argus 816-228-7535 daniel.schnelle@argusco.com
Shane Lance – Phone Pro Electrical Contractors, Inc.
970-250-4825 proelectrical.shane@gmail.com
Rowdy O’Grady – Phone Seneca Companies, Inc. 515-229-9617 rogrady@senecaco.com
Charles Bisbee – Phone JHL Constructors 303-550-1983 cbisbee@jhlconstructors.com
Jason Sallman – Phone Veterans Fuel Systems 813-632-0885 jason@veteransfueling.com
Rob Thompson – Phone Kinley Construction 714-651-7708 rthompson@kinleyconstruction.com
Chaz Nagel – Phone Kinley Construction 817-734-4878 cnagel@kinleyconstruction.com
Matt Heit – Phone Kinley Construction 817-914-8516 mheit@kinsleyconstruction.com
Ethan Lance – In Person Pro Electrical 970-589-5696 Elance58@gmail.com
Travis Tremby – In Person EEC/Pro 970-644-2783 Elevatedexcavation511@gmail.com
Brenda Gaide – in Person CF&E 719-429-1676 brenda@coforearth.com
Eric Henning – In Person CGRS 970-420-6868 eric@cgrs.com
Tim Goodrich – In Person CGRS 970-218-1455 tim@cgrs.com
Togi Tampubolon – In Person JHL Constructors 303-880-8288 ttampubolon@jhlconstructors
Joel Lawrence – In Person JET 1 Infrastructure 907-830-8201 Joel.lawrence@jet-infrastructure.com
Salida Airport – Harriet Alexander Field (ANK) Page - 3
Alyssa Long – In Person United Companies 719-618-8752 Alyssa.long@unitedco.com
Tyler Davis – In Person Meridian Contracting 970-209-3155 T.davis@meridiancon.net
Salida Airport – Harriet Alexander Field
County Project No: TBD
Dibble
January 2025
Page B-5 Bid Proposal – Addendum No. 1
BID SCHEDULE
CONTRACTOR NAME: ________________________________
ANK NEW FUEL FARM (BASE BID)
LINE ITEM APPROX. UNIT
NO. NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
1 C-100-14.1 Contractor Quality Control Program (CQCP) at the unit price of ______________________________
_________________ dollars and ______________ cents.
1 LS
2 C-102-5.1 Temporary Air and Water Pollution, Soil Erosion, and
Siltation Control at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 LS
3 C-105-6.1 Mobilization at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 LS
4 P-101-5.1 Sawcut AC Pavement (2-inch Depth) at the unit price of ______________________________
_________________ dollars and ______________ cents. 374 LF
5 P-101-5.2 Mill AC Pavement (2-inch Depth) at the unit price of ______________________________
_________________ dollars and ______________ cents. 82 SY
6 P-101-5.3 Remove 24-inch Flared End Section at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
7 P-152-4.1 Unclassified Excavation at the unit price of ______________________________
_________________ dollars and ______________ cents. 384 CY
8 P-152-4.2 Over-Excavation of Unsuitable Materials and
Replacement of Suitable Materials at the unit price of ______________________________
_________________ dollars and ______________ cents. 114 CY
9 P-152-4.3 Borrow Excavation at the unit price of ______________________________
_________________ dollars and ______________ cents. 1,385 CY
10 P-208-5.1 Crushed Aggregate Base Course (10-inch Depth) at the unit price of ______________________________
_________________ dollars and ______________ cents. 514 SY
11 P-208-5.2 Crushed Aggregate Base Course (12-inch Depth) at the unit price of ______________________________
_________________ dollars and ______________ cents. 2,894 SY
12 P-403-8.1 Asphalt Surface Course at the unit price of ______________________________
_________________ dollars and ______________ cents. 728 TON
13 SP-70.01.01 Portland Cement Concrete Pavement at the unit price of ______________________________
_________________ dollars and ______________ cents.
514 SY
Page B-6 Bid Proposal – Addendum No. 1
PAGE INTENTIONALLY LEFT BLANK
Page B-7 Bid Proposal – Addendum No. 1
NO. NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
14 P-603-5.1 Emulsified Asphalt Tack Coat at the unit price of ______________________________
_________________ dollars and ______________ cents. 298 GAL
15 P-605-5.1 Joint Seal at the unit price of ______________________________
_________________ dollars and ______________ cents. 610 LF
16 P-605-5.2 Edge Seal at the unit price of ______________________________
_________________ dollars and ______________ cents. 227 LF
17 P-620-5.1 Permanent Pavement Markings at the unit price of ______________________________
_________________ dollars and ______________ cents. 26 SF
18 D-701-5.1 24-inch Storm Drain, CMP at the unit price of ______________________________
_________________ dollars and ______________ cents. 134 LF
19 D-701-5.2 24-inch Galvanized Metal Flared End Section, (DET 4, DWG G3.1) at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
20 D-701-5.3 24-inch Corrugated Metal Pipe Band at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
21 T-901-5.1 Seeding with Hydromulch at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 AC
FUELING
22 33 56 43.15 12K Jet-A Tank at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
23 33 56 43.15 12K Avgas Tank at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
24 33 52 43.32 Combo Overwing Jet and Avgas Dispensing at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
25 33 52 43.31 Bulk Loading/Offloading Jet-A Skid at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
26 33 52 43.31 Bulk Offloading AVGAS Skid at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
Page B-8 Bid Proposal – Addendum No. 1
Page B-9 Bid Proposal – Addendum No. 1
NO. NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
27 33 52 43.13 Single Wall 1-1/2" Above Ground Piping at the unit price of ______________________________
_________________ dollars and ______________ cents. 175 LF
28 33 52 43.13 Single Wall 3" Above Ground Piping at the unit price of ______________________________
_________________ dollars and ______________ cents. 750 LF
29 03 30 00.00 Concrete Pavement – Tank Containment Pad at the unit price of ______________________________
_________________ dollars and ______________ cents. 2,520 SF
30 03 30 00.00 Concrete Pavement – Electrical Pad and Sidewalk at the unit price of ______________________________
_________________ dollars and ______________ cents. 108 SF
31 03 30 00.00 Concrete Pavement – Truck Refueler Loading
Containment Pad at the unit price of ______________________________
_________________ dollars and ______________ cents. 1,300 SF
32 03 30 00.00 Concrete Containment Basin at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
33 33 52 43.23 Containment Basin Pump w/control panel at the unit price of ______________________________
_________________ dollars and ______________ cents.
1 EA
34 33 41 00.02 Containment Inlet at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
35 33 41 00.02 Containment Piping (underground) – 8” Ductile Iron
Piping, Seals, and Backfill Material at the unit price of ______________________________
_________________ dollars and ______________ cents. 150 LF
36 33 41 00.02 Containment Piping (underground) – 2” HDPE Piping, Backfill Material at the unit price of ______________________________
_________________ dollars and ______________ cents. 10 LF
37 13 12 00 Canopy – Fueling Skid Canopy at the unit price of ______________________________
_________________ dollars and ______________ cents. 3 EA
38 13 12 00 Canopy – Electrical Pad canopy at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
39 13 12 00 Rack Structure at the unit price of ______________________________
_________________ dollars and ______________ cents.
1 EA
40 13 12 00 Foundations at the unit price of ______________________________
1 EA
Page B-10 Bid Proposal – Addendum No. 1
Page B-11 Bid Proposal – Addendum No. 1
NO. NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
41 13 12 00 Roof at the unit price of ______________________________
_________________ dollars and ______________ cents.
1 EA
42 26 24 16 480/277V Panelboard at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
43 26 24 16 240/120V Mini-Power Center at the unit price of ______________________________
_________________ dollars and ______________ cents.
1 EA
44 26 05 26.01 Ground Rod at the unit price of ______________________________
_________________ dollars and ______________ cents.
5 EA
45 26 05 26.01 Ground Rod Test Box at the unit price of ______________________________
_________________ dollars and ______________ cents.
1 EA
46 26 05 26.01 Conductor - #4/0 at the unit price of ______________________________
_________________ dollars and ______________ cents.
350 LF
47 26 05 26.01 Conductor - #1/0 at the unit price of ______________________________
_________________ dollars and ______________ cents.
300 LF
48 26 56 00.01 Tank Stair Fixture at the unit price of ______________________________
_________________ dollars and ______________ cents. 2 EA
49 26 56 00.01 Tank Stair Pole at the unit price of ______________________________
_________________ dollars and ______________ cents. 2 EA
50 26 56 00.01 Dispenser Canopy Light at the unit price of ______________________________
_________________ dollars and ______________ cents. 2 EA
51 26 56 00.01 Rack Light at the unit price of ______________________________
_________________ dollars and ______________ cents. 2 EA
52 26 27 26 Rack Light Switch at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
53 26 27 26 Tank/Skid Light Switch at the unit price of ______________________________
_________________ dollars and ______________ cents. 2 EA
54 40 70 00 Tank Gauging Console at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
55 40 70 00 Level Probe
_________________ dollars and ______________ cents. 2 EA
Page B-12 Bid Proposal – Addendum No. 1
Page B-13 Bid Proposal – Addendum No. 1
NO. NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
56 40 70 00 Interstitial Leak Probe at the unit price of ______________________________
_________________ dollars and ______________ cents. 2 EA
57 40 70 00 Alarm Strobe/Horn at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
58 40 70 00 EFSO Pushbutton - Weather-proof/Signage at the unit price of ______________________________
_________________ dollars and ______________ cents. 2 EA
59 40 70 00 EFSO Pushbutton - Explosion-proof/Signage at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
60 26 05 33.13 PVC conduit at the unit price of ______________________________
_________________ dollars and ______________ cents. 600 LF
61 26 05 33.13 GRS
at the unit price of ______________________________
_________________ dollars and ______________ cents.
1,100 LF
62 26 05 33.13 Ductbank at the unit price of ______________________________
_________________ dollars and ______________ cents.
100 LF
63 26 05 33.13 LFMC
at the unit price of ______________________________
_________________ dollars and ______________ cents. 50 LF
64 26 05 19.01 ATG Cable 1 at the unit price of ______________________________
_________________ dollars and ______________ cents. 300 LF
65 26 05 19.01 Cable - #8 at the unit price of ______________________________
_________________ dollars and ______________ cents. 600 LF
66 26 05 19.01 Cable - #12 at the unit price of ______________________________
_________________ dollars and ______________ cents. 1,350 LF
67 26 05 19.01 Cable - #14
_________________ dollars and ______________ cents. 1,200 LF
Page B-14 Bid Proposal – Addendum No. 1
Page B-15 Bid Proposal – Addendum No. 1
NO. NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
ELECTRICAL
68 26 05 00 Electrical Underground Pullbox at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 EA
69 26 05 09 2" Conduit Direct Buried at the unit price of ______________________________
_________________ dollars and ______________ cents.
350 LF
70 26 05 09 1" Conduit Direct Buried at the unit price of ______________________________
_________________ dollars and ______________ cents.
360 LF
71 26 05 09 2-1" Conduit Direct Buried at the unit price of ______________________________
_________________ dollars and ______________ cents.
372 LF
72 26 05 09 1-4" Conduit Direct Buried (Utility Primary Underground
Per Utility Requirements) at the unit price of ______________________________
_________________ dollars and ______________ cents.
70 LF
73 26 05 19 3-#1, #1 Neutral,#6 Ground at the unit price of ______________________________
_________________ dollars and ______________ cents. 380 LF
74 26 05 19 1-#12, #12 Neutral, #12 Ground at the unit price of ______________________________
_________________ dollars and ______________ cents. 480 LF
75 26 05 19 2-#10, #10 Neutral, #10 Ground at the unit price of ______________________________
_________________ dollars and ______________ cents. 480 LF
76 26 26 16.01 New Service Entrance Section 200 Amp., 3 Phase, 480/277 Volt, 22KAIC, NEMA 3R, on New Concrete Pad.
at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 LS
77 26 26 16.01 New Utility Transformer Pad Per Utility Requirements at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 LS
78 25 56 00 Lighting Control Panel complete at the unit price of ______________________________
_________________ dollars and ______________ cents. 1 LS
79 26 56 00 New Steel Pole with 1 LED Fixtures and L-810 Obstruction
Light on New Foundation with Grounding Complete at the unit price of ______________________________
_________________ dollars and ______________ cents. 2 EA
80 26 56 00 New Steel Pole with 2 LED Fixtures and L-810 Obstruction
Light on New Foundation with Grounding Complete
_________________ dollars and ______________ cents. 2 EA
Page B-16 Bid Proposal – Addendum No. 1
Page B-17 Bid Proposal – Addendum No. 1
NO. NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
81 L-125-5.1 New L-853 Retroreflective Taxiway Edge Marker (Blue) at the unit price of ______________________________
_________________ dollars and ______________ cents. 4 EA
82 L-125-5.2 Remove Existing L-853 Retroreflective Taxiway Edge
Markers
_________________ dollars and ______________ cents. 6 EA
83 Total Amount of Base Bid, Items 1 Thru 82 Inclusive $
/100 Dollars
Written Words
NOTE TO BIDDERS: All unit prices and bid totals of extended prices include all applicable taxes, delivery, and freight charges. Bidders are required to fill in all blank spaces with an entry. Bids submitted with blank spaces shall be considered “non-responsive.”
Page B-18 Bid Proposal – Addendum No. 1
Page B-19 Bid Proposal – Addendum No. 1
DEMOLITION (ADD ALT NO. 1)
NO. NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
1 02 41 19 UST and Concrete Pad Removal at the unit price of ______________________________
_________________ dollars and ______________ cents.
2 EA
2 02 61 00.00 Uncontaminated Soil Removal at the unit price of ______________________________
_________________ dollars and ______________ cents.
1180 TON
3 02 61 00.00 Contaminated Soil Removal at the unit price of ______________________________
_________________ dollars and ______________ cents.
675 CY
4 02 61 00.00 Groundwater Removal at the unit price of ______________________________
40,000 GAL
5 Total Amount of Add Alt No. 1, Items 1 Thru 4 Inclusive $
Total Amount of Bid, Base Bid Plus Additive Alternate $
NOTE TO BIDDERS: All unit prices and bid totals of extended prices include all applicable taxes, delivery, and freight charges. Bidders are required to fill in all blank spaces with an entry. Bids submitted with blank spaces shall be considered “non-responsive.”
File details come from the government source that posted it. Updated .