Amendment1 to 63500_00003199.pdf
PDF 63 KB Posted
- Solicitation number
- S-63500-00003199
- Issued by
- Wasco County, Oregon
About this file
This document is an amendment to a state and local contract opportunity for the Oak Springs Hatchery Underground Storage Tanks Removal Project in Wasco County, Oregon. The amendment adds requirements for the contractor to remove fuel pumps and fuel lines, dispose of any residual liquids, and restore the site by seeding lawn areas and rebuilding/replacing a rock retaining wall. The contractor will retain ownership of the fuel pumps, and the holes left after tank removal can be left open pending soil sample results, with the contractor providing adequate signage, fencing, and barricades. The mandatory bid form has been amended, and bidders will need to submit the updated version. The project aims to remove two abandoned underground fuel storage tanks that have been decommissioned since the early 1990s to alleviate the risk of tank failure and collapse.
The base bid for the project is required to include all the additional work specified in the amendment. Bidders must submit the amended mandatory bid form. Once the tank(s) have been removed and soil sample results are available, the contractor can leave the holes open, provided they take appropriate safety measures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment #1 to 63500-00003199
Add the following language to the Invitation to bid statement of work:
Contractor shall remove fuel pumps and fuel lines between the tanks and the pumps. Pumps shall remain the property of ODFW. Site restoration shall include seeding lawn area with grass seed mix and rebuilding/replacing rock retaining wall as applicable.
Both tanks have been pumped of any residual liquids. However, if any liquids remain, it shall be the contractor’s responsibility to remove and dispose of. All the above to be included in the base bid per each tank as applicable.
Once tank(s) has been removed and awaiting soil sample results. The holes can be left open pending soil sample results, contractor to provide adequate signage, fencing, and barricades as needed.
The Mandatory Bid sheet has been amended, Bidder(s) will need to submit the amended form.