About this file
This electrical addendum document pertains to Anchor Bay Phase 3 and provides detailed specifications and requirements for Division 26 electrical work to be performed by contractors. The project encompasses demolition, conduit and raceway installation, conductor work, grounding systems, safety disconnect switches, motor starters and controls, and variable frequency drive (VFD) motor controllers. The document includes comprehensive electrical symbols legend, abbreviations, and general electrical notes that establish the scope of work and technical standards. Division 26 contractors are required to visit the project site and determine the exact extent of demolition work before bidding. The contractor must obtain and pay for all required permits and inspection fees, with final inspection certificates from local authorities to be submitted to the owner. Submittals for all electrical materials and equipment must be provided within thirty days after contract signing, and the contractor shall provide as-constructed documents and operation and maintenance manuals upon project completion, including training for facility personnel.
All electrical materials and equipment must conform to specified codes and standards including the National Electrical Code (NEC), NEMA standards, OSHA requirements, ADA compliance, and local building and fire codes. The contractor shall provide a one-year written guarantee on all labor and materials following the owner's acceptance of the project. Wire and cable specifications require secondary feeders to be TYPE THWN-2 or XHHW-2 rated at 600V, with branch circuit wiring of the same type at #12 AWG minimum. Conduit requirements vary by location: rigid galvanized conduit (RGC) for outdoor and industrial facilities, electrical metallic tubing (EMT) for concealed interior applications, and Schedule 40 PVC or HDPE for below-grade installations. Variable frequency drive controllers must be supplied by approved manufacturers including ABB, Eaton, Schneider Electric, or Yaskawa, with microprocessor-based pulse width modulation systems, minimum 96 percent efficiency ratings, and comprehensive control and protective functions.
View the file
Other files for this state and local contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCPS
V
M C
X
X
X
TVSS
VFD
TRANSIENT VOLTAGE SURGE SUPPRESSION
VARIABLE FREQUENCY DRIVE
DUPLEX RECEPTACLE
CARBON MONOXIDE DETECTOR
H
DOCK LIGHT FIXTURE
CONTROL MODULE
S
TELEPHONE / DATA OUTLET
ADDENDUM NOTE
PLAN NOTE
DEMOLITION NOTE
THREE PHASE MOTOR
MONITOR MODULE
FIRE CONTROL POWER SUPPLY
VISUAL ONLY UNIT
ELECTRICAL SYMBOLS LEGEND
DH
J
SINGLE RECEPTACLE (120 VOLT)
EMERGENCY RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
FLUSH FLOOR BOX
SURFACE FLOOR BOX
SPECIAL EQUIPMENT RECEPTACLE
TELEPHONE OUTLET
DATA OUTLET
POWER POLE
JUNCTION BOX
WALL JUNCTION BOX
PULL (JUNCTION) BOX
UNDERFLOOR JUNCTION BOX
OUTLETS
LIGHT FIXTURE
STRIP FIXTURE
IN-GRADE LIGHT FIXTURE
SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)
WALL MOUNT LIGHT FIXTURE
CEILING LIGHT FIXTURE
TRACK & FIXTURE
STREET TYPE POLE FIXTURE
POLE MOUNTED LIGHT FIXTURE
EXTERIOR WALL MOUNT LIGHT FIXTURE
WALLPACK LIGHT FIXTURE
SPECIAL PURPOSE LIGHT FIXTURE
HIGH BAY LIGHT FIXTURE
EMERGENCY EGRESS LIGHT FIXTURE
(number of heads shown)
EMERGENCY LIGHT FIXTURE
FIXTURES
SWITCHES
SINGLE-POLE SWITCH
DIMMER SWITCH
TIME SWITCH
KEY SWITCH
MANUAL MOTOR SWITCH
THERMAL OVERLOAD SWITCH
SWITCH WITH PILOT LIGHT
FOUR-WAY SWITCH
THREE-WAY SWITCH
CIRCUITRY and RACEWAYS
UNDERFLOOR DUCT
BUS DUCT
PLUGMOLD AS SPECIFIED
WIREMOLD AS SPECIFIED
FLEXIBLE PIGTAILS/CONNECTIONS
"CONDUIT RUN CONTINUES" INDICATION
END OF CONDUIT RUN, CAP AND STAKE
END OF CONDUIT RUN
HOME RUN (with circuit numbers)
CONDUIT STUB DOWN
CONDUIT STUB UP
CONDUIT INSTALLED
CONDUIT INSTALLED
MECHANICAL
ELECTRIC WATER HEATER
ELECTRIC UNIT HEATER
PIPE TRACE HEATER
RESISTANCE HEATER, KW SHOWN
SINGLE PHASE MOTOR
SERVICE and EQUIPMENT
CAPACITOR
ENCLOSED CIRCUIT BREAKER
TRANSFER SWITCH
WIREWAY
GROUND CONNECTION PER N.E.C.
TELEPHONE TERMINAL BOARD
GENERATOR, KW SHOWN
CURRENT TRANSFORMERS
UTILITY METER, AS REQUIRED
WEATHERHEAD
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
COMB. STARTER
MAGNETIC STARTER
FUSED DISCONNECT SWITCH
TRANSFORMER
FIRE ALARM
TAMPER SWITCH (furnished by FP/C) FLOW SWITCH (furnished by FP/C)
FIREFIGHTER COMMUNICATION JACK
MAGNETIC DOOR HOLDER
REMOTE INDICATING LIGHT, CLG. MTD.
REMOTE INDICATING LIGHT, WALL MTD.
END OF LINE DEVICE
ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
PULL STATION
SPEAKER & LIGHT
SPEAKER
HORN
DUCT SMOKE DETECTOR
HEAT DETECTOR
SMOKE DETECTOR
HORN & LIGHT
DESIGNATIONS
(by E.C.)
(by others)
TT
FACP
ANN
EOL
G
WW
CT
TS
F
FC
F
T
1,3
OR
PM
WM
BD
UFD
F S
J
J
D
WH
PP
J
DUCT SMOKE DETECTORF/S
CEILING MOUNTED WIFI
DIGITAL EQUIPMENT METER, AS REQUIRED
POLE
PUMP
PANEL
P
PNL
PVC
PRV-
P-
PB
POLY VINYL CLORIDE
POWER ROOF VENTILATOR
PULL BOX
GENERAL CONTRACTOR
GROUND
HUMIDIFIERH-
GND
GFI
GC
GROUND FAULT INTERRUPTER
ABBREVIATIONS LEGEND
POWER
SWITCH
RECEPT
SF-
SWBD
TCC
SPEC
SW
RGC
RTU-
PWR
VOLTS
WATTS
UF
V
W
UL
VL
UNO
UH-
TS
TYP
TR
ROOF TOP UNIT
RECEPTACLE
SWITCHBOARD
UNDER FLOOR
SPECIFICATIONS
RIGID GALVANIZED STEEL CONDUIT
UNLESS NOTED OTHERWISE
UNDERWRITERS' LABORATORIES, INC.
TAMPER PROOF RECEPTACLE
TAMPER PROOF SWITCH
TEMPERATURE CONTROL CONTRACTOR
VERIFY LOCATION WITH OWNER
TYPICAL
UNIT HEATER
SUPPLY FAN
WITH
WITHOUT
W/
XFMR
W/O
WP
TRANSFORMER
WEATHER PROOF
HOUR
LIGHT
JUNCTION BOX
LIGHT CONTROL
ISOLATED GROUND
HORSEPOWER
MINIMUM
MOUNT
MAKE-UP AIR UNIT
MOTOR CONTROL CENTER
MAIN LUG ONLY
MOUNTED
MOUNTING
MAXIMUM
LIGHTING
LT FLEX
MTD
MUAU-
MTG
MLO
MIN
MT
MC
MAX
MCC
LTG
IG
LC
LT
IMC
JB
HR
HVAC
HOA
HP
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NIGHT LIGHTNL
NTS
NO
NIC
NC
HAND-OFF-AUTO SELECTOR SWITCH
HEATING/VENTILATING/AIR CONDITIONING
INTERMEDIATE METAL CONDUIT
LIQUID TIGHT FLEXIBLE METAL CONDUIT
MECHANICAL CONTRACTOR
HID HIGH INTENSITY DISCHARGE
A
AC
AFF
ACU-
AHJ
AHU-
AS
B-
BC
AIC
ATS
BLDG
CHLR-
CND (C)
CKT BKR
CKT
CUH-
CU-
DISC
DFU-
EF-
EC
DWH-
EBB-
DWG
CT-
EXIST./EX.
EWC
FLEX
FLA
FLR
FSES
FLUOR
EMT
ABOVE FINISHED FLOOR
AIR CONDITIONING UNIT
AMPS
ABOVE COUNTER
AIR HANDLING UNIT
AUTOMATIC TRANSFER SWITCH
AMPS INTERRUPTING CAPACITY
AUTHORITY HAVING JURISDICTION
ABOVE SHELF
BOILER
BUILDING
BELOW COUNTER
CHILLER
DOMESTIC WATER HEATER
CABINET UNIT HEATER
CIRCUIT
CIRCUIT BREAKER
CONDUIT
CONDENSING UNIT
COOLING TOWER
DUCT FURNACE
DRAWING
DISCONNECT
FOOD SERVICE EQUIP. SUPPLIER
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELECTRIC BASEBOARD
ELECTRICAL METALLIC TUBING
EXISTING
EXHAUST FAN
FLOOR
FLUORESCENT
FLEXIBLE CONDUIT
FULL LOAD AMPS
EM EMERGENCY
F/S FIRE/SMOKE
FU- FURNACE
1. ALL WALL AND FLOOR PENETRATIONS ARE TO BE SEALED TO MAINTAIN
ORIGINAL RATING.
2. ALL CONDUITS TO BE FIELD ROUTED ALONG EXISTING PIPING AND
STRUCTURAL STEEL.
3. THE DIVISION 26 CONTRACTORS SHALL VISIT THE PROJECT AND DETERMINE
THE EXACT EXTENT OF THE DEMOLITION WORK REQUIRED BEFORE BIDDING
THE PROJECT.
4. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE AND UNUSED
EQUIPMENT WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED
OTHERWISE.
5. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD
WORK, SURFACES SHALL BE PATCHED TO MATCH ADJACENT.
6. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL
REMAIN CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF
ANY TRADE NEED NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE
CAPPED BELOW FINISH SURFACE AND THEN PATCHED TO MATCH, OR AS
NOTED.
7. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR
ENLARGED TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL
REQUIRED CUTTING AND PATCHING.
8. IF ASBESTOS IS PRESENT, IT WILL BE REMOVED OR RENDERED HARMLESS
UNDER SEPARATE CONTRACT BY THE OWNER.
9. THE DIVISION 26 CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE
EXISTING WALLS TO MATCH THE ADJACENT SURFACES BEHIND ALL
SURFACE MOUNTED EQUIPMENT.
10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT VOLTAGES AND LOADS
PRIOR TO INSTALLING SERVICE TO EQUIPMENT.
11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENT AND CASUAL
FIELD OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR
CLARIFICATION.
GENERAL ELECTRICAL NOTES
DIVISION 26
ELECTRICAL SPECIFICATIONS
M
DIVISION 26 - ELECTRICAL SPECIFICATIONS
DESCRIPTION OF WORK
WORK SHALL INCLUDE, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING:
1. DEMOLITION
2. CONDUIT AND RACEWAYS
3. CONDUCTORS
4. GROUNDING
5. SAFETY DISCONNECT SWITCHES
6. MOTOR STARTERS AND CONTROLS
7. VARIABLE FREQUENCY MOTOR CONTROLLERS
STANDARDS
ELECTRICAL MATERIALS AND EQUIPMENT SHALL CONFORM TO THE REQUIREMENTS LISTED BELOW. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE MANUFACTURER. IN THE ABSENCE OF SPECIFIC INSTRUCTION IN THE TECHNICAL SPECIFICATIONS, EQUIPMENT AND INSTALLATION SHALL CONFORM
TO THE FOLLOWING APPLICABLE CODES, STANDARDS AND REGULATIONS, LATEST EDITIONS:
6. AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).
7. AMERICAN NATIONAL STANDARD INSTITUTE (ANSI).
8. UNDERWRITER'S LABORATORIES, INC. (UL).
9. AMERICAN WELDING SOCIETY CODE (AWSC).
10.LOCAL BUILDING, ELECTRICAL, AND FIRE CODES.
11.NATIONAL ELECTRICAL CODE (NEC).
12.SERVICE RULES AND REGULATIONS OF LOCAL ELECTRICAL UTILITY COMPANY.
13.NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA).
14.U.S. DEPARTMENT OF HEALTH & HUMAN SERVICES “HRS-M-HF” 84_1.
15.OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA).
16.NATIONAL FIRE PROTECTION ASSOCIATION (NFPA).
17.AMERICANS WITH DISABILITIES ACT (ADA).
CODES AND ORDINANCES
COMPLY WITH ALL LOCAL, STATE AND NATIONAL CODES AND ORDINANCES. COMPLY WITH OWNER'S SPECIFICATIONS, GUIDELINES AND REQUIREMENTS. BIDDERS SHALL FAMILIARIZE THEMSELVES WITH CODE REQUIREMENTS FOR THE TYPE OF FACILITY WHERE THE WORK IS BEING PERFORMED.
PERMITS AND INSPECTION FEES
THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND INSPECTION FEES. FINAL INSPECTION CERTIFICATES BY THE AUTHORITIES HAVING JURISDICTION, INCLUDING THE LOCAL ELECTRICAL INSPECTOR AND FIRE MARSHAL, SHALL BE OBTAINED BY THE CONTRACTOR. COPIES SHALL BE SUBMITTED IN DUPLICATE TO THE OWNER.
SUBMITTALS
SUBMIT PRODUCT DATA, SHOP DRAWINGS, WIRING DIAGRAMS, AND DESCRIPTIVE LITERATURE FOR ALL ELECTRICAL MATERIALS AND EQUIPMENT TO BE INSTALLED UNDER THIS CONTRACT.
MAKE SUBMITTALS WITHIN THIRTY (30) DAYS AFTER THE SIGNING OF THE CONTRACT. PRODUCT SHIPMENTS ARE NOT PERMITTED UNTIL SUBMITTALS HAVE RECEIVED FINAL APPROVAL.
AS-CONSTRUCTED DOCUMENTS
UPON PROJECT COMPLETION, THE CONTRACTOR SHALL PROVIDE A MARKED-UP COPY OF THE ORIGINAL CONTRACT DOCUMENTS TO THE OWNER, INDICATING CHANGES, ADDITIONS AND
MODIFICATIONS TO THE ORIGINAL DESIGN. DRAWINGS SHALL BE MANUALLY-PREPARED.
OPERATION & MAINTENANCE MANUALS
PROVIDE OPERATING INSTRUCTIONS AND MAINTENANCE INFORMATION, FOR EACH SYSTEM AND EQUIPMENT SPECIFIED, FOR USE BY FACILITY OPERATION AND MAINTENANCE PERSONNEL. MANUALS SHALL BE PROVIDED IN 3-RING BINDERS OR ELECTRONIC COPIES. THE MANUALS SHALL INCLUDE:
1. WIRING DIAGRAMS, CONTROL DIAGRAMS, AND CONTROL SEQUENCE FOR EACH SYSTEM AND ITEM OF EQUIPMENT.
2. START-UP, PROPER ADJUSTMENT, OPERATING, LUBRICATION, AND SHUTDOWN PROCEDURES.
3. SAFETY PRECAUTIONS.
4. THE PROCEDURE TO BE FOLLOWED IN THE EVENT OF EQUIPMENT FAILURE.
5. OTHER ITEMS OF INSTRUCTION AS RECOMMENDED BY THE MANUFACTURER OF EACH SYSTEM OR ITEM OF EQUIPMENT.
TRAINING
DURING OR UPON COMPLETION OF THE PROJECT, CONTRACTOR SHALL PROVIDE TRAINING OF OPERATION AND MAINTENANCE PERSONNEL FOR ALL REQUIRED ELECTRICAL COMPONENTS AND SYSTEMS. TRAINING SHALL BE CONDUCTED AT THE OWNER'S FACILITY. COORDINATE WITH THE OWNER FOR SCHEDULE.
SIGNAGE AND IDENTIFICATION OF SYSTEMS AND EQUIPMENT
1. OPERATING INSTRUCTIONS: PRINT OR ENGRAVE INSTRUCTIONS AND FRAME UNDER GLASS OR APPROVED LAMINATED PLASTIC. POST INSTRUCTIONS IN VIEW OF EQUIPMENT.
PROVIDE WEATHER-RESISTANT MATERIALS FOR EXTERIOR APPLICATIONS.
2. EQUIPMENT: PROVIDE NAMEPLATES FOR ALL EQUIPMENT AND DEVICES. NAMEPLATES SHALL BE SELF-ADHESIVE WITH ENGRAVED, LAMINATED ACRYLIC OR MELAMINE LABELS.
PROVIDE NAMEPLATES WITH WHITE LETTERS ON A BLACK BACKGROUND. MINIMUM LETTER HEIGHT SHALL BE 1/8-INCH.
3. WARNING SIGNS: PROVIDE A SELF-ADHESIVE WARNING LABEL THAT IS FACTORY PRINTED AND MULTI-COLOR. COMPLY WITH N.E.C. 70 AND 29 CFR 1910.145. LABELS FOR MULTIPLE
POWER SOURCES SHALL READ: “DANGER - ELECTRICAL SHOCK HAZARD - EQUIPMENT HAS MULTIPLE POWER SOURCES”. LABELS FOR OTHER EQUIPMENT REQUIRING WORK SPACE CLEARANCES SHALL READ: “WARNING - OSHA REGULATION - AREA IN FRONT OF ELECTRICAL EQUIPMENT MUST BE KEPT CLEAR FOR 36-INCHES”.
4. ARC-FLASH WARNING SIGNS: PROVIDE A SELF-ADHESIVE ARC-FLASH WARNING LABEL ON ALL SAFETY SWITCHES, STARTERS, SWITCHBOARDS, PANELBOARDS AND OTHER REQUIRED EQUIPMENT. LABEL SHALL READ: “WARNING. ARC FLASH AND SHOCK HAZARD. APPROPRIATE PPE AND TOOLS REQUIRED WHEN WORKING ON THIS EQUIPMENT.”
GUARANTEE
PROVIDE WRITTEN GUARANTEE FOR ALL LABOR AND MATERIALS FOR ONE (1) YEAR AFTER OWNER'S WRITTEN ACCEPTANCE OF THE PROJECT.
LAYOUT OF THE WORK
THE CONTRACTOR SHALL EXAMINE THE AREA OF WORK, AND ALL OTHER DISCIPLINE DRAWINGS, BEFORE PROCEEDING WITH THE LAYOUT AND INSTALLATION OF THE ELECTRICAL WORK.
LOCATE ELECTRICAL EQUIPMENT ESSENTIALLY AS SHOWN ON THE DRAWINGS. EXACT LOCATION OF EQUIPMENT SHALL BE DETERMINED AT THE JOB SITE, TO SUIT ACTUAL CONDITIONS.
THE CONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO INSTALLATION, SO THAT ALL COMPONENTS WILL BE INSTALLED IN PROPER RELATIONSHIP AND SEQUENCE.
DEMOLITION
CONTRACTOR SHALL REMOVE ALL EQUIPMENT AND MATERIAL INDICATED ON THE DEMOLITION PLANS OR AS REQUIRED TO INSTALL THE EQUIPMENT THAT IS PART OF THIS CONTRACT.
LIGHT FIXTURES INDICATED TO BE REUSED SHALL BE REMOVED, CLEANED AND RE-LAMPED BEFORE REINSTALLING. REMOVED LIGHT FIXTURES TO BE DEMOLISHED SHALL BE TURNED OVER TO THE OWNER UNLESS OTHERWISE SPECIFIED. ALL OTHER ELECTRICAL DEMOLITION ITEMS SHALL BE REMOVED FROM THE SITE. EXISTING CONDUITS MAY BE REUSED WHEN PRACTICAL.
CONTRACTOR SHALL PATCH EXISTING WALL AND CEILING OPENINGS IN FINISHED AREAS UPON REMOVAL OF ELECTRICAL EQUIPMENT. CONTRACTOR SHALL PROTECT ALL EXISTING
ELECTRICAL EQUIPMENT, INDICATED TO REMAIN, DURING CONSTRUCTION PERIOD.
CUTTING AND PATCHING
ALL NECESSARY CUTTING AND PATCHING OF THE BUILDING WALLS, FLOORS AND CEILINGS REQUIRED FOR REMOVAL OR INSTALLATION OF THE NEW WORK, SHALL BE FURNISHED BY THE CONTRACTOR. NO STRUCTURAL MEMBERS OF THE BUILDING SHALL BE CUT WITHOUT PRIOR APPROVAL OF THE ENGINEER. ALL NECESSARY PATCHING AND PAINTING OF SURFACES SHALL
BE BY CONTRACTOR. PAINT SHALL MATCH EXISTING.
GROUNDING
ALL ELECTRICAL EQUIPMENT SHALL BE GROUNDED IN A MANNER APPROVED BY THE AUTHORITY HAVING JURISDICTION. PROVIDE GROUND RODS AND BARE COPPER GROUND CONDUCTORS AT UTILITY TRANSFORMER PAD. PROVIDE A GROUND ROD AND GROUND CONDUCTOR AT THE BUILDING MAIN DISCONNECT SWITCH. PROVIDE A GROUND CONDUCTOR IN ALL POWER RACEWAYS. GROUND ELECTRICAL SYSTEMS PER NEC ARTICLE 250 OR AS DETAILED ON THE DRAWINGS.
WIRE AND CABLE
SECONDARY FEEDERS SHALL BE TYPE THWN-2 or XHHW-2, 600V RATED, COLORED BLACK OR COLOR CODED. BRANCH CIRCUIT WIRING SHALL BE TYPE THWN-2 OR XHHW-2, 600V RATED, 7 STRAND, #12 AWG MINIMUM, COLORED HOT-BLACK, NEUTRAL-WHITE AND GROUND-GREEN. BARE COPPER GROUND WIRE SHALL BE STRANDED TYPE.
ALL BRANCH CIRCUIT WIRING SHALL BE CONTINUOUS BETWEEN JUNCTION BOXES, WITH SPLICES MADE ONLY WITHIN BOXES. SOLDERLESS PRESSURE-TYPE CONNECTORS, PROPERLY INSULATED, SHALL BE USED FOR ALL SPLICES. NO POWER WIRE SMALLER THAN #12 AWG MAY BE USED UNLESS SPECIFIED UNDER DESCRIPTIONS OF SPECIAL SYSTEMS.
LABEL ALL CONDUCTORS WITH CIRCUIT NUMBERS AT BOTH ENDS, MINIMUM.
CONDUIT AND BOXES
CONDUIT SHALL BE 3/4” MINIMUM. EXPOSED OUTDOOR CONDUIT SHALL BE RGC. BELOW GRADE CONDUIT SHALL BE SCHEDULE 40 PVC OR HDPE. EXPOSED INTERIOR CONDUIT SHALL BE EMT. CONDUIT INSTALLED IN INDUSTRIAL FACILITIES SHALL BE RGC. CONDUIT FOR CONDUCTORS GREATER THAN 480-VOLTS SHALL BE RGC. CONCEALED INTERIOR CONDUIT SHALL BE EMT. CONDUIT AND BOXES IN CORROSIVE ENVIRONMENTS SHALL BE PVC-COATED RGC. BELOW GRADE, NON-METALLIC CONDUIT CONTAINING DATA AND COMMUNICATIONS WIRING, SHALL BE INSTALLED WITH A TRACER WIRE.
WHERE FLEXIBLE CONNECTIONS ARE REQUIRED, SUCH AS CONNECTIONS TO MOTORS AND LIGHT FIXTURES, LIQUID-TIGHT, FLEXIBLE METAL CONDUIT SHALL BE USED, WHERE PERMITTED
BY THE NEC.
EXTERIOR RGC CONDUIT JOINTS SHALL BE MADE WATERTIGHT BY COATING THREADS WITH A ZINC PAINT.
EXTERIOR-MOUNTED DEVICE BOXES AND BOXES INSTALLED IN INDUSTRIAL FACILITIES SHALL BE CAST TYPE. INTERIOR OUTLET BOXES SHALL BE PRESSED STEEL, COMPLETE WITH PLASTER RING IF NECESSARY, FOR EACH SWITCH, RECEPTACLE OR DEVICE SHOWN. CEILING OUTLET BOXES SHALL BE 4-INCH OCTAGON, 1-1/2-INCH DEEP. EACH OUTLET SHALL BE RIGIDLY SUPPORTED FROM THE BUILDING CONSTRUCTION (INDEPENDENT OF THE RACEWAY SYSTEM). LIGHT FIXTURE BOXES SHALL BE SUPPLIED WITH FIXTURE SUPPORT HARDWARE AND
SUPPORTED TO WITHSTAND 80 LBS.
SUPPORTS AND HANGERS
PROVIDE AND INSTALL NECESSARY STEEL BRACKETS, RODS, CHANNELS, CLAMPS, ETC., FOR SUPPORT OF ALL WORK UNDER THIS CONTRACT. MOUNT SECURELY TO CEILING OR WALL.
SAFETY DISCONNECT SWITCHES
SAFETY DISCONNECT SWITCHES SHALL BE CIRCUIT BREAKER OR FUSED TYPE, 250VAC OR 480VAC, CLASS A, HEAVY DUTY, DUAL HORSEPOWER RATED IN NEMA 1 ENCLOSURE OR WEATHER-PROOF AS INDICATED ON DRAWINGS. BUILDING SAFETY DISCONNECT SWITCHES SHALL BE RATED FOR “SERVICE ENTRANCE.”. VOLTAGE, CURRENT RATING, NUMBER OF POLES, CIRCUIT BREAKER OR FUSES AS INDICATED. CONSTRUCTION SHALL BE SUCH THAT, WHEN THE SWITCH HANDLE IS IN THE “ON” POSITION, THE COVER CANNOT BE OPENED. SWITCHES FOR
30-AMPERE TO 200-AMPERE LOADING SHALL BE SQUARE D TYPE HD OR EQUAL.
MOTOR STARTERS
THREE-PHASE MOTOR STARTERS SHALL BE COMBINATION TYPE, 250VAC OR 480VAC AS REQUIRED, CLASS A, HEAVY DUTY, DUAL HORSEPOWER RATED WITH OVERLOADS AND TIME DELAY
SWITCH. UNITS SHALL BE SQUARE D OR EQUAL.
FRACTIONAL HORSEPOWER MOTOR STARTERS SHALL BE TOGGLE TYPE, 120VAC WITH RED PILOT LIGHT.
VARIABLE FREQUENCY MOTOR CONTROLLERS
PROVIDE VARIABLE-FREQUENCY MOTOR CONTROL SYSTEM CONSISTING OF REQUIRED CONTROLLER ASSEMBLIES, OPERATOR INTERFACES, CONTROL POWER TRANSFORMERS, INSTRUMENTATION AND CONTROL WIRING, SENSORS, ACCESSORIES, SYSTEM PROGRAMMING, ETC. AS NECESSARY FOR COMPLETE OPERATING SYSTEM. PROVIDE PRODUCTS LISTED, CLASSIFIED, AND LABELED AS SUITABLE FOR PURPOSE INTENDED. CONTROLLER ASSEMBLIES SHALL COMPLY WITH NEMA ICS 7, NEMA ICS 7.1, AND NEMA ICS 61800-2; LIST AND LABEL AS
COMPLYING WITH UL 61800-5-1 OR UL 508A AS APPLICABLE.
MANUFACTURERS:
1. ABB.
2. EATON.
3. SCHNEIDER ELECTRIC.
4. YASKAWA
PROVIDE CONTROLLERS SELECTED FOR ACTUAL INSTALLED MOTORS AND COUPLED MECHANICAL LOADS IN ACCORDANCE WITH NEMA ICS 7.2, NEMA MG 1 PART 30, AND RECOMMENDATIONS OF MANUFACTURERS OF BOTH CONTROLLER AND LOAD, WHERE NOT IN CONFLICT WITH SPECIFIED REQUIREMENTS; CONSIDERATIONS INCLUDE, BUT ARE NOT
LIMITED TO:
1. MOTOR TYPE (E.G., INDUCTION, RELUCTANCE, AND PERMANENT MAGNET); CONSIDER NEMA MG 1 DESIGN LETTER OR INVERTER DUTY RATING FOR INDUCTION MOTORS.
2. MOTOR LOAD TYPE (E.G., CONSTANT TORQUE, VARIABLE TORQUE, AND CONSTANT HORSEPOWER); CONSIDER DUTY CYCLE, IMPACT LOADS, AND HIGH INERTIA LOADS.
3. MOTOR NAMEPLATE DATA.
4. REQUIREMENTS FOR SPEED CONTROL RANGE, SPEED REGULATION, AND BRAKING.
5. MOTOR SUITABILITY FOR BYPASS STARTING METHOD, WHERE APPLICABLE.
DEVICES ON LOAD SIDE OF CONTROLLER: SUITABLE FOR APPLICATION ACROSS FULL CONTROLLER OUTPUT FREQUENCY RANGE.
OPERATING REQUIREMENTS:
1. INPUT VOLTAGE TOLERANCE: PLUS/MINUS 10 PERCENT OF NOMINAL.
2. INPUT FREQUENCY TOLERANCE: PLUS/MINUS 5 PERCENT OF NOMINAL.
3. EFFICIENCY: MINIMUM OF 96 PERCENT AT FULL SPEED AND LOAD.
4. INPUT DISPLACEMENT POWER FACTOR: MINIMUM OF 0.96 THROUGHOUT SPEED AND LOAD RANGE.
5. OVERLOAD RATING:
5.1. VARIABLE TORQUE LOADS: MINIMUM OF 110 PERCENT OF NOMINAL FOR 60 SECONDS.
5.2. CONSTANT TORQUE LOADS: MINIMUM OF 150 PERCENT OF NOMINAL FOR 60 SECONDS.
POWER CONVERSION SYSTEM: MICROPROCESSOR-BASED, PULSE WIDTH MODULATION TYPE.
CONTROL SYSTEM:
1. PROVIDE MICROPROCESSOR-BASED CONTROL SYSTEM FOR AUTOMATIC CONTROL, MONITORING, AND PROTECTION OF MOTORS. INCLUDE SENSORS, WIRING, AND CONNECTIONS
NECESSARY FOR FUNCTIONS AND STATUS/ALARM INDICATIONS SPECIFIED.
2. PROVIDE INTEGRAL OPERATOR INTERFACE FOR CONTROLLER PROGRAMMING, DISPLAY OF STATUS/ALARM INDICATIONS, FAULT RESET, AND LOCAL CONTROL FUNCTIONS INCLUDING
MOTOR RUN/STOP, MOTOR FORWARD/REVERSE SELECTION, MOTOR SPEED INCREASE/DECREASE, AND LOCAL/REMOTE CONTROL SELECTION.
3. CONTROL FUNCTIONS:
3.1. CONTROL METHOD: SELECTABLE VECTOR AND SCALAR/VOLTS PER HERTZ UNLESS OTHERWISE INDICATED.
3.1.1. SCALAR/VOLTS PER HERTZ CONTROL: PROVIDE IR COMPENSATION FOR IMPROVED LOW-SPEED TORQUE.
3.1.2. VECTOR CONTROL: PROVIDE SELECTABLE AUTOTUNING FUNCTION.
3.2. ADJUSTABLE ACCELERATION AND DECELERATION TIME; LINEAR AND S-CURVE RAMPS; SELECTABLE COAST TO STOP.
3.3. SELECTABLE BRAKING CONTROL; DC INJECTION OR FLUX BRAKING.
3.4. ADJUSTABLE MINIMUM/MAXIMUM SPEED LIMITS.
3.5. ADJUSTABLE PULSE WIDTH MODULATION SWITCHING CARRIER FREQUENCY.
3.6. ADJUSTABLE MOTOR SLIP COMPENSATION.
3.7. SELECTABLE AUTORESTART AFTER NONCRITICAL FAULT; PROGRAMMABLE NUMBER OF TIME DELAY BETWEEN RESTART ATTEMPTS.
4. STATUS INDICATIONS:
4.1. MOTOR RUN/STOP STATUS.
4.2. MOTOR FORWARD/REVERSE STATUS.
4.3. LOCAL/REMOTE CONTROL STATUS.
4.4. OUTPUT VOLTAGE.
4.5. OUTPUT CURRENT.
4.6. OUTPUT FREQUENCY.
4.7. DC BUS VOLTAGE.
4.8. MOTOR SPEED.
5. PROTECTIVE FUNCTIONS/ALARM INDICATIONS:
5.1. OVERCURRENT.
5.2. MOTOR OVERLOAD.
5.3. UNDERVOLTAGE.
5.4. OVERVOLTAGE.
5.5. CONTROLLER OVERTEMPERATURE.
5.6. INPUT/OUTPUT PHASE LOSS.
5.7. OUTPUT SHORT CIRCUIT PROTECTION.
5.8. OUTPUT GROUND FAULT PROTECTION.
6. INPUTS:
6.1. DIGITAL INPUT(S): THREE.
6.2. ANALOG INPUT(S): TWO.
7. OUTPUTS:
7.1. ANALOG OUTPUT(S): ONE.
7.2. RELAY OUTPUT(S): TWO.
8. FEATURES:
8.1. PASSWORD-PROTECTED SECURITY ACCESS.
8.2. EVENT LOG.
POWER CONDITIONING/FILTERING: PROVIDE DC LINK CHOKE OR INPUT/LINE REACTOR FOR EACH CONTROLLER UNLESS OTHERWISE INDICATED OR REQUIRED. REACTOR IMPEDANCE: 3
PERCENT, UNLESS OTHERWISE INDICATED OR REQUIRED.
PACKAGED CONTROLLERS: CONTROLLERS FACTORY-MOUNTED IN SEPARATE ENCLOSURE WITH EXTERNALLY OPERABLE DISCONNECT AND SPECIFIED ACCESSORIES.
1. DISCONNECTS: CIRCUIT BREAKER OR DISCONNECT SWITCH TYPE.
2. DISCONNECT SWITCHES: FUSIBLE TYPE WITH SEPARATE INPUT FUSES.
2.1. PROVIDE EXTERNALLY OPERABLE HANDLE WITH MEANS FOR LOCKING IN OFF POSITION. PROVIDE SAFETY INTERLOCK TO PREVENT OPENING COVER WITH DISCONNECT IN ON
POSITION WITH CAPABILITY OF OVERRIDING INTERLOCK FOR TESTING PURPOSES.
2.2. PROVIDE AUXILIARY INTERLOCK FOR DISCONNECTION OF EXTERNAL CONTROL POWER SOURCES WHERE APPLICABLE.
3. PROVIDE DOOR-MOUNTED REMOTE OPERATOR INTERFACE.
ENCLOSURES:
1. COMPLY WITH NEMA ICS 6.
2. NEMA 250 ENVIRONMENT TYPE OR EQUIVALENT IEC 60529 RATING: UNLESS OTHERWISE INDICATED, AS SPECIFIED FOR FOLLOWING INSTALLATION LOCATIONS:
2.1. INDOOR CLEAN, DRY LOCATIONS: TYPE 1 OR TYPE 12.
3. FINISH: MANUFACTURER'S STANDARD UNLESS OTHERWISE INDICATED.
4. COOLING: FORCED AIR OR NATURAL CONVECTION AS DETERMINED BY MANUFACTURER.
OVERCURRENT PROTECTIVE DEVICES
1. OVERLOAD RELAYS:
1.1. PROVIDE OVERLOAD RELAYS AND, WHERE APPLICABLE, ASSOCIATED CURRENT ELEMENTS/HEATERS SELECTED FOR ACTUAL INSTALLED MOTOR NAMEPLATE DATA, IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND NFPA 70; INCLUDE CONSIDERATION FOR MOTOR SERVICE FACTOR AND AMBIENT TEMPERATURE
CORRECTION, WHERE APPLICABLE.
1.2. COMPLY WITH NEMA ICS 2.
1.3. INVERSE-TIME TRIP CLASS RATING: CLASS 20 UNLESS OTHERWISE INDICATED OR REQUIRED.
1.4. TRIP-FREE OPERATION.
1.5. VISIBLE TRIP INDICATION.
1.6. RESETTABLE.
1.6.1. EMPLOY MANUAL RESET UNLESS OTHERWISE INDICATED.
1.6.2. DO NOT EMPLOY AUTOMATIC RESET WITH TWO-WIRE CONTROL.
FUSIBLE DISCONNECT SWITCHES: QUICK-MAKE, QUICK-BREAK, DEAD-FRONT FUSIBLE SWITCH UNITS COMPLYING WITH NEMA KS 1, AND LISTED AND LABELED AS COMPLYING WITH UL 98; RATINGS, CONFIGURATIONS, AND FEATURES AS INDICATED OR AS REQUIRED. FUSE CLIPS AS REQUIRED TO ACCEPT INDICATED FUSES.
PROVIDE EXTERNALLY OPERABLE HANDLE WITH MEANS FOR LOCKING IN OFF POSITION. PROVIDE MEANS FOR LOCKING SWITCH COVER IN CLOSED POSITION.
PROVIDE SAFETY INTERLOCK TO PREVENT OPENING OF COVER WITH SWITCH IN ON POSITION WITH CAPABILITY OF OVERRIDING INTERLOCK FOR
END OF DIVISION 26
M A
T R
I X
BOILER
E-STOP
B-1 120V - 1Ø, 16 FLA
B-2 120V - 1Ø, 16 FLA
P-2 480V - 3Ø, 11 FLA
P-1 480V - 3Ø, 11 FLA
EX. PANEL
"LP-X"
EX. PANEL
"LP-H"
EX. PANEL
"RP-F"EX. XFMR
4 4
1 1
VFD VFD
ELECTRICAL KEY NOTES
PROVIDE NEW VARIABLE FREQUENCY DRIVE WITH INTEGRAL
OVERCURRENT PROTECTION. COORDINATE LOCATION FOR INSTALLATION.
3 CONTRACTOR SHALL REUSE EXISTING BOILER CIRCUIT TO FEED NEW
BOILER. EXTEND CONDUIT AND WIRE AS NECESSARY.
PROVIDE ALL NECESSARY WIRING AND PARTS FOR COMPLETE INSTALLATION
OF BOILER E-STOP SYSTEM. REFER TO DETAIL 1 ON SHEET E-500.
4 CONTRACTOR SHALL REUSE EXISTING PUMP CIRCUIT TO FEED NEW PUMP.
EXTEND CONDUIT AND WIRE AS NECESSARY.
R
EPO
BUTTON(S)
1 TYPICAL BOILER EMERGENCY OFF SWITCH
SCALE: N.T.S.
120V-1Ø TO 20 AMP
1 POLE BREAKER IN
PANEL "RP-F"
BOILER (B-1)
120V-1Ø TO 20 AMP
1 POLE BREAKER IN
PANEL "RP-F"
BOILER (B-1)
X-P-4 480V - 3Ø, 11 FLA
X-P-3 480V - 3Ø, 11 FLA
X-B-2
X-B-1
EX. PANEL
"LP-X"
EX. PANEL
"LP-H"
EX. PANEL
"RP-F"EX. XFMR
3 3 3 3
2 2
DEMOLITION NOTES
DISCONNECT MECHANICAL EQUIPMENT. CONDUIT AND WIRE TO REMAIN
FOR CONNECTION TO NEW BOILER.
2 DISCONNECT MECHANICAL EQUIPMENT AND REMOVE MOTOR STARTER.
CONDUIT AND WIRE TO REMAIN FOR CONNECTION TO NEW PUMP.
3 EXISTING EQUIPMENT TO REMAIN.
M A
T R
I X
KEY PLAN
AREA
OF WORK
N FLOOR PLAN - POWER
SCALE: 1/4" = 1'-0"
0 1 5 10
N FLOOR PLAN - ELECTRICAL DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5 10
| Sheets and Views |
| E100-25096300-24x36 |
| E500-25096300-24x36 |