This document is a detailed technical drawing for anchor bolt specifications and templates for the New Sunshine Substation project by the City of Gallup Electric Utilities Department in Gallup, New Mexico. The drawing provides comprehensive anchor bolt dimensions, installation notes, and a setting schedule across multiple pier and pad locations. Specific technical requirements include: all anchor bolts must be hot-dipped galvanized, use ASTM F1554 Grade 36 material, and include two heavy hex nuts and two hardened flat washers. The total number of anchors specified is 228, with various sizes ranging from 5/8" to 1 1/2" in diameter and lengths from 10" to 3'-8", utilizing different bolt types such as Hilti HVA and Hilti KWIK.
The document is marked "ISSUED FOR BID - NOT FOR CONSTRUCTION" and appears to be part of the procurement process for steel package materials for the substation replacement project. While specific pricing details are not included in this technical drawing, the comprehensive specifications suggest a precise engineering approach to foundation and structural mounting requirements. The drawing is prepared by T&D Services and dated 12/11/2023, indicating a recent design for enhancing the electrical distribution system's reliability in the Gallup area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
'L'
LENGTH'T1'
THREADS
ANCHOR BOLT DIMENSIONS
ANCHOR BOLT NOTES
1. ALL ANCHOR BOLTS SHALL HAVE TWO HEAVY HEX NUTS AND TWO
HARDENED FLAT WASHERS EACH, UNLESS NOTED OTHERWISE.
2. ALL ANCHOR BOLTS SHALL BE HOT-DIPPED GALVANIZED.
3. ALL ANCHOR BOLTS SHALL BE ASTM F1554, GRADE 36 UNLESS
NOTED OTHERWISE.
ANCHOR BOLT DIAMETER LENGTH ('L') THREADS ('T1')
4" 2'-0" 0'-6" 1 3'-0" 0'-6"
1 12" 3'-8" 0'-7 12"
ISSUED FOR BID - NOT FOR CONSTRUCTION
Anchor Setting Schedule
Designation QTY A/B Qty per Foundation
Total Quantity
ANCHOR BOLT
PROJECTION
PIERS
L1-1 8 1 1/2" x 3'-8" GR55 4 32 6.5" L3-1 (P) 2 N/A N/A N/A N/A L5-1 (P) 6 N/A N/A N/A N/A L6-1 (P) 6 N/A N/A N/A N/A
L7-1 3 1" X 3'-0" 4 12 5"
L8-1 1 1" X 3'-0" 4 4 5"
L10-1 14 1" X 3'-0" 4 56 5" L12-1 (P) 7 N/A N/A N/A N/A
L13-1 1 1" X 3'-0" 4 4 5"
L13-2 2 1" X 3'-0" 4 8 5"
L13-3 4 1" X 3'-0" 4 16 5"
L15-1 5 1" X 3'-0" 4 20 6"
L17-1 PENDING PENDING PENDING PENDING PENDING
PADS/MISC
L3-1 2 3/4" x 2'-0" 4 8 4"
L5-1 1 N/A N/A N/A N/A
L6-1 1 N/A N/A N/A N/A
L12-1 7 3/4" x 10" HILTI HVA 4 28 3"
L14-1 3 N/A N/A N/A N/A
L16-1 7 5/8" x 6" HILTI KWIK 4 28 1 5/8"
L18-1 2 5/8" x 6" HILTI KWIK 6 12 1 5/8"
Total anchors 228
AutoCAD SHX Text
ANCHOR BOLT SETTING TEMPLATE
AutoCAD SHX Text
TEMPLATE TP-1
AutoCAD SHX Text
FOR FOUNDATION L1-1
AutoCAD SHX Text
(4 REQUIRED)
AutoCAD SHX Text
SCALE:1 " = 1'-0"12" = 1'-0"
AutoCAD SHX Text
" HOLES
AutoCAD SHX Text 1 1516
AutoCAD SHX Text
" HOLE
AutoCAD SHX Text
AutoCAD SHX Text " x 16" x 1'-11" (BLACK)14" x 16" x 1'-11" (BLACK)
AutoCAD SHX Text
ANCHOR BOLT SETTING TEMPLATE
AutoCAD SHX Text
TEMPLATE TP-2
AutoCAD SHX Text
FOR FOUNDATIONS L7-1, L8-1, L10-1, L13-1, L13-2, L13-3
AutoCAD SHX Text
(40 REQUIRED)
AutoCAD SHX Text
SCALE:1 " = 1'-0"12" = 1'-0"
AutoCAD SHX Text " x 16" x 1'-4" (BLACK)14" x 16" x 1'-4" (BLACK)
AutoCAD SHX Text
" HOLE
AutoCAD SHX Text
AutoCAD SHX Text
" HOLES
AutoCAD SHX Text 1 116
AutoCAD SHX Text
ANCHOR BOLT SETTING TEMPLATE
AutoCAD SHX Text
TEMPLATE TP-3
AutoCAD SHX Text
FOR FOUNDATION L15-1
AutoCAD SHX Text
(10 REQUIRED)
AutoCAD SHX Text
SCALE:1 " = 1'-0"12" = 1'-0"
AutoCAD SHX Text
" HOLES
AutoCAD SHX Text 1 116
AutoCAD SHX Text " x 18" x 1'-6" (BLACK)14" x 18" x 1'-6" (BLACK)
AutoCAD SHX Text
" HOLE
AutoCAD SHX Text
AutoCAD SHX Text
ANCHOR BOLT SETTING TEMPLATE
AutoCAD SHX Text
TEMPLATE TP-4
AutoCAD SHX Text
FOR FOUNDATION L2-1
AutoCAD SHX Text
(2 REQUIRED)
AutoCAD SHX Text
SCALE:1 " = 1'-0"12" = 1'-0"
AutoCAD SHX Text 1316" x 2" SLOT(NS & FS)
AutoCAD SHX Text
" HOLE(NS & FS)
AutoCAD SHX Text
AutoCAD SHX Text HSS 4 x 2 x (BLACK)18 (BLACK)
AutoCAD SHX Text 1-1/2"=1'-0"
AutoCAD SHX Text
NEW SUNSHINE SUBSTATION
AutoCAD SHX Text
TEMPLATES & EMBEDS
AutoCAD SHX Text
NM
AutoCAD SHX Text
SS-305
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text 02/02/2024
AutoCAD SHX Text
KWA
AutoCAD SHX Text
60% STEEL PACKAGE FOR REVIEW
AutoCAD SHX Text B
AutoCAD SHX Text 11/07/2024
AutoCAD SHX Text
KWA
AutoCAD SHX Text
ISSUED FOR BID - NOT FOR CONSTRUCTION
AutoCAD SHX Text C
AutoCAD SHX Text 01/15/2025
AutoCAD SHX Text
SLK
AutoCAD SHX Text
LWB
AutoCAD SHX Text
SLK
AutoCAD SHX Text
KWA
AutoCAD SHX Text 12/11/2023
AutoCAD SHX Text 220011
AutoCAD SHX Text
CITY OF GALLUP
AutoCAD SHX Text
ELECTRIC UTILITIES DEPARTMENT
AutoCAD SHX Text
GALLUP, NM
AutoCAD SHX Text
ADDITIONAL ANCHOR DETAILS
AutoCAD SHX Text
DWN:
AutoCAD SHX Text
CKD:
AutoCAD SHX Text
APVD:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
JOB#:
AutoCAD SHX Text Transmission & Distribution Services
AutoCAD SHX Text Professional Engineers & Surveyors
AutoCAD SHX Text 9550 San Mateo Blvd. NE Suite G
AutoCAD SHX Text Albuquerque, NM 87113
AutoCAD SHX Text www.t-d-services.com
AutoCAD SHX Text This drawing is a copyrighted work product of T & D Services, LLC. as of the date shown on this drawing. Any re-use or copying of any portion of this drawing, without written permission from an authorized employee of T & D Services, LLC. is strictly prohibited.
AutoCAD SHX Text
SEQ #
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DWG NAME
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
REV
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REV
AutoCAD SHX Text S:\04 STATIONS\NM\CITY OF GALLUP\NEW SUNSHINE\STEEL\SS-305.DWG SKETCHAM 1/15/2025 SKETCHAM 1/15/2025SKETCHAM 1/15/2025 1/15/20251/15/2025
AutoCAD SHX Text
STATE
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
BILL OF MATERIALS
AutoCAD SHX Text
MARK
AutoCAD SHX Text
QTY
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
WGT (LB)
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
FT
AutoCAD SHX Text
IN
AutoCAD SHX Text
MISC. MATERIAL (TOTAL QUANTITY)
AutoCAD SHX Text
TP-1
AutoCAD SHX Text
AutoCAD SHX Text x 1614 x 16
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 417.6
AutoCAD SHX Text
(BLACK WGT.)
AutoCAD SHX Text 431.3
AutoCAD SHX Text
(GALV. WGT.)
AutoCAD SHX Text
TP-2
AutoCAD SHX Text
AutoCAD SHX Text x 1614 x 16
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 726.3
AutoCAD SHX Text
(BLACK WGT.)
AutoCAD SHX Text 750.1
AutoCAD SHX Text
(GALV. WGT.)
AutoCAD SHX Text
TP-3
AutoCAD SHX Text
AutoCAD SHX Text x 1814 x 18
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 229.8
AutoCAD SHX Text
(BLACK WGT.)
AutoCAD SHX Text 237.3
AutoCAD SHX Text
(GALV. WGT.)
AutoCAD SHX Text
TP-4
AutoCAD SHX Text
AutoCAD SHX Text HSS 4 x 2 x 18
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 76.0
AutoCAD SHX Text
(BLACK WGT.)
AutoCAD SHX Text 78.5
AutoCAD SHX Text
(GALV. WGT.)
AutoCAD SHX Text ALL CAST IN PLACE ANCHOR BOLTS SHALL BE ASTM F1554 WITH TWO ASTM A-563, GR. C HEAVY HEX. NUT(S) AND TWO ASTM F436 FLATWASHER(S) EACH, AND SHALL BE GALVANIZED ACCORDING TO ASTM A-153, UNLESS NOTED OTHERWISE.
AutoCAD SHX Text C
File details come from the government source that posted it. Updated .