Amendments to Aitchison Refuge Levee rehab.docx

DOCX document 15 KB Posted

Attached to
DNR - Aitchison Refuge Levee Rehabilitation
Solicitation number
19-422DNR-LNDMG-B-2429
Issued by
Marion County, Lee Center CDP, Illinois

About this file

The document provided is an amendment to the bid specifications for the Illinois Department of Natural Resources' Aitchison Refuge Levee Rehabilitation project, Bid 19-422DNR-LNDMG-B-2429. The project consists of two parts: a BASE BID for the rehabilitation of 1,000 linear feet of levee, and a UNIT PRICING component for the rehabilitation of a neighboring section of levee, bid in 50 contiguous linear foot increments. The contract award will be based on the BASE BID portion, while the UNIT PRICING portion may be awarded based on budgetary considerations. The contract term shall commence upon the last dated signature and expire on December 31, 2019. Additionally, all contract work must be suspended on the first day of the Waterfowl Hunting Season for the Central Zone.

The UNIT PRICING portion of the project shall be quoted as a price per 50 contiguous linear feet of levee rehabilitation. There are no set-asides, incumbent contractors, or specific funding requirements mentioned in the document. The amendment is intended to clarify the UNIT PRICING component of the project.

View the file

Other files

File Type Posted
Forms A Section V.18.1~12.docx DOCX document
B2429 Aitchison Marshall Levee IFB3 amended.doc DOC document
Project_Location.pptx PPTX presentation
Improvement_Sketch.pdf PDF
Forms B Section V.18.1~19.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois Department of Natural Resources Aitchison Refuge Levee Rehabilitation Bid 19-422DNR-LNDMG-B-2429 Amended Specifications

The Brief Description of the Invitation for Bid, paragraph Two, is amended to:

The project will consist of two parts – 1) BASE BID for rehabilitation of one thousand (1,000) linear feet of levee, bid as a Lump Sum amount for the entire one thousand (1,000) linear feet of levee rehabilitation, and 2) UNIT PRICING for rehabilitation of a neighboring section of levee, bid as a price per fifty (50) contiguous linear feet of levee rehabilitation. Contract award will be based on the BASE BID portion. The UNIT PRICING portion may be awarded based upon budgetary considerations.

Contract Section 2.3.1.2. is amended to:

2.1.3.2. UNIT PRICING – Vendor shall quote the UNIT PRICING portion as a price per Fifty (50) contiguous linear feet of levee improvement.

Contract Section 2.5.1.2. is amended to:

2.5.1.2.UNIT PRICING – Price per Fifty (50) contiguous linear foot of rehabilitation -
$_______________________________

(The above changes are intended to describe that the UNIT PRICING portion of the project shall be performed in increments of Fifty (50) CONTIGUOUS linear feet each.)

Contract Section 1.12.11 is added:

1.2.11. Aitchison Refuge borders a waterfowl hunting venue. As such, all contract work must be suspended on the first day of Waterfowl Hunting Season for the Central Zone (October 27 in 2018, and the date so designated by IDNR in 2019) and may resume upon approval of the Site Superintendent.

Contract Section 3.1 TERM OF THIS CONTRACT is amended to:

This contract shall commence upon the last dated signature of the parties and shall expire on December 31, 2019. If a start date is not identified, the term shall commence upon the last dated signature of the Parties.

File details come from the government source that posted it. Updated .