Angling Site Clearing - Addendum 01.pdf

PDF 11 MB Posted

Attached to
ANGLING ROAD ELEMENTARY - SITE CLEARING PACKAGE
Solicitation number
RFP PPS 270000000316 2
Issued by
Kalamazoo County, Michigan

About this file

This addendum to the Instructions to Bidders and supporting documents pertains to Portage Public Schools' Angling Road Elementary Site Clearing Package, issued by Owen-Ames-Kimball Co. as the Construction Manager on November 10, 2026. The project involves earthwork and site clearing services at 5201 Angling Road, Portage, Michigan. A single bid category—Bid Category No. 01 (Earthwork - Site Clearing)—has been established, encompassing complete site-related and demolition work, surveying and staking, applicable permits and inspections, maintenance of public roads, temporary tree protection, soil erosion control, grading, debris removal, track mat installation, and delivery of selected logs to Lake Center Elementary. A Pre-Bid Conference was scheduled for Wednesday, November 11, 2026, at 9:00 a.m. at the site location (5353 Angling Road, Portage, MI 49024, accessible from Vincent Avenue). Bidders must submit proposals in triplicate on the provided Bid Proposal Form and may bid on the single category or submit separate proposals if seeking consideration of combined and individual bids. Bid security in the form of a certified or cashier's check or bid bond is required at five percent (5%) of the base bid. Bids may not be modified, withdrawn, or cancelled for sixty (60) days following the bid receipt deadline. Successful bidders will receive a Notice of Pending Award and must submit required documentation within ten (10) days, including insurance forms, cost breakdowns, subcontractor lists, manufacturer information, and schedule details. For contracts exceeding $50,000, separate Performance and Payment Bonds are required. All bidders must complete a sworn and notarized Familial Disclosure Statement in accordance with Michigan's Revised School Code Section 1267.

The geotechnical report, dated June 19, 2026, prepared by Driesenga & Associates, Inc., documents subsurface conditions based on twenty-six soil borings (SB-1 through SB-26) advanced to depths between fifteen and thirty feet, completed May 19 and May 26–28, 2026. The site currently consists of vacant land with brush and tree cover. Subsurface materials include two to twelve inches of topsoil underlain by sand and clay fill to depths of three to six feet, with native loose to dense brown sands comprising the deeper layers. No groundwater was encountered during drilling operations. The site is classified as Seismic Site Class D under ASCE 7 standards. The proposed 70,000-square-foot elementary school building will utilize slab-on-grade construction with precast concrete planking for the second floor and steel joist roof framing. Foundation design parameters specify maximum loads of 10–15 kips per linear foot for wall footings or 200–250 kips at spread footings, with allowable total and differential settlements of one inch and one-half inch, respectively. The geotechnical report recommends a maximum net allowable soil bearing pressure of 2,000 psf, with six feet of undercutting (remove and replace) below foundations required, proof-compaction of native sands, and stabilization of subgrade soils as necessary. Pavement design recommendations include light/medium duty sections (60,000 ESAL) with 1.5 inches of MDOT 13A/4EML surface course, 1.5 inches of leveling course, six inches of MDOT 21AA aggregate base, and twelve inches of MDOT Class II granular base; heavy duty sections (250,000 ESAL) specify increased thicknesses. The Phase I Environmental Site Assessment, dated March 26, 2026, based on a site inspection conducted March 13, 2026, identified no recognized environmental conditions or significant contamination issues at the subject property.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 www.owen-ames-kimball.com

ADDENDUM NO. 1 – Portage Public Schools – Angling Elementary Site Clearing

November 10, 2026

The following items are changes, clarifications, corrections of errors, etc., with respect to the Contract Documents previously issued. This addendum shall be a part of the Contract Documents.

Items listed below may or may not affect the cost of the Contractor's Proposal. Changes in cost shall be incorporated in the Contractor's Proposal.

ITEM No.1

REVISED INSTRUCTIONS TO BIDDERS – ATTACHED

Items that are crossed out or in bold blue are changes to the original instructions to bidders.

ITEM No.2

GEOTECHNICAL REPORT – ATTACHED

ITEM No.3

ENVIRONMENTAL SITE ASSESSMENT – ATTACHED

ITEM No.4

POST BID INTERVIEW SCHEDULE – ATTACHED

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 1 of 9

SUPPLEMENT TO INSTRUCTIONS TO BIDDERS

STANDARD AIA FORMS

The Instructions to Bidders (AIA Document A701-2018 Edition), Articles 1 through 8, and as herein amended or added to, are a part of the Contract Documents, and shall apply to all Contractors, and/or Subcontractors.

ARTICLE 1 – DEFINITIONS Add Subparagraph 1.10 as follows:

1.10 All references made to Owner shall be implied to refer to the Construction Manager.

ARTICLE 3 – BIDDING DOCUMENTS

3.1 Distribution Add Subparagraph 3.1.6 as follows:

3.1.6 The Bidding Documents, including drawings, specifications, and necessary forms, can be examined at the following locations.

• Owen-Ames-Kimball Co. website: www.owen-ames-kimball.com/subcontractors/

• Builders Exchange plan rooms in Grand Rapids, Kalamazoo, Lansing, and Traverse City.

List a location of bid documents, in addition to OAK’s Office include Architect’s Office, Owner’s Office and Plan Room if applicable.

3.2 MODIFICATION OR INTERPRETATION OF BIDDING DOCUMENTS Revise Subparagraph 3.2.2. as follows:

Line 2 shall read “…ten days…”

ARTICLE 4 – BIDDING PROCEDURES

4.1 PREPARATION OF BIDS Revise Subparagraph 4.1.1. and Add Subparagraph 4.1.6.1, 4.1.9 and 4.1.10 as follows:

Bids shall be submitted, in triplicate, on the Bid Proposal Form included within the bidding Documents.

4.1.6.1 Proposals will be accepted for one (1) Bid Category only, or a combination of two (2) or more Categories. If the Bidders wish to have their combined bid considered for separate categories, they must submit separate proposals for the individual category along with their combined bid proposal.

4.1.9 A Pre-Bid Conference will be held in accordance with the following schedule:

Date: Wednesday, November 11th, 2026

Place: 5353 Angling Road, Portage, MI 49024 – Site Access off Vincent Ave

Time :9:00am

4.1.10 In accordance with Section 1267 of the Revised School Code each bid must be accompanied by a sworn and notarized Familial Disclosure Statement completed by the bidder disclosing any familial relationship between the Owner or any employee of the Bidder and any member of the District’s Board of Education or the

Superintendent of the District.

4.2 BID SECURITY Add Subparagraphs 4.2.1.1, 4.2.1.2 and Revise Subparagraph 4.2.3 as follows:

4.2.1.1 Bid security shall be required for each bid tendered.

4.2.1.2 Bid security shall be in the form of either a CERTIFIED or CASHIER’S CHECK on an open and solvent bank or bid bond issued by surety company payable to the Owner in an amount equal to five percent (5%) of the base bid.

4.2.3 Revise Lines 1 and 2 to read “If a surety bond is provided the attorney-in-fact who …”.

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 2 of 9

4.3 ADDENDA Revise Subparagraph 4.3.3 as follows:

4.3.3 Addenda will be issued no later than two days prior to the date for receipt of Bids except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.

4.4 MODIFICATION OR WITHDRAWAL OF BIDS Revise Subparagraph 4.4.3 as follows:

4.4.3 After the time and date of receipt of Bids, a bid may not be modified, withdrawn or cancelled by the Bidder for sixty (60) days.

ARTICLE 5 – CONSIDERATION OF BIDS

5.3 ACCEPTANCE OF BID (AWARD) Revise Subparagraph 5.3.2 and add Subparagraph 5.3.4 as follows:

5.3.2 Revise Line 1 to read “…right to accept Mandatory and Voluntary Alternates in any order…”

5.3.3 Owner reserves the right determine which bidders are considered the lowest qualified bidder and to award to said bidder.

5.3.4 After the Owner has awarded the Bid Categories the Construction Manager will prepare and send a Notice of

Pending Award to the successful Bidders.

ARTICLE 6 – POST-BID INFORMATION

6.1 CONTRACTOR’S QUALIFICATION STATEMENT Revise Subparagraph 6.1 as follows:

The Owner, Architect and Construction Manager may make such investigations as they deem necessary to determine the ability of the Bidder to perform the work. The Bidder shall furnish all such information and data for this purpose as the Construction Manager may request within twenty-four (24) hours, including, but not limited to, lists of projects completed, financial statements for the past two (2) years, a current list of work in progress. The Owner reserves the right, based on the advice of the Construction Manager and

Architect, to reject any bid if the evidence submitted, or investigation of such Bidder, fails to prove that such

Bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein.

6.3 SUBMITTALS Revise Subparagraph 6.3.1, replace Subparagraphs 6.3.1.1 thru 6.3.1.3 and add

Subparagraphs 6.3.1.4 thru 6.3.1.6 as follows:

6.3.1 The Bidder shall within ten (10) days upon issuance of a Notice of Pending Award furnish to the Owner through the Construction Manager the following:

6.3.1.1 The necessary insurance forms as specified in the Bidding Documents.

6.3.1.2 A cost breakdown on the continuation sheets of the “Application and Certificate for Payment”, AIA

Document G703 showing all major work items, separated by both material and labor.

6.3.1.3 A list of the work which will be performed with the Bidder’s own forces, a list of their subcontractors and a list of work that will be performed by the subcontractor’s forces.

6.3.1.4 Names of the manufacturer’s, products and suppliers of principle items, materials or systems proposed for the work.

6.3.1.5 Schedule information.

6.3.1.6 The Bidder will be notified in writing if any of the above items are not acceptable.

ARTICLE 7 – PERFORMANCE BOND AND PAYMENT BOND

7.1 BOND REQUIREMENTS Revise Subparagraph 7.1.1 as follows and Delete Subparagraph 7.1.3

7.1.1 Revise first sentence to read “For Contracts exceeding $50,000 the Bidder shall furnish separate Performance and Payment Bonds covering the…”

7.2 TIME OF DELIVERY AND FORM OF BONDS Delete Subparagraph 7.2.2

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 3 of 9

ARTICLE 8 – ENUMERARTION OF THE PROPOSED CONTRACT DOCUMENTS

8.1 Revise sentence to read: Copies of the proposed Contract Documents will be made available to the Awarded

Bidder as modified and would include but not limited to the following documents as issued by the Construction

Manager.

ARTICLE 9 – INSURANCE

9.1 INSURANCE REQUIREMENTS The required insurance will name Owen-Ames-Kimball Co., Owner and

Architect, along with their respective officers, agents and employees are named as additional insureds for the auto liability and general liability on a primary and non-contributory basis for ongoing and completed operations. The ONLY acceptable endorsement for the additional insureds requirements is ISO form CG 20

37 07 04.

9.1.1 Commercial General Liability – ISO Occurrence form CG 20 10 07 04 and CG 20 37 07 04 are the required forms.

ARTICLE 10 – DESCRIPTION OF WORK Add paragraph 10.1 and 10.2

10.1 BID CATEGORIES Add Subparagraphs 10.1.1, 10.1.1.1., 10.1.1.2, 10.1.1.3 as follows:

10.1.1 Bid Categories have been established to guide Bidders in determining scope of work where trade jurisdiction is not clearly defined. These descriptions are not meant to be all inclusive of work to be included in the Bid.

If a conflict in the assignment of work exists between the Bidding Documents and the descriptions of these bid categories, the requirements of the bid category description(s) shall take precedence and the

Construction Manager shall immediately be notified of the conflict. Bidders are to familiarize themselves with all Bid Categories.

10.1.1.1 Requirements for a specific Bid Category, trade or contract will generally be described in that portion of the

Specifications or Drawings related to that trade or contract. Such requirements may, however, be described in other sections of the contract documents. Contractors will be held responsible for having carefully examined all drawings and read all divisions of the specifications and all contract documents to avoid omissions or duplications and to ensure a complete job.

10.1.1.2 There is not necessarily a direct relationship between the Bid Category numbers or names and the

Specification Division or Section numbers.

10.1.1.3 Unless specifically noted as being furnished only, scopes include the complete installation including materials, labor, equipment, interface with the work of other trades, etc.

10.2 INDEX OF BID CATEGORIES Add paragraph 10.2

Bid Category No. 01 – Earthwork – Site Clearing

10.3 BID CATEGORY DESCRIPTIONS Add paragraph 10.3

Bid Categories have been established to guide Bidders in determining scope of work where trade jurisdiction is not clearly defined. These descriptions are not meant to be all inclusive of work to be included in Bid.

Unless specifically noted as being furnished only or install only, scope includes complete installation including all labor, material, equipment, etc.

Bidders are required to familiarize themselves with all Bid Categories and Alternates.

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 4 of 9

BID CATEGORY NO. 01 – EARTHWORK

Include:

1. Complete site related and demolition work as shown on the drawings and as specified in the following sections:

Division 01 – General Requirements

31 1000 Site Clearing

31 2000 Earthwork

32 9300 Plants

2. All necessary surveying and staking for this contractor’s work. The Construction Manager will supply building control points and establish a benchmark.

3. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

4. Responsible for keeping public roads clean of construction traffic dirt and debris.

5. Temporary tree protection measures.

6. Site related demolition, including but not limited to, pavements, site walls, utility structures, etc.

7. Soil erosion permit and erosion control.

8. Maintain and control grades to facilitate the run-off of site surface water.

9. Supply and maintain barricading as required for the work of this contractor.

10. Responsible to follow the most stringent requirements between the architectural specifications and those listed in the recommendations of the geotechnical report.

11. Responsible for all demo and debris removal shown on drawings.

12. Responsible for filling in/grading any holes created during demo and removal.

13. Provide and install track mat.

14. Remove, haul off and deliver selected logs to Lake Center Elementary 10011 Portage Rd, Portage, MI 49002. Drop off location to be coordinated with O-A-K and District. Ref Note on CD101.

15. Reference spec section 31 1000 Site Clearing, section 3.5 for complete tree and root removal.

16. Holes and depressions made from tree / root removal to be filled with engineered fill material.

Exclude:

1. Testing will be provided for and paid for by the Owner.

GENERAL COMMENTS

Demolition:

1. Dumpsters provided by the Construction Manager for use during construction shall not be available for the disposal of the following items: debris resulting from architectural, structural, mechanical, or electrical demolition operations; site related materials; paint products, hazardous materials. Contractors generating such materials shall provide dumpsters for them and legally dispose of them off site.

2. Unless specifically noted otherwise the division of demolition work shall be as follows: sitework contractor – site demolition; general trades contractor – architectural and structural demolition; mechanical/plumbing contractor –

HVAC and plumbing demolition; fire protection contractor – fire protection demolition; electrical contractor – electrical demolition.

3. Demolition shown on the demolition plans is the responsibility of the Demolition / General Trades Contractor.

Patching of items as a result of demolition shown on the Demolition plans is the responsibility of the contractor who is responsible for similar elements throughout the building.

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 5 of 9

4. Demolition (and related patching) needed but not shown on the demolition plan is the responsibility of the contractor requiring it.

General Safety:

1. Your Firm, all employees, subcontractors, and material suppliers onsite will comply with Owen-Ames-Kimball

Co.’s Safety Policy and Requirements, INCLUDING BUT NOT LIMITED TO THESE HIGHLIGHTED ITEMS:

a. Hard hats are required.

b. Contractor safety manuals/books will be kept on-site.

c. Contractors must provide their own first aid and fire protection equipment.

d. Contractors are responsible for providing the necessary barricades for their work.

e. Contractors are responsible for their own fall protection.

f. Contractors must comply with the "Right to Know" law.

g. Contractors must comply with O.A.K.'s substance abuse policy.

h. No Smoking, Tobacco, or E-Cigarettes on School Property.

i. A designated competent/qualified person shall be required to be on site for the following but not limited to structural demolition, scaffolding, fall protection & excavations.

j. Contractors shall furnish a written job specific Silica Exposure Plan per MiOSHA requirements.

k. Contractors required to work in a masonry restricted zone must have proper training.

2. Owen-Ames-Kimball Co. Safety Manual can be viewed in its entirety here:

https://tinyurl.com/34zxyj49

End of Instruction Bidders

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 6 of 9

STATEMENT OF PARTICIPATION

Owen-Ames-Kimball Co. strives to recognize and represent the community in which you reside and serve through continuous efforts to encourage local participation and inclusive practices on all our construction projects.

Owen-Ames-Kimball Co. encourages local participation. We believe we have a responsibility to support the growth of the businesses within the community in which the project resides.

Owen-Ames-Kimball Co. practices inclusion. These inclusive practices are established within our organization and in our business endeavors, and strongly promoted on our jobsites. We encourage all of our subcontractors to implement inclusive practices within their organizations and through partnering efforts on our projects.

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 7 of 9

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 8 of 9

Portage Public Schools, Angling Road Elementary – Site Clearing Package – Addendum 01 - Page 9 of 9

12330 James Street, Suite H80 Holland, Michigan 49424 Ph. (616) 396-0255 Fax (616) 396-0100 www.driesenga.com LLaannssiinngg KKaallaammaazzoooo GGrraanndd RRaappiiddss YYppssiillaannttii

Holland Grand Rapids Kalamazoo Lansing Ypsilanti

June 19, 2026 via electronic mail

Mr. Russ Gerbers

PORTAGE PUBLIC SCHOOLS

8701 Mustang Drive Portage, Michigan 49002

Re: Geotechnical Report Portage PS Angling Road Elementary 5201 Angling Road, Portage, Michigan Driesenga & Associates, Inc. Project No 2650432.3A

Dear Mr. Gerbers:

Driesenga & Associates, Inc. is pleased to submit the attached report of subsurface exploration performed for the above-referenced project. The report presents the exploration procedures, subsurface conditions encountered, and our recommendations for development of the site with respect to proposed earthwork, foundation construction, and pavement design. As the project nears construction you can contact Andrew Anschuetz at 269-544-1455 or andrewa@driesenga.com in our local office to provide a quote for construction materials testing and survey needs.

Proper execution of our recommendations will affect the design, construction and performance of the structure and related facilities, and the potential associated risks involved. Therefore, the issues and recommendations presented in this report should be discussed with the project team, including Driesenga & Associates, Inc. This will increase the likelihood that the issues are understood and our recommendations are applied in a manner consistent with the project budget, tolerance of risk, and expectations for performance and maintenance.

We appreciate the opportunity to be of service to you. If you have any questions concerning this report, or if we can be of further service as design and construction progresses, please contact our office.

mailto:andrewa@driesenga.com

GEOTECHNICAL REPORT

SITE:

PORTAGE PS ANGLING ROAD ELEMENTARY

5201 ANGLING ROAD, PORTAGE, MICHIGAN

June 19, 2026

PROJECT NO. 2650432.3A

PREPARED FOR:

PORTAGE PUBLIC SCHOOLS

8701 MUSTANG DRIVE, PORTAGE, MICHIGAN

Prepared by:

Driesenga & Associates, Inc.

TABLE OF CONTENTS

1.0 INTRODUCTION

1.1 LOCATION

1.2 PURPOSE

1.3 SCOPE

1.4 DESIGN INFORMATION

2.0 SITE CONDITIONS

2.1 GENERAL

2.2 SURFACE CONDITIONS

2.3 DESCRIPTION OF SUBSURFACE SOILS

2.4 GROUNDWATER OBSERVATIONS

2.5 SEISMIC SITE CLASS

2.6 LIMITATIONS

3.0 RECOMMENDATIONS

3.1 SITE PREPARATION

3.2 FOUNDATIONS

3.3 FLOORS

3.4 PAVEMENTS

3.5 GROUNDWATER CONTROL

3.6 TEMPORARY EXCAVATION STABILITY

4.0 GENERAL COMMENTS

APPENDICES

APPENDIX A Figure 1 – Site Location Figure 2 – Boring Locations APPENDIX B Soil Boring Logs APPENDIX C Field and Laboratory Procedures

1.0 INTRODUCTION

1.1 LOCATION

This report presents the results of the geotechnical investigation completed for the proposed

Portage Public School’s Angling Road Elementary. The site is located at 5201 Angling Road, Portage, Michigan as shown on Figure 1 – Site Location (Appendix A).

1.2 PURPOSE

The purpose of this investigation was to determine the subsurface profile, the engineering characteristics of the subsurface soils, and to provide recommendations in regard to the proposed design and construction based on our interpretation of the test results. This report was prepared in general accordance with our proposal dated April 16, 2026, as authorized by Mr. Russ Gerbers of

Portage Public Schools on April 26, 2026.

1.3 SCOPE

The field exploration to estimate engineering characteristics of the site soils included performing a site reconnaissance, advancing the soil borings, performing standard penetration tests, and recovering split-spoon samples. Soil boring locations were determined in the field by measuring from existing site features. Existing ground surface elevations were not provided and obtaining them was beyond the scope of this investigation.

Twenty-six (26) soil borings, designated SB-1 to SB-26, were advanced in the vicinity of the proposed development on May 19 and May 26 to 28, 2026, at the approximate locations shown on

Figure 2 - Boring Locations (Appendix A). The soil borings were advanced with hollow-stem augers to depths ranging between fifteen (15) and thirty (30) feet below the ground surface. During drilling, soil samples were collected from split-spoon sampling via standard penetration testing

(ASTM method D 1586) at intervals of 2.5 feet to a depth of 10 feet, and intervals of 5 feet from a depth of 10 feet to the end of each boring. The soil boring logs are contained in Appendix B. The field and laboratory procedures are described in Appendix C.

1.4 DESIGN INFORMATION

The project consists of a new elementary school building of approximately 70,000 square feet. The first floor is intended to be slab-on-grade, the second floor is intended to be precast concrete plank, and roof framing is intended to be primarily steel joists. A basement, crawl space, or mechanical tunnels are not anticipated to be required though the slab on grade elevation may step to follow the site contours, pending design. Loading and performance criteria are as follows:

• Preliminary maximum foundation loading is 10-15 kips per linear foot for wall footings, or

200-250 kips at spread footings.

• Allowable total and differential settlement is 1 inch and ½ inch respectively.

Assuming that the new construction will not include any basement areas, exterior footing depths are assumed to be a minimum of 3.5 feet below the final ground surface elevation.

We have assumed maximum tolerable settlements of 1 inch total and ½ inch differential. We anticipate cuts and fills on the order of 4.0 feet or less will be required to establish site grades. Any significant deviation from these assumptions should be brought to the attention of Driesenga &

Associates, Inc. as soon as possible.

2.0 SITE CONDITIONS

2.1 GENERAL

The stratification of the soils, as shown on the soil boring logs in Appendix B, represents the soil conditions at the actual soil boring locations. Variations may occur away from or between the soil borings. Stratigraphic lines shown on the soil boring logs represent the approximate boundary between the soil types, but the transition may be gradual. They are not intended to show exact depths of change from one soil type to another. In addition, changes in soil type may occur between the sample intervals that are consequently not observed by the driller.

The soil boring logs in Appendix B include the drilling method, materials encountered, penetration resistances, and pertinent field observations made during the drilling operations along with the results of the laboratory testing.

2.2 SURFACE CONDITIONS

The subject property is currently vacant with brush and tree cover. The site is surrounded by maintained lawn, asphalt parking, and driveway areas associated with residential and commercial uses.

2.3 DESCRIPTION OF SUBSURFACE SOILS

Surface materials encountered at the site generally consist of 2 inches to 12 inches of topsoil underlain by sand and clay fill extending to depths ranging between 3 to 6 feet. The native soil consists of very loose to dense, brown, fine to coarse grained sands which extended to the explored depth of the soil borings.

Hand Penetrometer tests were performed on representative portions of cohesive soil samples to obtain an indication of the unconfined compressive strength of the material. As indicated on the soil boring logs, the estimated unconfined compressive strength ranged from 2.5 to 3.5 tons per square foot (tsf).

The estimated group symbol, according to the USCS, is shown in the USCS column just before the textural description of the various strata on the soil boring logs in Appendix B.

2.4 GROUNDWATER OBSERVATIONS

Groundwater was not encountered in any of the soil borings during or after completion of drilling operations. Hydrostatic groundwater levels and the elevations and volumes of groundwater should be expected to fluctuate throughout the year, based on variations in precipitation, evaporation, run-off, and other factors. The groundwater levels (or lack thereof) indicated by the soil borings and presented in this section represent conditions at the time the readings were taken. The actual groundwater levels at the time of construction may vary.

Groundwater measurements were attempted during drilling and again shortly after completion of the drilling operations. After drilling and collection of groundwater readings, the boreholes were backfilled with auger cuttings and the surface was repaired approximating previous conditions.

Since the boreholes were backfilled shortly after drilling, long-term groundwater level information is not available from the soil borings. To obtain long-term groundwater levels, groundwater observation wells would be required.

2.5 SEISMIC SITE CLASS

The proposed building’s seismic class was determined for use in the structural design of the proposed project. Soils information was obtained from the soil borings completed on-site, as well as information obtained from the “Soil Survey of Kalamazoo County” by the United States

Department of Agriculture, the “Quaternary Geology of Michigan” completed by W.R. Farrand, the USGS Topographic Quadrangle and the Hydrogeologic Atlas of Michigan. It is assumed that the proposed structure falls under Building Class III according to the 2015 Michigan Building

Code (MBC) Table 1604.5. Based on this information it is our determination that seismic site class

D be used according to the ASCE 7 – Table 20.3-1 for structural calculations.

2.6 LIMITATIONS

Soil and groundwater conditions have been observed and interpreted at the soil boring locations only. This information has been used as the basis for our analyses and the recommendations that follow. Although we have allowed for minor variations in subsurface conditions in the development of our recommendations, conditions can vary away from and between soil boring locations. Should this become evident during construction, we should be contacted to review our recommendations. This geotechnical evaluation and report were prepared for geotechnical purposes only. We did not perform environmental related borings or analytical tests.

3.0 RECOMMENDATIONS

3.1 SITE PREPARATION

To increase the likelihood that the recommended allowable soil bearing capacities are achieved and tolerable settlements are not exceeded, the recommendations contained herein should be followed.

Within the building footprint and any areas to receive fill, all existing building material, topsoil, old fill, organic-containing material, frozen soil and other unsuitable material should be removed. The clearing should extend a minimum of 5 feet beyond the limits of proposed building and pavement areas and areas to receive structural fill.

It is strongly recommended that the building pad and pavement subgrade areas be evaluated by

Driesenga & Associates, Inc. after the area has been cleared and stripped. This evaluation may be performed by proofrolling with a loaded tandem axle dump truck or another method selected by the geotechnical engineer to identify any areas of soft subgrade soil. Where soft subgrade soils are encountered, remedial actions as recommended by the geotechnical engineer will be required.

Any existing foundations, floor slabs, utilities, and other below-grade structures from previous construction should be completely removed from the footprint of the proposed building. In proposed pavement areas, existing utilities and other below-grade structures should be removed to at least 2.5 feet below the final subgrade level. Alternatively, utilities can be left in place below pavement areas if the void space of the utility is completely grouted. Depressions or excavations from the demolition and removal operations should be backfilled with granular structural fill meeting the requirements of MDOT Class II sand compacted in accordance with the recommendations below.

Existing fill was encountered in the soil borings and extended about 3 to 6 feet below the existing ground surface. Without documentation of the placement of the fill, we consider it to be

“uncontrolled fill.” If documentation of the existing fill is available, we would be pleased to review it to determine its suitability of slab, pavement, and/or structural fill support.

Deeper and/or looser uncontrolled fill may be encountered at the site, particularly adjacent to existing or former structures, or in the vicinity of existing utilities. The existing fill may be suitable for support of slabs, pavements, and/or structural fill after additional evaluation and special preparation and only where it is not underlain by buried topsoil or other organic, deleterious or otherwise unsuitable soils and the owner accepts the risks in doing so. Existing fill with excessive organics (over 4%), voids or debris should be removed and replaced with structural fill. Test pits should be performed to identify unsuitable fill. The test pits could be performed prior to construction. However, suitability of the existing fill will need to be determined on a case-by-case basis during construction. The remaining fill, after removing unsuitable fill, is anticipated to be suitable to support floor slabs, pavements and structural fill, provided an increased risk of unsatisfactory performance is acceptable. We believe the risk of unsatisfactory performance such as cracking and settlement associated with the construction of slabs-on-grade and pavements on or above the existing fill is relatively low after preparation.

Ultimately, if the risk of poor slab and/or pavement performance is not acceptable, complete removal of the existing fill and replacement with structural fill should be performed. Based on the soil borings, the existing fill could extend 6 feet or more below the existing ground surface. If performed, the removal of the existing fill should extend a minimum of 10 feet beyond the edges of the proposed building, or laterally on a two vertical to one horizontal slope from the bottom outside edge of the foundation, whichever is greater. This action should reduce the amount and depth of undercutting during foundation construction since the unsuitable fill and any unsuitable soils directly beneath fill would be removed. For this case, the test pit evaluation would not be necessary. However, a test pit evaluation could be performed to provide a better estimate of the nature, depth and extent of the existing fill.

Trees were located within the project area when this investigation was conducted. Large trees may have relatively widespread root structures and related organic veins. The earthwork activities within the building and pavement areas should include complete removal of the tree roots and organic veins.

In all general fill areas, the exposed granular soil surface should be scarified to a depth of 12 inches and compacted to a minimum of 95% of Modified Proctor maximum dry density (MDD) per

ASTM D 1557 method, or 98% of MDD as determined by the Michigan Cone Method. Sand soils were encountered at or near the final subgrade level in some of the soil borings in the proposed building area. Within the proposed building area the native sand should be proof-compacted by at least six (6) passes of a 10-ton vibratory roller.

Significant disturbance of the subgrade may result from repeated construction traffic on the clay fill. The exposed subgrade may need to be stabilized after removal of surface materials to support construction traffic or to reduce subgrade disturbance. Also, the clays may become disturbed due to ponded water and/or repeated construction traffic. Therefore, the contractor should remove standing water from the subgrade and prevent surface water from reaching the footing excavations and the subgrade. In addition, construction traffic should use haul roads and should not haphazardly traffic the site. The client should understand that construction costs may be higher during wet, snowy and/or colder months and that site preparation may be more extensive due to the effects of moisture on the soils. The contractor should limit the number and size of construction equipment on the site, should grade the site during stripping operations to allow surface water to drain from areas of proposed development, and should remove water from areas where it collects.

In addition, site utilities should be installed early in the project to channel groundwater into the sand-filled trenches. Even with the above precautions, a significant amount of subgrade disturbance may result. Subgrade soils that become disturbed should be removed and replaced with structural fill or crushed aggregate. We recommend including a contingency in the construction budget to provide for subgrade improvements.

It is recommended that any fill materials be placed in or near horizontal maximum 8-inch-thick loose lifts and compacted to a minimum of 95% of Modified Proctor MDD, or 98% of Michigan

Cone MDD. If a vibratory roller is used for compaction, the loose lift thickness may be increased to 12 inches. Soils used for structural fill should consist of clean sand meeting SW or SP classification in accordance with USCS criteria. Where granular soils are placed within clay soil profile, a drainage outlet should be provided to prevent the collection of water due to creating a

“bathtub” effect.

3.2 FOUNDATIONS

Considering the subsurface conditions on this site, the assumed proposed construction and the recommended site preparation activities, it is acceptable for the proposed school to be supported on conventional spread footings, but only after the subgrade soils are improved as noted below.

Footings bearing on newly placed structural fill placed over suitable native soils or directly on the native soils may be designed for a maximum net allowable soil bearing pressure of 2,000 psf. The allowable bearing pressure may be increased by one-third for seismic or wind loads. The footings should not be placed on the existing fill material. Six (6) feet of undercutting (remove and replace) below the foundations will be required in the building footprint in order to achieve the recommended bearing capacity.

At some locations, the native sand soils may be in relatively loose condition and not suitable for support of foundations at the recommended design soil bearing pressure. In addition, these soils may become loosened below the bottom of footing level from the excavation activities or from construction traffic, especially if allowed to dry out. Therefore, the excavated footing bearing surfaces should be compacted to a minimum of 95% of Modified Proctor MDD, or 98% of MDD as determined by the Michigan Cone Method, just prior to concrete placement. A hand-operated plate compactor may be used for loose or disturbed soil that is less than 6 inches in thickness. For deeper compaction, we recommend using a hoe-pac mounted on a backhoe. Water may need to be added to achieve the desired compaction for the allowable bearing capacity.

If it is not possible to improve the sands by densification, the unsuitable soils may need to be removed and the foundations placed on suitable native soils encountered at lower levels.

Alternatively, the undercut may be backfilled with crushed aggregate to the bottom of footing level. In addition, wet or easily disturbed foundation bearing soils could be encountered at some locations. If wet soils are encountered, we recommend a layer of crushed aggregate be placed on the subgrade. The thickness of this layer will depend on the conditions encountered at the time of construction. In areas where undercutting is required, the undercut should extend laterally on a two vertical to one horizontal slope from the edge of the footing.

To attain the recommended bearing pressure where foundations bear on clay soils, improvement of the foundation subgrade may be required in some areas. The soil conditions may vary from those disclosed by the soil borings and undercuts may be required. The amount of improvement will depend on the finished floor elevation, the amount of disturbance during earthwork operations, and the soil and groundwater conditions at the foundation bearing level(s). We do not anticipate compaction of the clay soils will be effective and improvements may include mixing a layer of coarse crushed aggregate into the subgrade. If the subgrade conditions cannot be improved either by compaction or mixing in crushed aggregate, the unsuitable soil should be removed and replaced with structural fill. In areas where undercutting is required, the undercut should extend laterally on a two vertical to one horizontal slope from the edge of the footing.

All perimeter footings and footings in unheated areas should bear at least 42 inches below finished grade for protection from frost action. To reduce the likelihood of frost heave, trench footings should be formed vertically and should not be allowed to widen near the top. If interior footings are to bear on compacted fill, the fill should be placed in accordance with the recommendations of

Section 3.1. Interior foundations can be constructed on suitable natural soils or on structural fill overlying suitable natural subgrade just below the floor slab. However, the footings and proposed bearing soils should be protected from freezing during construction if work is conducted in the cold winter months. Due to the sands encountered at the site, construction of trench footings is probably not feasible. Therefore, we anticipate footing excavations will need to be sloped back and the foundations formed. The placement of footing concrete should be done as soon as footing excavations have been completed and approved to reduce the potential for disturbance or freezing of the footing subgrade.

Prior to concrete placement, the bearing surface should be free of loose soil and standing water.

The contractor should avoid stockpiling excavated materials immediately adjacent to the excavation walls. It is recommended that stockpiled materials be kept back from the excavation a minimum distance equal to half the excavation depth to prevent surcharging the excavation walls.

Total and differential settlement of foundations properly designed and constructed based on our recommendations are not expected to exceed 1 inch and ½ inch, respectively.

3.3 FLOORS

The soil below the floor slab should be prepared in accordance with the recommendations in

Section 3.1. A noncohesive soils mat such as MDOT Class II sand should be provided directly below the floor slabs. The mat should be a minimum of 8 inches in thickness and compacted to a minimum of 95% of Modified Proctor MDD.

We recommend providing vapor barriers below floor slabs that will receive an impermeable floor finish/seal. Even if these floor coverings are not planned, the vapor barrier can reduce the transmission of moisture vapor from the ground into the building. However, the placement of a vapor barrier affects construction of the floor slab, concrete curing, and the rate of moisture loss as the concrete dries. These factors could affect the performance of the slab. The manufacturer of the vapor barrier should be consulted in regard to the depth of the barrier below the slab.

The floor slab should be suitably reinforced and proper joints should be provided at the junctions of the slab and foundation system so that a small amount of independent movement can occur without causing damage. A minimum of 6 inches of structural fill should be provided between the bottom of the slab and the top of the shallow spread footing below. Otherwise, other arrangements should be made to allow for potential relative settlements, such as grade beams, thickened slabs with appropriate reinforcing steel or other appropriate details. A modulus of subgrade reaction of 150 pci should be used in the design of slabs-on-grade.

3.4 PAVEMENTS

Specific traffic information was not available in developing these pavement recommendations. For design purposes, we have assumed that passenger vehicles and light trucks will traffic all light/medium duty pavement areas. Heavy duty pavement areas will include entrances, service drives and bus parking areas, and will be trafficked by semi-tractor trailers, buses, refuse trucks, and fire engines. The following Design Inputs were used in our evaluation:

• Estimated Native Subgrade CBR = 2 to 3 percent

• Design Subgrade Resilient Modulus (MR) = 3,100 to 4,100 psi

• Reliability = 85% flexible

• Standard Deviation = 0.49 flexible

• Initial Serviceability Index = 4.2

• Terminal Serviceability Index = 2.0

• New HMA Layer Coefficient = 0.42

• New Aggregate Base Layer Coefficient = 0.14

The following pavement sections are provided based on subgrade soil conditions and the design inputs noted above. The ESAL design values noted below should be confirmed by the design engineers and, if different, D&A should be consulted to revise the provided pavement section accordingly.

Light to Medium Duty (60,000 ESAL's)

Layer Material Thickness (inches)

Structural Layer Coefficient

Drainage Coefficient

Structural Number

Surface Course

MDOT 13A/4EML

or Similar 1.5 0.42 1 0.63

Leveling Course

MDOT 13A/4EML

or Similar 1.5 0.42 1 0.63

Aggregate Base

MDOT 21AA

(Natural or Limestone)

6 0.14 0.75 0.63

Granular Base Class II 12 0.08 0.75 0.72

Total Structural Number (SN) 2.61

Heavy Duty (250,000 ESAL's)

Layer Material Thickness (inches)

Structural Layer Coefficient

Drainage Coefficient

Structural Number

Surface Course

MDOT 13A/4EML

or Similar 2 0.42 1 0.84

Leveling Course

MDOT 13A/4EML

or Similar 2 0.42 1 0.84

Aggregate Base

MDOT 21AA

(Natural or Limestone)

8 0.14 0.75 0.84

Granular Base MDOT Class II 12 0.08 0.75 0.72

Total Structural Number (SN) 3.24

Compaction of asphalt courses should range between 92% and 96% of the Theoretical Maximum

Density (TMD).

The pavement subgrade should be prepared as described in Section 3.1. Above the subgrade, the sand subbase should be constructed in accordance with the tables above using Michigan

Department of Transportation (MDOT) Class II Fine Aggregate fill (MDOT Division 3, Section

301 “2012 Standard Specifications for Construction”, April 1, 2011) compacted to a minimum of

95% of the material’s MDD as determined by Modified Proctor.

Due to the clayey soils encountered at the site, site grading and stormwater controls will be important to protect paved drives and parking areas. To further protect new paved areas, perimeter underdrains should be placed beneath pavement edges within the bottom portion of the pavement sand subbase. Four (4) inch-diameter sock-tube backfilled with at least 6 inches of peastone cover should be used. The drains should flow via gravity to a common low point and into the off-site storm sewer system.

The aggregate base for pavement areas should follow MDOT Dense-Graded Aggregate Base

Course Materials – Division 3, Section 302 and Division 9, Section 902, using a 21AA (Grading

Requirements per MDOT Table 902-1) Natural or Limestone Dense-Graded Aggregate material in accordance with the tables above. If recycled aggregate is chosen for this layer, the thickness of the layer should be increased by 2 inches. This gravel base may be placed in one (1) lift and should be compacted to a minimum of 95% of the material’s MDD as determined by Modified Proctor.

Construction traffic should be minimized on the new pavement. If excessive construction traffic is anticipated on the pavement structure, the initial asphalt lift thickness could be increased and placement of the final lift could be delayed until the majority of the construction activities have been completed. This action will allow repair of localized failure, if any does occur, as well as reduce load damage on the pavement system.

A bond coat of emulsion should be used between the base course and wearing course when more than 48 hours have elapsed between placement of the courses, or the surface of the base course has been contaminated by soil or dust. Performance grade asphalt cement should be used in the production of all bituminous mixtures. Reclaimed Asphalt Pavement (RAP) may be permitted in percentages in accordance with MDOT guidelines and specifications for use in the surface course mix design. We recommend following MDOT Tier 1 or Tier 2 criteria.

After the pavement is complete, we recommend instituting a regular maintenance program that includes sealing of cracks and patching of distressed areas. This should reduce the effect of water infiltration and associated frost action.

In areas where the durability of Portland cement concrete (PCC) is desired over bituminous pavement (i.e., loading areas, dumpster pads) a rigid pavement is recommended. Concrete pavement should be constructed on a base layer of at least 6 inches of Michigan Department of

Transportation (MDOT) Class II sand subbase (Division 9, Section 902, Grading Requirements per

Table 902-3). The concrete slab should consist of a minimum of 6 inches of 4,000 psi, air entrained concrete (MDOT Division 6, Section 601 – PCC Pavement and Division 9, Section 901 – Cement and Lime); however, actual design of the slab including reinforcement type and spacing should be performed by the Project Structural Engineer.

These recommendations assume typical conditions during the June through September construction season. Any substitution of materials or deviation from these stated assumptions should be reviewed to assess potential impact on the recommended design.

3.5 GROUNDWATER CONTROL

Groundwater problems are not anticipated to be a significant issue during construction. However, because the native clay foundation materials generally tend to soften when exposed to free water, every effort should be made to keep the excavations dry if perched water is encountered or if rainfall occurs while the footing excavations are open. Ideally, the footings should be excavated, formed, and poured on the same day to reduce the potential for rainwater to affect footing subsoils.

Any water which enters the footing excavation can likely be controlled by a gravity drain system, sump pump, or other minor dewatering procedure. Concrete should not be placed in footing excavations containing water. Upon removal of any trapped water, the soils should be reviewed by a soils engineer and any soft areas replaced with structural fill per Section 3.1, as necessary.

Perimeter foundation drains should be installed along foundations where interior finished floor elevations are lower than perimeter grades, or where exterior grades slope toward the building. In addition, all roof drains should be diverted to downspouts which carry water away from foundations and supporting walls. Where granular engineered fill is placed within the native clay soils, adequate drainage of the granular material should be provided so as to avoid creating an area for water to collect.

3.6 TEMPORARY EXCAVATION STABILITY

If excavations are anticipated for the proposed structure and/or utilities, shoring and bracing or flattening (laying back) of the slopes may be required to obtain a safe working environment.

Excavations should be sloped or shored in accordance with local, state and federal regulations, including OSHA (CFR Part 1926) excavation trench safety standards. We recommend that all excavated soils be placed away from the edges of the excavation at a distance equaling or exceeding the depth of the excavation. In addition, surface runoff water should be diverted away from the crest of the excavated slopes to prevent erosion and sloughing.

Localized areas of soft or unsuitable soils not detected by our borings or in unexplored areas may be encountered once construction begins. Vertical cuts in these soils may be unstable and may present a significant hazard because they can fail without warning. Therefore, temporary construction slopes greater than 5 feet high should not be steeper than one horizontal to one vertical

(1H: 1V) and excavated material should not be placed within 10 feet of the crest of any excavated slope.

Unbraced excavations may experience some minor localized instability (i.e., sloughing). To reduce potential sloughing, excavated slopes should be covered with plastic for protection from rainfall and moisture changes. It should be emphasized that continuous observations by personnel from our office are important during trenching or excavation operations at the site.

4.0 GENERAL COMMENTS

If significant changes are made in the plans and specifications, the location of the proposed structure, or the loading conditions outlined in Section 1.4 are exceeded, a consultation should be arranged to review such changes with respect to the prevailing soil conditions. It may then be necessary to submit supplementary recommendations. If deviations from the noted subsurface conditions are encountered during construction, they should also be brought to the attention of

Driesenga & Associates, Inc. should be afforded the opportunity to review the project design drawings and specifications to verify the factors affecting subgrade and foundation performance comply with our recommendations.

It is recommended that the services of Driesenga & Associates, Inc. be engaged to observe excavation for the footings and to test and evaluate the soils in the footing excavations prior to placement of foundations in order to determine that the soils have the required bearing capacities.

Monitoring and testing should also be performed to verify that suitable materials are used for controlled fills and that they are properly placed and compacted.

This report and any future reports or addenda performed for this site should be supplied to potential bidders prior to them submitting their proposals. We also recommend the construction contract include provisions for dealing with differing conditions. Contingency funds should be reserved for potential problems during earthwork and foundation construction.

This report was for geotechnical purposes only. We did not sample for environmental purposes or perform any analytical testing. However, the contractor should be prepared to handle environmental conditions encountered at this site that may affect the excavation, removal, or disposal of soil; dewatering of excavations; and health and safety of workers. Any Environmental

Assessment reports prepared for this property should be made available for review by bidders and the successful contractor.

This report has been prepared solely for the use of the client for the project specifically described in this report. This report cannot be relied upon by other parties not involved in this project, unless written permission is granted by Driesenga & Associates, Inc. If this report or any of its contents are utilized by parties other than our original client and the project team members, Driesenga &

Associates, Inc. can not be held…